    EA for the Proposed STP

    Dindigul Municipality Pure Enviro9

    2. PROJECT DESCRIPTION

    2.1 PROJECT BACKGROUND

    There is no sewerage system existing in Dindigul town. Sewage disposal is primarily

    through septic tanks. In general, it is discharged in to the open street drains. Some soak pits of

    shallow depth and inadequate size are also in existence. These soak pits do not function properly

    and thereby allowing the sullage overflows. The street drains carrying sullage and sewage, are

    ultimately discharged in to water courses. Table 2.1 describes the salient features of the Dindigul

    District.

    The sewerage system will comprise of construction of 13.65 MLD Sewage Treatment Plant

    of activated sludge process, laying of Trunk main sewer line diameter of 400 mm and 450 mm for a

    length of 1.00 km and secondary/laterals for a length of 93.00 km in diameter ranging from 200 mm

    to 500 mm. In the system one intermediate pumping station has also been proposed to pump about

    4 MLD of sewage to be transported to a gravity sewer through a pumping main of diameter 350 mm

    and a length of 650 metres. For house service connection it has been proposed 110 mm & 160 mm

    diameter ODU PVC pipes (4 to 6 per manholes). The house service connection is provided

    normally to the manholes, where 2 or 3 House Service Connections (HSC) will be to Road Side

    Chamber (RSC) and RSCs will in turn be connected with manholes. Also provision has been made

    in the cost estimate for dismantling cum refilling the septic tank / soak pit utilities for those who do

    not find space for effecting a separate connection.The collection system is designed for the volume of waste water to be generated for the

    projected population of 2023. Per capita wastewater generation is considered as 80% of the net

    water supply. Peak factor has been considered to design the sewer lines.

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    2/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro10

    2.2 SALIENT FEATURES

    Table 2.1 Salient Details

    Feature Details

    Site Location Pallapatti, Dindiugl Taluk, Tiruvallur District

    Site Latitude and Longitude

    Corner 1 N 10 21' 8.51" E 77 56' 43.717"

    Corner 2 N 10 21' 6.455" E 77 56' 49.627"

    Corner 3 N 10 20' 53.605" E 77 56' 41.532"

    Corner 4 N 10 20' 52.064" E 77 56' 47.057"

    Topography Plain

    SOI Toposheet 66 C/8

    Above Mean Sea level in m 262 m above mean sea level

    Population of the project village 11834 as per 2001 Census

    Name of Village Population (2001)

    Sindalagundu 8869

    Surrounding Villages (2 KmRadius)

    Pillayarnattam 2092

    Nearest City Dindigul 4.0 Km

    Nearest Highway NH-5 0 Km,State highway eastern side of the project site

    Nearest Railway line 6.0 Km

    Nearest Railway station Dindigul 4.0 Km

    Nearest Railway Junction 4 Km Dindigul

    Nearest Air port 55 Km Madurai Air portNearest Forest Nil

    Nearest Hill Ranges Nil

    Nearest State / Taluk Boundary 9.8 Km Vedasandur Taluk

    Coastal Boundary 160 Km

    Ecological Sensitive areas(Wild life sanctuaries)

    No Ecological Sensitive area with in 10 km radius

    Name of Taluk

    Dindigul (Part)

    Vedasandur (Part)Number of villages within 2 kmradius

    3 (Full and Part)

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    3/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro11

    2.3 PROJECT LOCATION

    Location : Palapatti Village

    Present Usage : Barren land

    Area Available : 68.69 acres

    STP Area Requirement : 1.89 acres

    Total vacant area : 66.56 acres

    Ownership : Dindigul Municipality

    Dindigul is located at 10.35 N 77.95 E. It has an average elevation of 268 metres

    (879 feet) MSL. The area is underlined by hard-rock and a drought-prone region. It is spread over

    an area of about 14.01 Sq.Kmand is characterized by undulating topography with hills located inthe southern parts, sloping towards north and northwest. The highest elevation (altitude) in the hilly

    area (Sirumalai Hill) is of the order of 1350 m MSL, whereas in the plains it ranges from 360 MSL in

    the southern portions to 240 MSL in the northern part of the area. No perennial stream exists in the

    area, except for short distance streams encompassing second- and third-order drainage. Run-off

    from precipitation within the basin ends in small streams flowing towards the main river, Kodaganar.

    2.4 PROJECT COST

    The total project cost is estimated to be Rs.10.34 Crores (Detailed breakup is given in

    Table 2.2) and the total operation and maintance cost is estimated to be 1.98 Crores (Detailed

    breakup is given Table 2.3).

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    4/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro12

    Table 2.2 Project cost

    S.No Details Amount(Rs.)

    I

    a.

    Capital cost:

    Submission and acceptance of detailed designs, drawings and estimates 20,00,000

    b Hydraulic process design and layout of the plant 15,00,000

    c Structural design and construction drawing for primary units 10,00,000

    c Structural design and construction drawing for secondary units 15,00,000

    d. Structural design and construction drawing for sludge handling, treatmentarrangements unit and auxiliary units.

