TECHNICAL CORRECTION September 2002 Process Industry Practices Electrical PIP ELTFT01D Field Inspection and Testing of New Electrical Equipment Data Sheet

ELTFT01D

  • Upload
    mhenna

  • View
    32

  • Download
    1

Embed Size (px)

Citation preview

Page 1: ELTFT01D

TECHNICAL CORRECTIONSeptember 2002

Process Industry PracticesElectrical

PIP ELTFT01DField Inspection and Testing of

New Electrical Equipment Data Sheet

Page 2: ELTFT01D

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

In an effort to minimize the cost of process industry facilities, this Practice hasbeen prepared from the technical requirements in the existing standards of majorindustrial users, contractors, or standards organizations. By harmonizing these technicalrequirements into a single set of Practices, administrative, application, and engineeringcosts to both the purchaser and the manufacturer should be reduced. While thisPractice is expected to incorporate the majority of requirements of most users,individual applications may involve requirements that will be appended to and takeprecedence over this Practice. Determinations concerning fitness for purpose andparticular matters or application of the Practice to particular project or engineeringsituations should not be made solely on information contained in these materials. Theuse of trade names from time to time should not be viewed as an expression ofpreference but rather recognized as normal usage in the trade. Other brands having thesame specifications are equally correct and may be substituted for those named. AllPractices or guidelines are intended to be consistent with applicable laws andregulations including OSHA requirements. To the extent these Practices or guidelinesshould conflict with OSHA or other applicable laws or regulations, such laws orregulations must be followed. Consult an appropriate professional before applying oracting on any material contained in or suggested by the Practice.

This Practice is subject to revision at any time by the responsible Function Team and willbe reviewed every 5 years. This Practice will be revised, reaffirmed, or withdrawn.Information on whether this Practice has been revised may be found at www.pip.org.

© Process Industry Practices (PIP), Construction Industry Institute, TheUniversity of Texas at Austin, 3925 West Braker Lane (R4500), Austin,Texas 78759. PIP member companies and subscribers may copy this Practicefor their internal use. Changes, overlays, addenda, or modifications of anykind are not permitted within any PIP Practice without the express writtenauthorization of PIP.

PIP will not consider requests for interpretations (inquiries) for this Practice.

PRINTING HISTORYMarch 2001 IssuedSeptember 2002 Technical Correction

Not printed with State funds

Page 3: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 1 OF 19September 2002

Client Engineering Org. Spec. No.

Project Title Location Date

Project Location Contract No. Equip. No.

Proj. No. Specifier Name Tele. No.

P.O. No.

Refer to PIP ELTFT01 for General Requirements.Applicable State and Local Codes: _____________________________________________________________

Use test forms indicated below:

FORM NO. TEST FORM NOTES¨ TF-1 Grounding System ____________________________________________

(See Section 6.) ____________________________________________

¨ TF-2 Medium-Voltage Switchgear ____________________________________________(See Section 7.) ____________________________________________

¨ TF-3 Relay Calibration ____________________________________________(See Sections 7 & 11.) ____________________________________________

¨ TF-4 Power Transformers ____________________________________________(See Section 8.) ____________________________________________¨̈ Optional TTR Test

¨ TF-5 Shielded Power Cable ____________________________________________(See Section 9.) ____________________________________________¨̈ Optional Radiographs

¨ TF-6 Non-Shielded Cable and Wiring ____________________________________________(See Section 10.) ____________________________________________

¨ TF-7 DC High-Potential ____________________________________________(See Sections 7 through 12.) ____________________________________________

¨ TF-8 Medium-Voltage MCC Line-up ____________________________________________(See Section 11.) ____________________________________________

¨ TF-9 Medium-Voltage Starters ____________________________________________(See Section 11.) ____________________________________________¨̈ Optional CT Ratio VerificationTest

¨ TF-10 Medium-Voltage Motors ____________________________________________(See Section 12.) ____________________________________________

¨ TF-11 Low-Voltage Switchgear ____________________________________________(See Section 13.) ____________________________________________

¨ TF-12 Low-Voltage MCC Line-ups andSwitchracks

____________________________________________

(See Section 14.) ____________________________________________

¨ TF-13 Low-Voltage Starters ____________________________________________(See Section 14.) ____________________________________________

