    Smart City Integrated Solutions Project

    Energy City-Qatar

    Systems Design Guideline

    Office Plots & Buildings

    Version 0.5.0

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    2/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (2/22) ECQ Confidential All Rights Reserved

    Table of Contents

    Overview .................................................................................................................................................................... 3

    Instructions to Developers ...................................................................................................................................... 5

    City Command & Control Center (C3) ................................................................................................................. 6

    Smart City Requirements ........................................................................................................................................ 7

    Section (1): Local Operations Room (LOR) ..................................................................................................... 10

    Section (2): Technical Systems .......................................................................................................................... 11

    Security Systems ............................................................................................................................................ 11

    1. CCTV Surveillance System ................................................................................................................. 11

    2. Access Control System (ACS) ............................................................................................................ 12

    3. Intrusion Detection System (IDS) ...................................................................................................... 14

    Safety Systems ................................................................................................................................................ 16

    1. Fire Alarm System (FAS) .................................................................................................................... 16

    2. Gas Detection System (GDS) .............................................................................................................. 16

    Building Management & Control Systems................................................................................................. 17

    1. Lighting Control System (LCS) .......................................................................................................... 17

    2. Building Management System (BMS) ............................................................................................... 18

    3. Office Automation ............................................................................................................................... 19

    Audio Visual Systems ................................................................................................................................... 20

    1. Public Address System (PAS) ............................................................................................................ 20

    2. Digital Signage ..................................................................................................................................... 20

    Section (3): Appliances ....................................................................................................................................... 22

    1. LED Lighting. ....................................................................................................................................... 22

    2. Electrical Fire Containment. ............................................................................................................... 22

    3. Glass Anti-Shattering. ......................................................................................................................... 22

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    3/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (3/22) ECQ Confidential All Rights Reserved

    Overview

    Energy City Qatar project (ECQ) is defined to build a complete integrated smart city, equipped with fully

    integrated, state-of-the-art intelligent and interactive technical solutions, to automate most of the manual processesand services running inside the different city operation cycles.

    These solutions were defined to fulfill the city requirements to set unique city identity, and support the different

    running operation and maintenance services.

    The Smart City Integrated Solutions (SCIS) are defined and deployed to satisfy the city and city elements technical

    needs with respect to the following services:

    1. Security & Protection.2. Health, Safety, & Environment.3. Urban Traffic Management & Control.4. Building Management and Control.5. Energy Management.6. Audio Visual.7. Entertainment.8. Communication & Telecommunications.

    The smart city concept to be implemented by ECQ is fully defined and developed by Integrated Smart City

    Company of Doha Qatar (ISC). This concept will assure the citys compliance with the five main requirements of

    ISC Smart City Model, which are listed as follows:

    1. Secured CityECQ shall be equipped with all countermeasures to ensure the overall security of the city and city

    elements. These measures should enable city operators to gain complete video surveillance, access control

    of people and vehicles, and protection against illegal intrusion to the different city elements.

    2. Safe CityECQ shall be equipped with all systems and solutions to satisfy all the city requirements for human health

    and safety, and environment.

    3. Connected CityECQ different elements shall be digitally connected through a well-defined multi-layered high-bandwidth

    communication platform. This connectivity will enable any city element to exchange data, audio and video

    information with any other element, and most-of-all with the city Command & Control Center (CCC).

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    4/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (4/22) ECQ Confidential All Rights Reserved

    4. Intelligent CityECQ shall deploy the latest state-of the-art technologies in all the city technical systems and solutions. The

    hardware and software components of these systems shall be provided by the most referenced and field-

    tested vendors in the related field worldwide.

    5. Green CityECQ is defined to be Silver LEED Green Building certified city. All systems and solutions should be

    designed, configured, and programmed to satisfy the different green city certificate requirements, such as

    energy saving, consumption monitoring, etc.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    5/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (5/22) ECQ Confidential All Rights Reserved

    Instructions to Developers

    1. This document is addressing the technical systems design consultants of all ECQ plot developers.2. The purpose of this document is to set the minimum requirements of technical systems and solutions design,

    with respect to the quality, quantity of components, local plot-wide integration, and central city-wide

    integration, in order to fully comply with the ECQ Integrated Smart City model and systems.

    3. At DC2 design stage, each plot developer shall submit the detailed design package of each designated system,for review and full compliance approval by ECQ in accordance with the enclosed design guidelines. The

    design package should include but not limited to all design layouts, single line diagrams, bill of quantities, and

    technical specifications, of all plot buildings and elements.

