25

Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 2: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Detailed Program March 2011 to September 2011

goal – allow the winery to be self-sustainable in water & energy

Page 3: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Best Value Competition June 2011 to January 2012

Advertisement & Prequalification • 17 Teams submit Prequalification Packets, June 2011 • Prequalification consists of required elements (pass/fail) and scoring (48 points possible) based on experience of team and individuals • 5 Teams interviewed, August 2011 Design Build Competition • 3 Teams selected to prepare designs and bid price • Two one-on-one sessions with each team, Nov & Dec 2011 Bids Received • Bid date, January 2012 • Detailed evaluation with points awarded • Best value price determined

Page 4: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Project Award March 2012

Page 5: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 6: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 7: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 8: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 9: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Passive Design clerestory windows

and shading devices

Page 10: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 11: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 12: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Optimize Design reduce loads insulate well

daylight reduce infiltration

address thermal breaks passive cooling

Page 13: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

WALL

Exterior Wall 4 inch insulated wall panel over Snap-R 1 inch EPS

spacer over 10 inch girt (11in batt insulation) = R-55.7

Page 14: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

ROOF

Roof 6 inch insulated roof panel over 12 inch metal girt

with batt insulation = R-70

Page 15: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

specified double wall insulated dampers on all envelope penetrations

provided thermal and load bearing insulation

pads at structural steel connections

Thermal Bridging

Page 16: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy
Page 17: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Challenges: • maintain building interior temperature

between 50 and 80 degrees F WITHOUT the use of any active mechanical systems

• net zero site energy Software Selection: • IES vs Epro

Thermal / Energy Modeling

Page 18: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Where to Look?

Net Zero Energy Building Tip: Understand building physics

Infiltration Opaque Envelope

Windows

Page 19: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Infiltration construct an

airtight building

followed ASTM E1827-11 single point method for air tightness

looking for rate less than 0.1 cfm/sf

door blower test, identify leaks

with smoke guns

actual leakage 0.08 cfm/sf

Page 20: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

once load reduced, use night flush through one fan with thermal storage in internal concrete walls and slab

Net Zero Energy Building Tip:

Understand micro climate

Mechanical Solution

Page 21: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Temperature Results

Page 22: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Temperature Results

Page 23: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

Energy Results

Page 24: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy

• If 6 months results are extrapolated to one year, Total Building Energy consumption = 3,588 kWh

That is 1.44 kBtu/sq.ft-year • Modeled was 1.66kBtu/sq.ft-year

Energy Results

Net Zero Energy Building Tip: Model accurately

Page 25: Detailed Program - California Higher Education ... · Detailed Program. March 2011 to September 2011 . goal – allow the winery to be self-sustainable in water & energy