fishbeck, thompson, carr & huber engineers scientists * architects 000003 PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan

fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

fishbeck, thompson, carr & huberengineers • scientists * architects

000003

PHASE I

REMEDIAL DESIGN

ADDITIONAL STUDIES REPORT

FOR

ELECTRO-VOICE, INC.Buchanan, Michigan

Page 2: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

PHASE I

REMEDIAL DESIGN

ADDITIONAL STUDIES REPORT

FOR

ELECTRO-VOICE, INC.Buchanan, Michigan

April 1995Project No. F93307D

1995

Prepared by:

FISHBECK, THOMPSON, CARR & HUBER, INC.6090 East Fulton, P.O. Box 211

Ada, Michigan 49301-0211(616) 676-2666

7402 Westshire Drive, Suite 110Lansing, Michigan 48917-9764

(517) 627-1141

Page 3: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE OF CONTENTS

1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Work Plan Scope and Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.3 Geology and Hydrogeology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.4 Nature and Extent of Lagoon Area Soils Contamination . . . . . . . . . . . . . . . . 4

2.0 ADDITIONAL STUDIES WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62.1 Lower Aquifer Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62.1.2 Soil Boring and Sampling Methodology . . . . . . . . . . . . . . . . . . . . . 7

2.2. Quarterly Groundwater Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72.3 Lagoon Area Soils - Extent of Contamination Investigation . . . . . . . . . . . . . . 8

2.3.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82.3.2 Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92.3.3 Background Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112.3.4 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122.3.5 Holding Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

3.0 DISCUSSION AND CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 293.1 Lower Aquifer Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 293.2 Lagoon Area Soils - Extent of Contamination Investigation . . . . . . . . . . . . . . 293.3 Summary of Remediation Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

4.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

List of Tables

Table 2-1 • Background Soil Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Table 2-2 • Summary of Soil Sampling Results from Lagoon Investigation . . . . . . . . . . . . 15

List of Figures

Figure 1-1 * Location MapFigure 2-1 • Soil Boring Location MapFigure 2-2 • Soil Sampling MapFigure 2-3 • Lagoon Area Soil Analysis Decision Flow ChartFigure 2-4 • Depth of Soil Contamination MapFigure 3-1 • Cap Subgrade/Excavation Contours

frrdi

Page 4: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE OF CONTENTS (continued)

List of Appendices

Appendix 2-A • Soil Boring Log for Lower Aquifer InvestigationAppendix 2-B • FTC&H Field Standard Operating ProceduresAppendix 2-C • Summary of Soil CharacteristicsAppendix 2-D • Laboratory Analytical Results for Lagoon Investigation Soil Samples

froh

Page 5: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

1.0 INTRODUCTION

1.1 Background

I Electro-Voice, Inc. (EV) is a sound equipment manufacturer. Activities at the plant includeadministration, assembly, die casting, machining, painting, electroplating, research, and development.The plant is located in southwestern Michigan at the southern limit of the City of Buchanan, BerrienCounty, approximately six miles west of Niles, Michigan (Figure 1-1). The EV property isapproximately 11.5 acres in size and is located within the northwest quarter of Section 36, T7N, R18W.

In February 1983, EV was placed on the Michigan and the National Priority Lists. An Administrative

w Order by Consent (U.S. Environmental Protection Agency [U.S. EPA] Docket No. V-W-87-C-023) toconduct a remedial investigation (RI) and feasibility study (FS) was entered into by EV and the U.S. EPAon October 8, 1987. The results of the RI were presented in a report titled, Final Remedial InvestigationReport for Electro-Voice, Inc., dated August 1990, and prepared by Fishbeck, Thompson, Carr, &Huber, Inc. (FTC&H). The results of the FS were presented in a report titled, Feasibility Study Report,Electro-Voice, Inc. Site, dated September 10, 1991, and prepared for the U.S. EPA by CH2M Hill,

A Record of Decision for the First Operable Unit (ROD) (onsite remediation) was signed by the U.S.EPA Regional Administrator on June 23, 1992. The Operable Unit Consent Decree and Statement of

\ Work for the Remedial Design and Remedial Action for the First Operable Unit at the Electro-Voice Sitewas filed with the U.S. District Court on September 20, 1993. The Consent Decree/Statement of Work

} (SOW) divided the remedial design/remedial action (RD/RA) work into two phases: Phase I addressesthe former lagoon area soils investigation, including the extent of contamination investigation, the

installation and maintenance of a hazardous waste cap, lower aquifer investigation, and off-property.• groundwater monitoring; Phase II includes the installation and operation of a groundwater remediation

system, the installation and operation of a dry-well area soils remediation system, and the associated1 performance monitoring. On October 4, 1993, EV received authorization from the U.S. EPA to proceed

with the Phase I RD/RA work, as set forth in the Consent Decree/SOW.j

The major components of the RA for the first operable unit ROD for the EV site were discussed in the

Phase I Remedial Design Work Plan for Electro-Voice, Inc., prepared by FTC&H (February 1994).Greater detail regarding each component is also provided in the Consent Decree/SOW for the first

04/14/95 froh

Page 6: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

operable unit (Appendix B of the Operable Unit Consent Decree). This report presents the results of thePhase I RD Additional Studies.

1.2 Work Plan Scope and Organization

The Consent Decree/SOW requires that two work plans be prepared as part of the Phase I work. Thefirst (SOW - Task II) was the Phase I RD Work Plan, which provided the overall management strategy

for performing the Phase I RD for the first operable unit at the EV site. The Phase I RD Work Planaddressed the additional studies for the lower aquifer investigation and the lagoon area soils - extent ofcontamination investigation, and the RD of the hazardous waste cap elements required in the ConsentDecree/SOW. Also included in the Phase I RD Work Plan, by reference, was the off-propertygroundwater monitoring program. Several additional elements were included, namely the site-specificHealth and Safety Plan, a Sampling and Analysis Plan, a site-specific Quality Assurance Project Plan(QAPP), a project schedule, a project organization plan, and a reporting summary, to complete thePhase I RD Work Plan. The Phase I RD Work Plan was prepared by FTC&H, and submitted to the U.S.EPA on November 30, 1993. The Phase I RD Work Plan was approved by the U.S. EPA on March 7,1994.

The second work plan (SOW - Task III) document to be prepared is the Phase I RA Work Plan, which

addresses the implementation of the Phase I RA. The Phase I RA Work Plan will be prepared after U.S.EPA approval of the final design submittal.

1.3 Geology and Hydrogeology

A summary of the geology and hydrogeology at the EV site follows. Further details on the geologic and

hydrogeologic setting may be found in the Electro-Voice Remedial Investigation/Feasibility Study WorkPlans (FTC&H, 1988), Phase II - Field Data, Volume I of III, Electro-Voice Rl/FS (FTC&H, 1989), andin the Final Remedial Investigation Report for Electro-Voice (FTC&H, 1990).

The local geology consists of unconsolidated glacial drift deposits underlain by the Late Devonian age

Antrim Shale Formation. The glacial drift consists of two primary units; an upper outwash sand andgravel unit, and a lower clay-rich till unit. The upper outwash unit is characterized as light-to-darkbrown, fine-to-coarse-grained, loose sand with varying gravel and pebble content. A general coarsening

downward sequence has been observed, with occasional silty sands and clayey zones in the upper horizon,

04/14/95 - 2 -

Page 7: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

grading to discrete and alternating intervals of fine, medium, and coarse sand with depth (FTC&H,

1990). The lower portion of the outwash sand and gravel unit comprises an areally extensive unconfmedaquifer. This unconfmed aquifer ranges in thickness from approximately 50 feet at the EV site toapproximately 10 feet near McCoy Creek to the north (FTC&H, 1980).

A blue-gray to gray-brown, clay-rich till unit underlies the upper aquifer or outwash unit. The till unit

is characterized as a very stiff, blue gray to gray-brown clay with minor sand and gravel. This clay-richconfining layer was encountered in all the investigative borings at the EV site that penetrated the aquifer,and was marked by drilling refusal at these locations. However, some of the borings did penetrate intothe till as much as 25 feet. The top of the clay-rich confining layer was found at elevations ranging from630 to 670 feet mean sea level (msl). The thickness of the till unit was not determined during the RI.However, regional well logs indicate the till unit ranges from 3 to 90 feet in thickness (FTC&H, 1990).

The thickness of the unconsolidated glacial deposits overlying the bedrock in Berrien County generallyranges from 101 to 200 feet (Western Michigan University [WMU], 1981). The glacial drift depositsat the EV site are estimated to be 150 to 180 feet thick (FTC&H, 1990).

The Late Devonian age Antrim Shale Formation consists of black shale. The elevation of the top of thebedrock surface ranges from 550 to 600 feet above msl (WMU, 1981). The elevation of the easternportion of the EV site is approximately 740 feet above msl. Hence, the depth to the Antrim Shale isestimated to be 140 to 190 feet below ground level (bgl). One residential well record (Well 36-53

[FTC&H, 1989]) describes a blue shale at a depth of 173 feet bgl. Presumably, this could be the AntrimShale. However, the exact location of this well could not be determined. The thickness of the Antrim

Shale is estimated to be between 50 to 100 feet (WMU, 1981). The Antrim Shale is underlain bylimestones of the Middle Devonian age Traverse and Detroit Group, and by evaporites of the LateSilurian age Salina Group (WMU, 1981). These bedrock formations are very dense, relatively

impermeable, and have no potential for groundwater supply.

The groundwater flow direction in the upper outwash aquifer is primarily northwesterly at the EV site.The direction trends to north-northeasterly in the central portion of the study area, and trendsnorthwesterly again at the northern portion of the study area near the McCoy Creek discharge boundary

(FTC&H, 1990).

04/14/95 - 3 -

froh

Page 8: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

The depth to the water-table surface varies within the study area. The water-table surface isapproximately 30 feet bgl in the former lagoon area and decreases in depth to approximately 10 feet bglnear McCoy Creek. The water-table surface is as deep as 60 feet bgl in the south and central portion ofthe study area (FTC&H, 1990).

1.4 Nature and Extent of Lagoon Area Soils Contamination

The former dry well and the former plating waste lagoons were identified in the RI/FS as contaminantsource locations for the EV site. The Phase I RD Work Plan for the first operable unit addressed thecleanup/closure of the former lagoons. Information regarding other areas is provided in the Electro-VoiceRemedial Investigation/Feasibility Study Work Plans, dated July 1988, and the Final RemedialInvestigation Report for Electro-Voice, dated August 1990.

In 1952, EV constructed two bentonite-clay-lined lagoons, north and south, for disposal of liquid wastefrom the electroplating operation at the plant. The two lagoons were connected in series by an overflowpipe. EV discharged metal-plating waste to the north lagoon from 1952 to 1962. Use of these lagoonswas discontinued in 1962 after a new wastewater treatment facility was installed at the site (FTC&H,1990).

In September 1980, the north lagoon and its contents were removed. This included the removal of 9,500gallons of water, approximately 19,600 gallons of sludge, and 40 cubic yards of clay liner. Thesematerials were disposed of offsite. The area was then filled with clean soil (FTC&H, 1990). The southlagoon was not considered to be contaminated and was, therefore, filled with clean soil and contouredto match the natural surface topography of the area. Lagoon closure activity was performed inaccordance with Michigan's Hazardous Waste Management Act (Public Act 64 of 1979) and itsAdministrative Rules. The waste was listed on industrial waste disposal manifest forms, and approvedfor transportation and disposal by the Michigan Department of Natural Resources (MDNR) (FTC&H,1990).

Documentation related to the site history concluded that the soils contamination was confined primarilyto the immediate lagoon area. Subsequent surface soil sampling downslope and outside of the formerlagoon areas indicated elevated metal concentrations in the surface soils. It is believed that thesurrounding surficial soils were contaminated due to runoff and previous lagoon closure activities, suchas bulldozing contaminated soils to the edge of the lagoons, and the subsequent sediment transport ofthese soils. The horizontal and vertical extent of metals contamination in these soils were determined aspart of the Phase I RD.

04/14/95 -4- rTT

Page 9: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

F i p •""—="" ' r^ *~•t-v r.Broof(wood ; ' . • • • •. • LQ 0

" . i oll Course^ | y' .1 ' ' •- .^ ~

LOCATION MAP

07

ncfej o

0)

cb 6 so . g- <3 fl

c x« • ow'w

if0).043CQ

O

o

siLd_lUJ

o:OCLLJo:

Q (/)Qi UJ_ o

Z)UJI-

O

PROJECT NO.93307D

1-1

Page 10: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

2.0 ADDITIONAL STUDIES WORK

The additional studies for the Phase I work included a lower aquifer investigation and a lagoon area soils- extent of contamination investigation. The purpose and methodology for each investigation is presentedbelow. Off-property groundwater sampling is ongoing as part of the Phase I work.

2.1 Lower Aquifer Investigation

2.1.1 Purpose

The purpose of the lower aquifer investigation was to determine whether a lower aquifer was present inthe vicinity of the EV site. This was done by loci ting a deep boring near MW-9D. The originalscreened auger boring near the location of MW-9D was completed to 93.5 feet bgl. The boring for theinstallation of monitor well MW-9D was completed to 74.5 feet bgl. The intent of this investigation was

to sample below the depth of the previous borings to determine if a lower aquifer was present. If such

an aquifer did exist, a groundwater monitor well would be installed to determine if any site-related

contamination had been released to this aquifer.

The thickness of the upper aquifer at the site was estimated to be 50 feet (FTC&H, 1990). A clay-til!unit underlies this aquifer. A double-cased soil boring was to be drilled 15 feet into the clay-till unit nearonsite monitor wells MW-9S and MW-9D, an area that directly underlies groundwater contamination ofthe upper aquifer (Figure 2-1). Contaminants historically detected in MW-9S and MW-9D include thevolatile organic compounds (VOCs) 1,1-dichloroethane, 1,2-dichloroethene (total), and vinyl chloride.If clay was present below approximately 90 feet, three soil samples of the clay til!, collected at intervalsof 5, 10, and 15 feet into the clay till, were to be submitted for laboratory analysis of VOCs.

If a water-bearing unit 5 feet or more in thickness and capable of yielding a substantial quantity of

groundwater to a monitor well was encountered, one or more groundwater samples would be collectedand analyzed for VOCs in lieu of analyzing the clay sampies. If the water-bearing unit was less than 10feet thick, a groundwater monitor well would be installed at the top of the unit and sampled for VOCs

analyses. If the water-bearing unit was greater than 10 feet thick, vertical groundwater profile samplingfor VOC analysis would be performed at 10-foot intervals through the thickness of this lower water-bearing unit. The proposed methodologies for the soil boring, soil sampling, vertical groundwater profile

04/14/95 -5 -

Page 11: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

sampling, monitor well installation, and groundwater sampling were provided in the Phase I RD WorkPlan.

2.1.2 Soil Boring and Sampling Methodology

The soil boring, LAB-1, was performed on May 11 and 12, 1994, by Stearns Drilling Company ofDutton, Michigan using 8V4-inch inside-diameter hollow-stem augers. Drilling proceeded to 89 feet bgl,where a clay-till was encountered. A split-spoon sample collected at 89 to 91 feet bgl contained a stiff

silty clay. The drilling continued to 93 feet bgl to set the outer steel casing. However, a hard

clay/bedrock surface was encountered at 93 feet bgl. A split-spoon was collected from 92 to 92.2 feetbgl. The collected sample appeared to be predominantly "slough" from the overlying strata. However,reddish brown clay and some shale fragments were present in the tip of the spoon. The augers weresubsequently cleaned to clear the "slough" and a second spoon was driven to collect another sample from92 feet bgl. The blow counts for the second split-spoon were 200 counts for \ inch of spoon driven; the

augers were at refusal. The tip of the spoon contained a hard red-brown clay with fragments of reddish-brown shale.

It was determined that this lower reddish-brown strata was the top of the underlying bedrock shale, andthat a lower aquifer, or water-bearing zone, was not present. This conclusion was based on the extremelyhigh drilling pressure, the high blow counts (200 counts for \ inch of recovery), the presence of shale

fragments in the split-spoon and on the drill bit, and the reddish-brown color of the shale fragments whichwas indicative of the local underlying weathered shale formation. The decision was made to abandon andgrout the boring following discussions with the U.S. EPA. The boring log for LAB-1 is included inAppendix 2-A.

2.2. Quarterly Groundwater Sampling

Quarterly off-property groundwater sampling continued in accordance with the U.S. EPA approved

Electro-Voice, Inc., Groundwater Monitoring Plan for U.S. Environmental Protection Agency (FTC&H,November 1992). The first sampling event under the Phase I RD/RA was conducted in April 1994.Quarterly sampling was conducted in June and September 1994. The annual groundwater sampling wasconducted in January 1995. The sampling will continue on a quarterly basis until the second operable

unit ROD is effective or until the U.S. EPA, in conjunction with MDNR, determines that monitoring is

04/14/95 -6-

Page 12: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

no longer necessary. The results of the groundwater analyses have been forwarded to the U.S. EPA and

MDNR as they are received.

