24
ROSENCWAIG E Y T A N

Eytan Rosencwaig :: Design Portfolio

Embed Size (px)

DESCRIPTION

Work done at Tulane School of Architecture

Citation preview

  • ROSENCWAIGE Y T A N

  • My name is Eytan Rosencwaig, I was born in San Jose, Costa Rica, and will graduate from Tulane Universitys M. Arch. program in May 2016.

    Ever since I was young I have been fascinated by the idea that something that began as a simple concept in someones head could become an actual built element in the real world. This thought has pushed my design curiosity through Tu-lanes rigorous academic pro-gram and has made me eager and excited to begin my pro-fessional career in the field of architecture.

    [email protected]

    1123 Hillary St.New Orleans, LA70118

    (607) 319 9120

  • 15

    TAB

    LE OF C

    ON

    TENTSnew orleans building arts institute

    5

    new orleans tanzakademie

    marina 193 barcelona

    community integration center barcelona

    1

    new orleans civil courts building

    13

    cuban consulate new orleans

    9

    17

  • CU

    BA

    N C

    ON

    SU

    LATE N

    EW O

    RLEA

    NS

    fall 2015

    1

  • CUBA CONSULATE NEW ORLEANSEYTAN ROSENCWAIG

    PRIVATE

    PUBLICSEMI PRIVATE

    OFFICE T

    OWER

    WESTINSHOPPING SITE

    431

    325

    170

    76HOTEL

    35

    81

    CBD

    FRENCH Q

    MIS

    SIS

    SIP

    PI

    LEISURE/SHOPPING OFFICES HOTELSSITE COMMERCIAL MIXED GOVERNMENTPUBLIC PLAZA

    1/512 = 1-0

    CONSULADO DE CUBA

    1/32 = 1

    CANAL

    CUBANCULTURE STORE

    SECU

    RITY

    VISA

    WIN

    DOW

    S

    COM

    MER

    CIAL

    SECURITY

    COM

    MER

    CIAL

    LOADING

    SERV

    ICE CO

    MMER

    CIAL

    GALL

    ERY

    PLA

    ZA

    CIGARBAR

    AURIT

    ORIU

    M

    GALLERY

    BAR / A

    UD. LOB

    BY BACK

    OF H

    OUSE

    SECUR

    ITY BA

    RRAC

    KS

    TOUR

    ISMOF

    FICES

    LEGA

    LOF

    FICES

    CONS

    ULAR

    OFFI

    CES

    TRAD

    EOF

    FICES

    CONS

    ULAR

    RESID

    ENCE

    STAFF K

    ITCHEN &

    LOUNGE

    EDUC

    ATION

    OFF

    ICES

    INFO

    RM

    ATIO

    NO

    FFIC

    ES

    1/64 = 1

    PLANS - 1/16 = 1

    1

    2

    3

    2

    1

    3

    4

    5

    6

    SECTIONS - 1/16 = 1

    AA

    B

    SECTIO

    N B

    4

    5

    6

    CUBA CONSULATE NEW ORLEANSEYTAN ROSENCWAIG

    PRIVATE

    PUBLICSEMI PRIVATE

    OFFICE T

    OWER

    WESTINSHOPPING SITE

    431

    325

    170

    76HOTEL

    35

    81

    CBD

    FRENCH Q

    MIS

    SIS

    SIP

    PI

    LEISURE/SHOPPING OFFICES HOTELSSITE COMMERCIAL MIXED GOVERNMENTPUBLIC PLAZA

    1/512 = 1-0

    CONSULADO DE CUBA

    1/32 = 1

    CANAL

    CUBANCULTURE STORE

    SECU

    RITY

    VISA

    WIN

    DOW

    S

    COM

    MER

    CIAL

    SECURITY

    COM

    MER

    CIAL

    LOADING

    SERV

    ICE CO

    MMER

    CIAL

    GALL

    ERY

    PLA

    ZA

    CIGARBAR

    AURIT

    ORIU

    M

    GALLERY

    BAR / A

    UD. LOB

    BY BACK

    OF H

    OUSE

    SECUR

    ITY BA

    RRAC

    KS

    TOUR

    ISMOF

    FICES

    LEGA

    LOF

    FICES

    CONS

    ULAR

    OFFI

    CES

    TRAD

    EOF

    FICES

    CONS

    ULAR

    RESID

    ENCE

    STAFF K

    ITCHEN &

    LOUNGE

    EDUC

    ATION

    OFF

    ICES

    INFO

    RM

    ATIO

    NO

    FFIC

    ES

    1/64 = 1

    PLANS - 1/16 = 1

    1

    2

    3

    2

    1

    3

    4

    5

    6

    SECTIONS - 1/16 = 1

    AA

    B

    SECTIO

    N B

    This project is located in the New Orleans Central Business District. The building creates an challenging combination mixing a Cuban Consulate and a commercial plaza on the ground floor.

    The program is separated in three parts. The first floor has the public aspects of the consulate, as well as a public plaza and the entrance to an art gallery that leads up to the second floor. The second floor houses several other public amenities such as an auditorium, a large reception space / bar, and an exterior cigar lounge. All offices and other consular elements are located above this floor, leaving the consular apartment as the penthouse of the building.

    This separation of programatic ideas begins to inform the facade design, creating different systems for distinct levels of privacy which are all visible from the outside.