¨ TF-14 Low-Voltage Motors ____________________________________________(See Section 12.) ____________________________________________

Continued, next page

Page 4: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 2 OF 19September 2002

¨ TF-15 Low-Voltage Panelboards, Lighting,and Receptacles ____________________________________________(See Section 15.) ____________________________________________

¨ TF-16 Dielectric Absorption ____________________________________________(See Sections 5, 8, & 12.) ____________________________________________

Page 5: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 3 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Grounding System Test Form TF-1Below Ground (before back-filling or pouring concrete)

__________ Check ground system compliance with drawings and specifications. __________ Check ground rod accessibility in ground well. __________ Check grid wire sizes and color identification. __________ Inspect all underground splices. __________ Inspect all internal foundation ground connections.

Above Ground __________ Check ground system compliance with drawings and specifications. __________ Check connections for tightness. __________ Check mechanical protection of ground wire. __________ Test continuity – ground wells and ground terminal bars. __________ Test ground rods or electrodes in electrical equipment. __________ Test main ground grid (fall of potential method - record below). __________ Test electrical system neutral grounding (fall of potential method - record below). __________ Test switchgear ground bus (fall of potential method - record below). __________ Test motor control centers ground bus (fall of potential method - record below). __________ Test switch racks ground (fall of potential method - record below). __________ Test transformer ground (fall of potential method - record below). __________ Test medium-voltage switch ground (fall of potential method - record below).

Type *

(See below)

Location of Ground Tested Resistance toGround Ohms

CheckContinuity

Remarks

* Type (1) Rod (2) Loop (3) Grid (4) Equipment (5) Other - Specify

Test Method/Instrument Used:

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 6: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 4 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Medium-Voltage Switchgear Test Form TF-2Equipment Description Equipment No.

Circuit No. Voltage

_________ Check alignment, levelness, and tightness of bolting.

_________ Check all equipment for the removal of blocking,supports, temporary ties, temporary jumper wires.

_________ Check control power transformer and PT fuses size,type, and circuit location.

_________ Check CT and PT ratios.

_________ Check CPT size.

_________ Check all components for proper identification per thedrawings and specifications.

_________ Inspect bus bar connections (torque per manufacturer’sspecification).

_________ Verify connection hardware per project specifications.

_________ Inspect bus supports for cleanliness and tightness.

_________ Inspect ground connections to ground bus.

_________ Inspect operation of the drawout mechanism mechanicalinterlocks, position indicators, and safety features.

________ Inspect operation of shutter devices.

________ Inspect PT disconnecting and grounding mechanisms.

________ Inspect CB insulating parts - cleanliness and dryness.

________ Inspect CB electrical contact surfaces - cleanlinessand smoothness.

________ Lubricate contact surfaces per manufacturer's spec.

________ Inspect CB contact wipe and alignment permanufacturer's spec.

________ Inspect vacuum breaker mechanical adjustments andcritical dimensions per manufacturer's spec.

________ Inspect operation of circuit breaker manual operation-verify that all parts are free and work smoothly.

________ Inspect operation of breaker mechanical trip function.

________ Inspect lubrication of breaker-operating mechanismand all other breaker moving parts.

Test – Insulation Resistance - Switchgear Bus (megohms – 1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A-Gnd _________B-Gnd __________C-Gnd

Test – Insulation Resistance - Instrument Transformers (megohms – 1-minute test with 1000-volt megohmmeter)

___________ ____________ ____________ __________ ___________ _____________

Test – Insulation Resistance - Circuit Breaker - Closed Position (megohms –1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A-Gnd _________B-Gnd __________C-Gnd

Test – Contactor (Closed Position) Contact Resistance (micro ohms)

___________A ____________B ____________C

Test – Insulation - Circuit Breaker - Closed Position (voltage – step voltage method with DC hi-pot)

Hi-Pot Test Form Attached _____________

Test – Integrity Vacuum Circuit Breaker (in accordance with manufacturer’s instructions)

Test – CT Secondary Circuits including Relays and Metering DevicesTest – Ground CT Secondary Circuits including Relays and Metering DevicesTest – PT Secondary Circuits including Relays and Metering DevicesTest – Voltmeter, Ammeter, and Selector SwitchesTest – Space Heaters including Switching and Indicating DevicesTest – Circuits Breaker - Minimal Voltage Trip (40% of Nominal Voltage)Test – Circuit Breaker - Opening Time (according to manufacturer’s specifications)

Verify Proper Bus Phasing.Function Test – Circuit Breaker (Test Position)_________ Close and trip from ALL local control devices._________ Close and trip from ALL remote control devices.