2.3 Lagoon Area Soils - Extent of Contamination Investigation

2.3.1 Purpose

The purpose of the lagoon area investigation was to determine the horizontal and vertical extent of soilsthat required capping/excavation outside of the proposed former lagoons cap area. Previous limited soilsampling for specific metals downslope and outside the proposed lagoon cap area was conducted by EVprior to the preparation of the Phase I RD Work Plan. The sampling indicated that surficial soils, 1 to2 feet bgl, were contaminated and most likely would equire excavation and placement beneath the cap.

Two types of soil sampling could have been used to determine the extent of the lagoon area soils to beexcavated; cleanup verification sampling prior to excavation or post-excavation cleanup verificationsampling. The former method, sampling prior to excavation, was chosen as the more efficient way toevaluate the lateral and horizontal extent of contaminated soils. Potential consequences of performingcleanup verification sampling after excavation include:

Delays in capping the contaminated material while waiting to sample and for laboratoryturnaround of the verification samples. This would expose contaminated soil to wind andsurface water erosion.

Time and costs associated with contractor mobilization/demobilization due to failure to

determine the full extent of contamination, including multiple delays for additional rounds of

sampling and laboratory analysis.

Delays caused by cap redesign due to additional soils being placed under the cap.

The analytical results from the soil sampling were used to determine which soils had been impacted fromlagoon area contaminants. The impacted soils would then be remediated with the former lagoon areas.The soil sampling and statistical analysis of the analytical results were conducted in accordance with theMDNR Cleanup Verification Guidance Document (MDNR Guidance Document), dated November 1991.

04/14/95 - 7 - froh

Page 13: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

2.3.2 Methodology

The area of investigation was initially estimated to cover approximately 97,000 square feet (Figure 2-2).

According to the MDNR Guidance Document, this acreage is considered a medium-sized site. Hence,the grid interval for stationing was calculated using the following equation:

Where: GI = grid interval (feet)A = area to be gridded (square feet)

Based on this calculation, a grid interval of 44 feet wj > required for the soil sampling. The grid layout

for 67 initial investigative soil sampling locations was surveyed and staked to establish the horizontallocation and elevation prior to soil sampling. The 44-foot grid interval used was actually a greaterdensity than could have been used. Additional soil sampling locations were added laterally beyond theoriginal area of investigation, resulting in a larger area of concern. Using the larger area in the above

formula would have resulted in a wider grid spacing. However, to maintain consistency with the originalsampling grid spacing, the 44-foot interval was used for the additional soil sampling points. Theinvestigated area of concern, with a superimposed grid interval of 44 feet, is shown in Figure 2-2. Soilsamples were initially collected at depth intervals of 0 to 1, 1 to 2, 2 to 3, 3 to 4, and 4 to 5 feet bgl ateach grid node. Background soil samples were also collected at five locations, as shown in Figure 2-2.

The background soil samples were collected from each soil horizon encountered while augering from a

depth of 0 to 5 feet bgl. The first round of soil sampling at each of the grid nodes, LSB-1 thoughLSB-72, and at each depth interval (0 to 1 foot bgl through 4 to 5 feet bgl) was conducted by FTC&H

personnel from April 25 to May 11, 1994.

The soil samples were obtained using a closed head, stainless-steel hand auger in accordance withFTC&H Standard Operating Procedure (SOP) #F6-4.1 (Appendix 2-B). The soil samples were identified

using the sample labeling criteria provided in the Phase I RD Work Plan QAPP. The soil samples were

collected in the appropriate bottles, packed in ice, and transported to the laboratory under chain-of-custody procedures (SOP #F3-2 in Appendix 2-B). The analytical methods, sample packaging, bottles,

and hold times were specified in the Phase I RD Work Plan QAPP. The hand auger was decontaminatedbetween samples by washing with a trisodium phosphate solution, rinsing with deionized water, andallowing to air dry. Decontamination fluids were containerized for later disposal. Field locations and

04/14/95 -8-

Page 14: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

other pertinent notes were recorded in the field notebook per SOP #F3-1 (Appendix 2-B). Soilcharacteristics of the samples are summarized in Appendix 2-C.

The Michigan Environmental Response Act (MERA) allows soils to be remediated to background

contaminant levels, Type A Default levels, or to a level which will pass an acceptable leaching test. Thecalculation of background soil contaminant values is discussed in Section 2.3.3 Background Calculations.The Type A Default levels in soil are provided in the MDNR MERA Operational Memorandum No. 15,Default Type A Cleanup Criteria. The soil samples can also be leached by a leaching test which isapproved by MDNR MERA Operational Memorandum No. 12, Alternate Leaching Tests. The results

of the leaching tests are then compared to the appropriate groundwater criteria for evaluation purposes.

Any one, or a combination, of these criteria may be used to establish acceptable contaminant levels ata site or for individual samples.

Based on these analytical alternatives and to establish a methodical procedure, the soil samples weresubmitted for laboratory analysis using a phased approach. The phased analytical approach for theinvestigative soil samples is shown in the logic diagram in Figure 2-3. Initially, soil samples weresubmitted for laboratory analysis of the indicator analytes cyanide, cadmium, and chromium. Further

analyses were conducted based on the analytical results of these indicator analytes. If the indicatoranalyte concentrations in a soil sample were below their respective State of Michigan, Act 307 Type ADefault levels, the soil sample was analyzed for the remainder of the metals of concern. The metals ofconcern were arsenic, barium, copper, lead, nickel, and zinc. If the concentrations of the metals of

concern were below their respective Type A Default levels, the soil sample was considered clean.

If one or more of the indicator analyte concentrations was above its respective Type A Default

concentration, a leaching test for the analyte(s), the Synthetic Precipitation Leaching Procedure (SPLP),

was performed. The SPLP is approved for metals analyses per the MDNR MERA OperationalMemorandum No. 12, Alternate Leaching Tests. The soil sample was submitted for either total metalor SPLP analysis of the metals of concern (arsenic, barium, copper, lead, nickel, and zinc) if theindicator analyte concentrations from the SPLP were below their respective cleanup criteria. The soilsample was considered clean if the concentrations of the metals of concern were below the cleanupcriteria, or if the concentrations of the metals of concern from the SPLP were below the cleanup criteria.

At any point in the comparison process (i.e., at any "no" point on Figure 2-3), the sample could beconsidered contaminated if the results were above the appropriate cleanup criteria.

04/14/95 -9- froh

Page 15: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

2.3.3 Background Calculations

The Phase I RD Work Plan was written so that the metal and cyanide concentrations in the soil samples

could be compared to either the Type A Default criteria, or the respective background concentrations inthe soil to determine if the soils were clean or contaminated. The leachate concentrations from the soilsamples could also be compared to the appropriate cleanup criteria to determine if the soil samples wereclean or contaminated. To establish background concentrations, the background soil samples, LSB-68,LSB-69, LSB-70, LSB-71, and LSB-72, were submitted for laboratory analysis of total arsenic, barium,cadmium, chromium, copper, cyanide, lead, nickel, and zinc. The background analyte concentrationswere calculated following the statistical methods presented in the MDNR Guidance Document (Table 2-1).

The mean background concentration (Xb) and background variance (Sb) were calculated for each analytewithin each soil horizon. Three soil horizons were encountered at the background soil sampling location;

a silty clay, a clayey sand to clayey silt, and a sand to silty sand. The background coefficient of variance(CV) was also calculated for each analyte and each soil horizon to evaluate the data distribution. Thebackground value or maximum allowable limit for each analyte within each soil horizon was calculatedfor each analyte with a CV less than 1.00. The background value equaled the sum of the meanbackground concentration for each analyte plus three times the standard deviation for that analyte (Xb 4-3Sb). The results of the background soil sampling analyses are presented in Table 2-1.

The background metal and cyanide values were calculated to evaluate whether the local metal and cyanideconcentrations in the soil were higher than the Type A Default values. Higher background values wouldprovide more latitude in evaluating whether a sample was clean or contaminated. In general, the localmetal and cyanide values, based on three analyzed soil samples, were lower than the referenced Type A

Default values. Hence, four soil samples (n = 4), as required by the MDNR Guidance Document, were

not analyzed for each of the soil horizons. The Type A Default cleanup criteria and the leachateconcentrations were used instead to evaluate the soils investigative data.

Background concentrations of arsenic, chromium, and lead in the silty clay horizon (n = 4) were greaterthan the Type A Default values. These data (arsenic, chromium, and lead concentrations in the silty clayhorizon) were not used to evaluate whether the investigative soil samples were clean or contaminated

because the respective soil horizons were not always comparable. Furthermore, it was easier to applythe Type A Default criteria uniformly to the investigative soil samples, rather than matching the analytes

in each investigative soil horizon with the respective analyte and comparable background soil horizon.

04/14/95 - 10-

Page 16: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

2.3.4 Results

Investigative soil samples, LSB-1 through LSB-67, and background soil samples, LSB-68 through

LSB-72, were collected in a single sampling event from April 25 to May 11, 1994. Based on the

analytical results of the investigative soil samples, three additional soil sampling rounds to collect soil

samples at deeper depths and at new sampling locations were performed. The rationale and background

for each additional soil sampling round are discussed below.

Soil samples from the 4- to 5-foot bgl interval from LSB-1 to LSB-67 were submitted first for the analysis

of cadmium, cyanide, and total chromium (indicator metals). The results of these analyses aresummarized in Table 2-2. Cadmium, total cyanide, and chromium concentrations above the Type ADefault soil levels were detected in some of the sample.' from the 4- to 5-foot bgl interval. These samplesincluded LSB-2, LSB-5, LSB-8, LSB-9, LSB-13, LSB-14, LSB-18, LSB-28. LSB-32, and LSB-38.

Therefore, additional samples from the 6.5- to 7.5-, and the 9- to 10-foot interval bgl were obtained atthese locations during a second round of sampling. Soil samples from the 9- to 10-foot bgl interval were

then submitted for analysis of the indicator metals.

In addition, three new soil sampling locations, LSB-73, LSB-74, and LSB-75, were located 33 feet northof LSB-1, LSB-2, and LSB-3, respectively (Figure 2-2) to funher define the lateral extent of the lagooncontaminants. The land begins to slope up near these borings. Hence, a spacing of 44 feet would haveplaced the borings too far up the hill, and beyond the impact of surface runoff from the lagoons. These

new soil sampling locations were sampled at depths of 0 to 1, 1 to 2, 2 to 3, 3 to 4, 4 to 5, 6.5 to 7.5,and 9 to 10 feet bgl. Soil samples from the 4- to 5-foot bgl interval were initially submitted for theindicator metal analyses. This second round of soil sampling was conducted between June 21 and 23,

1994.

A tentative western boundary for the lagoon cap was established based on the analytical results of the soil

samples from the 4- to 5-foot bgl interval. This tentative boundary coincided with the north-south soil

grid line beginning at LSB-81, and extending south to LSB-54, then angling southeast to LSB-66. The

samples selected for laboratory analyses were west, or outside of the tentative cap boundary. Soil

samples from the 0- to 1-foot bgl interval and west of the proposed lagoon cap extent were submitted forthe indicator analyses after receipt of the analytical results from the 4- to 5-foot bgl interval. Cadmium,total cyanide, and/or chromium concentrations above the Type A Default levels were detected in someof the soil samples from the 0- to 1-foot bgl interval. These samples included LSB-I, LSB-3, LSB-4,

04/14/95 ' - 11 -

Page 17: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

LSB-7, LSB-10, LSB-19, LSB-20, LSB-22, LSB-23, LSB-44, LSB-64, LSB-65, and LSB-67. Therefore,14 new soil sampling locations, LSB-76 to LSB-89, were sampled at depths of 0 to 1, 1 to 2, 2 to 3, 3to 4, and 4 to 5 feet bgl (Figure 2-2) during the third round of soil sampling. Soil samples from the 0-

to 1-foot bgl interval were submitted for the indicator metal analyses. These new locations were used

to further define the lateral extent of the lagoon contaminants.

Cadmium, total cyanide, and/or chromium concentrations above the Type A Default soil levels weredetected in samples from the 9- to 10-foot bgl interval at locations LSB-5, LSB-8, LSB-13, LSB-28, andLSB-38. Deeper soil samples were obtained by hand augering to the 14- to 15-foot bgl interval forLSB-28 and LSB-38, and to the 16-to 17-foot bgl interval for LSB-5, LSB-8, and LSB-13. These soil

samples were submitted for the indicator metals analyses. This third round of soil sampling wasperformed July 25 though 29, 1994.

It was not possible to hand auger soil borings LSB-82 through LSB-85 north of the lagoon area, as bricks,cement blocks, and other near-surface debris were encountered. These soil borings and additional soil

borings LSB-90 through LSB-93 (Figure 2-2), were performed during the fourth round of soil samplingon November 16 and 17, 1994, using a backhoe to remove the near-surface debris. The soil sampleimmediately below the surface debris, at the native soil horizon, was submitted for total arsenic and leadanalyses, and the SPLP analyses of barium, cadmium, chromium, copper, cyanide, nickel, and zinc.

Many of the soil samples from the 4- to 5-foot bgl interval were submitted initially for laboratory SPLP

analyses of the remaining metals of concern, specifically, arsenic, barium, copper, lead, nickel, and zinc,rather than total metals analyses of the metals of concerns. Selected soil samples from the 9- to 10-footbgl interval and deeper sampling depths were also submitted for the SPLP analyses of the metals ofconcern rather than total metal analyses.

The following rationale was used for submitting the soil samples for SPLP analyses of the metals ofconcern rather than for total metals analyses. Five soil samples were submitted during the early stageof the investigation for total metals analyses of the metals of concern, specifically, arsenic, barium,

copper, lead, nickel, and zinc. Three soil samples were chosen from locations with high indicator metalconcentrations (LSB-20, LSB-32, and LSB-51), and several soil samples were chosen from locations with

indicator metal concentrations below the Type A Default concentrations (LSB-27 and LSB-58). The totalmetal concentrations for the metals of concern ranged from below the Type A Default concentrations to

above the Type A Default concentrations. Comparison of total indicator metal concentrations with SPLP

04/14/95 - 12 - froh

Page 18: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

results showed the SPLP analyses to be a better measure of soils exceeding State of Michigan cleanupcriteria. Based on these analyses, the remaining soil samples were submitted for SPLP analyses of the

metals of concern rather than for total metals analyses to speed the investigative process. This revisedapproach was made in consultation with the respective regulatory agencies.

The soil analytical results are summarized in Table 2-2, and the laboratory sheets with the analytical

results are provided in Appendix 2-D. The depth and extent of contamination, based on any metal of

concern or cyanide exceeding the cleanup criteria in the soil samples, is shown in Figure 2-4. Thefollowing assumptions were used to generate Figure 2-4. First, the extent of contamination in areaswhich will be under the cap is not shown. Second, locations where contamination is not believed to bedue to the lagoons are not shown. These include soil sampling locations LSB-67 and LSB-89 on the southend of the site, and soil sampling locations LSB-4, LSB-7, LSB-73, LSB-74, LSB-75, LSB-76, LSB-78,and LSB-80 at the northwest end of the site. The rationale for not including these locations in the extent

of contamination is discussed in Section 3.2 Lagoon Area Soils - Extent of Contamination Investigation.

Third, the debris area north of the cap (soil sampling locations LSB-82 through LSB-85, and LSB-90

through LSB-93) is not included as the soils beneath the bricks and concrete were clean.

2.3.5 Holding Times

Some of the soil samples were held more than six months before laboratory analysis due to the sequential

nature of the soil sample submission and the performance of additional sampling rounds. The U.S. EPA

expressed concern over this issue and commented that analytical results from soil samples exceeding the"six months hold time" should be considered "biased low."

In general, there are no holding times for either the metals of concern or cyanide in the soil samples.

Sometimes the holding time for metals in water samples, six months, is followed for soil samples.However, the metals of concern are chemical elements which may be bound in the soil as oxides,sulfides, hydroxides, or other complexes. The complexes holding the element in the soil may breakdown

or change with time. However, the metal itself will still remain within the soil. This is different from

VOCs or other organic compounds which can volatilize from and/or breakdown into different compoundswithin the sample. In the case of organic compounds, analyses of a sample beyond its holding time,

compared to one within its holding time, can produce very different results because of these processes.However, soil samples are digested prior to metal analysis to breakdown the complexes holding the metal

elements and to release these metals into solution. Therefore, metals present in the soil sample when it

04/14/95 - 13 -

froh

Page 19: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

was collected will still be there when the soil is analyzed regardless of the holding time. Hence, it is notnecessary to consider metal analyses conducted beyond the "six months hold time" as "biased low."