    4. The ECQ plot developer shall conform to the specified vendors list for each system, as an essential technicalcondition to achieve the complete and consistent operation with the ECQ Smart City centralized integration

    platform.

    5. At construction stage, all system components shall be submitted for compliance approval by ECQ inaccordance with the enclosed technical specifications and integration requirements.

    6. For all plot systems, connected with the ECQ Command & Control Center, the Complete Integrationcondition, between the Plot system and the respective Central Management System at ECQ Command &

    Control Center, should be valid upon fulfilling the following requirements:

    a.

    All functions of the Local Plot System should be operated by the respective Central ManagementSystem at ECQ Command & Control Center.

    b. The Central Management System should be able to operate any future upgrades of the Local PlotSystem.

    c. The Local Plot System should support and operate with any future upgrades of the respective CentralManagement System.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    6/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (6/22) ECQ Confidential All Rights Reserved

    City Command & Control Center (C3)

    ECQ has one centralized City Command and Control Center (C3), which is located at H01 plot building #3.

    All city-wide systems are managed and controlled centrally by C3. All plot-wide systems, located in the buildings

    LORs are connected and integrated with the central management platform at C3, to achieve central monitoring and

    control features of all elements in all ECQ plots.

    The main purposes of C3 are:

    1. Provide complete city monitoring, control and management, and data gathering services, to the ECQoperators, and facility managers.

    2. Provide a complete incident management and recovery services for city-level and multi-plot incidents.3. Provide on-demand facility operations support services to city plots in case of plot incidents.4. Act as a secondary and stand-by LOR for all the connected LORs throughout the city.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    7/22

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    8/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (8/22) ECQ Confidential All Rights Reserved

    3. AppliancesThe following appliances shall be deployed by the plot developer as per the following deployment

    guidelines:

    1. LED Lighting2. Electrical Fire Containment3. Glass Anti-Shattering

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    9/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (9/22) ECQ Confidential All Rights Reserved

    Design Guidelines

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    10/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (10/22) ECQ Confidential All Rights Reserved

    Section (1): Local Operations Room (LOR)

    To Be Defined in Release 1.0

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    11/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (11/22) ECQ Confidential All Rights Reserved

    Section (2): Technical Systems

    The following guidelines shall be considered when designing the systems for ECQ office plot elements:

    Security Systems

    1. CCTV Surveillance System1.1.The following table shows the standard office plot elements, to be covered by the CCTV

    surveillance cameras, along with location-specific coverage requirements:

    Element PTZ/Fixed Coverage

    Office Building Outdoor Area

    Gate PTZ Full at preset

    Road PTZ Full at preset with 5mm lines

    Intersection PTZ Full with 100m radius circles

    Public Area PTZ Full at preset

    Perimeter PTZ View 1m object from 100m at full screen

    Office Building

    Entrance Fixed Full Indoor

    Emergency Exit Fixed Full Indoor

    Car Parking PTZ Entrances, Driving lanes, ElevatorPublic Elevator Fixed Full Indoor

    Service Elevator Fixed Full Indoor

    Elevator Shaft PTZ Full at preset

    Elevator Lobby Fixed Full Indoor

    Stairs Area Fixed Full Indoor

    Corridor Fixed Full with 30m radius circle

    Loading Dock PTZ Full at preset

    Workshop Not Applicable Not Applicable

    Trash Room PTZ Full at presetStorage Room Fixed Full Indoor

    Rest Room Not Applicable Not Applicable

    Communication Room Not Applicable Not Applicable

    Switchgear Room Not Applicable Not Applicable

    UPS Room Not Applicable Not Applicable

    Transformer Room Not Applicable Not Applicable

    Electrical Room PTZ Full at preset

    Mechanical Room PTZ Full at preset

    Local Operations Room Fixed Full at presetRoof PTZ Full with 100m radius circles

    Office Not Applicable Not Applicable

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    12/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (12/22) ECQ Confidential All Rights Reserved

    1.2.The CCTV management system is connected to ECQ C3 through the city TCP/IP backbonenetwork.

    1.3.Continues 24hr/7dy recording of each camera, through IP Network Video Recorders (NVRs), withminimum 4 weeks playback storage.

    1.4.All CCTV Control & Management System components such as decoders/encoders, NVRs, clientand server software must support direct and complete integration ability with the ECQ City

    Security Management System at C3.

    1.5.The Approved venders for CCTV Surveillance System and its components such asdecoders/encoders, NVRs, client and server software are:

    Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.