Function Test – Circuit Breaker (Operating Position)__________ Close and trip from ALL local control devices.__________ Close and trip from ALL remote control devices.

Function Test–-Resistance Grounding Systems_________ Test protection / alarm functions

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 7: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 5 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Relay Calibration Test Form TF-3Equipment Description Equipment No.

Circuit No. Voltage

Relay Manufacturer Type

Catalog No. CT Ratio

Current Range Instantaneous Range

_________ Check bearing and bearing end play.

_________ Check disc clearance.

_________ Check connection for tightness.

_________ Check taps for tightness.

_________ Check contacts for cleanliness.

_________ Inspect cover gasket.

_________ Inspect for moisture and foreign materials.

Test ResultsDesign SettingsA B C Gnd

Min. Pick-up AMPS AMPS AMPS AMPS AMPS

Time Lever

Time @ 3X SEC SEC SEC SEC SEC

Time @ 10X SEC SEC SEC SEC SEC

Instantaneous Pick-up AMPS AMPS AMPS AMPS AMPS

Time @ 1.4X SEC SEC SEC SEC SEC

Insulation Resistance

Flag Tap

Flag Pick-up

Flag Seal-in

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 8: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 6 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Power Transformer Test Form TF-4Equipment Description Equipment No./Transformer No.

Manufacturer Serial No.

Type Primary kV Secondary kV Voltage Rating

_________ Check all components for proper identification perthe drawings and specifications.

_________ Check nameplate rating, impedance, and availabletap positions.

_________ Check case including cooling fins, primary terminalenclosure, or switch enclosure for any externalmechanical damage.

_________ Check tank, cooling fins, and all other welded orbolted joints under oil for evidence of oil leakage.

_________ Check all valves, fittings, and gasket surfaces fortightness and any evidence of oil leakage.

_________ Check unit for inclusion of all standard auxiliaryitems per the purchase specification.

_________ Check secondary terminal box for adequateweatherproofing.

_________ Check primary terminal enclosure for adequateweatherproofing and bolting.

_________ Inspect operation of tap changer unit.

_________ Inspect level indicator for proper oil level.

_________ Inspect liquid temperature indicator and pressure-vacuum indicator for appropriate readings.

_________ Inspect ground connection to transformer ground padand to transformer secondary neutral if applicable.

_________ If supplied, inspect ground resistor and ground CTmounting and their connections.

Test – Oil Samples - (per NETA ATS)Dielectric Breakdown V __________ Neutralization Number ______________ Specific Gravity _____________InterfacialTension___________ Color_______________ Power Factor ______________ Water Content _____________________

Test – Gas Chromatograph - (Attach Report)

Test – Insulation Resistance - (dielectric absorption test - 10 minute)_________ 5000-Volt Megohmmeter Systems Rated above 2300 V _________ 2500-Volt Megohmmeter Systems Rated 601–2300 V

_________ 1000-Volt Megohmmeter Systems Rated below 600 V

Polarization Index _________ A ______________ B ________________ C

Dielectric Absorption Test Form Attached _____________

Test – AC Power FactorReport Attached _____________

Optional Test – Transformer Turns Ratio (TTR)Report Attached _____________

Function Test – Safety InterlocksDescription of System

Function Test – Auxiliary Devices_________ Liquid Temperature Device and Alarms

_________ Pressure Device and Alarms

_________ Fault Pressure Relay and Alarms

_________ Level Device and Alarms

_________ Cooling Fans and Controls

Function Test – Space Heaters___________ Power Circuit

___________ Switching Devices

Set Transformer TapsList Tap Position _____________ List Positions Left _____________

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 9: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 7 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Shielded Power Cable Test Form TF-5Equipment Description Equipment No.