Cyanide in the soil samples is also relatively immobile. The cyanide is believed to be tightly bonded to

copper, zinc, and nickel or other metals in the soil. Because of the relatively high metal concentrations

in the soil, any free cyanide ions would probably complex with the metals in the soils. Any free

hydrogen cyanide, which is very volatile, would have migrated from the soils vadose zone prior to samplecollection. The total cyanide analysis for soils is designed to breakdown the soils' metal - cyanidecomplexes, and to release HCN, which can be detected and measured. Therefore, as with the metals,cyanide present in the soil sample when it was collected will still be there when the soil is analyzedseveral months past the holding time. It is not necessary to consider cyanide analyses conducted severalmonths beyond a "six months hold time" as "biased k A-."

04/14/95 - 14- froh

Page 20: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

o

£

TABLE 2-1^ Background Soil Calculations ^__

Results reported in micrograms per kilogramsSand/Silty Sand

Analyte

ArsenicBariumCadmiumChromiumCopperCyanideLeadNickelZinc

Type ADefault Value

5,80075,000

1,20018,00032,000

39021,00020,00047,000

LSB-68(4.5-5')

—~

669,100

~ND

------

LSB-69(2-3')2,100

27,00041

5,2006,400

ND6,1006,300

26,000

LSB-70(7.5-8')

„,__

398,300

~150-~-

LSB-71(2-3')2,700

48,00082

7,4007,400

ND11,0009,400

34,000

LSB-72(3-4')

4,10030,000

3511,00013,000

3509,000

13,00043,000

Mean

2,96735,000

538,2008,933

1008,7009,567

34,333

Std. Dev.

8389,274

181,9132,904

1382,0122,7386,944

Mean +3SD

5,48162,821

10713,93917,647

51414,73517,78055,166

Clayey Silt

Analyte

ArsenicBariumCadmiumChromiumCopperCyanideLeadNickelZinc

Type ADefault Value

5,80075,000

1,20018,00032,000

39021,00020,00047,000

LSB-68(0-1')3,700

59,000280

11,00011,000

ND20,00011,00059,000

LSB-69(o-r>2,600

48,000280

6,0008,100

ND19,0007,100

40,000

LSB-70(0-1 ')2,800

49,000200

7,0008,000

ND15,0008,400

36,000

LSB-71(3-4')5,600

59,00070

15,00016,000

ND15,00020,00067,000

Mean

3,67553,750

2089,750

10,7750

17,25011,62550,500

Std. Dev.

1,1865,262

863,5623,248

02,2785,035

12,894

Mean +3SD

7,23369,536

46520,43620,520

024,08326,73089,181

Siltv ClayAnalyte

ArsenicBariumCadmiumChromiumCopperCyanideLeadNickelZinc

Type ADefault Value

5,80075,000

1,20018,00032,000

39021,00020,00047,000

LSB-68(2-3')4,000

50,00064

12,00013,000

ND7,800

13,00040,000

LSB-70(3-4')2,600

94,000220

11,0008,100

ND8,300

13,00040,000

LSB-72(1-2')3,800

89,000190

12,0008,800

21017,00014,00056,000

Mean

3,46777,667

15811,6679,967

7011,03313,33345,333

Std. Dev.

61819,669

68471

2,16499

4,224471

7542

Mean +3SD

5,321136,675

36113,08116,458

36723,70514,74867,961

CV

0.180.250.430.040.221.410.380.040.17

ND = Not Detected 3SD = Three Standard Deviations— M«f A n., i,^(i CV = Coefficient of Variance

CV

0.320.100.410.370.30

00.130.430.26

CV

0.280.260.350.230.331.380.230.290.20

Page 21: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

2vo

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if nol shaded.

's/l

en5T£.ouio^*o^^l

1

ONi

t~~h""ijy\h— J*

DcpiliCd £tt Cl

1 530.',^.4j76q 8.5002345 510 250 12,00071017

Cd CH Cr1 i.4QQ 450 14,0002345 270 160 9,00071017

Cd Ctt Cti2345 71,000, ; ;^460, , 2iOCO7 ; $2,0$' 290 ?4^S^:

1017 20,000 - '^570- /t^OOO

Cd CM Ctl i^tffl 7JQ 22JJQQ2345 U U 12,0007

1017

LSB-Ol LSB-02A s B j C i i N i E b Z n C d C M C l A s E a C u M i

U 1,100 U U U 30 8.900 U 18,000 U 1.200 U U

2.000 U 9.100 U 620 U U

LSB-03 LSB-04A s B a C u N i E b Z n C d C M Q A s B a C u ^ i

U 1.400 U U U 40 2,100 460 18,000^ ,-'iff| 760 U U

U 430 U U U U 360 U 1 1 .000 L 1.200 U U

LSB-05 LSB-06A s E a C u t l i E b Z D C d C M C i A s f i a C u M i

• 15,000 i ,580" ; -^Oot)"

/ 1.200 20 U I 60 1,7QQ U 13.000 (/ 980 U U

0 710 U U U 20

LSB-07 LSB-08A s E a C u K i E b Z n C d C N C r A s E a C u K i

(/ 450 U U , & 90

i 1.000 U U 1 30 5,800 150 ' 57,000 U 1.200 U U

21,000 680 28,000 U 540 U U25.000 250 9,700 / MOO 20 U

i • ————————————————

DepthEb Zn

1234

U 40 51

U 40 1017

Eb Zu3 20 1

234

[/ 20 57!017

Eb Zn1234

U 20 511017

Eb Zni234

V JO 57

tf 50 10.? 110 17

'

Page 22: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2 ^_Summary of Soil Sampling Results from Lagoon Investigation

Regular Font - samples analyzed initially for total metals. Reported as ug'kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metafs; passed if not shaded.^~ Dopih LSB-09 LSB-107 0 C s l C N C i A i B a C u M i E b Z i l C U C N C r A s B a<. ' 5J3QQ 20Q 18,000 U 1,000<s> 2a 38 4w 5 . 36X86 i7oV$3RtiBB u 590 u v v 20 410 iso 1 1,000 u 2300 ?

\oUi 10 1.800 U 1 1 .000 U 380 U U U 30^ 17

LSB-ll LSB-12C d C M C t A s B a C u M i E b Z o C d C M C i A s B a

1 600 240 9.100 V 690 V U U 50 ^H4,600 ' •°'l "'/:':'27,OQli'23

i 4— 5 220 U 10.000 U 640 U U U U USQ V 22JJQQ U 980

11017

i-sn-13 I.SB uC d C M C i A s B a C u N i E b Z n C U C N C i A s U a

l2345 , ;•; '24,606 I.OW^^M.OOO U 490 U U U 30 170 U 43.000 U 1.000710 '- l^jjBISB''**"'"''^^0? U 610 U U U 30 120 U 24.000 » J5017 .•..'•^^^pvJMtf: 11,000 2 /.Of» 20 U '£,, 140

LSB-15 LSB-I6C d C N C r A s B a C u M i E b Z a C d C M C i A s B a

1 220 U 7,200 2 530 U U U 30 330 270 7,300 (/ 5002

H"5 4^S 5 U U 4,100 110 U 8.600 U 610

<T 7MT-. 10N-> ,7

DepthCu Mi Eb Zn

f t/ y #> i234

u u u u s11017

Cu Mi Eb Znl234

(/ W U 40 571017

CD Mi Eb Zni234

V U U 80 51

U U U 10 1017

Cu Mi Eb Zn(/ U U 10 1

234

U U (1 10 511017

Page 23: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

9a

ioU)o

Depch

2345710

1234

.5710

2345710

12345710

LSB-17

Italicized Font - samples analyzed initially for SPUP. Reported as ug/l.Shaded values are above Type B criteria

Underlined parameters were analyzed for total metals; passed if not shaded

LSB-18Cd CM Ci As Ba Cu

18,000 1,800 '"39,000

I.6QQ ilfl 18,000 / 7,400

LSB-19

60

Cd CM Cr As Ba

790 42Q JI.QQQ U

240 U 2JJJQQ U

940

1.100

Cu Ml Eb In

U U U

10 U U

30

Depth

123457

70 10

LSB-20

Cd CM &120 : 5\flba' 6,300

As Ba Cu Mi Eb Zn Cd CM' zirT6bo i'

& As Ba4,500

U U 5,900 3,000 400 U U 5,600 U 170 U 8.500 U 500

Cu Mi Eb Zn100,086"". 37,000"*" '51,000 410,000

U V U 20

LSB-21 LSB-22

Cd CM Ci As Ba Cu Hi Cb Zn CdHJQQ

CM Cc11,000

ASU

Ba600 U U 2 20

3 .900 250 18,000 630 U 40 230 260 9,100

LSB-23 LSB-24

Cd CM Ci2.400 1.300 14,000

65 U 11,000

AsV 620

CuU

Mi[7

Zn40

Cd360

45

34

CK320

Ci8,000

14,000

10,000

AS(7

Ba590

Cu MiU U

ttU

Zn60

2345710

2345710

2345710

Page 24: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

O

5D

{_/!

?

1.o

TABLE 2-2 -._-Summary of Soil Sampling Results from Lagoon Investigation

Depth

234571015

1

234571015

1214571015

23457

10

Regular Font - samples analyzed initially for lotal metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

LSB-25

110

110

67

Cd

J.3QQ

Cd

14,000

Italicized Font - samples analyzed initially for SPLP. Reported as ug/lShaded values are above Type B criteria.

Underlined parameters were analyzed for total melals; passed if not shaded.

LSB-26Cd190

CN260

Ci10,000' '

As Ba7/0

CuU U

Eb Za60

Cd780

CN41Q

Ci12,000

ASU

Ba1.000

Cu NiU

Eb ZD30

6.900 110 570

LSB-27 LSB-28

U 7,100

U 6.800 (/ 640 U U U 3,80b

4.9002 6 0 i l Q :4QQ 14.000

1,300

1.700470

LSB-29Cr

58Q 16.000

L'.i

470

Mi 2JI Cr fia

10

LSB-31

40 270 U 4,600 V 310

LSB-32

Cr As

380 iV

N i Q j Z n C d C N C r A s B a

167,000 5,500 ;/250;OOb 2,200 50,000

1,200 220 ••;'" 64 300

2010

Cu

Cu Ni Eb

10

Cd190

CNU

Cr11,000

As4,400

DJ52,000

Cu14,000

Ni13.000

Eb17,000

Zn5JJQQ

Cd CN Cr AS Ba Cu Ni Eb Zu

40

19020

Zn

66,060 ; 110,060 990,000

Depth

234571015

234571015

1234571015

Page 25: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

(—) Regular Font - samples analyzed initially for total metals. Reported as ug/kg.^ Shaded values are above Type A criteria.j^ Underlined parameters were leached; passed if nol shaded.

a

Depth

45710

2,300 270

LSB-33

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if not shaded.

LSB-34CN Ci As Ba24 IOO^y^-3, 480

Cu30

Ni ^ Eb ZD190

Cd CN Ci58 70

270

ASU

BaJ/0

Cu Ni20 U'

Za!40

Depth

2345710

LSB-35 LSB-36

o

Cd CN430 U

92 150

Cr As Ba Cu6,700 U 450 10

14,000

Ni Eb Zn CdU U U 120

61

CM240

U

C[12,000

6,500

ASU

U

Ba530

610

CuU

U

Niu

U

Eb ZnU 60

U U

123457

LSB-37 LSB-38

234571015

Cd Cfcl Ci As Ba Cu

95 MQ 13.000 U 250 U

Ni E b Z n

U 20

C d C M C l A s f i a

340 15,000TSSt 13,000

',,4 1,600U 490

Cu Mi

20 UU U

Eb Zu123457

130 10[/ 15

LSB-39 LSB-40C d C N Q A s

440 280 8,800 U 530 U

C d C M C i A s

3 20 1?,0«) 9,2iO(J</ ;32.000

Ba Cu Hi Eb Zn

Page 26: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

Italicized Font - samples analyzed initially for SPLP. Reported as ug/).Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if not shaded.

O

Ui

Depth

1234571015

LSB-41 I.SB-42C d C N C r A s B a C u N i E b Z n C d C M C i A s

390 U 7,600

£11 Mi tt 2nDepth

234571015

LSB-43 LSB-44

to

Cd CM Ci Ai Ba Cu

1.900 'r2',SOO 12,000

C d C N C i A s

81 U 13.000

Ba Cu Ni Eb in12345710

LSB-45 LSB-46

2345710

Cdno

CN180

Q12,000

ASU

Ba970

CuU

MiV

EbV

ZQ40

Cd310

CM4QQ

Ci7,600

AsU

Ba710

Cua

Miu

Ebu

Zn60

120 U 9,000 L 820 U U V 20 110 U 9,200 U 260 10 U U 10

2345710

LSB-47 LSB-48

23457

10

Cd CM Ci As130,8)0 2,300 76.000

E a C i i t i i E b Z n C i l C N C i A s

2.200. 150 12,000 U 660 U U 40 800 220 9,800 U 250

Cu Ki Eb Zn

U U U U

12345710

Page 27: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

O

£

.s.OLMWOvBLfl

NJ

Depth

12345710

23457If)

12345710

12345710

Regular Font - samples analyzed initially for total metats. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed rf not shaded.

LSB-49

Italicized Font - samples analyzed initially for SPLP. Reported as ugfl.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if not shaded.

LSB-50Cd CM Cc As Ba Cu

210 U 3,900 U 240 U U U U !<f&?

LSB-51

Cd CM Ci As Ba

8,300

LSB-52Cd CM Ci As Ba Cu N i E b Z n Cd CN Ci As

. 32,006 v •"-.; 9,'«6b; 220:000 i .300 6,900 ••74,1606.'. . 43,000 11 .coo '^ilSfobtiJ 530 200 24.000

USB-53 LSB-54

82 U 7.800 U 320 U U U 10

LSB-53

75 -"" 9,lJi» 7,200

39 160 5,800 U 560

LSB-56C d C N C i A s B a C u

1.8QQ 430 24.000 U 300 U U U U 980 190 6,400 U 430

Cu Mi

U U U

C d C M C r A s B a C u M i E b

U U U

la

Cd150 u

Ci8,100

As(/ 1,000

Cuu

Miu

Eb Zn Cd CN Cr As Ba Cu Mi Eb Zu

Dcpih

2345710

12345710

23457

U 10

Zn12345710

Page 28: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

O£:£^O^-/l

CD-.8Q-O

u3O^o^HI/1

t

OJ1

r>i

Reg

Depth

1

2

34

57

10

1

234

5

7

10

12

34

57

10

1

2

3

457

10

ular Font • samples analyzed initially for total metals. Reported as ug/kgShaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

LSB-57

Cd CM Ci As Ba Cii250 U 6.200 U 1.300 U

44 U 11,000 U 440 U

LSB-59

Cd CN Ci As fia Cii32.000 31800 74,000

530 170 9,700 (7 580 U

610 270 13.000

LSB-61

Cd CN Ci As Ea Cii210 390 8,900 U 1. 100 U

39 220 5,200 U 620 U

LSB-63

Cd CN & As Ba Cu,190,0136 ::f4>OS. 180.000

-W2iw::- *t^*y&$to3.JQQ 390 13.000 U 430 U

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for tolal metals; passed if not shaded.

LSB-58 Depth

Ni Eb Zn Cd CN Ci As fia C u N i E b Z nU 6 40 180 U 5.100 1,500 27,000 5,800 6,400 9,300 33.000 1

259 180 12.000 3

4U U 20 58 U 6,900 5

7

10

LSB-60

Ni Eb Zn C d C M C i A s Ba Cu Ni Eb Za12

U V 40 3

41800 220 9.700 U 450 U U U 20 5

7

10

LSB-62

N i E b Z D C d C M C r A s f i a C u N i E b Z nW 4 70 1.000 150 11.000 // 550 U U U 120 1

2

34

U U 20 34 130 4,100 5

7

10

LSB-64

M i E b Z a C d C M C i A s E a C u M i E b Z n920 52Q 8.900 U 630 U V U 50 \

234

U U 20 61 U 8,800 U 340 U If U U 5

1

10

Page 29: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

*.Ui

s.o

o

to

&

Depth

12345710

2345710

12345710

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

LSB-65

Italicized Font • samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if not shaded.