    CUBA CONSULATE NEW ORLEANSEYTAN ROSENCWAIG

    PRIVATE

    PUBLICSEMI PRIVATE

    OFFICE T

    OWER

    WESTINSHOPPING SITE

    431

    325

    170

    76HOTEL

    35

    81

    CBD

    FRENCH Q

    MIS

    SIS

    SIP

    PI

    LEISURE/SHOPPING OFFICES HOTELSSITE COMMERCIAL MIXED GOVERNMENTPUBLIC PLAZA

    1/512 = 1-0

    CONSULADO DE CUBA

    1/32 = 1

    CANAL

    CUBANCULTURE STORE

    SECU

    RITY

    VISA

    WIN

    DOW

    S

    COM

    MER

    CIAL

    SECURITY

    COM

    MER

    CIAL

    LOADING

    SERV

    ICE CO

    MMER

    CIAL

    GALL

    ERY

    PLA

    ZA

    CIGARBAR

    AURIT

    ORIU

    M

    GALLERY

    BAR / A

    UD. LOB

    BY BACK

    OF H

    OUSE

    SECUR

    ITY BA

    RRAC

    KS

    TOUR

    ISMOF

    FICES

    LEGA

    LOF

    FICES

    CONS

    ULAR

    OFFI

    CES

    TRAD

    EOF

    FICES

    CONS

    ULAR

    RESID

    ENCE

    STAFF K

    ITCHEN &

    LOUNGE

    EDUC

    ATION

    OFF

    ICES

    INFO

    RM

    ATIO

    NO

    FFIC

    ES

    1/64 = 1

    PLANS - 1/16 = 1

    1

    2

    3

    2

    1

    3

    4

    5

    6

    SECTIONS - 1/16 = 1

    AA

    B

    SECTIO

    N B

    CUBA CONSULATE NEW ORLEANSEYTAN ROSENCWAIG

    PRIVATE

    PUBLICSEMI PRIVATE

    OFFICE T

    OWER

    WESTINSHOPPING SITE

    431

    325

    170

    76HOTEL

    35

    81

    CBD

    FRENCH Q

    MIS

    SIS

    SIP

    PI

    LEISURE/SHOPPING OFFICES HOTELSSITE COMMERCIAL MIXED GOVERNMENTPUBLIC PLAZA

    1/512 = 1-0

    CONSULADO DE CUBA

    1/32 = 1

    CANAL

    CUBANCULTURE STORE

    SECU

    RITY

    VISA

    WIN

    DOW

    S

    COM

    MER

    CIAL

    SECURITY

    COM

    MER

    CIAL

    LOADING

    SERV

    ICE CO

    MMER

    CIAL

    GALL

    ERY

    PLA

    ZA

    CIGARBAR

    AURIT

    ORIU

    M

    GALLERY

    BAR / A

    UD. LOB

    BY BACK

    OF H

    OUSE

    SECUR

    ITY BA

    RRAC

    KS

    TOUR

    ISMOF

    FICES

    LEGA

    LOF

    FICES

    CONS

    ULAR

    OFFI

    CES

    TRAD

    EOF

    FICES

    CONS

    ULAR

    RESID

    ENCE

    STAFF K

    ITCHEN &

    LOUNGE

    EDUC

    ATION

    OFF

    ICES

    INFO

    RM

    ATIO

    NO

    FFIC

    ES

    1/64 = 1

    PLANS - 1/16 = 1

    1

    2

    3

    2

    1

    3

    4

    5

    6

    SECTIONS - 1/16 = 1

    AA

    B

    SECTIO

    N B

    CUBA CONSULATE NEW ORLEANSEYTAN ROSENCWAIG

    PRIVATE

    PUBLICSEMI PRIVATE

    OFFICE T

    OWER

    WESTINSHOPPING SITE

    431

    325

    170

    76HOTEL

    35

    81

    CBD

    FRENCH Q

    MIS

    SIS

    SIP

    PI

    LEISURE/SHOPPING OFFICES HOTELSSITE COMMERCIAL MIXED GOVERNMENTPUBLIC PLAZA