Circuit No. Size Voltage Insulation Length

_________ Check cable size, type, and rating.

_________ Check cable support systems (tray, conduit, ormessenger) including conduit bushings, straps,clamps, messenger hardware, and thermalexpansion provisions.

_________ Check installation for adequate bending radius for allcables and individual conductors.

_________ Check cables for any exterior mechanical damage.

_________ Check grounding of cable support system includingcable tray grounding jumpers.

_________ Inspect installation of cable termination fittings (includingpouring of fittings if applicable).

_________ Inspect all terminations and splices for conformance tomanufacturer's recommendations.

_________ Verify proper type and size of connector or lug.

_________ Verify that proper hydraulic crimp tool and die is used.

_________ Verify proper termination and splicing, including use ofrecommended tapes (semi-conducting, insulating),shielding, jacket, and tracking-resistant cover or propersize preformed stress cone unit or system.

_________ Verify that cable terminators are properly installed.

_________ Verify proper routing of cable shield and bondingconductors through zero sequence CT’s.

Test – Insulation Resistance - on the Reel –- (megohms –1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A-Gnd _________B-Gnd ___________C-Gnd

Test – Continuity - Final Position –-

___________A- ____________B- ____________C- __________ - Gnd _________ Shield

Test – Insulation Resistance - Final Position –- (megohms – 1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A-Gnd _________B-Gnd ___________C-Gnd

Test – Insulation - Final Position –- (voltage – step voltage method with DC Hi-Pot)

DC Hi-Pot Test Form Attached _____________

_________ Verify that all grounds are removed before energization.

Test – Insulation Resistance - after Dielectric Test –- (megohms – 1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A- Gnd _________B- Gnd ___________C- Gnd

Optional Test – Radiograph

___________Radiograph Attached ____________ Radiograph Acceptable

Remarks________________________________________________________________________________________

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 10: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 8 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Non-Shielded Cable and Wiring Test Form TF-6Equipment Description Equipment No.

Circuit No. Size Voltage Insulation Length

_________ Check cable size, type, and rating.

_________ Check cable support systems (tray, conduit, ormessenger) including conduit bushings, straps,clamps, messenger hardware, and thermalexpansion provisions.

_________ Check installation for adequate bending radius for allcables and individual conductors.

_________ Check cables for any exterior mechanical damage.

_________ Check grounding of cable support system includingcable tray grounding jumpers.

_________ Inspect installation of cable termination fittings (includingpouring of fittings if applicable).

_________ Verify proper type and size of connector or lug.

_________ Verify that proper hydraulic crimp tool and die is used.

_________ Verify that proper tapes are being used.

_________ Verify that cable terminators are properly installed.

Test – Insulation Resistance - on the Reel (Power Cable) –- (megohms – 1-minute test)

_________ 5000-Volt Megohmmeter Systems Rated above 2300 V __________ 2500-Volt Megohmmeter Systems Rated 601–2300 V

_________ 1000-Volt Megohmmeter Systems Rated below 600 V

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B- Gnd ___________ C-Gnd

Test – Continuity - Final Position

___________A- ____________B- ____________C- __________ -Gnd _________ Shield

Test – Insulation Resistance - Cable 600-Volt and Less Final Position –- (megohms – 1-minute test)

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance - Cable above 600-Volt Final Position –- (megohms – 1-minute test)

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation - Final Position –- (voltage – step voltage method with DC Hi-Pot)

___________ DC Hi-Pot Test Forms Attached ____________ Results Acceptable

___________ Verify that all grounds are removed before energization.

Remarks ______________________________________________________________________________________

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 11: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 9 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

DC High-Potential Test Form TF-7Equipment Description Equipment No.

Test Equipment UsedAir Temperature _________ Humidity ______________

TimeMin.

VoltskV

A

B

C

A

B

Le

aka

ge

Cu

rre

nt

Mic

roa

mp

ere

s

C

Time/Minutes

KILOVOLTS, DC

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

MicroAmperes

Page 12: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 10 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Medium-Voltage MCC Line-up Test Form TF-8Equipment Description Equipment No.