LSB-66 DepthC d C H C r i s E a C u N i E b Z n C d C N & A s B a

8JQQ 220 9.300 U 290 U U U 10

170 U 1 1 .000 1 ,200 230 13,000

LSB-67 LSB-68 (B)C d C N C t A s f i a C u M i E b Z n C d C N Q A s H a

2.QQQ 8.10 8,700 U 1.300 U U •'">•'; fe^; 60 280 U 1 1,000 3,700 59.000

240 U 6,100 64 U 12.000 4.000 50,000

43 140 8,700 U $90 V U U U 66 U 9, 100

LSB-69 (B) LSB-70 (B)Cd CN Ci As Ik QJ Ni Eb Zn Cd CN Ci As &a

280 U 6,000 2,600 48,000 8,100 7.100 19,000 40.000 200 U 7,000 2.800 49,000

41 U 5,200 2,100 27,000 6,400 6,300 6.100 26,000220 U 11.000 2,600 *fa'$to

39 150 8.300

LSB-71 (B) LSB-72 (B)Cd CN Cr As Ba Cii N i E b Z n Cd CN Ci As Ba

190 210 12.000 3,800^:.''*f89,(KiO82 U 7,400 2,700 48,000 7,400 9,400 1 1 ,000 34.00070 U 15,000 5,600 59,000 16.000 20,000 15,000 •'''"• *$j$!fy . 35 350 11,000 4.100 30,000

Cu Hi Eb Zo12345710

£11 Ni Eb Zn11.000 11.000 20.000' -M.Oflb 1

213.000 13.000 7,800 40.000 3

45710

Cu Ni Eb Zn8,000 8.400 15.000 36,000 1

23

8.100 13.000 8,300 40.000 45710

£u Ni ED Znl

8.800 14.000 17.000'. ;!36,Qi60 23

13.000 13,000 9.000 43.000 45710

Page 30: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

£5

o>

i.o

Depth

12345710

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

LSB-73Cd

100

210

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals; passed if not shaded.

LSB-74CM Ci As

i/'",r'*T:2'

150 16,000

U 8.800

Ba890

360

CuU

MiV\

Eb Zn100

CdU.

330

250

CNU.

210

U

atf!

13,000

8,500

AS Ba•'':$2t 530

U I.4OO

£uU

Mii / i

Znso

70

Depth

2345710

KJ120

110

LSB-75 LSB-76

Cd460

CN220

Ci9,400 M{

As.'*«•*

Da*W

CuU

HiU

£bU

ZnM

Cd370

CH320

Q8.400 |V

.. Al- Ba500

CuU

HiU

Eb(/

Zn40

U 17,000

U 6.500

490 10 U 480

2345710

t.SK-77 1 -SB-78Cd

740CN370

Ci11,000

As Ba380

CuU

MiU

EbU

USO

Cd240

CN140

Ci9,300

As Ba490

CuU

HiU

Eb(/

ZL40

360 20 U 810 30

12345710

LSB-79 1 -SB-80

Cd3.800

CM4QQ

Ci12,000

AsU 550

450

Cu[/

Niu

Eb(/

ZuJO

Cd540

CM200

Ci9,200

As Bai'f'i 520

U 750

CuU

Mi£/

EbU

ZnU

20

234

5710

Page 31: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary or Soil Sampling Results from Lagoon Investigation

£>L/l

aoUi

Pepth__

12345710

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria.

Underlined parameters were leached; passed if not shaded.

LSB-81

Cd170

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria

Underlined parameters were analyzed for total metals; passed if not shaded.

LSB-82

CMU

Ci8,100

AsU

Ba560

CuU

MiU

EbU

Zn30

C d C N C i A s Ba

0-3 U U 3,700 1.400

Cu

10

Ni Eb

7,200

Zn

60

Depth

345710

NJ

234

57

910

LSB-83 LSB-84

C d C N C r A s B a C i i N i E b Z n C d C M C i A s B a C u N i E b

U U U 3,800 770 /O [/ 10,000 40U U U 3,900 770 U U 11,000

Zn

70

123457910

12

3457

10

LSB-85 LSB-86

Cd CM Ci As Ea £u Mi Eb Zn Cd290

CM54J3

Ci7,000

Asu

Qa630

Cu(/

Miu

Eb(;

Zn50

U 1,900 J20 7,800

260 40

12345710

345710

LSB-87 L.SB-8Cd

200CM4JQ

Ci8.600

Asa

Ba400

CU til Eb ZD20

£43.000

CMZ5Q

Ci9.600

AsU

BJI670

Cu(/

MiU

Ebw

Za20

250 30 490

Page 32: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

TABLE 2-2Summary of Soil Sampling Results from Lagoon Investigation

Regular Font - samples analyzed initially for total metals. Reported as ug/kg.Shaded values are above Type A criteria,

Underlined parameters were leached; passed if not shaded.

Italicized Font - samples analyzed initially for SPLP. Reported as ug/l.Shaded values are above Type B criteria.

Underlined parameters were analyzed for total metals: passed tf not shaded.

8.OtyiOJO

Depth

2345710

LSB-89 LSB-90Cd

440CM5J5Q

CL8,300

AsU

fiaA/00

Cu.t/

Zn Cd CN Cr Di Mi

6.QQO /, 200 13,000

Depth

2345710

LSB-91 LSB-92

NJ

12

345710

f l a C i i N i E b

4,200 350 U U 14,000

Z n C d C K C r A s

U U U 2,300

Cu Hi Eb

U U 8,900

2345710

LSB-93

1

23456710

Cd CM C i A s B a C u N i B

[/ 4,400 940 6.700

Zn

/O

MDNR Criteria: Cd-CN-Cr-As-Ba-Cu-N i -Pb-Zn-

Soil Type A1,200 ug/kg

390 tig/kg18,000 ug/kg5,800 ug/kg

75,000 ug/kg32.000 ug/kg20,000 ug/kg21,000 ug/kg47,000 ug/kg

SPLP Leachate Type B3.5 ug/lISO ug/l120 ug/l

0.02 ug/l2,400 ug/l1,300 ug/l

530 ug/l4 ug/l

2,300 ug/l

Note: The blank spaces indicate that a sample was either collectedand analyzed, or not collected. Analytical results for thesoil samples submitted for laboratory analysis are shownin this table.

Page 33: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

>Tl

SYLVAN ST

CECIL ST.

K1Y

o>

roOo

NOR

ELECTRO-VOICE, INC.BUCHANAN, MICHIGAN

PHASE I RDADDITIONAL STUDIES REPORT

fishbeck, thompson, carr & huberengineers • scientists • architects

Ada • LansingMichigan

Page 34: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

INITIAL! ESTIMATED EXTENTOR IMF ACTED SOILS(FEBRLARY 1994)

PROPERTY BOUNDARY

LEGEND# INVESTIGATIVE SOIL SAMPLE LOCATION(S> BACKGROUND SOIL SAMPLE LOCATION

SOIL SAMPLING MAP

Page 35: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

SUBMIT SAMPLE FORANALYSIS OF INDICATOR

ANALYTES

Compare toBackground and Type

A Default Levels

CONTAMINATED SAMPLE

LAGOON AREA SOIL ANALYSIS

DECISION FLOWCHART

Analyze for Metals ofConcern

Bolow Background orTyp« A Default Lovub

7

CONTAMINATED SAMPLE

CLEANSAMPLE

CLEANSAMPLE

CLEANSAMPLE

CLEANSAMPLE

O J3(/] ""rt

.So «

43W

• iHM-H

-91Q

O

-oo563

ilUJ_jLd

OO.Ulo:

Q (/)ct: uj_ Q

3UJ (—oo tn

otro

PROJECT NO,

93307D

2-3

Page 36: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

ro ELECTRO-VOICE, INC.BUCHANAN, MICHIGAN

PHASE I RDADDITIONAL STUDIES REPORT

ftoh fishbeck, thompson, carr & huberengineers • scientists • architects

Ada • LansingMichigan

Page 37: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

3.0 DISCUSSION AND CONCLUSIONS

3.1 Lower Aquifer Investigation

The investigation determined that a lower aquifer, or water-bearing zone, was not present at the site basedon the boring located near MW-9D. At a depth of 92 feet bgl, a hard reddish-brown strata, the top of

the underlying bedrock shale, was encountered. The boring was abandoned and grouted followingdiscussions with and approval by the U.S. EPA. No further investigation of the lower aquifer was

conducted.

3.2 Lagoon Area Soils - Extent of Contamination Investigation

The lateral and vertical extent of contamination, based on the soil sampling results, is shown in Figure2-4. The extent of the lagoon cap, excavation areas, and the excavation cross sections are detailed in the

Basis of Design for Electro-Voice, Inc., prepared by FTC&H and dated February 1995.

The horizontal distribution of metals in the soil coincide with the natural drainage pattern or slope of theland. It appears that contaminants migrated with runoff from the lagoon area and flowed downslope(west-northwest) to the elevationally lowest area. Lateral migration of contaminants appears to berestricted by the natural drainage pattern or sidewalls of the drainage pathway.

Generally, the lateral extent or perimeter of contamination (outside of the area to be capped) was defined

by the 0- to 1-foot bgl interval meeting the appropriate cleanup criteria. It was observed that if the topsoils were clean, the underlying soil layers were also clean. This observation was supported by a numberof locations, including LSB-3, LSB-10, LSB-11, LSB-16, and LSB-26. In addition, a number of

locations had a top soil sample with elevated metal/cyanide concentrations and a lower sample(s) withmetal/cyanide concentrations which met the relevant cleanup criteria. Examples include LSB-6, LSB-17,

and LSB-20.

The reason for this pattern appears to be the contaminants' mode of transport. It appears that the lagoonareas are generally the source of the elevated metal/cyanide concentrations and that these contaminants

are transported by surface water runoff from the lagoons. This would generally produce the highestlevels of contamination in the surface layer(s) of soil, and contaminant concentrations would be expected

to decrease with depth because of the affinity of metals to bind to soil. This distribution of contaminants

04/14/95 (Revised 05/30/95) - 2 8 - P i

iron

Page 38: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

is observed in the area influenced by surface runoff, wherein Type A Default levels are exceeded in the0- to 1-foot bgl interval, but met at lower intervals in the soil horizon.

Relatively high levels of metal/cyanide contamination were concentrated along the axis of the drainage

pathway. These elevated metal/cyanide concentrations extended to depths of 15 feet or more. The soils

in the area of borings LSB-5, LSB-8, and LSB-13 will be excavated to the groundwater surface and theexcavated soils will be placed under the lagoon cap.

Two anomalous areas with slightly elevated lead and arsenic concentrations in the surface soils (0- to 1-foot bgl) were identified, one at the south end of the site and the other at the northwest end of the site.At the south end of the site, soil sampling locations LSB-67 and LSB-89 had elevated lead concentrationsin the 0- to 1-foot bgl interval, as determined by both the total metal and SPLP analyses. These two soil

sampling locations are topographically upgradient of the lagoons and the drainage pathway. Therefore,the lagoons are not believed to be the source of the elevated lead concentrations. However, both pointslie in a drainage pathway which leads from the adjacent road (Carrol! Street) and other offsite property.Therefore, it appears that the source of the elevated lead concentrations may be road runoff from thenearby street or runoff from the areas.

Several soil sampling locations in the northwest corner of the site had slightly elevated lead or arsenic

concentrations in the 0- to 1-foot bgl interval. Samples from locations LSB-7, LSB-73, and LSB-74 had

lead concentrations above the relevant cleanup criteria, as determined by total lead and SPLP analyses.Samples from locations LSB-4, LSB-75, LSB-76, LSB-78, and LSB-80 had arsenic concentrations abovethe relevant cleanup criteria, as determined by total arsenic and SPLP analyses.

The source of contamination in the soil samples from these anomalous areas, however, does not appearto be the lagoons. These soil samples were obtained near the low area which receives and collects surfacewater runoff from nonsite areas such as roads and backyards, in addition to surface water runoff from

the lagoons. These soil sampling locations are also the furthest from the lagoon area. Therefore,elevated arsenic and lead concentrations in the drainage pathway soils between the lagoon and the low

area would be expected if these contaminants were transported by surface water runoff from the lagoonarea. However, this distribution of arsenic and lead is not observed. For example, the highest arsenic

concentrations were detected at locations LSB-75, LSB-76, LSB-78, and LSB-80. However, the highestconcentrations of the indicator metals or contaminants of concern were not detected at these locations.Cadmium, cyanide, and chromium concentrations above the cleanup levels were detected at locations

04/14/95 (Revised 05/30/95) - 29 -

Page 39: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

LSB-5, LSB-8, and LSB-13 in the drainage pathway. However, arsenic concentrations at these same

locations were below the cleanup levels. Concentrations of all the indicator and contaminants of concern,

except arsenic, in the surface (0- to 1-foot bgl) sample at location LSB-20 were above the cleanup levels.Lastly, all of the indicator and contaminants of concern, except arsenic and barium, were detected at

concentrations above the cleanup levels at locations LSB-32 and LSB-51. These latter two locations are

in the former lagoon area which will be capped. Similarly, the distribution of lead does not fit the

distribution pattern of the other contaminants.

Furthermore, some of the soil sampling locations with elevated arsenic or lead concentrations are

topographically higher than the low area (approximately 3 to 5 feet higher). It is unlikely that runoff

from the lagoons would flow to these higher areas, or that water would pond to a sufficient depth in the

low area to reach these elevations. The soils in this area are permeable and no signs of such ponding

were noted in the low area. It is believed, based on the above, that the arsenic and lead contaminants

of concern are coming from an upgradient offsite source, and flowing downhill by surface water runoff

to the same lowland area in which runoff water from the lagoons collects.

3.3 Summary of Remediation Activities

The purpose of this section is to summarize the remediation activities in the area of and downgradient

of the lagoons. Greater detail and engineering drawings are provided in the Basis of Design Report for

Electro-Voice, Inc., prepared by FTC&H and dated February 1995.

The remediation activities include excavation of contaminated soils and capping of contaminated soils

(Figure 3-1). Contaminated soils downgradient of the cap will be excavated and placed in the area to be

capped. Locations LSB-5, LSB-8, and LSB-13 will be excavated to the groundwater surface. Other soil

locations will be excavated to depths as indicated in the Basis of Design report.

The cap will extend from LSB-25 west to LSB-19, turn south to LSB-58, and angle southeast from LSB-

58 along LSB-62, and LSB-65 to LSB-67. At LSB-67, the cap will extend east to the top of the bank

and will follow the edge of the bank north to LSB-25 (Figure 3-1).

04/14/95 (Revised 05/30/95) - 30 -

Page 40: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

SDMS ADMINISTRATIVE RECORDIMAGERY INSERT FORM

SITE NAME

DOC ID #DESCRIPTION

OF ITEM(S)REASON WHY

UNSCANNABLEDATE OFITEM(S)

NO. OF ITEMSPHASE

O.U.LOCATION

ELECTROVOICE INC91460

MAP

X ILLEGIBLE or FORMATOVERSIZED

NONE

1X Remedial Removal Deletion Docket

Volume 1 of 2Original X Update # 7

Box# 3 Folder # 1

COMMENTS

Page 41: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

4.0 REFERENCES

FTC&H, Electro-Voice, Buchanan, Michigan, Remedial Investigation/Feasibility Study Work Plans, Ada,Michigan, July 1988.

FTC&H, Phase II - Field Dam, Volume I of III, Electro-Voice RI/FS Buchanan, Michigan, Ada,Michigan, December 1989.

FTC&H, Final Remedial Investigation Report for Electro-Voice, Inc. Buchanan, Michigan, Ada,Michigan, August 1990.

FTC&H, Electro-Voice, Inc. Groundwater Monitoring Plan for U.S. Environmental Protection Agency,Ada, Michigan, November 1992.

FTC&H, Final Phase I Remedial Design Work Plan for Electro-Voice, Inc., Buchanan, Michigan, Ada,Michigan, February 1994.

FTC&H, Basis of Design Report for Electro-Voice, Inc., Buchanan, Michigan, Ada, Michigan, February1995.

U.S. Environmental Protection Agency, Declaration for the Record of Decision, June 23, 1992.

U.S. Environmental Protection Agency, Consent Decree for the Electro-Voice Superfund Site,September 20, 1993.

Western Michigan University, Hydrogeologic Atlas of Michigan, Western Michigan University,

Department of Geology, Kalamazoo, Michigan, in conjunction with the U.S. Environmental Protection

Agency, Underground Injection Control Program, 35 Plates, 1981.

04/14/95 - 31 -

Page 42: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

APPENDIX 2-A

SOIL BORING LOG FOR LOWER AQUIFER INVESTIGATION

Page 43: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

ftohfishbeck, thompaoru carr & huber

engineers • scientists • architectsAda • Lansing

Project Name: Electro-Voice/Phase I RD Aquifer InvestigationSite Location: Buchanan. Michigan__________________Contractor: Stearns Drilling Comnanv__________Rig Type: CME 950_____________________

LAB-Iof

Boring/Well No:.Page: 1___ ____Start Date: May 11. 1994Finish Date:.Project No.:_

Mav 12. 1994F93307B

Borehole Diameter 11-12"Casing: Diameter! —

I n t e r v a l : - -

Screen:

Total Length Installed:.Material: _____Diameter: _____Interval: ______

Slot Size:^_ gged bv: Matthew A. Baltusis - FTC&HGeophysical Logs: ____________Development Method: _________Notes: Adjacent to MW-9S and MW-9D.

