EMIS-R Data Collector Uncovered. Teresa Williams NWOCA/SSDT OAEP - 2013. Data Collector Components. Tabs Collection Requests Collection Status Submissions Progress Data Sources. Data Collector Components. Tabs. Collection Requests. Gives one access to the Manifest and its components - PowerPoint PPT Presentation

Citation preview

Page 1: EMIS-R Data Collector Uncovered

EMIS-R Data CollectorUncovered

Teresa WilliamsNWOCA/SSDTOAEP - 2013

Page 2: EMIS-R Data Collector Uncovered

2

Data Collector Components

• Tabs– Collection Requests– Collection Status– Submissions– Progress– Data Sources

Page 3: EMIS-R Data Collector Uncovered

3

Data Collector Components

• Tabs

Page 4: EMIS-R Data Collector Uncovered

4

Collection Requests

• Gives one access to the Manifest and its components

• What is a Manifest?– Think of it as the ‘rules’ for the reporting period

data submission• What reporting period• What record types are needed• What fiscal year is being reported• Validations on data

Page 5: EMIS-R Data Collector Uncovered

5

Collection Requests

• Manifest components

Page 6: EMIS-R Data Collector Uncovered

6

Collection Requests

• Manifest Components; continued– Start/Stop Collection• Allows a district to begin process• Gathers up the data from your ‘Data Sources’• Excludes data that can not be processed • Allows a district to stop the process

Page 7: EMIS-R Data Collector Uncovered

7

Collection Requests

• Manifest components; continued– Prepare

• Think of this as running the ‘aggs’• Data validations are ran

– Valid and invalid records are determined

– Preview• Imperative the data be reviewed before every submission• A good prior run does not mean the current one is good

– Submission• Sends data to ODE Report Collector for processing

Page 8: EMIS-R Data Collector Uncovered

8

Collection Requests

• Manifest components; continued– Cancel• Cancels the submission in-progress• Does not cancel submission already at ODE• To cancel a submission already at ODE

– Complete a new collect, prepare and submission– Replaces the one already at ODE

– Review• Same as ‘Preview’ after submission

Page 9: EMIS-R Data Collector Uncovered

9

Collection Requests

• Manifest components; continued– View Submission Results• Gives district access to details on submissions• Status of each

– Schedule Collections• Allows district to schedule collections on a regular basis

Page 10: EMIS-R Data Collector Uncovered

10

Collection Begins

• Must have data present for a collection to complete– Flat File• Folders are created on data collector for district use

– SIF accessible data• SIF is used to gather data needed for specific collection

Page 11: EMIS-R Data Collector Uncovered

11

Data Sources

• Flat file upload– Move extracted flat files from source system to

flat file folder• Select ‘Data Sources’ tab

Page 12: EMIS-R Data Collector Uncovered

12

Data Sources

• Other Data Sources– Click on ‘Other Data Sources’

Page 13: EMIS-R Data Collector Uncovered

13

Data Sources

• Flat File Upload; continued• Click on ‘Manage’ link

Page 14: EMIS-R Data Collector Uncovered

14

Data Sources

• Flat File Upload; continued• Delete old files• Upload new files• If duplicates are encountered the most recent file is

used and other is ignored

Page 15: EMIS-R Data Collector Uncovered

15

Start Collection

• Provides link to what data to use in collection– Flat file• If using folders for reporting periods be sure to select

correct one– Data Collector will not process records with the wrong fiscal

year or reporting period and does not issue an error» The records are just ignored

• If using a single folder select it

Page 16: EMIS-R Data Collector Uncovered

16

Start Collection

• SIF zone may be defined if utilizing this functionality– This should not be deleted or changed– Doing so will cause any SIF collections to fail– Mark the SIF zone check box

Page 17: EMIS-R Data Collector Uncovered

17

Start Collection

• SIF Zone defined

Page 18: EMIS-R Data Collector Uncovered

18

Collection Status

• Allows district to more closely watch the collection phase– Click on “>” to open detail– Functions for SIF or Flat file– Green ‘check’ represents success on that record

type– Red ‘X’ represents process on that record type did

not complete normally

Page 19: EMIS-R Data Collector Uncovered

19

Collection Status

• Example of Collection Status

Page 20: EMIS-R Data Collector Uncovered

20

Prepare Phase

• Prepare– Completes a series of data checks– Generates Level 1 report• Errors should be reviewed• Link will be available from Collection Request

– If link fails Collection was cancelled• Upload new data from source system as needed• Data can be submitted to ODE with Level 1 errors

Page 21: EMIS-R Data Collector Uncovered

21

Preview Phase

• Preview– Very important step• Should not submit data to ODE without completing this

step• Be sure to select the option to include ‘missing data’

Page 22: EMIS-R Data Collector Uncovered

22

Preview Phase

• Preview; continued– Verify counts are the same or higher for each record

type before submission to ODE• If lower counts, substantiate • Not enough to just check total counts• Record may have just moved from the valid to invalid

column• Suggest a spreadsheet to hold your counts or a screen shot

of counts for each submission• If counts are lower ODE will notify ITC and district will be

contacted

Page 23: EMIS-R Data Collector Uncovered

23

Preview Phase

• Example of counts– Be sure you have valid data

Page 24: EMIS-R Data Collector Uncovered

24

Preview Phase

• Preview; continued– Preview allows district to review raw data being

submitted• Can be opened as CSV using Excel for manipulation

– Sorting– Selections– Filters

• Can also be opened with HTML– Provides color coding– May not always work well for very large districts