Circuit No. Voltage

________ Check MCC for alignment, levelness, and tightness ofall bolting.

________ Check all equipment for removal of blocking, supports,temporary ties, and temporary wire jumpers.

________ Check that all protective barriers are properly installed.

________ Check door alignment of individual starter units anddoor interlock operation.

________ Check PT fuses for size, type, and circuit location.

________ Check PT ratio and size.

________ Check all components for proper identification per thedrawings and specifications.

________ Inspect MCC bus bar supports for cleanliness andtightness.

________ Inspect ground connections to ground bus.

________ Inspect MCC bus bar connections for tightness byverifying that the torque meets manufacturer’sspecifications.

________ Verify that connection hardware is consistent with theOwner’s project specifications.

Test – Insulation Resistance – Line-up Bus - (megohms – 1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance – Potential Transformer - (megohms –1-minute test)

List each reading for all conductors. ________ _________

Test – Space Heater_____Power _____Switching Devices _____Indicating Devices

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 13: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 11 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Medium-Voltage Motor Starter Test Form TF-9Equipment Description Equipment No.

Motor No.

HP Volts F.L.A. S.F.

Protective Device Mfg. Rating Setting

Starter Mfg. Size O.L. Heater Size

CT Ratio (if applicable)

Ground CT Ratio (if applicable) O.L. Relay Setting

Power Wire Size Control Wire Size Ground Wire Size

_________ Check size, type, and rating of control power fuses.

_________ Check size and rating of control power transformer.

_________ Check voltage rating of contactor coil.

_________ Check size, type, and rating of power and controlcables.

_________ Check wiring for conformance to color code and forproper identification per the drawings andspecifications.

_________ Check control power transformer for size, type, andcircuit location.

_________ Check CT ratios ratio and size.

_________ Check CPT size.

_________ Check wiring including fuses to power factorcorrection capacitors.

_________ Check for proper equipment labeling.

_________ Inspect operation of mechanical interlocks, positionindicators, drawout or rollout mechanism, and allsafety interlock features.

_________ Inspect size, type, and rating of current-limitingpower fuses.

_________ Inspect contactor rating.

_________ Inspect CT ratio.

________ Inspect overload protective device rating and setting.

________ Inspect operation of external overload protective devicereset.

________ Inspect contactor insulating parts for cleanliness anddryness.

________ Inspect contactor electrical contact surfaces forcleanliness and smoothness. Lubricate permanufacturer's instructions.

________ Inspect contactor-seating surfaces of unplated andlaminated magnet faces of contactor and relays. Removeany rust or rust preventative if present.

________ Inspect contactor power stabs and adjust permanufacturer's instructions.

________ Inspect manual operation of contactor and mechanicalrelay devices to verify that all parts are free and worksmoothly. Verify adjustment for contact wipe andalignment per manufacturer's instructions.

________ Inspect lubrication of contactor moving parts.

________ Inspect contactor vacuum bottles for damage.

________ Inspect wire terminations at contactor including luginstallation.

________ Test proper operation of overload protective device.Operate mechanical trip option if present.

Test – Insulation Resistance - Control Power and Instrument Transformers - (megohms –1-minute test)

List each reading for all conductors. ________ _________

Test – Insulation Resistance - Contactor (Closed Position) - (megohms – 1-minute test with 5000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A- Gnd _________ B- Gnd ___________ C- Gnd

Test – Contactor (Closed Position) Contact Resistance – (micro ohms)

___________A ____________B ____________C

Test – Vacuum Contactor (in accordance with manufacturer’s instruction)

________Acceptable

Test – Contactor Drop-Out Time (if specified)

________Acceptable

Test – Space Heater_____Power _____Switching Devices _____Indicating Devices

(Continued, next page)

Page 14: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 12 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Medium-Voltage Motor Starter Test Form TF-9(Continued)

Function Test – Contactor (Test Position)_________ Close and trip from ALL local control devices.

_________ Close and trip from ALL remote control devices.

Function Test – Contactor (Protective Devices)_________ Trip from ALL protective devices.

_________ Trip from ALL auxiliary devices.

Test – CT Circuits including Relays and Metering Devices

Optional Test – CT Ratio Verification

Test – Voltmeter, Ammeter, and Selector Switches

Function Test – Power Factor Capacitor___________ Verify Capacitor Discharge System.