Driller/Helper: Jim/Dennis/RichDrilling Method: Hollow-stem augerTotal Depth Drilled:_J&lGravel Pack: Type:_

Seal:

Grout:

TOC Elevation:Ground Elevation:.

Interval*:.Type: -Interval*:,

Interval*:.

Static Water Level: —Static Water Level: --

Date:.Date:.Date:.Date-

SampleTypeand

NumberRec.(ft)

Blowsper 6"

Depth

_ 3-89' See well log MW-9D for lilhologic description.Sample Description/Comments

ScreeningResults

InstrumentUsed

20_

30_

kDepth below ground level'"Legend: SS = Split Spoon; ST = Shelby Tube/Pocket Penetrometer; SL — Sectional Liner; N = Standard Penetration Resistance

Page 44: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

frohfishbeck, thompson, carr & huber

engineers * scientists • architectsAda • Lanslng

Project Name: Electro-Voice/Phase I RD Aquifer Investigation

Boring/Well No:.Page:_2_____

LAB-1of

Start Date: Mav 11. 1994Finish Date:.Project No.:_

Mav 12. 1994F93307B

SampleTypeand

Number

SS

SS

Rec.(ftl

1.1

<0.1

Blowaper 6"

13291216

200 for0.5"

Depth(bgl)*

40

50

60

70

80

90

-

-

-

-_

_

_

Sample Description/Comments

*

SO-65' CLAY per drilling characteristics.

'ILL at 85' per drilling characteristics.

8*89' Drilling pressure increased.9-91':0.9' of GRAVEL (50-70%), fine, subrounded; SAND (30-40%), fine to medium.0.2' of SILT (<70%); CLAY (>3056); moist, medium brown-red, stiff.subrounded to rounded; wet, light gray, poorly sorted. "Slough" from above.

IEDROCK at 92' consisting of SHALE, very weathered, moderateiy stiff, medium red-rown matrix with fragments of mon; competent SHALE.

End of boring at 92'.

ScreeningResult!

InstrumentUsed

*Depth below ground level"'Legend: SS = Split Spoon; ST - Shelby Tube/Pocket Penetrometer; SL = Sectional Liner; N = Standard Penetration Resistance

Page 45: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

APPENDIX 2-B

FTC&H FIELD STANDARD OPERATING PROCEDURES

Page 46: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FISHBECK, THOMPSON CARR & HUBER, INC.STANDARD OPERATING PROCEDURE

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 1 of 1 1Version 2.0Date: 4/7/94

Scope: The following SOP is to be used as a guideline when recording activities on any jobsiteoutside of the FTC&H offices. The primary purpose of recording data in the fieldnotebook and on the field data sheets is to create a record by which anyone canreconstruct the field activity without reliance on the recorder's memory. The fieldnotebook and field data sheets will become part of the final evidence file.

Equipment: Field Notebook for Site ActivityCalculatorWaterproof Ink PenWatch (for time of day)Field Data Sheets

Procedure:

1. All information pertinent to the field activity or sampling event must be recorded in a fieldnotebook on field data sheets using the waterproof ink pen. If the ink pen does not function atthe time of entry, note the malfunction as reason for using some other method (i.e., pencil, etc.).At a minimum, entries in the field notes must include the following:

a. Date.b. Time of each entry (24-hour clock).c. FTC&H personnel on jobsite.d. Objective/purpose for activity.e. Name, address and telephone number of field contact.f. References, such as maps or photographs of the study site.g. Field observations.h. Weather conditions, if known, or estimate.i. Describe any field methods to be used for the site activities, reference additional SOPs, if

possible.j. Personnel and equipment decontamination procedures,k. Signatures of personnel responsible for observations.

2. For sampling efforts, specific details for each sample will be recorded on designated field datasheets within the field notebook. However, in addition to the items listed above, the followinginformation will be included in the field notes portion of the notebook.

a. Type and number of samples to be collected.b. Sample location and identification number.c. Sampling method (reference SOP numbers) particularly deviations from the work plan or the

SOP listed.d. Page number reference for sample documentation sheet,e. Sample handling, packaging, labeling and shipping information, including destination.

Page 47: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3~1Page 2 of 1 1Version 2.0Date: 4/7/94

3. The field notes portion of the notebook should be completed in a sequential, chronological order.No blank pages should be found within the daily notes section of the notebook. Data changesor errors within the field notebook should be corrected by placing a single line through the data,followed by the recorders initials, followed by the correction.

4. The field notebook should be kept in a secure place during the field activities (i.e. in hand,within visual site, locked in field vehicle, etc,). Upon completion of the activity, the fieldnotebook should be checked for completeness. A copy of the completed notebook will then bemade. The copy of the notebook will be stored as part of the FTC&H project files. The originalfield notebook will become part of the final evidence file.

5. Specific examples of the field data sheets forms are as follows:

a. Field Notes (Page 3)b. Groundwater Sample Documentation (Page 4)c. Soil Boring Forms (Page 5)d. Soil Sample Documentation (Page 6)e. Surface Water Sample Documentation (Page 7)f. Sediment Sample Documentation (Page 8)g. Hydraulic Conductivity Test Data (Page 9)h. Step-Drawdown Test Data (Page 10)i. Aquifer Test - Pumping Well (Page 11)

froh

Page 48: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 3 of 11Version 2.0Date: 4/7/94

FIELD NOTES

Project Name:_

Project No.:

Project Site Location:, Date:

frc>h

Page 49: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP #F3-1Page 4 of 1 1Version 2.0Date: 4/7/94

Site:

GROUNDWATER SAMPLE DOCUMENTATION

Proj-^i No.:_ Date:Sampling Station:Weather Conditions:Physical Location:Static Water Level:Method: Wet Tape

I.D. Numbers:

Electric Tape Drop Buzzer

Arrival Time:

Lock Key No.;Total Depth:

Other:Physical Condition of Well:__Pump Decon Time/Procedure: _Purging Data:

Bailer/Pump Type and Suiting:.Calculation of one well volume: V =* 0.17 rl v = ________r = radius of well in inches Three well volumes1 = column of water in Feel Purge Rate:

Presampling Data: Initial Purge Water Description:Clock Time Total Volume Purged

________ Start Purging

0.17 (

gallons

Snecirlc Conductance % Difference of Conductivity

Begin Sampling:__________Final Sample Water Description:Field Filtration Method, if used:Field Parameter Measurements:

pH (S.U.):____________Turbidity: ____________

Finish Sampling:

Temperature (°C):Eh:

Specific Conductance (/tmhos/cm):Dissolved Oxygen:_______

Sample Containers:Time of Measurements:

Bottle Tvml

"mlmi

"mi

Glass or PlusCicClass or PlasticGlass or PlasticGlass or Plastic

Filtered PreservativeY«s or No None, HN03. NaOH, H2S04

Yes or No None, HN03, NaOH. H,SO4

Yes or No None, HN03, NaOH, H2SO4

Yes or No None, HNO^, NaOH, H,S04

Reference numbers for any serialized documents on which the sample(s) is listed (sample labels, air bill numbers,chain-of-custody, etc.):_____________________________________________________

Any Deviation from Plan/Notes:

Sample Personnel:Name

froh

Page 50: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 5 of 11Version 2.0Date: 4/7/94

fef

fohbcck. thompson, cacr & HUKT

Ad* • Li mint

Project Name:,Site Location:,,Contractor__Rig Type:___Borehole Diameter___Casing: Diameter.

Interval:_

Screen:

Total Length Installed:.Material:________Diameter________Interval'_________Material:________Slot Size:________

Logged by:______Geophysical Logs:__Development Method:.Notes:__________

Boring/Well No:_Page:_______ of.Start Date:______Finish Date:_____Project No.:_____

Driller/Helper___Drilling Method:__Total Depth Drilled:.Gravel Pack: Type:.

Seal:

Grout

Interval*:.Type:——Interval*:.Type:___Interval*'

TOC Elevation:__Ground Elevation:,.Static Water Level:,Static Water Level:.

Date:.Date:.Date:.Date:.

Sampl*Typ«ud

NumberR.C.(ft)

Blovip«r 8"

D«pthSample D«teription/Commenti

ScrMdinjRuuJU

Initrumtnt

'Depth b«lo» [round Itvoi"L«c«nd: 33 = Split Spoon; ST s Sh«lby Tub./Poek« P«n*tn>m*lir; 3L = 3«tion»l LLnir; N = Sl»nd»rd P.n.tntion

Page 51: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 6 of 11Version 2.0Date: 4/7/94

SOIL SAMPLE DOCUMENTATION

Site:

Sampling Station:_

Date: _____ Time:Weather Conditions:

Sample Identification Number:.

Physical Location:________

Sampling Equipment and Procedures, if deviation from plan:

Sample Description (Type, Quantity, Appearance, Analysis Performed):

Sample Containers:

___ 500 ml Amber glass, with no preservation___ 1,000 ml Plastic, with HNOs___ 250 ml Plastic, with no preservation

___ 40 ml Glass vials, with no preservation

Field Compositing Method, if deviation from plan:_

Decontamination Procedures, if deviation from plan:

Reference numbers for any serialized document!) on which the sample(s) is listed

(sample labels, air bill numbers, chain-of-custody, etc.):

Photographic Information:

Notes:

Sample Personnel:Name: Signatures:

Page 52: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 7 of 11Version 2.0Date: 4/7/94

SURFACE WATER SAMPLE DOCUMENTATION

Sampling Slarinn:

Date: Time:

Sample Identification Number:

Physical Location:

Sampling Equipment and Procedure!

Weather Conditions:

. if deviation from plan:

Sample Description (Type. Quantity, Appearance, Analysis Performed):

Sample Containers:__ 1,000 ml Plastic, with no preservation__ 1,000 ml Plastic, with Ultrex__ 1.000 ml Plastic, with HjSO.__ 500 ml Plastic, with NaOH

__ 500 ml Amber glass, with HjSO,__ 40 ml Glass vials, with no preservation__ 1.000 ml Amber glass, with no preservations__ 1,000 ml glass, with HjSO,

Field Filtration Method, if used:

Decontamination Procedures, if deviation from plan:_

Reference number? for any serialized document* on which the uinplefs) is luted (sample labels, air bill numbers, chain-of-cusiody, eta);

Photographic Information:_______

Final Field Parameters Measurements:

Temperature (*C):______________________Specific Conductance {^mhos/cm):________________

Corrected Specific Conductance 0»tnhos/cm):____..„,-•-_pH (S.U.):_________Time of Measurements:.

Notes:

Sample Personnel:

Signaturea

froh

Page 53: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 8 of 1 1Version 2.0Date: 4/7/94

SEDIMENT SAMPLE DOCUMENTATION

Site:

Sampling Station:,Date: Time:

Weather Conditions:

Sample Identification Number:,

Physical Location:________Sampling Equipment and Procedures, if deviation from plan:

Sample Description (Type, Quantity, Appearance, Analysis Performed):

Sample Containers:____ 500 ml Amber glass, with no preservation

____ 1,000 ml Plastic, with no preservation____ 250 ml Plastic, with no preservation____ 40 ml Glass vials, with no preeervation

Field Compositing Method, if deviation from plan:_

Decontamination Procedures, if deviation from plan:

Reference numben for any serialized documents on which the sample (a) is listed

(sample labels, air bill numbers, chain-of-custody, etc.):

Photographic Information:

Notes:

Sample Personnel:Name: Signatures:

Page 54: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 9 of 11Version 2.0Date: 4/7/94

HYDRAULIC CONDUCTIVITY TEST DATA

Site:_______

Sample Station:,Date:_______ Time: Weather Conditions:Sample Identification No.:_ Physical Location:,Equipment and Procedures, if deviation from plan:.

Hermit Data:Unit Serial No.:___________Transducer XD Setting:________

Test Data: Insert Rod

Test No.:__________ Step No,:,Length of Rod Used:__________

Test Data: Remove RodTest No.:__________ Step No.;_

Transducer Scale Factor;feet Reference Setting:

Start Time: End Time:

feet Diameter of Rod Used:

Start Time: . End Time:

Length of Rod Used;, feet Diameter of Rod Used:Decontamination Procedures, if deviation from plan:

inch

inch

Reference numbers of any serialized documents on which the samples) is listed (sample labels, air bill numbers,chain-of-custody, etc.):_________________________________________________________

Photographic Information:

Well Details:Static Water Level:.Screen Material:

_ feet Total Depth:______ feet Total Water Column Length:Slot Size:_____ Screen Length:_____ feet Screen Diameter,

Gravel Pack Material:__Total Aquifer Thickness:,Notes:__________

Gravel Pack Length:. feet Gravel Pack Diameter.

Sample Personnel:Name:

_feetinchinchfeet

Page 55: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 10 of 11Version 2.0Date: 4/7/94

STEP-DRAWDOWN TEST DATA

Project Name:_

Date:Project Task No.

Elevation of Measuring Points:_

Well No.: Method of Drawdown Measurement:Static Water Level Elevation:

Method of Pumping Rate Measurement:,

Observer:_________________

Remarks/Additional Well Information:

ClockTime

ElapaedTime

PumpingRate fQ) Hold Read DTW Drawdown fs) Q/S

Page 56: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FIELD NOTEBOOK AND FIELD DATA SHEETSSOP#F3-1Page 11 of 11Version 2.0Date: 4/7/94

AQUIFER TEST - PUMPING WELL

Project Name:_

Project No.:__

Well No.:

SWL Measuring Method:.

Pump Setting:_______

Pump Size:__________

Observer (Initials/Name):____________Other Observation Well (I.D. and Distance:.

Project Task No.:.

Date:

Casing Length:__

Casing Diameter:_

TOG Elevation:_

SWL Elevation:_

Ground Elevation:

Remarks: (i.e., discharge location, discharge/recharge boundary locations, etc.)

MinutesClock FromTime Start Hold Read

Drawdownor Pumping

Recovery Rate

Page 57: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FISHBECK, THOMPSON, CARR & HUBER, INC.STANDARD OPERATING PROCEDURE

CHAIN-OF-CUSTODYSOP #F3-2Page 1 of 8Version 1.4Date: 4/7/94

Scope: The following SOP outlines the requirements that provide the ability to trace possessionand handling of samples from time of collection through transportation to the laboratoryfor analysis and final reporting of the data.

Equipment: Sample TagsCustody SealsChain-of-Custody RecordSample-Analysis Request SheetWaterproof Ink Pen

Definition:

Samples are considered to be in a person's custody if they are:

1. In a person's physical possession.2. In view of a person after taking possession.3. Secured by that person so that no one can tamper with it, or secured by that person in an area

that is restricted to authorized personnel.

Procedure:

1. Sample tags are necessary to prevent misidentification of samples. An example of a completedsample tag is included on Page 4. Sample tags should include at least the following information:

a. Project number.b. Name of collector.c. Date and time of collection.d. Sample identification.e. Preservatives used.f. Filtration used.g. Any notes that may affect the analysis.h. Analysis to be completed.

Tags should be securely affixed to sample containers prior to or at the time of collection.

2. All sampling activity will be recorded in two places in the field notes. In the sequential portionof the field notes, the following information will be recorded:

a. Sample location and number.b. Type and number of samples.c. Reference to page number of Sample Documentation Sheet for the particular sample

location.

froh

Page 58: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN-OF-CUSTODYSOP #F3-2Page 2 of 8Version 1.4Date: 4/7/94

9.

The second location for recording sampling activity is on the Sample Documentation Sheet.All numbers referencing chain-of-custody documents are also recorded at this location.

Upon completion of sample collection, a chain-of-custody record will be completed and willaccompany the sample-shipment container (cooler) to the laboratory. If more than onesample-shipment container is used, a separate chain-of-custody form should be completedfor each container. An example of a completed chain-of-custody form is included on Page 5.

The chain-of-custody record will include the following information:

a. Client name.b. FTC&H project name and number.c. Sampling site location.d. Sample identification or description.e. Date and time (24-hour clock) of collection.f. Type of sample; i.e., investigative, duplicate, blank, trip blank, etc.g. Signature of collector.h. Signature of persons involved in the chain of possession.

The chain-of-custody form is to be completed with a waterproof ink pen.

The completed Chain-of-Custody Record and a Sample-Analysis Request sheet (referenceSOP #F3-3) will be placed in a waterproof container (zip-lock plastic bag) and placed insidethe sample-shipment container.

Using bubble packing or styrofoam sheets, securely wrap samples and arrange in the shippingcooler in such a way as to minimize the chance for breakage during shipment. Place a layerof blue ice packs over the samples and wrap cooler securely with strapping tape if shipmentby common carrier.