    15,00,000

    II Submission and acceptance of detailed Environmental Assessment Report 8,00,000

    III

    1.

    2.

    3.

    4.

    5.

    Construction of the following components of the plant

    Receiving Chamber

    Screening units

    De-gritting units

    Distribution box & Bye-pass arrangement

    Primary and Secondary Units

    38,00,000

    48,00,000

    55,00,000

    49,00,000

    3,85,00,000

    6. Chlorination Tank 22,00,000

    7. Sludge sump and Pump house 28,00,0008. Centrifuge House 67,00,000

    9. Administrative Building including Furniture and Laboratory Equipments 55,00,000

    10. Internal Roads, Pathways, Pavements, Storm water drainage 45,00,000

    11. Misc. Civil works like Fencing / Entry Gate 21,00,000

    12. Site Clearance, Disposal / Plot Development Landscaping etc., 8,49,400

    13. Electrical works including (Bidder to specify various units) 1,29,00,000

    IV. Implementation of EMP 50,600

    Total (Rupees Ten Crore and Thirty Four Lakhs Only) 10,34,00,000

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    5/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro13

    OPERATION AND MAINTANCE COST:

    Table 2.3 O & M Cost (5 years)

    S.No Description Amount

    (in Rs.)

    1 Fixed cost (Man power, maintenance of allCivil Structures and entire plant HouseKeeping, all repairs including spares &Replacement, Oil & Grease cost)

    10,570,000

    2 Variable cost (except TNEB powercharges, Diesel cost, Chlorine Dosagecosts) other chemical consumable costand safe disposal grit / sludgetransportation to site

    9,048,000

    3 Greenbelt 47,200

    4 Environmental Monitoring Plan duringOperation Phase

    1,34,800

    TOTAL (Rupees One Crore and Ninety EightLakhs Only)

    1,98,00,000

    2.5 MANPOWER

    The STP will have the following employees for its operation. Table 2.4 shows the total

    manpower requirement for Dindigul STP.

    Table 2.4 Manpower

    S.No Description Nos

    1 Plant operator 2

    2 Lab Chemist 1

    3 Lab Assistant 1

    4 Watchman / helper 25 Gardener / Farm Assistant 2

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    6/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro14

    2.6 TREATED WATER DISPOSAL SYSTEM

    Treated effluent is pumped through R.C.C pipes (300mm) of grade NP-3 about 16

    manholes run in of size 30 m with intervals of closed conduits. There will be no major ecological

    impact due to laying of treated effluent discharge pipe line and the treated sewage will be disposed

    in the Kodaganar River after meeting the standards.

    2.7 DETAILS OF SLUDGE & METHOD OF DISPOSAL

    Disposal body : Kodaganar River

    Direction : West to STP plant

    Disposal point : At Palam Rajakkam Patty,Palani Road

    Distance from the STP : 5 km

    Treated Sewage Collection Tank : 1

    Pumping stations : 2

    Pumping Main Km : 6.36 Km (RM Colony to Project site)

    2.0 Km (Parapatti to Project site)

    Pipe line routing : The treated effluent is discharged through RCC

    pipe to the final disposal point located at Palam

    Rajakkam via Ponmandurai road, Madurai road

    (towards Trichy) and Palani road.

    Figure 2.6Shows thePipe line routing

    Impact due to pipe laying : There will be no major ecological impact due to

    laying of treated effluent discharge pipe line.

    Storage and Disposal of Biosludge

    The dewatered biosludge (4.5 tons per day) from the centrifuge will be collected through

    jute bags/ Hessian bags and will be sent to composting yard for processing to compost in

    consultation with the Municipal authorities.The Topo Plan, Digital Satellite Imaginary of the project site, Surrounding of the project

    site, STP layout and P&I diagram for the Dindigul STP are shown in Figures 2.1, 2.2, 2.3, 2.4 and

    2.5 respectively.

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    7/12

    EAfortheProposedSTP

    DindigulMunicipality

    PureE

    nviro

    15

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    8/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro16

    Figure 2.2 Digital Image

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    9/12

    EA for the Proposed STP

    Dindigul Municipality Pure Enviro17

    Figure 2.3 Surrounding Details of the Site

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    10/12

    EAfortheProposedSTP

    DindigulMunicipality

    PureE

    nviro

    18

    F

    Figure

    2.4

    STP

    layout

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    11/12

    EAfortheProposedSTP

    DindigulMunicipality

    PureE

    nviro

    19

    Figure2.5

    P&Idiagram

  • 7/27/2019 dgl part-3_0 DRAINAGE SYSTEM.pdf

    12/12

    EAfortheProposedSTP

    DindigulMunicipality

    PureE

    nviro

    20

    Figure

    2.6

    Pipe

    line

    routing