EHS ENP-05

REVISION: 00 July 2010 Page 1 of 3

PROCEDURE FOR COMPLIANCE MONITORING

1.0 PURPOSE

This procedure specifies the process of reporting compliance monitoring and other significant environmental data.

2.0 SCOPE

All projects (Free Zone and Business Units) with significant environmental issues within the Ports, Customs and Free Zone Corporation (PCFC) and Dubai World jurisdiction areas.

3.0 PROCEDURE

3.1 Completion of Environmental Impact Assessment (EIA) Compliance Report Form and/or EHS Monitoring Report Form

3.1.1 Projects with approved EIA Study shall accomplish EIA Compliance Report Form

and EHS Monitoring Report Form. Projects without approved EIA Study with significant environmental issues shall accomplish the EHS Monitoring Report Form.

3.1.2 All entries shall be typed or legibly written. If a certain parameter does not apply to

your operations, kindly indicate NA (not applicable) on the blank provided.

3.1.3 If in case there is a need to conduct laboratory analysis, any accredited third party laboratory (http://www.dac.dm.ae) can be approached.

3.2 Submission of EIA Compliance Report and/or EHS Monitoring Report

3.2.1 The accomplished EIA Compliance Report and/or EHS Monitoring Report along with its attachments (if any) shall be submitted to EHS in soft copies only either through email ([email protected]) or written in portable media (e.g., CD) at the Reception – EHS Main Office, Main Gate No. 3, Jebel Ali Free Zone.

Page 2: ehsenp 05procedureforcompliancemonitoringrev0001.07.10

EHS ENP-05

REVISION: 00 July 2010 Page 2 of 3

3.2.2 The frequency of submission of EIA Compliance Report shall be on a quarterly

basis for Category A projects and semi-annual basis for Category B projects. On the other hand, EHS Monitoring Report shall be submitted on a quarterly basis. The frequency of analysis for the EHS Monitoring Report shall be as per the requirement in the relevant environmental permits (e.g., Air Emission, Irrigation, etc.) issued. The deadline of submission shall be on the 15th day of the month succeeding the last month of the quarter being covered by the Report (i.e., EHS Monitoring Report for the 4th Quarter – October, November, December – deadline of submission is on or before 15th day of January).

3.3 Review of the EIA Compliance Report and/or EHS Monitoring Report

The submitted Report/s and its attachment/s shall be reviewed by EHS. Any feedbacks shall be communicated directly to the contact person indicated in the submitted form.

3.4 Non-submission of the EIA Compliance Report and/or EHS Monitoring Report

Failure to submit EIA Compliance Report and/or EHS Monitoring Report shall be given a notice. After two (2) instances of failure of submission after notices have been given, a Warning Notice shall be issued. If no response has been received, Final Warning Notice shall be given. Any succeeding failure of submission after the issuance of Final Warning Notice shall correspond to a financial penalty.

4.0 Attachments

4.1 Outline for Environmental Impact Assessment (EIA) Compliance Report (http://www.ehss.ae) 4.2 EHS Monitoring Report Form (ENF-05a)

5.0 Applicable Regulations

5.1 EHS Environmental Regulations 5.2 EHS Environmental Guidelines

Page 3: ehsenp 05procedureforcompliancemonitoringrev0001.07.10

EHS ENP-05

REVISION: 00 July 2010 Page 3 of 3

6.0 EHS Contacts

Cris T. Villoso EIA Officer 04 – 8068860 [email protected] / [email protected] Milagros Amor V. Iligan EIA Officer 04 – 8068821 [email protected] / [email protected] Wendell S. Acena Blue Community Officer 04 – 8068814 [email protected] / [email protected]