A Chain-of-Custody Seal is used to seal sample-shipment containers which are ready to betransported by means other than the FTC&H sampling team. An example of a completedChain-of-Custody Seal is included on Page 6. The seals should contain the followinginformation:

a. Project name.b. Project number.c. Date sealed.d. Signature of sampler who last relinquished samples.

The seal is to be completed with a waterproof ink pen.

Samples should be delivered to the laboratory for analysis as soon as possible. The samplesmust be delivered to the person in the laboratory authorized to receive samples (samplecustodian).

Page 59: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN-OF-CUSTODYSOP #F3-2Page 3 of 8Version 1.4Date: 4/7/94

10. There are three routes through which samples reach the laboratory, including:

a. FTC&H personnel who collected samples delivers them to the analytical laboratorydirectly.

b. FTC&H personnel who collected samples delivers them to the FTC&H offices and asecond FTC&H personnel delivers them to the analytical laboratory.

c. FTC&H personnel delivers samples to a common carrier; i.e., UPS, Federal Express,etc., to be shipped to the analytical laboratory. In this case, the Bill of Lading or airbillpackage tracking number becomes part of the chain-of-custody documentation.

11. The relinquish/received portion of the chain-of-custody form has been included on Page 7,illustrating the described situations. A completed sample Federal Express shipping label isincluded on Page 8, illustrating the portions of the form to be filled out by samplingpersonnel. The areas to be completed by the sampling personnel include sections I, 2, 3, 4,and 5. The airbill package tracking number is found in the upper right hand corner and isto be recorded on the Chain-of-Custody form and Sample Documentation Sheet in the fieldnotebook.

The actual chain-of-custody document contains three separate copies. These will bedistributed as follows:

Pink Copy - kept by FTC&H sampling personnel and retained in the project file.

Yellow Copy - retained by analytical laboratory for their records.

White Copy - returned to FTC&H project personnel with the analysis data package andretained in the project file.

froh

Page 60: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN- OF- CUSTOD YSOP #F3-2Page 4 of 8Version 1.4Date: 4/7/94

PROIFHT NO. V°HC

SAMPLE OBTAINED BY:

O PROJECT ENG./HYDROC

DATF- \Q q

SAMPLE LOCATION: Mi

\^K

EO: Kt

<;AMPiFNn TAVl-3 ( a-VOy

ow

v- 2 C 5 ~ vo1 1y

rnMP. n

fiRABX

PRESERVATIVES ADDED:

ANALYSIS: SO \ O | "ft O3.

NnO VOCa

REMARKS: ^\ f*P ^ V\VU

A^oc.eirVift^

FILTERFH H FISH

BEC

K, T

HO

MPS

ON

. CA

RR 4

HU

BER

6080

EAS

T FU

LTO

NAD

A, M

t 49

301

PHO

NE (

616)

676

-133

3

Figure 1

Page 61: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN-OF-CUSTODYSOP #F3-2Page 5 of 8Version 1,4Date: 4/7/94

m1•a* *5 *o *

a:<rcr

uJ

SSifU. < <0 <

9

> ^

QO«,0

li.O

<

<a~ -.

IIIIo£

0C

M

n d

5 tr

fl

H

00

ic^

H

rt

<^

rt0oo

rfl

03

(W

a

a

tfa-

3 .I £1

1.«T

mOl

Figure 2

froh

Page 62: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN-OF-CUSTODYSOP #F3-2Page 6 of 8Version 1.4Date: 4/7/94

CUSTODY SEAL PROJECT NO. OATC

SGNATVte

Figure 3

froh

Page 63: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

SOP #F3-2CHAIN-OF-CUSTODY Page 7 of 8

Version 1.4Date: 4/7/94

j

jj*_^3

1

X4

ij

j

1"

s1

w.

\ ;I

\

:i

^

Cai j

I^•3o

°A•*— 1

£C£

^1•53

"i

•fi

-*>Js

2j*a

_^

11

^

1

tc

j

a

31

5."-

5

^/Q 1.\j ^

a:

VI

|Q

*

S,j?

11*

o

j

a

3X

3-S

J1a

— c"* »'>I 31

V 9z ~s1 f1 -:"" i

•a f

s1 5

1 ^3 <•~ <-j

1 1£ C^

^COLOCMCO

01

2!

Q

IL.

1

s —Q

i

4X

C3c5

J^o

——

10

«

s-10.

2

I Q£

1

•a*F

•;

*4 ____

J

t

i

*c>£

i0

j

iij

cJ $

-?i "32 -3"^ ^1 4

l"j^*

(.

i i31JIt£

i 5

-52 -1•fJ* '^.

' <fC-

C

£

|

j

S

O

|oCi I"^

i>>is

s11a

j

f4

'^

*J

1

1^a;

J

JjQ

3

J.y.4

•s1<

*

ia

5J.

KT,

i*1

*

a

•aXi

:ii-i!

i* f& 00

„ -I'' 1

-J /1 -i, 1

^d11 5s 1i

j

E<£

T

COLOOJCO

o r2

QQQ

|

|O

I ~

a

|ixC•o[_o

V

*O

——

~~

&

S•8

|1Q.

1

JJ

'aa

*

|*

* —

J«ISI

j

^

o

J

1

n,4

?

_j

J

3

, ^iL

iL

|

[j

1

:i

i

f**

; 7

li

if

'•&t

C.

fJ't•

L

;f

ir^ i1 tf

i,i.iQ

ui 'I 1ff «

1 1^lt

|

^

Q

k

1

I1""

>

i

J

a

3

1z.X4

<

£

J_

jj

a

3|

a^i«o

J

5

{

[

I

i1|Ii

:

i

•j:

.^^

•1

<ss

-~.r)

CNJCO

Ol•^r

oo

1

1ai

o

14\*

•a•»C

J"O

1O

3

|1<L

•"SB.Jl'aa

4cJ**

X

«fc!|

Fieure 4

Page 64: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CHAIN-OF-CUSTODYSOP #F3-2Page 8 of 8Version 1.4Date: 4/7/94

0 © C OA J03 NI3IUO

1! a

sinnnnnaDoa

•SOVMOVd UnOA NO TIIBUIV 3H13AOOV H \.30VTdaW9T3m3S3HId03h»3W*BH3SV3Td \

VJ 0 vj W J

Figure 5

Page 65: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FISHBECK, THOMPSON, CARR & HUBER, INC.STANDARD OPERATING PROCEDURE

SAMPLE ANALYSIS REQUEST SHEETSOP #F3-3Page 1 of 2Version 1.2Date: 12/19/94

Scope: The purpose of this SOP is to provide uniformity in the completion of a SampleAnalysis Request Sheet (Analytical Work Request). The purpose of the Sample AnalysisRequest Sheet is to clearly and accurately apprise the laboratory of all informationpertinent to the analytical work requested.

Procedure:

1. The Sample Analysis Request Sheet (Analytical Work Request) will be filled out as completelyas possible before samples are given to a laboratory for analysis. A copy of this form has beenincluded on Page 2.

2. The following lists the necessary information needed to be completed by either the ProjectManager or the Project Engineer/Scientist:

a. Who is to receive the final laboratory report?b. Who is to receive the invoice?c. Client name.d. Client address.e. Client telephone number, including area code.f. Client contact person.g. Date samples are submitted.h. Date results are needed.i. FTC&H Project number.j. FTC&H Project Manager or Project Engineer/Scientist.k. Analytical parameters requested.1. Initials of person approving request and date.

3. The FTC&H field personnel who actually collect the samples will provide the followinginformation:

a. Name(s) of person collecting sample(s).b. Date of sample collection,c. Time of sample collection if only one sample.d. Sample(s) description identification.

4. The Sample Analysis Request Sheet must include all of'the above listed information beforesamples are brought to the laboratory for analysis. Samples will not be received by FTC&HAnalytical Services without a completed Sample Analysis Request Sheet. The only informationthat will be completed by laboratory personnel is the initials of the person approving the work.

fro-h

Page 66: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

S-

FTC&H ANALYTICAL SERVICESAnalytical Work Request

A<filrf<;<f;

Request Apprc

Work Approve

PrnlM-l Niimhfr''

Project Fn£inwr/Sflpntlsl:

ved By:

n* By

Final Report: FTC&II |Client 1

Invoice: I'TC&H |Client 1

———————————————————————

————— 1GENERAL CHEMISTRY PARAMETERS

Acidily ChlorideAlkal ini ty , Bicarbonate COD

1 Alkalinity, Carbonate ColorAlkalinity. Total Cyanide, ABOD Cyanide, FBromide Cyanide, T

METALS Please specify T = Total or D « Dissolved; S

Fluoride N, Nitrite Phosphorus. T Specific Cond.Hardness Oil & Grease Solids, T Specific Grav. IIMBAS pH Solids, TD Sulfate JN. Ammonia Phenols. R Solids. TS Sulfide IN, T.Kjeldahl Phosphorus, D Solids, V TPHN, Nitrate Phosphorus. O Solids, VS TOC |

- Standard Lab DL or A - Act 307 DL

Aluminum Beryllium Chromium, H Gold Manganese PalladiumAntimony Boron Chromium, T Iron Mercury PlatinumArsenic Cadmium Cobalt Lead Molybdenum PotassiumBarium Calcium Copper Magnesium Nickel Selenium

| ORGANIC ANALYSES

EPA 601 Purgeable Halocarbons EPA 624 PurgeablesEPA 602 Purgeable Aromalics EPA 625 BN SVOCsEPA 608 Pesl/PCBs EPA 625 Acid SVOCs

Turbidity

Silver ZincSodium I!ThalliumVanadium ||

MDNR Scan 1 EPA 8010 Purgeable Halocarbons EPA 8240 PurgeablesMDNR Scan 2 EPA 8020 Purgeabte Aromatics EPA 8270 ON SVOCsMDNR Scan 3 EPA 8310 Polynuclear Aromatics EPA 8270 Acid SVOCs |jMDNR Scan 8 EPA 8080 Pest/PCBs |

1 WASTE CHARACTERIZATION ANALYSES Please specify

SPLP/Metals (As Ba Cd Cr+6 Cr Cu HE Pb Se Ag Zn]TCLP/Metals |As Ba Cd Cr+6 Cr Cu Hg Pb Se Ag Zn]ASTM D3987-85/SVOCsEP Tox/Metals [As Ba Cd Cr*6 Cr Cu Hg Pb Se Ag Zn]

1

DL: S = Sld lab DL or A = Act 307 DL

SPLP/VOCs SPLP/SVOCsTCLP/VOCs TCLP/SVOCs

SPLP/CNSPLP/S" ||

ASTM D3987-85/CN ASTM D3987~85/S~ Flash Point ||Cyanide, R EP Tox/SVOCs

Sulfide, RPaint Filler Test

SAM

PLE AN

ALY

SIS REQ

UEST SH

EET

o t/> (i>_ 5' K) #M 3 o ^

i^O tO N> W

Page 67: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

FISHBECK, THOMPSON, CARR & HUBER, INCSTANDARD OPERATING PROCEDURE

SOIL SAMPLING BY HAND-AUGER METHODSOP#F6-4.1Page 1 of 2Version J . IDate: 11/16/93

Scope: The following SOP is to be used to acquire soil samples from the surface to a depthof approximately five feet.

Equipment: Closed head 31-inch hand augerClosed head 2{-inch hand augerExtension rods"T" Handles4-foot-long piece of 4-inch inner-diarneter polyvinyl chloride (PVC) pipeClean paper towelingSpray bottle of trisodium phosphate (TSP) solutionSpray bottle of deionized, organic free waterOne large disposable aluminum pan for EACH site to be sampledTongue depressorsAppropriate number and type of sample containers and labels

Procedure:

Remove top layer of litter and debris from area to be sampled. With tip of the 3±-inch auger, startsmall hole in soil. Place auger tip into hole and hold auger steady. As auger moves into soil,slowly and carefully rotate the auger to keep it loose in the borehole. This will allow for easyremoval upon completion of drilling. When auger has reached a depth of 1-foot below groundlevel (bgl), stop turning. Leave auger standing in borehole unti l ready to take sample.

When ready to obtain sample, remove auger. Using a tongue depressor, scrape top 1 to 2 inchesof soil from auger and discard. Collect sample material into a disposable aluminum pan. Mix thesoil matrix completely. Place soil into appropriate sample containers.

Label the sample containers clearly and accurately. Complete chain-of-custody documents andrecord activities in field notebook. Store samples in cooler with ice during sampling andtransportation periods.

Decontaminate equipment between samples by washing with a TSP solution and rinsing withdeionized water. Dry equipment with clean paper towel or allow to air dry before further use.

Following collection of 1 -foot bgl sample, place PVC casing in hole and push down to 1 -foot bgl.Carefully remove any remaining soil cuttings from inside casing to prevent mixing of soils fromdifferent depth intervals.

Place 21-inch auger inside casing and auger to 2 feet bgl. Remove auger from borehole, leavingPVC casing in place. Scrape top 1 to 2 inches and bottom 1 to 2 inches of soil from auger anddiscard. Collect sample as previously described.

Page 68: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

SOIL SAMPLING BY HAND-AUGER METHODSOP #F6-4.1Page 2 of 2Version I.IDate: 11/16/93

After sample collection, auger to 2 feet bgl using 3i-inch auger. At 2 feet bgl, remove 3i-inchauger and push PVC casing to depth of 2 feet bgl. Carefully remove any remaining soil cuttingsfrom inside PVC casing. Place 2i--inch auger inside PVC casing and auger to 3 feet bgl. Repeatsoil sample collection by continuing auger/casing process un t i l final depth is reached.

Prepare a boring log record of the soil types and thickness encountered for each location. Thisboring log will be used in the preparation of any reports for the site.

fro-h

Page 69: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

APPENDIX 2-C

SUMMARY OF SOIL CHARACTERISTICS

froh

Page 70: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Summary of Soil CharacteristicsElectro- Voice, Inc.

Depth123456789

9.51017

Depth123456789

9.510

11.514

14.517

LSB-1Clayey Sandy SiltClayey SiltClayey SiltClayey SiltClayey Silt

LSB-7Clayey SiltClayey SiltClayey SiltSilty Clay

LSB-2Clayey SiltClayey SiltClayey SiltClayey Silty SandClayey Silty SandClayey Silty SandClayey Sandy GravelClayey Sandy GravelClayey Sandy GravelClayey Sandy GravelSand

LSB-8Clayey SiltClayey SiltClayey SiltSilty ClaySilty ClaySandSandSandSandSandSandGravelly SandSandClaySilty Sand

LSB-3Clayey SiltClayey SiltClayey Silty SandClayey Silty SandSilty Gravelly Sand

LSB-9Clayey SiltClayey SiltClayey Silty SandClayey Silty SandSilty Gravelly SandSilty Gravelly SandGravelly Silty SandGravelly Silty SandGravelly Silty SandGravelly Silty SandGravelly Silty Sand

LSB-4Clayey Silty SandClayey SiltClayey SiltClayey SandClayey Sand

i

LSB-10Clayey SiltSilty ClayGravelly Clayey SandClayey Silty SandClayey Silty Sand

LSB-5Clayey SiltSandy Clayey SiltClayey Gravelly SandClayey Gravelly SandClayey Gravelly SandClayey Gravelly SandClayey Sandy GravelClayey Sandy GravelGravelGravelSandSand

LSB-1 1Sandy SiltSandy SiltSandy SiltSilty SandClayey Gravelly Sand

LSB-6Clayey SiltClayey Silty SandClayey Silty SandClayey Silty SandSilty Sand

r LSB-1 2Clayey Silt^ayey SiltSilty ClaySilty ClayClayey Sand

Page 71: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Summary of Soil CharacteristicsElectro-Voice, Inc.

Depth

123456789

9.510121417

Depth123456789

9.51017

LSB-13Clayey SiltClayey SiltClayey SiltClayey SiltClayey SiltClayey SiltClayey SandClayey SandClayey SandSilty SandSiity SandSandGravelly SandSand

LSB-19SandSandSandSandGravelly Sand

LSB-14

Silty SandSilty SandSilty SandSandy SiltSilty SandSilty SandSilty SandSilty SandSilty SandSilty SandSilty Sand

LSB-20Silty SandClayey Silty SandClayey Silty SandSandSand

LSB-15

SandSandSandSandSand

LSB-21Silty ClaySilty ClaySilty ClaySilty ClaySilty Clay

LSB-16

Silty ClaySandy ClaySandy ClayClayey Gravelly SandClayey Gravelly Sand

LSB-22Silty SandClayey SandClayey SandClayey SandClayey Sand

LSB-17

Silty ClaySilty ClaySilty Sandy ClaySilty Sandy ClayClayey Sand

LSB-23Sandy SiltClayey SandClayey SandClayey SandSandy Clay

LSB-18

Clayey SiltClayey SiltClayey Sandy SiltClayey Sandy SiltClayey Sandy SiltClayey Sandy SiltClayey Sandy SiltClayey Sandy SiltSilty Gravelly SandSilty Gravelly SandSilty Gravely Sand

LSB-24Silty SandClayey SiltClayey SiltClayey SiltSilty Sand

Page 72: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Summary of Soil Characteristics -—Electro-Voice, Inc.