Page 25: EMIS-R Data Collector Uncovered

25

Preview Phase

• Preview; Continued– Excluded record count• Should always be reviewed• These are records the Data Collector did not process• Not included in any specific record type count• Not on Level 1 report• Some are valid and can be ignore

– For example GE records outside of date range

Page 26: EMIS-R Data Collector Uncovered

26

Preview Phase

• Preview; Continued– Generic record• May contain records that do not yet have a specific

record type in submission process to ODE– Example – FA, DL– Can be reviewed if desired

» No action is needed if individual record counts are accurate

Page 27: EMIS-R Data Collector Uncovered

27

Preview Phase

• Preview; continued– Check last column of spreadsheet– Pink/Peach rows in HTML format• Yes = Record is valid and will be included in submission• No = Record is not valid and will not be included in your

submission• Dep = There is a dependency between this record and

another record that is preventing this record for being included, the data on the record itself is valid– KRAL must be on a KG student– FS missing count week attendance, FN non-attending reason

Page 28: EMIS-R Data Collector Uncovered

28

Submission

• Once satisfied with data, it can be submitted to ODE– Submission must be delivered at ODE by 4:59 to

be processed that evening• Can be submitted afterwards, data is not processed

that evening for Level 2 or otherwise• Recommend submission once per day

– If multiple are needed, the last one replaces the prior

Page 29: EMIS-R Data Collector Uncovered

29

Submission

• Once data is at ODE ready for processing– Email notification is sent back to district through

the data collector– Status in data collector is set to ‘pending

processing’

Page 30: EMIS-R Data Collector Uncovered

30

Submission

• When data is processed– Depending on reporting period and whether a Level

2 report is generated• Status in data collector may be set to ‘Processing

Completed’• Non-completed status does not mean ODE did not

process your data– Simply means no Level 2 was generated and returned– ODE is looking to improve this

• If you received notification ODE received your submission it will be processed

Page 31: EMIS-R Data Collector Uncovered

31

Submission Results

• Shows when district data was submitted

Page 32: EMIS-R Data Collector Uncovered

32

Review

• Same as Preview except this is after submission is completed

Page 33: EMIS-R Data Collector Uncovered

33

Level 2 Reports

• Level 2 reports may be returned to Data Collector following submission process at ODE– Notification is sent as such– Won’t always get a Level 2– May get a Level 2 if no submission• Another district submitted that created a conflict

– Link will show on Collection Request• If Link fails, first go to View Submission Results

Page 34: EMIS-R Data Collector Uncovered

34

Level 2 Reports

• Don’t be fooled with Level 2 errors• Be sure the data you are looking at in the data

collector matches up with the Level 2 report• Check the report header

Page 35: EMIS-R Data Collector Uncovered

35

Level 2 Reports

Page 36: EMIS-R Data Collector Uncovered

36

Level 2 Reports

• Be sure Submission Num and Attempt match what shows on the Manifest– Only way to know the Level 2 is from the current

collection– A new collection may change the output and

cause misguided work• Can use Export to file for CSV format

Page 37: EMIS-R Data Collector Uncovered

37

Cancel

• Use this option to cancel a collection and/or a prepare– Does not cancel a submission already at ODE– To cancel a collection already at ODE a district

must submit a new collection– After selecting cancel, Manifest resets to last

completed submission info

Page 38: EMIS-R Data Collector Uncovered

38

Scheduling Collections

• Function to allow a district to regular schedule a collection and prepare– May be a useful feature for a large district– Uses the data already in the data collector flat file

or available by SIF at the time it runs

Page 39: EMIS-R Data Collector Uncovered

39

Scheduling Collections

• Select option from Manifest

Page 40: EMIS-R Data Collector Uncovered

40

Scheduling Collections

• Select desired options• Click ‘Schedule’

Page 41: EMIS-R Data Collector Uncovered

41

Data Archives

• Allows district the option of retrieving the data included in the 2 most recent submissions to ODE– Must be unzipped– May need assistance from a tech coordinator

Page 42: EMIS-R Data Collector Uncovered

42

Data Archives

• Link to archives is under ‘Submissions’ tab

Page 43: EMIS-R Data Collector Uncovered

43

Data Archives

• Click on drop down to select reporting period data

• Click on drop down to select ‘Archive Type’– Submissions– Preview files

• Click on ‘List Archives’

Page 44: EMIS-R Data Collector Uncovered

44

Data Archives

• Listing of available files for reporting period will open

• Right click on file and ‘save as’

Page 45: EMIS-R Data Collector Uncovered

45

In Conclusion

• EMIS-R allows a district to submit data every day if desired

• EMIS-R is an improvement over the legacy ‘aggs’– Data is cleaner before submission

• Some said EMIS-R would never work– Experienced growing pains but all software does

• EMIS-R rocks!!

Page 46: EMIS-R Data Collector Uncovered

46

Questions