    2. Access Control System (ACS)2.1 The following table shows the standard office plot elements, to be covered by the CCTV

    surveillance cameras, along with location-specific coverage requirements:

    Element Coverage

    Office Building

    Emergency Exit Access Door

    Car Parking Access Door

    Public Elevator Elevator Door

    Service Elevator Elevator Door

    Elevator Shaft Not Applicable

    Elevator Lobby Access Door

    Stairs Area Access Door

    Corridor Not Applicable

    Loading Dock Access Door

    Workshop Access Door

    Trash Room Not ApplicableStorage Room Access Door

    Rest Room Access Door

    Communication Room Access Door

    Switchgear Room Access Door

    UPS Room Access Door

    Transformer Room Access Door

    Electrical Room Access Door

    Mechanical Room Access Door

    Local Operations Room Access DoorRoof Access Door

    Office Access Door

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    13/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (13/22) ECQ Confidential All Rights Reserved

    2.1.The ACS Management System is connected to ECQ C3 through TCP/IP backbone network.2.2.All ACS Control & Management System components such as central controller, interface modules,

    client and server software must support direct and complete integration ability with the ECQ City

    Security Management System at C3.

    2.3.The Approved venders for the ACS Control & Management System components such as centralcontroller, interface modules, client and server software are:

    Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    14/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (14/22) ECQ Confidential All Rights Reserved

    3. Intrusion Detection System (IDS)3.1.The following table lists the office plot elements to be protected by the IDS, along with respective

    target intrusion area to be monitored:

    Elements Target Intrusion Area

    Office Building Outdoor Area

    Gate Not Applicable

    Road Not Applicable

    Intersection Not Applicable

    Public Area Not Applicable

    Perimeter Perimeter Ground

    Office Building

    Entrance Doors

    Emergency Exit Doors

    Car Parking Not Applicable

    Service Elevator Not Applicable

    Public Elevator Not Applicable

    Elevator Lobby Not Applicable

    Elevator Shaft Not Applicable

    Stairs Area Windows

    Corridor Windows

    Loading Dock Windows

    Workshop Windows

    Trash Room Windows

    Storage Room Windows

    Rest Room Windows

    Communication Room Windows

    Switchgear Room Windows

    UPS Room Windows

    Transformer Room Windows

    Electrical Room Windows

    Mechanical Room Windows

    Local Operations Room Windows

    Roof Doors

    Office Windows

    3.2.The IDS Management System shall be connected to ECQ C3 through city TCP/IP backbonenetwork.

    3.3.All ACS Control & Management System components must support direct and completeintegration ability with the ECQ City Security Management System at C3.

    3.4.The Approved venders for the IDS Control & Management System components such as centralcontroller, interface modules, client and server software are:

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    15/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (15/22) ECQ Confidential All Rights Reserved

    Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    16/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (16/22) ECQ Confidential All Rights Reserved

    Safety Systems

    1. Fire Alarm System (FAS)1.1.The FAS design should meet all requirements and specifications of Qatar Civil Defense

    Department and other governmental agencies.

    1.2.All FAS Control & Management System components must support direct and complete integrationability with the ECQ City Integrated Safety Management System at C3.

    1.3.The Approved venders for the FAS components such as central controller, interface modules, clientand server software are:

    Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.

    2. Gas Detection System (GDS)2.1.The installation of a gas detection system in underground car parks allows an audible and visual

    alarm to indicate any area where the build up of carbon monoxide (CO) from vehicle emissions

    reaches dangerous levels.

    2.2. The system shall be connected to the BMS for alarm monitoring.2.3. Approved vendor is Siemens or any other equivalent.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    17/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (17/22) ECQ Confidential All Rights Reserved

    Building Management & Control Systems

    1. Lighting Control System (LCS)1.1.The LCS shall be applied to all lighting located at the following office plot elements, along with

    their respective control functionality:

    Elements Control Functionality

    Office Building Outdoor Area

    Gate On/Off

    Road On/Off

    Intersection On/Off

    Public Area On/Off + Dimming

    Perimeter On/Off + Dimming

    Office Building

    Entrance On/Off + Dimming

    Emergency Exit On/Off + Dimming

    Car Parking On/Off + Dimming

    Service Elevator On/Off + Dimming

    Public Elevator On/Off + Dimming

    Elevator Lobby On/Off + Dimming

    Elevator Shaft Not Applicable

    Stairs Area On/Off + Dimming

    Corridor On/Off + Dimming

    Loading Dock On/Off

    Workshop On/Off

    Trash Room On/Off

    Storage Room Not Applicable

    Rest Room On/Off

    Communication Room On/Off

    Switchgear Room On/Off

    UPS Room On/Off

    Transformer Room On/OffElectrical Room On/Off

    Mechanical Room On/Off

    Local Operations Room On/Off + Dimming

    Roof On/Off

    Office Included within the office automation

    1.2.The dimming function for building public areas should be controlled by motion or presencedetection sensors.