Depth12345678910

11.513.5

15Depth

12

34567891017

LSB-25

Clayey Sandy SiltClayey Sandy SiltSilty SandSilty SandSand and Gravel

LSB-31

Clayey SiltClayey SiltClayey SiltClayey SiltClayey Sandy Silt

LSB-26

Silty ClayGravelly SandGravelly SandGravelly SandGravelly Sand

LSB-32

Silty SandClayey SiltClayey SiltClayey SiltClayey SiltClayey SiltClayey SiltClayey SiltSilty SandSilty Clay

LSB-27

Silty ClaySilty ClayGravelly SandGravelly SandGravelly Sand

LSB-33

Sandy SiltSandy SiltClayey Sandy SiltSandy SiltSandy Silt

LSB-28

Silty Clayey SandSilty Clayey SandSandy Clayey SiltSilty ClaySilty ClaySilty ClaySilty ClayClayey SandClayey SandClayey SandSandSilty ClayClayey Silty Sand

LSB-34

Sandy SiltClayey Sandy SiltClayey SiltSilty ClaySilty Sandy Clay

LSB-29

Sandy Silty ClaySandSandSandSand

LSB-35

Silty Gravelly SandSilty ClaySilty ClaySilty ClaySilty Gravelly Sand

LSB-30

Silty SandSilty SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly Sand

LSB-36

Silty ClayClayey SiltSandy SiltSand and GravelSand and Gravel

Page 73: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Summary of Soil CharacteristicsElectro -Voice, Inc.

Depth

1234567

8910

12.517

Depth

12

34

5

67891017

LSB-37Silty SandSilty SandSilty SandClayey SiltClayey Silt

LSB-43

Silty SandSilty SandSilty SandSilty SandClayey Silty Sand

LSB-38

Clayey SiltClayey SiltClayey Sandy SiltClayey Silty SandClayey Silty SandClayey Silty SandSilty ClaySilty ClaySilty ClayClayey SandSandGravelly Sand

LSB-44

Silty SandSilty SandSilty SandSilty SandSandy Silty Clay

LSB-39

Silty SandSilty SandSilty Gravelly SandSandy GravelSandy Gravel

LSB-45

Clayey SiltClayey Sandy SiltSilty Sand and GravelSandSand

LSB-40

Sandy SiltClayey SiltSilty SandSilty ClaySandy Gravel

LSB-46

Clayey SiltSilty SandClayey SiltSilty SandSilty Sand

LSB-41

Silty Sand and GravelSilty SandSilty SandSilty SandSilty Sand

LSB-47

Clayey Silty SandSilty SandSilty SandyClayey Sandy SiltClayey Sandy Silt

LSB-42

Silty SandSilty SandSilty ClayClayey Silty SandSandy Silt

LSB-48

Silty SandSilty SandSilty SandSilty SandSilty Sand

Page 74: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

^^ Summary of Soil Characteristics —Electro-Voice, Inc.

Depth123456789

9.51017

Depth

123456789

9.51017

LSB-49

SandSandSandSand and GravelSand

LSB-55

Silty SandSilty SandSilty SandSilty SandSandy Silt

LSB-50

Silty ClaySilty ClaySand and GravelSand and GravelSand and Gravel

LSB-56

Silty SandSandSandSandSand

LSB-51

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-57

Silty SandSilty SandSilty ClaySilty ClayClayey Silty Sand and Gravel

LSB-52

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-58

Silty SandSilty ClaySand and GravelSand and GravelSand

LSB-53

Clayey SiltClayey Sandy SiltSandSandSand and Gravel

LSB-59

Silty SandSilty SandSandy SiltClayey Sandy SiltSilty Sandy Clay

LSB-54

Silty SandSilty SandSilty SandSilty SandSilty SandSandSandGravelGravelSandSand

LSB-60

Silty SandSand and GravelSilty SandSandSilty Sand

Page 75: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Summary of Soil CharacteristicsElectro-Voice, Inc.

Depth

1234

5

6789

9.51017

DepthI234567

89

9.51017

LSB-61

Sandy SiltSilty SandSilty SandSilty SandSilty Sand

LSB-67

Silty SandSilty SandClayey Silty SandSandy Silty ClayClayey Sandy Silt

LSB-62

Clayey Sandy SiltSandSandSandSand

LSB-68

Clayey SiltSilty ClaySilty ClayClayey Silty SandSilty Sand

LSB-63

Silty Gravelly SandSand and GravelSilty Gravelly SandSandy SiltClayey Sandy Silt

LSB-69

Clayey SiltClayey SiltSandSandSilty Clay

LSB-64

Clayey Sandy SiltSilty SandClayey Sandy SiltClayey Sandy SiltSilty Sand

LSB-70

Clayey SiltClayey SiltSilty ClaySilty ClaySilty ClaySilty ClaySilty ClaySilty Sand

LSB-65

Gravelly Silty SandGravelly Silty SandClayey Sandy SiltClayey Sandy SiltSilty Clay

LSB-71Silty SandSilty SandSilty SandClayey SiltClayey Sand

LSB-66

Silty SandSilty SandSilty SandSilty SandClayey Silty Sand

LSB-72

Gravelly Silty SandSilty ClaySilty ClaySilty SandSilty ClayClayey Sand

Page 76: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

"^ Summary of Soil Characteristics — 'Electro -Voice, Inc.

Depth

123456789

9.51017

Depth

1234567

891017

LSB-73

Silty SandSandy SiltSandy SiltSandy SiltClayey SiltClayey SiltSilty Gravelly SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly Sand

LSB-79

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-74

Sandy SiltSandy SiltSandy SiltClayey SiltClayey SiltClayey SiltSilty Gravelly SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly Sand

LSB-80

Clayey Silty SandClayey Silty SandClayey Silty SandClayey Sand/GravelClayey Sand/Gravel

LSB-75

Sandy SiltSandy SiltSandy SiltClayey SiltClayey SiltClayey SiltSilty Gravelly SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly SandSilty Gravelly Sand

LSB-81

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-76

Clayey Silty SandClayey Silty SandClayey Silty SandSilty SandSilty Sand

LSB-82

DebrisDebrisDebrisDebrisDebrisDebrisSilty Clayey SandSilty Clayey SandSandSand

LSB-77

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-83

DebrisDebrisDebrisDebrisDebrisDebrisSandy ClaySilty SandGravelly SandGravel and Sand

LSB-78

Clayey Silty SandClayey Silty SandGravelly SandGravelly SandGravelly Sand

LSB-84

DebrisDebrisDebrisDebrisDebrisDebrisDebrisDebrisSilty Clayey SandSilty Clayey Sand

Page 77: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oto

Summary of Soil CharacteristicsElectro- Voice, Inc.

Depth

12345678910

Depth1234567

8910

LSB-85

DebrisDebrisDebrisSilty Clayey SandSilty Clayey SandSilty SandSilty SandSilty Clayey SandSandSand

LSB-90DebrisDebrisDebrisDebrisSilty SandSilty SandSandSandSandSand

LSB-86

Silty SandSitty SandSilty SandSilty SandSilty Sand

LSB-91DebrisDebrisDebrisDebrisGravelly SandGravelly SandSandSandSandSand

LSB-87

Silty SandSilty SandSilty SandSilty SandSand

LSB-92

DebrisDebrisDebrisDebrisGravelly SandSandSandSandSandSand

LSB-88

Silty SandSilty SandSilty SandSilty SandSilty Sand

LSB-93DebrisDebrisDebrisDebrisDebrisClayey Silty SandSilty SandSilty SandSandGravelly Sand

LSB-89Silty SandSilty SandSilty SandSilty SandSilty Sand

Page 78: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

APPENDIX 2-D

LABORATORY ANALYTICAL RESULTS FOR

LAGOON INVESTIGATION SOIL SAMPLES

Page 79: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-1 (0 - l')I04/27/94F93307C, COC No: 6814

Report Date: 06/24/94Lab Number: 940600306Date Received: 06/08/94Client ID: 60688

003

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

5304.78.5

86.4

ug/kgmg/kging/kg

Page 80: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-1 (4 - 5')I04/27/94F93307C, COC No: 9366

Report Date: 05/13/94Lab Number: 940400675Date Received: 04/29/94Client ID: 60688

002-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

5100.2512

80.3

ug/kgmg/kgmg/kg

Page 81: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900289Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-1 (4 --5')I04/27/94F93307C, COC No: 6878

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.10.01 U0.02 U

1 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 82: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-2 (4 - 5') I04/26/94F93307C, COG No: 9117

014

Report Date: 11/02/94Lab Number: 94100467Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.7

Units

s. u.

Page 83: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400676Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-2 (4 - 5')I04/26/94F93307C, COG No: 9366

'• Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

89000.14 U18

85.6

ug/kgmg/kgmg/kg%

Page 84: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900290Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr.' Ron Graham

Sample ID: SPLP/LSB-2 (4 - 5') I04/26/94F93307C, COC No: 6878

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Arsenic 1 U ug/1Barium 1.2 ™g/lCopper 0.01 U mg/1Nickel 0.02 U mg/1Lead 1 U ug/1Zinc 0.04 rog/1

Page 85: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00?

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100455Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-2 (4 - 5')I04/26/94F93307C, COC No: 9117

Results reported with "U" flag indicate the parameter was analyzed- for but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

0.7

Units

ug/1

Page 86: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-2 (9 - 10')I06/22/94F93307C, COG No: 9101

Report Date: 07/13/94Lab Number: 940601031Date Received: 06/24/94Client ID: 60688

012-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

20000.14 U9.190.9

ug/kgmg/kgmg/kg

Page 87: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-2 (9 - 10')Duplicate06/22/94F93307C, COG No: 9102

Report Date: 07/13/94Lab Number: 940601032Date Received: 06/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

j CadmiumCyanide, T.

i Chromium, T.j Solids, Total

14000.14 U7.0

90.8

ug/kgmg/kgmg/kg

013

Page 88: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-2 (9 - 10')I06/22/94F93307C, COC No: 6861

Report Date: 07/25/94Lab Number: 940700344Date Received: 07/15/94Client ID: 60688

coz

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

0.9

Units

ug/1

Page 89: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-2 (9 - 10') I] 06/22/94> F93307C, COC No: 6861

012.

Report Date: 07/20/94Lab Number: 940700354Date Received: 07/15/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit,

Parameter

I pH

Result

7.5

Units

s.u.

Page 90: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-2 (9 - 10')06/22/94F93307C, COC No: 6876

002

Report Date: 10/04/94Lab Number: 940900275Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.620.01 U0.02 U

1 U0.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 91: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-3 (0 - l')I04/26/94F93307C, COC No: 6814

Report Date: 06/24/94Lab Number: 940600307Date Received: 06/08/94Client ID: 60688

004-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium/ T.Solids, Total

34000.45

1483 .8

ug/kgmg/kgmg/Jcg

Page 92: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-3 (0 - I7)I04/26/94F93307C, COC No: 6861

005

Report Date: 07/25/94Lab Number: 940700345Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

1.0

Units

ug/1

Page 93: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-3 (0 - l')I04/26/94F93307C, COC No: 6861

Report Date: 07/20/94Lab Number: 940700355Date Received: 07/15/94Client ID: 60688

013

• Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.0

Units

s.u.

Page 94: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-3 (0 - l')I04/26/94F93307C, COC No: 9396

Report Date: 10/28/94Lab Number: 94100247Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U1.4

0.005 U0.01 U0.02 U

5 U0.04

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 95: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400677Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-3 (4 - 5')I04/26/94F93307C, COC No: 9366

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2700.169.0

91.7

ug/kgmg/kgmg/kg

Page 96: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

OO'

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-3 (4 - 5') I04/26/94F93307C, COC No: 6878

Report Date: 10/04/94Lab Nuinber: 940900291Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.430.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 97: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600308Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-4 (0 - l')I04/26/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

71000.4618

80.6

ug/kgmg/Jcgmg/kg%

Page 98: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-4 (0 - l')I04/26/94F93307C, COG No: 6861

Report Date: 07/29/94Lab Number: 940700346Date Received: 07/15/94Client ID: 60688

004

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, Total

0.40.005 U

ug/1mg/1

Page 99: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014

Electro-Voice Report Date: 07/20/94600 Cecil Street Lab Number: 940700356Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-4 (0 - l')I04/26/94F93307C, COC No: 6861

'; Results reported with "U" flag indicate the parameter was analyzed* for but not detected in the sample above the detection limit.

Parameter

pH

Result

7.4

Units

s.u.

Page 100: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100259Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-4 (0 - l')I04/26/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

ArsenicBariumCopperNickelLeadZinc

Result

30.760.01 U0.02 U

30.02

Units

ug/1mg/1mg/1mg/1ug/1mg/1

Page 101: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Attention: Mr, Ron Graham

Sample ID: LSB-4 (0 - 1')I/Soil04/26/94F93307C, COC No: 9414

002-

Electro-Voice600 Cecil StreetBuchanan MI 49107

Report Date: 11/23/94Lab Number: 941100284Date Received: 11/15/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

780081.2

Page 102: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100383Buchanan MI 49107 Date Received: 10/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-4, 4-5'04/26/94F93307C, COC No: 9400

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

550087.2

Page 103: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400679Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-5 (4 - 5')I04/26/94F93307C, COG No: 9366

_ •• Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

710000.4628

85.8

ug/kgmg/kgmg/kg

Page 104: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-5 (4 - 5') I04/26/94F93307C, COC No: 6878

Report Date: 10/04/94Lab Number: 940900293Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

11.20.020.02 U

10.06

ug/1mg/1mg/1mg/1ug/1mg/1

Page 105: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-5 (6.5 - 7.5')I06/22/94F93307C, COC No: 9101

Report Date: 07/13/94Lab Number: 940601030Date Received: 06/24/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

520000.29

2887

ug/kgmg/kgrag/kg

Page 106: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800079Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-5 (16 - 17')07/26/94F93307C, COG No: 9272

* Results reported with "U11 flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T;Solids, Total

200000.5719

91.7

ug/kgmg/kgmg/kg

Page 107: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Oil

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900284Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-5 (16 - 17')07/26/94F93307C, COC No: 6876

* Results reported with "U" flag- indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.710.01 U0.02 U

1 U0.02

ug/lmg/lmg/1mg/lug/1mg/l

Page 108: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-6 (0 - l')I04/26/94F93307C, COC No: 6862

Report Date: 08/02/94Lab Number: 940700332Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

150000.58

226.2

82.3

ug/kgmg/kgmg/kgs.u.

Page 109: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400680Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-6 (4 - 5')I04/26/94F93307C, COC No: 9366

, Rssults reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

17000.15 U

1386.1

ug/kgmg/kgmg/kg

Page 110: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-6 (4 - 5')I04/26/94F93307C, COG No: 6811

003

Report Date: 06/24/94Lab Number: 940600341Date Received: 06/09/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

0.2 U

Units

ug/i

Page 111: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Report Date: 10/04/94Lab Number: 940900294Date Received: 09/19/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-6 (4 - 5')I04/26/94F93307C, COC No: 6878

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.980.01 U0.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 112: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

39000.7822

86.2

ug/kgmg/kgmg/kg

001?

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600309Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-7 (0 - l')I04/26/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 113: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-7 (0 - l')l04/26/94F93307C, COG No: 6861

005

Report Date: 07/29/94Lab Number: 940700347Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cyanide, Total

Result

0.005 U

Units

mg/1

Page 114: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-7 (0 - I7)I04/26/94F93307C, COG No: 6861

Report Date: 07/20/94Lab Number: 940700357Date Received: 07/15/94Client ID: 60688

015

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.1

Units

s.u.

Page 115: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-7 (0 - I')*04/26/94F93307C, COC No: 9396

Report Date: 10/31/94Lab Number: 94100238Date Received: 10/17/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumChromium, T.CopperNickelLeadZinc

2 U0.450.4 U

0.02 U0.01 U0.02 U19

0.09

ug/1mg/1ug/1mg/1mg/1mg/1ug/1mg/1

Page 116: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-7 (0 - 1')I/Soil07/28/94F93307C, COC No: 9414

01!

