1 Drill Rigs and Nomenclature

Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

Embed Size (px)

Citation preview

Page 1: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

1

Drill Rigs and Nomenclature

Page 2: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

2

Page 3: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

3

Page 4: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

4

Page 5: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

5

Page 6: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

6

Blow out protectors

(below drilling

platform) showing:

bell nipple (to mud

tanks)

mouse hole casing

choke manifold

outlet.

Page 7: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

7

Rotation

system

Page 8: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

8

Page 9: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

9

Page 10: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

10

Page 11: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

11

Page 12: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

12

Drill Site/Rig Personnel

• Tool Pusher – responsible for all rig operations (rig manager). The

boss around drill rigs.

• Driller – controls drilling process.

• Roughneck – drill floor people.

• Roustabout – general labors.

• Company man – usually the drilling engineer.

• Mud man – prepares, conditions, And monitors mud.

• Geologist – sample collection & interpretation; ID’s reservoirs,

coring and test horizons; mandates rig functions (circulate bottoms

up, etc.), transmits this data to company supervisors.

• Mud logger collects drill cuttings, records mud gasses and prepares

sample/mud log

Page 13: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

13

Small air drill-rig south of

Tulsa Oklahoma

Pictures taken in Dec. 2007 by

Rick Andrews

Page 14: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

14

Page 15: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

15

Page 16: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

16

Page 17: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

17

Page 18: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

18

Page 19: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

19

Page 20: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

20

Page 21: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

21

Page 22: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

22

Page 23: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

23

Page 24: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

24

Typical “big” drill rigs used on

land and allied equipment

Page 25: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

25

Page 26: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

26

Page 27: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

27

Page 28: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

28

Page 29: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

29

Page 30: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

30

Page 31: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

31

Page 32: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

32

Page 33: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

33

Page 34: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

34

Page 35: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

35

Page 36: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

36

Page 37: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

37

Page 38: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

38

Page 39: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

39

Page 40: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

40

Cable Tool Drill Rigs

Commonly used before 1950

Page 41: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

41

Old cable drill rig

abandoned in Redden

Oil Field in southern

Oklahoma.

Page 42: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

42

Draw-works of an old cable drill rig abandoned in

Redden Oil Field in southern Oklahoma.

Page 43: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

43

Greatly worn tip of

cable tool bit. From

the abandoned

Redden Oil Field in

southern Oklahoma.

Page 44: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

44

Offshore drill rigs

Page 45: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

45

Fixed production platforms

Page 46: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

46

Jackup rigs

Page 47: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

47

Pontoon type semisubmersible rig

Page 48: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

48

Twin hull semisubmersible rig

Page 49: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

49

Page 50: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

50

Page 51: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

51

Page 52: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

52

Semisubmersible rig sinking after being towed to site

Page 53: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

53

Semisubmersible rig

blown under bridge

during Katrina

Page 54: Drill Rigs and Nomenclature - University of · PDF file12 Drill Site/Rig Personnel • Tool Pusher –responsible for all rig operations (rig manager). The boss around drill rigs

54

Jackup rig collapsing after hurricane in Gulf of Mexico