Calibrate Each Protective Relay Device - (in accordance with drawings and specifications)

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 15: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 13 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Medium-Voltage Motor Test Form TF-10Equipment Description Equipment No.

Motor No. Manufacturer

HP RPM Volts F.L.A. S.F.

_________ Check motor nameplate hp, rpm, voltage, full loadamps, and service factor.

_________ Check motor rotation arrow to verify that it conformsto driven equipment requirements.

_________ Check motor ground connections.

_________ Check motor shaft for free rotation.

_________ Check motor bearings for proper lubrication.

_________ Check motor bearing isolation.

_________ Check motor surge capacitors and arresters forratings and connections.

_________ Check motor residual CT’s for proper rating and cablerouting.

_________ Check RTDs.

_________ Check power and control conduits and cables forproper tagging.

_________ Check all equipment items for conformance to areaclassification.

_________ Check equipment installations for location of seals,breathers, and drains.

_________ Check for proper equipment labeling.

_________ Inspect wire terminations at motor including luginstallation.

_________ Inspect motor bearings and their lubrication system.

Test – Insulation Resistance - Motor Only - (voltage – 10-minute dielectric absorption test - 5000-volt megohmmeter)

_________ Phase to Ground (Attach Form) __________ Polarization Index

Test – Insulation - Motor Only –- (DC Hi-Pot)

___________ Forms Attached ____________ Results Acceptable

___________ Verify that all grounds are removed before energization.

Remarks ______________________________________________________________________________________

Test – Insulation Resistance - Cable and Motor - (voltage – 10-minute dielectric absorption test - 5000-volt megohmmeter)

_________ Phase to Ground (Attach Form) __________ Polarization Index

Function Test – Motor (Uncoupled)_________ Verify proper rotation.

Function Test – Motor (Uncoupled) –1-Hour Run-in_______ Record no load current. ________ Record vibration.

_______ Record bearing temperature.

_______ Verify magnetic center.

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 16: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 14 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Low-Voltage Switchgear Test Form TF-11Equipment Description Equipment No.

Circuit No. Voltage

_________ Check alignment, levelness, and tightness of bolting.

_________ Check all equipment for the removal of blocking,supports, temporary ties, temporary jumper wires.

_________ Check control power transformer and PT fuses size,type, and circuit location.

_________ Check CT and PT ratios.

_________ Check control power transformer size.

_________ Check all components for proper identification per thedrawings and specifications.

_________ Inspect bus bar connections (torque permanufacturer’s specification).

_________ Verify connection hardware per projectspecifications.

_________ Inspect bus supports for cleanliness and tightness.

_________ Inspect ground connections to ground bus.

_________ Inspect operation of the drawout mechanism mechanicalinterlocks, position indicators, and safety features.

_________ Inspect circuit breaker insulating parts for cleanlinessand dryness.

_________ Inspect circuit breaker electrical contact surfaces forcleanliness and smoothness. Lubricate permanufacturer's instructions.

_________ Inspect circuit breaker contact wipe and alignment andverify that it is in accordance with manufacturer'srecommendations.

_________ Inspect proper operation of breaker mechanical tripfunction.

_________ Inspect lubrication of all breaker moving parts.

_________ Inspect stab adjustment and lubricate permanufacturer's instructions.

Test – Insulation Resistance - Switchgear Bus - (megohms – 1-minute test with 1000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A- Gnd _________ B- Gnd __________ C- Gnd

Test – Insulation Resistance - Circuit Breaker - Closed Position - (megohms – 1-minute test with 1000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A- Gnd _________ B- Gnd __________ C- Gnd

Test – Contact Resistance Circuit Breaker - Closed Position -- (micro ohms)

__________ A _________ B __________ C

Test – Insulation Resistance - Instrument Transformers -- (megohms – 1-minute test with 1000-volt megohmmeter)

___________ ____________ ____________ __________ ___________ _____________

Calibrate Each Protective Relay Device - (in accordance with relay setting-summary or coordination study)

Test – CT Secondary Circuits including Relays and Metering Devices

Test – PT Secondary Circuits including Relays and Metering Devices

Test – Ground CT Secondary Circuits including Relays and Metering Devices

Test – Space Heaters including Switching and Indicating Devices________ Power ________ Switching Devices ________ Alarms

Function Test – Circuit Breaker - Test Position_________ Close and trip from ALL local control devices._________ Close and trip from ALL remote control devices.