    1/512 = 1-0

    CONSULADO DE CUBA

    1/32 = 1

    CANAL

    CUBANCULTURE STORE

    SECU

    RITY

    VISA

    WIN

    DOW

    S

    COM

    MER

    CIAL

    SECURITY

    COM

    MER

    CIAL

    LOADING

    SERV

    ICE CO

    MMER

    CIAL

    GALL

    ERY

    PLA

    ZA

    CIGARBAR

    AURIT

    ORIU

    M

    GALLERY

    BAR / A

    UD. LOB

    BY BACK

    OF H

    OUSE

    SECUR

    ITY BA

    RRAC

    KS

    TOUR

    ISMOF

    FICES

    LEGA

    LOF

    FICES

    CONS

    ULAR

    OFFI

    CES

    TRAD

    EOF

    FICES

    CONS

    ULAR

    RESID

    ENCE

    STAFF K

    ITCHEN &

    LOUNGE

    EDUC

    ATION

    OFF

    ICES

    INFO

    RM

    ATIO

    NO

    FFIC

    ES

    1/64 = 1

    PLANS - 1/16 = 1

    1

    2

    3

    2

    1

    3

    4

    5

    6

    SECTIONS - 1/16 = 1

    AA

    B

    SECTIO

    N B

    2

    2

    1

    3

    5

    4

    6

  • 3

  • 4

  • NEW

    OR

    LEAN

    S C

    IVIL C

    OU

    RTS

    spring 2015

    The major idea in this project is to work as an integration of sustainable water systems in a public plaza that is also an amenity to the neighborhood, the city, and the New Orleans Civil Courts building. The water systems include a constructed wetland, a roof catchment and treatment area, and a wastewater treat-ment area on the back of the site.

    The wetland in the front acts as a buffer zone for medium water levels, with occupiable wide stairs that to be used as park amenities. The roof catchment plant collects rain water, and moves it to a side tank where the water could be circulated back into the building for non-potable uses. The rest of the water is stored to be used for a decorative water element that falls of the side of the building next to the exterior cafe.The wastewater treatment area in the back brings down dirty water from the building and cleans it using a natural filtration system to be later circulated back into the canal.

    The building has two main masses, one housing all court elements and the other is an elevated wing where CDC Clerk and several other government offices are located. 5

  • section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    6

  • section 2

    20 40 60 80 1000

    COURTROOM FLOOR PUBLIC CORRIDORVIEW OF EXTERIOR CAFE

    A B

    C

    section 2

    20 40 60 80 1000

    COURTROOM FLOOR PUBLIC CORRIDORVIEW OF EXTERIOR CAFE

    A B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    The civil courts are located in floors 2 - 6 and are connected through a stair system running along the front facade of the building. The stair begins off the lobby and travels to all the courts floors allowing to enter each floor and also provides exterior terraces at each level.

