Upload
micheal
View
216
Download
0
Embed Size (px)
DESCRIPTION
Equipment
Citation preview
TECHNICAL BIDEQUIPMENT LIST
PROJECT EQUIPMENT LIST (OWNED/LEASED)EQUIPMENT DESCRIPTION LEASED
SPMT LEASED
Cargo Barge LEASED
Tug Boats x2 LEASED
Seagoing Tug LEASED
Ramp LEASED
Forklift
LEASED
Crane LEASED
SPMT (2 X 12 axles; 2 x 6 axles)
ABS + A1 BARGE with 8 mooringbollards of 12”Loading Capacity: 12 t/m2
INSHORE PUSHER TUG with 6tbollard pullINSHORE PUSHER TUG with 8tbollard pull
4200HP-SHALLOW DRAFT AHTSVESSEL4000HP-AH_LH TUG
The Ramp Tonnage10 Tons/sqrmeterFour 6 x 6m Ramps will be available (360Tons) Total Ramp tonnage = 1440 Tons
CAT DP15N 1.5 Kg Load capacityCAT DP18N 1.75Kg Load capacityDiesel engine powered Fork lift
A mobile Crane up to 5000 Tons will beused for ramp movement and positioning