_________ Verify operation of auxiliary devices.

_________ Trip circuit breaker form local protective devices.

Function Test – Circuit Breaker - Operating Position_________ Close and trip from ALL local control devices.

_________ Close and trip from ALL remote control devices.

_________ Verify operation of auxiliary devices.

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 17: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 15 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Low-Voltage MCC Line-ups and Switchracks Test Form TF-12Equipment Description Equipment No.

Circuit No. Voltage

_________ Check alignment, levelness, and tightness of bolting.

_________ Check all equipment for the removal of blocking,supports, temporary ties, temporary jumper wires.

_________ Check door alignment for indivdual units.

_________ Check door interlock operation.

_________ Check all components for proper identification per thedrawings and specifications.

_________ Check installation of seals, breathers, and drains.

_________ Check equipment for area classification.

_________ Check equipment labels.

_________ Inspect bus bar splice connections (torque permanufacturer’s specification).

_________ Verify connection hardware per project specifications.

_________ Inspect bus supports for cleanliness and tightness.

_________ Inspect ground connections to ground bus.

Test – Insulation Resistance - Bus-Disconnects Open Position - (megohms – 1-minute test with 1000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B-Gnd __________ C-Gnd

Test – Insulation Resistance - Bus-Disconnects Closed Position - (megohms - 1-minute test with 1000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________A-Gnd _________B-Gnd __________C-Gnd

Test – Space Heaters including Switching and Indicating Devices

__________ Power __________ Switching Devices __________ Alarms

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 18: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 16 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Low-Voltage Motor Starter Test Form TF-13Equipment Description Equipment No.

Motor No.

HP Volts F.L.A. S.F.

Starter Mfg. Size O.L. Heater Size

CT Ratio (if applicable)

Ground CT Ratio (if applicable) O.L. Relay Setting

Power Wire Size Control Wire Size Ground Wire Size

_________ Check starter main and auxiliary contact conditionand alignment.

_________ Check starter/breaker components for cleanliness.

_________ Check control fuse size, type, and rating.

_________ Check control power transformer size and rating.

_________ Check starter coil voltage rating.

_________ Check mechanical function of starter/breaker.

_________ Check wiring for color code and identification perdrawings and specifications.

________ Check terminations at starter including lugs.

________ Check components for proper identification perdrawings and specifications.

________ Check equipment labels.

________ Inspect breaker size, rating, and instantaneous settings.

________ Inspect power fuse size, type, and rating.

________ Inspect starter size, O.L. size, and settings.

________ Inspect operation of external O.L. reset device.

Function Test – Control Circuits (Motor Leads Disconnected)_________ Close and trip starter from ALL control devices (list devices).

_________ Verify operation of auxiliary devices (list devices).

Test – Space Heaters ________Power ________Switching Device

Function Test – Power Factor Capacitor___________ Verify capacitor discharge system.

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 19: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 17 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Low-Voltage Motor Test Form TF-14Equipment Description Equipment No.

Motor No. Manufacturer

HP RPM Volts F.L.A. S.F.

_________ Check motor nameplate hp, rpm, voltage, full loadamps, and service factor.

_________ Check motor rotation arrow to verify that it conforms todriven equipment requirements.

_________ Check motor ground connections.

_________ Check motor shaft for free rotation.

_________ Check motor bearings for proper lubrication.

_________ Check RTDs.

_________ Check power and control conduits and cables forproper tagging.

_________ Check all equipment items for conformance to areaclassification.

_________ Check equipment installations for location of seals,breathers, and drains.

_________ Check for proper equipment labeling.

_________ Inspect wire terminations at motor including luginstallation.

_________ Inspect motor bearings and their lubrication system.

Test – Insulation Resistance – Motor Only - (megohms – 1-minute test - 1000-volt megohmmeter)

T1-Grd ________ T2-Grd ________ T3-Grd ________

Test – Insulation Resistance - Cable and Motor - (megohms – 1-minute test - 1000-volt megohmmeter)

T1-Grd ________ T2-Grd ________ T3-Grd ________

Function Test – Motor (Uncoupled)_________ Verify proper rotation.