    7

  • section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    COUR

    TS + J

    UDGES

    CHAM

    BERS

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    section 1

    water catchment area

    rainwater storage tank

    controlled waterfall

    non-potable building use

    low water

    medium water

    high water

    low water

    medium water

    high water

    LOW WATER MEDIUM WATER 10 YEAR STORM

    courts

    offices

    NEW ORLEANS CIVIL COURTS BUILDING + WATER PLAZA

    LOBB

    Y

    I.T SU

    PPOR

    T

    STOR

    AGE

    LOAD

    ING

    +SU

    PPOR

    T M

    ECHA

    NICA

    L

    JURY

    PO

    OL

    CAFE

    SCRE

    ENIN

    G

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    COUR

    TS + J

    UDGE

    S CHA

    MBER

    S

    SHERRIFFDEPARTMENT

    JUDICIAL ADMINISTRATION

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    CDC CLERKOFFICES

    GREEN

    ROOF

    STAFF KITCHEN

    CONFERECEROOM

    EXTERIOR TERRACEEXTERIOR

    TERRACE

    1 2-4 5-7 8

    FIRE STAIRS

    PUBLIC CIRCULATION

    STAFF CIRCULATION

    OPEN STAIR

    PUBLIC ELEVATORS

    STAFF ELEVATORS

    EYTAN ROSENCWAIG

    PLAZA WATER ROOF WATER

    CIRCULATION

    PROGRAM DISTRIBUTION

    VIEW FROM GRAVIER AND LOYOLA

    20 40 60 80 1000

    20 40 60 80 1000

    STRUCTURE

    2 3 4 5 6 7 8

    VIEW FROM CITY HALL

    A

    B

    C

    8

  • NEW

    OR

    LEAN

    S TA

    NZ

    AK

    AD

    EMIE

    spring 2014

    9

    The New Orleans Tanzakademie project consists of designing a school of dance in recently re-emerging part of the city, the Warehouse District. The idea is that the building can serve as a useful environment both for dancers and regular visitors. The program consists of a main performance theater, back-of-the-house serices for it, a bar, a black box theater, and eight practice studios. The buildings facade works dinamically. It is lined with vertical folding panels that can remain in different positions to create several different facade configurations that can provide distinct shading options and confort throughout the building.

