1660 LINCOLN ST., SUITE 2710, DENVER, CO 80264 • Phone: 303.861.0362 • WWW.COGA.ORG © 2012 Colorado Oil & Gas Association. All rights reserved. Site Preparation Estimated Time: 7-14 days depending on the size of the pad On Site Construct roads to the well site. Clear the surface for the wellpad Average pad space is 5 acres Drilling & Hauling Estimated Time: Drilling: 3-4 days for directional wells and 10-15 for horizontal wells Hauling: 30-45 days – Depending when the completion contractor can be scheduled, there may be some time when no hauling occurs directly after drilling On Site Use fresh water and bentonite clay to drill the well Install casing and cement Conduct pressure testing and cement bond logging Remove drilling equipment Haul water and tanks for hydraulic fracturing operations Hydraulic Fracturing Estimated Time: 1-3 days per well On Site Hydraulic fracturing crews pump a mixture of water on site, sand, and chemicals for each well Crews remove pumps and trucks Production & Reclamation Estimated Time: 30 years production On Site Reclaim any surfaces that do not require permanent infrastructure for production Ongoing facility operations and monitoring Drill Time Basics Stages of the Life of a Well in Days

Drill Time Basics - FourPoint Energy · Drilling & Hauling Estimated Time: Drilling: 3-4 days for directional wells and 10-15 for horizontal wells Hauling: ... Drill Time Basics

Embed Size (px)

Citation preview

Page 1: Drill Time Basics - FourPoint Energy · Drilling & Hauling Estimated Time: Drilling: 3-4 days for directional wells and 10-15 for horizontal wells Hauling: ... Drill Time Basics

1660 LINCOLN ST., SUITE 2710, DENVER, CO 80264 • Phone: 303.861.0362 • WWW.COGA.ORG

© 2012 Colorado Oil & Gas Association. All rights reserved.

Site Preparation

Estimated Time:

7-14 days depending on the size of the pad

On Site

• Constructroadsto the well site.

• Clearthesurfacefor the wellpad

• Averagepadspaceis 5acres

Drilling & Hauling

Estimated Time:

Drilling:3-4daysfordirectionalwellsand10-15forhorizontalwells

Hauling:

30-45days–Dependingwhenthecompletioncontractorcanbescheduled,theremaybesometimewhennohaulingoccursdirectlyafterdrilling

On Site

• Usefreshwaterandbentoniteclaytodrillthewell

• Installcasingandcement

• Conductpressuretestingandcementbondlogging

• Removedrillingequipment

• Haulwaterandtanksforhydraulic fracturingoperations

Hydraulic Fracturing

Estimated Time:

1-3daysperwell

On Site

• Hydraulicfracturingcrews pumpamixtureofwateron site,sand,andchemicals foreachwell

• Crewsremovepumps andtrucks

Production & Reclamation

Estimated Time:

30yearsproduction

On Site

• Reclaimanysurfacesthat donotrequirepermanent infrastructureforproduction

• Ongoingfacilityoperations andmonitoring

Drill Time Basics

Stages of the Life of a Well in Days