DESCRIPTION

Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11. 1) FACTS. 1) FACTS. 3 major events in 30 min (11:03, 11:11, 11:34) Discrimination not easy but last was worst (short on Verbois OHL) - PowerPoint PPT Presentation

Citation preview

Page 1: Distribution network  fault  on  LHC1 10/07/2011

Distribution network fault on LHC110/07/2011

F Duval, G Cumer on behalf of EN/EL 10/07/11

Page 2: Distribution network  fault  on  LHC1 10/07/2011

EHT1

LHC2,4,5/6,8

110MVA110MVA 90MVA 90MVA

70MVA

70MVA

ZN

60MVA

MP560MVA

130kV EOS

SEM12

MP730MVA

LHC

PULSE SPS

MP630MVA

ATLAS / LHC1.8

63MVA

MEY PS Stable

18kV

18kV66kV

18kV

18kV

ATLAS / LHC1.8

18kV SW ME59

ISOLDEPS Pulsed

bpn

Configuration before fault 10/07/11 11h

1) FACTS

Page 3: Distribution network  fault  on  LHC1 10/07/2011

- 3 major events in 30 min (11:03, 11:11, 11:34)- Discrimination not easy but last was worst (short on

Verbois OHL)- Impact on several points (starting contact: EHT2

pulsed, Diesel network, Meyrin admin. loop)- False intertrip on MP7 (second in a row after 3 month

of storms)- Autotransfer failed to refeed SEM12 (Io on couplers)

1) FACTS

Page 4: Distribution network  fault  on  LHC1 10/07/2011

EHT1

LHC2,4,5/6,8

110MVA110MVA 90MVA 90MVA

70MVA

70MVA

ZN

60MVA

MP560MVA

130kV EOS

SEM12

MP730MVA

LHC

PULSE SPS

MP630MVA

ATLAS / LHC1.8

63MVA

MEY PS Stable

18kV

18kV66kV

18kV

18kV

ATLAS / LHC1.8

18kV SW ME59

ISOLDEPS Pulsed

bpn

Configuration after fault and Autotransfert 10/07/11 11h 351) FACTS

Page 5: Distribution network  fault  on  LHC1 10/07/2011

- Situation after autotransfert 11:34:48- All machines off- LHC loop and ATLAS partially off- MEYRIN reenergized from Swiss network- DIESEL generators started well on all LHC points

- Situation after Piquet reconfiguration 13:50

- Piquet at work at 12:15 (difficult to understand)- fail to refeed loop from LHC2 ( Io) at 12:58- LHC loop fed from LHC2 (in two steps) 13:28- ATLAS fully refed at 13:49

- Network back to the standard configuration at 16:00

1) FACTS

Page 6: Distribution network  fault  on  LHC1 10/07/2011

EHT1

LHC2,4,5/6,8

110MVA110MVA 90MVA 90MVA

70MVA

70MVA

ZN

60MVA

MP560MVA

130kV EOS

SEM12

MP730MVA

LHC

PULSE SPS

MP630MVA

ATLAS / LHC1.8

63MVA

MEY PS Stable

18kV

18kV66kV

18kV

18kV

ATLAS / LHC1.8

18kV SW ME59

ISOLDEPS Pulsed

bpn

Configuration after standby reconfiguration 10/07/11 13h 501) FACTS

Page 7: Distribution network  fault  on  LHC1 10/07/2011

2) ANALYSIS

- Another false intertrip on MP7

- second in a row after 3 months of storm seasons- intertrip will be deactivated ASAP- Fiber optics will be installed for intertrips

- Io twice attempting to reenergized SEM12 (LHC loop + ATLAS)

- No explanation yet

- Unexpected and complex situation for Standby service

- 2h15 before renergizing LHC1 (too long)