  • dress

    studio

    studio

    studio

    dress

    dressdress

    dress

    dressdress

    dress studio

    A.H.U

    Tanzakademie

    3/32=1

    1/64=1

    bike

    scene shop

    scn storage

    costume/laundry

    loading

    grn room dress

    theater

    A.H.U

    bar

    dress

    Fulton Street

    S. P

    eters Street

    Section 2

    Section 1

    Section 3

    Level 1

    admin office

    individual offices

    class

    theater

    class

    Mechanical A.H.U

    Level 2

    studio

    blackbox

    studio

    studio

    ext terrace

    dress

    dress

    dress

    studio

    dress

    dress

    dressdress

    dress

    A.H.U

    Level 3

    Level 4

    dress

    studio

    studio

    studio

    dress

    dressdress

    dress

    dressdress

    dress studio

    A.H.U

    Tanzakademie

    3/32=1

    1/64=1

    bike

    scene shop

    scn storage

    costume/laundry

    loading

    grn room dress

    theater

    A.H.U

    bar

    dress

    Fulton Street

    S. P

    eters Street

    Section 2

    Section 1

    Section 3

    Level 1

    admin office

    individual offices

    class

    theater

    class

    Mechanical A.H.U

    Level 2

    studio

    blackbox

    studio

    studio

    ext terrace

    dress

    dress

    dress

    studio

    dress

    dress

    dressdress

    dress

    A.H.U

    Level 3

    Level 4

    dress

    studio

    studio

    studio

    dress

    dressdress

    dress

    dressdress

    dress studio

    A.H.U

    Tanzakademie

    3/32=1

    1/64=1

    bike

    scene shop

    scn storage

    costume/laundry

    loading

    grn room dress

    theater

    A.H.U

    bar

    dress

    Fulton Street

    S. P

    eters Street

    Section 2

    Section 1

    Section 3

    Level 1

    admin office

    individual offices

    class

    theater

    class

    Mechanical A.H.U

    Level 2

    studio

    blackbox

    studio

    studio

    ext terrace

    dress

    dress

    dress

    studio

    dress

    dress

    dressdress

    dress

    A.H.U

    Level 3

    Level 4

    dress

    studio

    studio

    studio

    dress

    dressdress

    dress

    dressdress

    dress studio

    A.H.U

    Tanzakademie

    3/32=1

    1/64=1

    bike

    scene shop

    scn storage

    costume/laundry

    loading

    grn room dress

    theater

    A.H.U

    bar

    dress

    Fulton Street

    S. P

    eters Street

    Section 2

    Section 1

    Section 3

    Level 1

    admin office

    individual offices

    class

    theater

    class

    Mechanical A.H.U

    Level 2

    studio

    blackbox

    studio

    studio

    ext terrace

    dress

    dress

    dress

    studio

    dress

    dress

    dressdress

    dress

    A.H.U

    Level 3

    Level 4

    dress

    studio

    studio

    studio

    dress

    dressdress

    dress

    dressdress

    dress studio

    A.H.U

    Tanzakademie

    3/32=1

    1/64=1

    bike

    scene shop

    scn storage

    costume/laundry

    loading

    grn room dress

    theater

    A.H.U

    bar

    dress

    Fulton Street

    S. P

    eters Street

    Section 2

    Section 1

    Section 3

    Level 1

    admin office

    individual offices

    class

    theater

    class

    Mechanical A.H.U

    Level 2

    studio

    blackbox

    studio

    studio

    ext terrace

    dress

    dress

    dress

    studio

    dress

    dress

    dressdress

    dress

    A.H.U

    Level 3

    Level 4

    Control Layers

    Concrete Slab

    Insulation

    Beam

    Drop Ceiling

    Joists

    Plumbing + lighting

    Capflashing

    Base Flashing

    Ballast

    Wood Floor

    Earth

    Concrete foundation

    Concrete Piles

    1/2=1Wall Section Axonometric

    3/32=1

    Section 1

    Section 2

    THEATERSERVICE

    THEATER

    LOBBY

    BAR

    THEATER

    ADMINISTRATION

    MECHANICAL

    BLACKBOX

    STUDIO

    STUDIO

    TERRACE

    A.H.U

    STUDIO

    STUDIO

    COURTYARD

    1/32=1

    Program Diagram10

  • section 1 section 2

    section 3

    11

    shutter detail

  • section 2

    12

    closed semi-open open

  • fall 2014

    MA

    RIN

    A 1

    93

    BA

    RC

    ELON

    A

    GROUND FLOOR1:200

    SPORTS CLUB1:200

    TYPICAL APARTMENT FLOOR1:200

    1:200

    PENTHOUSE LEVEL 1

    PENTHOUSE LEVEL 2

    1:200

    COMMERCIA

    L

    PARKINGSPORTS CO

    URTSLO

    BBY

    PROGRA

    MPRO

    GRAM

    CIRCUL

    ATION

    APARTMEN

    TSAPAR

    TMENTSPOO

    LGYM

    LOUNGE

    RUNNING TRACK

    RUNNING TRACK

    RU

    NN

    ING

    TR

    AC

    K

    RU

    NN

    ING

    TR

    AC

    K

    The Marina 193 project consists of an ordinary residential building in an up and coming neighborhood in the cosmo-politan city of Barcelona, Spain.

    The building has commercial parcels in the first floor, a sports complex in part of the first and the entire second floor. The idea of the sports complex is to integrate the origi-nal purpose of the site, which used to be a multi purpose sports court into the building to give back to the people in the neighborhood.

    Floors above the sports complex have one and two bed-room apartments and larger penthouse apartments in the top two floors that have four bedrooms.

    13

  • 14

  • MAR

    KET

    PLAN

    T BRID

    GE

    RAMADA

    EXTERIOR E

    ATING

    GREEN P

    ARKSPA

    CE

    PRODUCTIVEGARDEN

    GREENHOUSETOOLSHED

    GREEN P

    ARKSPA

    CE

    KITCHEN CLAS

    SROOM STORAGE

    WATER CISTER

    N

    SKATE PARK

    fall 2014 COM

    MU

    NITY

    INTEG

    RA

    TION

    CEN

    TER

    MAR

    KET

    PLAN

    T BRID

    GE

    RAMADA

    EXTERIOR E

    ATING

    GREEN P

    ARKSPA

    CE

    PRODUCTIVEGARDEN

    GREENHOUSETOOLSHED

    GREEN P

    ARKSPA

    CE

    KITCHEN CLAS

    SROOM STORAGE

    WATER CISTER

    N

    SKATE PARK

    SITEPLAN

    2ND LEVEL PLAN

    This project addresses community integration issues in Fort Pienc, an up-and-coming neighborhood in Barcelona. The the project is a public park and community productive garden and kitchens where people of different backgrounds and generations can come together in one place for different activities.

    A bridge structure dissects the site in two parts, allowing for one side the act as a productive area and the other as a recreational space. The bridge serves as a promenade that crosse the site walking through an elevated market, a productive plant bridge and a ramada.

    The productive side includes a productive garden, a market where grown goods can be sold, a green-house, and community kitchens where cooking classes are offered. The recreational side has a skatepark which offers local youth to practice skating which is widely popular in the area, and other activities like ping-pong, and green space.

    productive

    15

  • recreation

    16

  • 1 2

    3

    4

    57

    89

    1011

    12

    13

    14 15

    1. Market

    2. Cafe

    3. Auditorium

    4. Classrooms

    5. Offices

    6. Library

    7. Gallery

    8. Sculpture Garden

    9. Residences

    10. Common Work Spaces

    11. Metal Shop

    12. Masonry Shop

    13. Plaster Shop

    14. Wood Shop

    15. Kiln

    16. Exterior Work Space

    16

    Second level plans

    1/16=1

    Section A

    Section B

    Section C

    Section D

    First level plans+-0'

    +-1.5'

    +-3'

    +-0'

    +-3'+-0'+-3'

    +-3' +-6'

    +-3'

    +-1.5'+-0'

    +-3'

    +-0'

    +-3'

    +-0' +-3'

    +-3' +-0'

    1/32=1

    parti diagram

    roof plan

    fall 2013

    NO

    LA B

    UILD

    ING

    AR

    TS IN

    STITU

    TE

    17

  • roof plan 18

  • 19

    1/16=1

    North Elevation

    West Elevation

    East Elevation

    South Elevation

    1/16=1

    North Elevation

    West Elevation

    East Elevation

    South Elevation

    1/16=1

    North Elevation

    West Elevation

    East Elevation

    South Elevation

    1/16=1

    North Elevation

    West Elevation

    East Elevation

    South Elevation

    The project consists of designing a building arts institute in which artists from across the country can stay for some months and create. Some elements of the program include a library, classrooms, an auditorium, a gallery, residences, and different kinds of art workshops (wood, masonry, etc.)

    The concept talks about how the site becomes a town center, being the only break in the neighborhood grid. There is a linear park extending from St. Claude Ave. straight through the site, having stopping points at the crossing of each street. The park follows a path that curves in and out.

    The program is divided into bars that pull in and out from a central path to create the effect of being pushed through space as the linear park in the neighborhood does.

  • circulation model

    20

  • [email protected] (607) 319 9120 c o n t a c tc o n t a c t