    1.3.The Approved vender is Siemens or any other equivalent.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    18/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (18/22) ECQ Confidential All Rights Reserved

    2. Building Management System (BMS)2.1.The equipment like (Air Cooled Units, Package Units A/c Units and chillers) are connected to DDC

    controllers through hard wire integration.

    2.2.The BMS I/O Points Schedule and BMS Equipment List for monitoring and controlling buildingMEP equipment and systems should be engineered based on the provided Standard I/O Points

    Schedule and BMS Equipment List enclosed with these guidelines.

    2.3.The DDC Controllers shall utilize standard protocols, BACnet over IP /LON.2.4.The Management Level shall support the model of a distributed network of multiple Operator

    Workstations.

    2.5.The function of the Operator Workstation is to provide a user-friendly operator interface and toprovide data archiving facilities. For system reliability, the workstations shall not be requiring to

    perform any of the control features.

    2.6.The Local Building Management Station (LBMS) shall be capable of the following Display of graphical representations of the plant overlaid with live data Monitor and operate / influence process devices Receiving of alarm messages from the process level and directing them to the appropriate

    reporting device e.g. printer, pager, fax, e-mail, SMS

    Monitor process devices for communication problems and other device faults. Adjusting time strategies in the process level. Long term storage of logged data from the process devices Archiving / retrieve data to/from long term data storage Display graphically the logged data Custom application programming

    2.7.The BMS shall allow supplier independent integration of third-party subsystems.2.8.The BMS must support direct and complete integration ability with the City Facility Management

    System (CFMS) at ECQ C3. This integration should enable the CFMS operator to communicate with

    the BMS through BACnet/IP protocol, and to perform remotely complete monitoring, and control

    operations to the designated building, exactly at the same level can be performed by the BMS.

    2.9.The Approved venders for the LCS System components are: Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.

    2.10. The BMS equipment list and I/O data points should be in full conformance with the enclosedStandard BMS Equipment Schedule.

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    19/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (19/22) ECQ Confidential All Rights Reserved

    3. Office Automation3.1.Light Control.3.2.HVAC Control.3.3.Curtain (Blind) Control.

    To Be Defined in Release 1.0

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    20/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (20/22) ECQ Confidential All Rights Reserved

    Audio Visual Systems

    1. Public Address System (PAS)1.1.The public address system shall be deployed in the public areas to provide public address

    announcement and emergency evacuation messages.

    1.2.Each Office building shall be equipped with stand-alone PA systems, and then all the PA officebuilding systems to be connected through IP to a central PA command system at ECQ C3.

    1.3.The approved vendor for PAS system component are: ATEIS. Any other vendor that supports direct and complete integration with C3 integration platform.

    2. Digital Signage2.1. Digital Signage shall provide the following:

    Visual public address Evacuation Guidelines Event information Schedules Advertisement.

    2.2. The following table lists the elements of the plots buildings and surrounding outdoor areas, to becovered with Digital Signage, along with location:

    ECQ Office Plots Indoor/Outdoor

    Office Building Outdoor Area

    Gate Not Applicable

    Road Not Applicable

    Intersection Not Applicable

    Public Area Outdoor

    Perimeter Not Applicable

    Office BuildingEntrance Indoor & Outdoor

    Emergency Exit Not Applicable

    Service Elevator Not Applicable

    Car Parking Not Applicable

    Public Elevator Not Applicable

    Elevator Lobby Not Applicable

    Elevator Shaft Not Applicable

    Stairs Area Indoor & Outdoor

    Corridor Not Applicable

    Loading Dock Not Applicable

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    21/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Page (21/22) ECQ Confidential All Rights Reserved

    Workshop Not Applicable

    Trash Room Not Applicable

    Storage Room Not Applicable

    Rest Room Not Applicable

    Communication Room Not Applicable

    Switchgear Room Not Applicable

    UPS Room Not Applicable

    Transformer Room Not Applicable

    Electrical Room Not Applicable

    Mechanical Room Not Applicable

    Local Operations Room Indoor & Outdoor

    Roof Not Applicable

    Office Not Applicable

  • 7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)

    22/22

    Version 0.5.0Systems Design Guidelines - ECQ Office Plots

    Section (3): Appliances

    1. LED Lighting.To Be Defined in Release 1.0

    2. Electrical Fire Containment.To Be Defined in Release 1.0

    3. Glass Anti-Shattering.To Be Defined in Release 1.0