Function Test – Motor (Uncoupled) – 30-Min. Run-in_______ Record no-load current.

_______ Record vibration.

_______ Record bearing temperature.

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 20: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 18 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Low-Voltage Panelboards, Lighting, and ReceptaclesTest Form

TF-15

Equipment Description Equipment No.

Circuit No. Voltage

_________ Check transformer nameplate voltage and powerrating.

_________ Check panelboard nameplate voltage and currentratings.

_________ Check each panelboard for a complete and accuratecircuit directory.

_________ Check panelboard circuit breaker ratings sizes.

_________ Check size, type, and rating of all power and controlpower fuses.

_________ Check size and rating of control power transformer.

_________ Check voltage rating of contactor coil.

_________ Check contactor main and auxiliary contact conditionand alignment.

_________ Check contactor and circuit breaker components forcleanliness including all seating surfaces ofunplated and laminated magnet faces. Remove anyrust or rust preventative.

_________ Check mechanical function of all contactor,disconnect switch, and circuit breaker movableparts.

_________ Check wiring for conformance to color code andproper identification per the drawings andspecifications.

_________ Check size of power and grounding cables.

_________ Check conduits and cables for proper tagging per thedrawings and specifications.

_________ Check equipment installations for location of seals,breathers, and drains.

_________ Check lighting fixture nameplate voltage, wattage,temperature rating, and type.

_________ Check lamp for proper size and type.

_________ Check all components for proper identification per thedrawings and specifications.

_________ Check all equipment items for conformance to areaclassification and environment.

_________ Check for proper equipment labeling.

_________ Inspect grounding connection to transformersecondary neutral, panelboard neutral bus, andequipment cases.

_________ Inspect transformer tap connections.

Test – Insulation Resistance - Transformer - (megohms – 1000-volt megohmmeter)

Primary: A – Gnd__________ B – Gnd__________ C – Gnd _________

Secondary: A– Gnd__________ B – Gnd__________ C – Gnd _________

Primary–Secondary: A – Gnd__________ B – Gnd__________ C – Gnd _________

Test – Insulation Resistance - Feeder - (megohms – 1000-volt megohmmeter)

___________A-B ____________B-C ____________C-A __________ A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance - Panelboard (All Circuit Breakers Closed) - (megohms – 1000-volt megohmmeter)

A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance - Individual Branch Circuits Breakers Conductors - (megohms – 1000-volt megohmmeter)

A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance - Feeder and Transformer Primary - (megohms – 1000-volt megohmmeter)

A-Gnd _________ B-Gnd ___________ C-Gnd

Test – Insulation Resistance - Transformer Secondary and Panelboard (All Circuit Breakers Closed) - (megohms –1000-volt megohmmeter)

A-Gnd _________ B-Gnd ___________ C-Gnd

Function Test_________ Verify transformer secondary voltage (based on normal operating load).

_________ Verify load balance of panelboard.

_________ Verify proper operation of contactors and control circuits.

General Comments:

Tester’s Representative: Owner’s Representative:

Date: Date:

Page 21: ELTFT01D

ASSOC. PIP:ELTFT01

DOCUMENTATIONREQUIREMENTS SHEET ELTFT01D

Field Inspection and Testing ofNew Electrical Equipment Data Sheet

PAGE 19 OF 19September 2002

Refer to PIP ELTFT01 for General Requirements. Project No. Date

Dielectric Absorption Test Form TF-16Equipment Description Equipment No.

Circuit No. Size Voltage Insulation Length

List Test ConnectionsTime

15 Sec.

30 Sec.

45 Sec.

1 Min.

2 Min.

3 Min.

4 Min.

5 Min.

6 Min.

7 Min.

8 Min.

9 Min.

10 Min.

Polarization Index = 10 Min./1 Min.

Equipment Description Equipment No.

Circuit No. Size Voltage Insulation Length

List Test Connections

Time

15 Sec.

30 Sec.

45 Sec.

1 Min.

2 Min.

3 Min.

4 Min.

5 Min.

6 Min.

7 Min.

8 Min.

9 Min.

10 Min.

Polarization Index = 10 Min./1 Min.

General Comments:

Tester’s Representative: Owner’s Representative: