Facilities Update Site Improvements

Embed Size (px)

DESCRIPTION

Facilities Update Site Improvements. Encinitas Union School District September 5, 2006. Capri. New HVAC system New campus entrance w/ student drop-off / pick-up Playground asphalt replacement and regrade. Moved in one relocatable to house Media Center during construction Next steps - PowerPoint PPT Presentation

Citation preview

Facilities UpdateFacilities UpdateSite ImprovementsSite Improvements

Encinitas Union School DistrictEncinitas Union School DistrictSeptember 5, 2006September 5, 2006

CapriCapri• New HVAC system• New campus entrance w/ student

drop-off / pick-up• Playground asphalt replacement

and regrade.• Moved in one relocatable to house

Media Center during construction • Next steps

– Landscaping and irrigation at front of site

– New marquee– Parking area– Media Center– Outdoor patio– Elevator– New stucco and painting

El Camino CreekEl Camino Creek

• Completed three cottage-style classrooms

• Next steps– Sandblast and repaint

stairways

– Replant slopes

Flora VistaFlora Vista

• Preschool addition– Added two offices and one

classroom– Replaced carpet with VCT– Replaced existing toilets

• Remodeled main office• Remodeled principal’s office• Replaced school roof• Replaced lunch shade shelter• Sandblast and repaint windows• Next steps

– Remodel existing storage– Add tack board to interior

hallways– Replace asphalt (06-07)– Paint exterior of school (06-07)

La Costa HeightsLa Costa Heights

• Completing two new bathrooms

• Added relocatable classroom• Next steps

– Replace old playground equipment

– Replace safety surfacing on playgrounds

– Convert relocatables at back of site to cottage-style classrooms

– Add modular cottage at front of site

Mission EstanciaMission Estancia

• Remodeled new computer room

• Next steps– Replace tiles on outside walls – Move relocatables to south

side of site and convert to cottage-style classrooms

– Replace school roof (solar?) (06-07)

Ocean KnollOcean Knoll

• Remodel auditorium• Remodel office entry• Conversion of HVAC

plant to storage room• New ball wall• Playground asphalt

recycled and replaced• Next steps

– Add school sign– Asphalt striping

Ocean KnollOcean Knoll

Olivenhain PioneerOlivenhain Pioneer

• Added nine cottage-style classrooms on east side of site

• Added three bathrooms• Replaced carpet, tile, and

painted throughout site• Next steps

– Complete sink in existing art room

– Replace school roof (solar?) (06-07)

– Replace HVAC (07-08)

Olivenhain PioneerOlivenhain Pioneer

Park Dale LanePark Dale Lane

• Office renovation

• Next steps– Add modular

cottage at east side of site

Paul Ecke CentralPaul Ecke Central

• Renovate teacher’s lounge into kitchen and workroom

• New computer lab• Replaced old portable classroom

w/ cottage-style classroom• Next steps

– Remodel auditorium– Add three classrooms adjacent to

auditorium– Improve perimeter along Vulcan– Add student drop-off/pick-up on

Vulcan– Renovate parking on west side of

site

Next Steps…Next Steps…

• Adoption of standardized classroom

• Renovate playgrounds at all sites

• Review facility priorities from 2004

• Site visits to determine current and future facility needs and priorities