Report Date: 11/30/94Lab Number: 941100293Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadSolids, Total

95065.4

Page 117: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-7 (4 - 5') I04/26/94F93307C, COG No: 9366

Report Date: 05/13/94Lab Number: 940400681Date Received: 04/29/94Client ID: 60688

• Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

190 U0.15 U12

84.5

ug/kgmg/kgmg/kg

Page 118: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Hr. Ron Graham

Sample ID: SPLP/LSB-7 (4 - 57)I04/26/94F93307C, COC No: 6878

Report Date: 10/04/94Lab Number: 940900295Date Received: 09/19/94Client ID: 60688

* Results reported with "D" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLead2inc

11.00.01 U0.02 U

10.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 119: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00;

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900301Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-13 (4 - 5') I04/27/94F93307C, COC No: 6879

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.490.01 U0.02 U

1 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 120: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00:,

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-13 (9 - 10')06/22/94F93307C, COG No: 6876

Report Date: 10/04/94Lab Number: 940900278Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.610.01 U0.02 U

1 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 121: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-12 (4 - 5') I04/27/94F93307C, COC No: 6811

005

Report Date: 06/24/94Lab Number: 940600343Date Received: 06/09/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumChromium, T.

0.2 U0.02 U

ug/1mg/1

Page 122: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-12 (4 - 5')I04/27/94F93307C, COC No: 6878

Report Date: 10/04/94Lab Number: 940900300Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.980.01 U0.02 U

1 U0.04

ug/lmg/lmg/1mg/lug/lmg/l

Page 123: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014

Electro-Voice Report Date: 05/18/94600 Cecil Street Lab Number: 940400687Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-13 (4 - 5')I04/27/94F93307C, COC No: 9367

Results reported with "U" flag indicate the parameter was analyzed-" for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

240001.985

76 .4

ug/kgmg/Jcgmg/kg

Page 124: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-13 (9 - 10') I06/22/94F93307C, COC No: 9101

Report Date: 07/13/94Lab Number: 940601028Date Received: 06/24/94Client ID: 60688

009

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

120000.66

2087.6

ug/kgmg/kgmg/kg

Page 125: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

ooj

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100384Buchanan MI 49107 Date Received: 10/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-7, 4-5'04/26/94F93307C, COC No: 9400

Results reported with "U" flag indicate the parameter was analyzed- for but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicSolids, Total

300085.2

ug/kg%

Page 126: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-8 (4 - 5')I04/26/94F93307C, COG No: 9366

Report Date: 05/13/94Lab Number: 940400682Date Received: 04/29/94Client ID: 60688

009

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result units

CadmiumCyanide, T.Chromium, T.Solids, Total

58000.1557

85.4

ug/kgmg/kgrag/kg

Page 127: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-8 (4 - 5'}I04/26/94F933Q7C, COC No: 6878

Report Date: 10/04/94Lab Number: 940900296Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.2

0.01 U0.02 U

1 U0,03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 128: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-8 (9 - 10') I06/21/94F93307C, COC No: 9101

Report Date: 07/13/94Lab Number: 940601023Date Received: 06/24/94Client ID: 60688

004

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

210000.6828

88.4

ug/kgmg/kgmg/kg

Page 129: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900276Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-8 (9 - 10')06/21/94F93307C, COG No: 6876

* Results reported with "U" flag indicate the parameter was analyzed~ for but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.540.01 U0.02 U

1 U0.05

ug/1rag/1mg/lmg/1ug/1mg/1

Page 130: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-8 (16 - 17')07/26/94F93307C, COG No: 9272

Report Date: 08/31/94Lab Number: 940800078Date Received: 08/04/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T,Chromium, T.Solids, Total

250000.259.7

91.2

ug/kgmg/kgmg/kg

Page 131: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

012-

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900285Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-8 (16 - 17')07/26/94F93307C, COC No: 6876

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

11.1

0.020.02 U

30.11

ug/1mg/1mg/1mg/1ug/1mg/1

Page 132: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0\0

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400683Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-9 (4 - 5')I04/26/94F93307C, COG No: 9366

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

360000.17

2586.1

ug/kging/kgmg/kg

Page 133: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-9 (4 - 5') I04/26/94F93307C, COC No: 6878

oio

Report Date: 10/04/94Lab Number: 940900297Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.590.01 U0.02 U

1 U0.02

ug/1 ,mg/1mg/1mg/1ug/1mg/1

Page 134: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/13/94600 Cecil Street Lab Number: 940601024Buchanan MI 49107 Date Received: 06/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-9 (9 - 10') I06/21/94F93307C, COG No: 9101

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

18000.14 U11

89.3

ug/kgmg/kgmg/kg

Page 135: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900277Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-9 (9 - 10')06/21/94F93307C, COC No: 6876

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.380.01 U0.02 U

1 U0.03

ug/img/lmg/1mg/lug/1mg/l

Page 136: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-9 (9 - 10'} I04/26/94F93307C, COG No: 9117

Report Date: 11/03/94Lab Number: 94100456Date Received: 10/24/94Client ID: 60688

003

* Results reported with "U" flag indicate the parameter was analysedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

0.4 U

Units

ug/1

Page 137: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

015

Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100468Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-9 (9 - 10')I04/26/94F93307C, COG No: 9117

..Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

6.4

Units

s.u.PH

Page 138: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00'

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600310Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-10 (0 - l')I04/27/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

50000.70

1881.6

ug/kgmg/kgmg/kg

Page 139: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00k

Report Date: 07/25/94Lab Number: 940700348Date Received: 07/15/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-10 (0 - I7)I04/27/94F93307C, COC No: 6861

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

6.5

Units

ug/1

Page 140: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/20/94600 Cecil Street Lab Number: 940700358Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-10 (0 - l')I04/27/94F93307C, COG No: 6861

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.5

Units

s .u.

Page 141: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-10 (0 - l')I04/27/94F93307C, COC No: 9396

Report Date: 10/31/94Lab Number: 94100244Date Received: 10/17/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedr but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

2 U1.00.7

0.005 U0.01 U0.02 U

5 U0.03

ug/1mg/1ug/1mg/1mg/1mg/1ug/1mg/1

Page 142: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/13/94600 Cecil Street Lab Number: 940400684Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-10 (4 - 5')I04/27/94F93307C, COC No: 9366

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

4100.15 U11

84.1

ug/kgmg/kgmg/kg

Page 143: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Oil

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-10 (4 - 5')I04/27/94F93307C, COC No: 6878

Report Date: 10/04/94Lab Number: 940900298Date Received: 09/19/94Client ID: 60688

* Results reported with "IT" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.280.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 144: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

6000.249.1

84.1

ug/kging/kging/kg

00?

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 9406003X1Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-11 (0 - l')I04/27/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 145: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

002-

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100258Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-11 (0 - l')I04/27/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.690.01 U0.02 U

2 U0.05

ug/1mg/1mg/1mg/1ug/1mg/1

Page 146: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014-

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100270Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-11 (0 - l')I04/27/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.2

Units

s.u.

Page 147: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-11 (4 - 5')I04/27/94F93307C, COG No: 9366

Report Date: 05/18/94Lab Number: 940400685Date Received: 04/29/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, TSolids, T.

2200.14 U1088

ug/kgmg/kgmg/kg

Page 148: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil streetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-11 (4 - 5') I04/27/94F93307C, COG No: 6878

Report Date: 10/04/94Lab Number: 940900299Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.640.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 149: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700333Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-12 (0 - l')l04/27/94F93307C, COC No: 6862

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

140000.46

277.3

80.9

ug/kgmg/kgmg/kgs.u.

Page 150: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-12 (4 - 5')I04/27/94F93307C, COG No: 9367

013

Report Date: 05/18/94Lab Number: 940400686Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, T.

17000.15 U22

83.6

ug/kgmg/kgmg/kg

Page 151: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Report Date: 08/30/94Lab Number: 940800077Date Received: 08/04/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-13 (16 - 17')07/26/94F93307C, COG No: 9272

4 * Results reported with "U" flag indicate the parameter was analyzedv for but not detected in the sample above the detection limit.

005

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

28000.8111

85.8

ug/kgmg/kgmg/kg

Page 152: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-13 (16 -17')07/26/94F93307C, COG No: 6876

Report Date: 10/04/94Lab Number: 940900286Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

21.0

0.020.02 U

50.14

ug/1mg/1mg/1mg/1ug/1mg/1

Page 153: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

-_J

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-14 (4 - 5') I04/27/94F93307C, COG No: 9367

015

Report Date: 05/18/94Lab Number: 940400688Date Received: 04/29/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedf for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, TSolids, T.

1700.14 U

4390.2

ug/kging/kgmg/kg

Page 154: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oc:

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-14 (4 - 5') I04/27/94F93307C, COC No: 6879

Report Date: 10/06/94Lab Number: 940900302Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U101 U02 U1 U

0.08

ug/1mg/1mg/1mg/1ug/1mg/1

Page 155: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100457Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-14 (4 - 5')I04/27/94F93307C, COC No: 9117

v Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Chromium, T

Result

0.02 U

Units

mg/1

Page 156: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-14 (4 - 5')I04/27/94F93307C, COG No: 9117

Report Date: 11/02/94Lab Number: 94100469Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.4

Units

s.u.

Page 157: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-14 (9 - 10'} I06/22/94F93307C, COG No: 9101

Report Date: 07/13/94Lab Number: 940601029Date Received: 06/24/94Client ID: 60688

010

' Results reported with "U" flag indicate the parameter was analyzedbut not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1200.14 U24

90.9

ug/kgmg/kgmg/kg

Page 158: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-14 (9 - 10')06/22/94F93307C, COC No: 6876

Report Date: 10/04/94Lab Number: 940900279Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.350.01 U0.02 U

1 U0.01

ug/lmg/lmg/1mg/lug/lmg/l

Page 159: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-14 (9 - 10') I04/27/94F93307C, COC No: 9117

Report Date: 11/03/94Lab Number: 94100458Date Received: 10/24/94Client ID: 60688

005

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Chromium, T.

Result

0.02 U

Units

mg/1

Page 160: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-14 (9 - 10')I04/27/94F93307C, COC No: 9117

Report Date: 11/02/94Lab Number: 94100470Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.8

Units

s.u.

Page 161: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600312Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-15 (0 - l')I04/27/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2200.14 U7.2

91.3

ug/kgmg/kgmg/kg

Page 162: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-15 (0 - l')I04/27/94F93307C, COG No: 9197

Report Date: 11/03/94Lab Number: 94100295Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.530.01 U0.02 U

2 U0.03

ug/lmg/1mg/1tng/lug/lmg/1

Page 163: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0<J7

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-15 (0 - l')I04/27/94F93307C, COG No: 9197

Report Date: 10/21/94Lab Number: 94100299Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result* •. •* v* «VB^H •

6.4

Units

s.u.

Page 164: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-15 (4 - 5') I04/27/94F93307C, COG No: 9367

Report Date: 05/18/94Lab Number: 940400689Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, T.

68 U0.13 U4.194.1

ug/kgmg/kgmg/kg

Page 165: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-15 (4 - 5')D04/27/94F93307C, COC No: 9367

Report Date: 05/18/94Lab Number: 940400694Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, T.

56 U0.163.6

94.3

ug/kging/kgmg/kg

Page 166: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

3300.277.3

84.6

ug/kging/kgmg/kg

j_

010

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600313Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-16 (0 - I'}*04/28/94F93307C, COG No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 167: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-16 (0 - l')I04/28/94F93307C, COC No: 9397

Report Date: 10/31/94Lab Number: 94100260Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.500.01 U0.02 U

2 U0.01

ug/1mg/1mg/1mg/1ug/1mg/1

Page 168: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter

pH

Result

7.3

Units

s . u .

OH*

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100272Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-16 (0 - l')I04/28/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 169: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

017

Electro-Voice Report Date: 05/18/94600 Cecil Street Lab Number: 940400690Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-16 (4 - 5')I04/27/94F93307C, COC No: 9367

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium , T .Solids, T.

1100.14 U8.6

88.3

ug/kgmg/kgmg/kg%

Page 170: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-16 (4 - 5')I04/28/94F93307C, COC No: 6879

DCf

Report Date: 10/06/94Lab Number: 940900303Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.610.01 U0.02 U

1 U0.01

ug/1mg/1mg/1mg/1ug/1mg/1

Page 171: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-17 (0 - l')I04/28/94F93307C, COC No: 6862

Report Date: 08/02/94Lab Number: 940700334Date Received: 07/15/94Client ID: 60688

002

* Results reported with "IT" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

180001.8397.184.3

ug/kgmg/kgmg/kgs.u.

Page 172: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-17 (4 - 5') I04/27/94F93307C, COC No: 9367

Report Date: 05/18/94Lab Number: 940400691Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, T.

16000.41

1884.0

ug/kgmg/kgnig/kg

Page 173: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-17 (4 - 5')I04/28/94F93307C, COC No: 6811

octt

Report Date: 06/24/94Lab Number: 940600342Date Received: 06/09/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cadmium

Result

0.6

Units

ug/1

Page 174: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Report Date: 10/06/94Lab Number: 940900304Date Received: 09/19/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-17 (4 - 5') I04/28/94F93307C, COC No: 6879

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

11.40.01 U0.02 U

20.06

ug/lmg/lmg/lmg/lug/lmg/l

Page 175: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-17, 4-5'04/26/94F93307C, COC No: 9400

Report Date: 10/31/94Lab Number: 94100385Date Received: 10/20/94Client ID: 60688

oof

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

390086.3

Page 176: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/17 (4 - 5') I04/28/94F93307C, COC No: 9117

Report Date: 10/31/94Lab Number: 94100460Date Received: 10/24/94Client ID: 60688

007

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cyanide, Total

Result

0.013

Units

mg/1

Page 177: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100472Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-17 (4 - 5')I04/28/94F93307C, COC No: 9117

,* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

019

Parameter

PH

Result

6.7

Units

s.u.

Page 178: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

019.

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-18 (4 - 5')I04/27/94F93307C, COG No: 9367

Report Date: 05/3.8/94Lab Number: 940400692Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, TSolids, T.

7900.4341

87.0

ug/kgmg/kgmg/kg

Page 179: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00!*

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900305Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-18 (4 - 5')I04/27/94F93307C, COC No: 6879

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

19401 U

U0.0.0.02 U

1 U0.03

ug/lmg/lrag/1mg/lug/lmg/l

Page 180: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

006

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100461Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/18 (4 - 5')I04/27/94F93307C, COG No: 9117

* Results reported with "U" flag indicate the parameter was analyzed .,for but not detected in the sample above the detection limit.

Parameter Result Units

Cyanide, Total 0.005 U mg/1Chromium, T. 0.02 U rog/1

Page 181: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

020

Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100473Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-18 (4 - 5')I04/27/94F93307C, COC No: 9117

e Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.1

Units

s.u.

Page 182: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-18 (9 - 10')I06/22/94F93307C, COC No: 9101

Report Date: 07/13/94Lab Number: 940601027Date Received: 06/24/94Client ID: 60688

00$

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2400.15 U

2185.2

ug/kgmg/kging/kg

Page 183: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

001

Electro-Voice Report Date: 10/04/94600 Cecil Street . Lab Number: 940900280Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-18 (9 - 10')06/22/94F93307C, COG No: 6876

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected'in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.10.010.02 U

1 U0.07

ug/lmg/lmg/1mg/lug/1mg/l

Page 184: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-18 (9 - 10')I04/27/94F93307C, COC No: 9117

Report Date: 11/03/94Lab Number: 94100459Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Chromium, T.

Result

0.02 U

Units

rag/1

Page 185: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

01$

Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100471Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-18 (9 - 10')I04/27/94F93307C, COG No: 9117

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.3

Units

s.u.

Page 186: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

on

Report Date: 06/24/94Lab Number: 940600314Date Received: 06/08/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-19 (0 - 1'JI04/27/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide , T .Chromium , T .Solids, Total

1205.06.393.8

ug/kgmg/kgmg/kg%

Page 187: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/18/94600 Cecil Street Lab Number: 940400693Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-19 (4 - 5')I04/27/94F93307C, COG No: 9367

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, TSolids, T.

49 U0.13 U5.996.3

ug/kgmg/kgmg/kg

Page 188: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-19 (4 - 5')I04/27/94F93307C, COC No: 9555

Report Date: 01/05/95Lab Number: 941200533Date Received: 12/20/94Client ID: 60688

004

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result units

ArsenicLeadSolids, Total

30005.6

96.0

ug/kgmg/kg

Page 189: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice Report Date: 01/04/95600 Cecil Street Lab Number: 941200534Buchanan MI 49107 Date Received: 12/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-19 (4 - 5') I04/27/94F93307C, COC No: 9555

^ Results reported with "U11 flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCopperNickelZinc

0.400.01 U0.02 U0.01 U

mg/1mg/1mg/1mg/1

Page 190: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600315Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-20 (0 - 1'JI05/04/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

12000021160

80.6

ug/kgmg/kgmg/kg

Page 191: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Report Date: 08/10/94Lab Number: 940700370Date Received: 07/19/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-20 (0-1)105/04/94F93307C

•* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

4500781003751410

ug/kgmg/kgmg/kgmg/kgmg/kgmg/kg

Page 192: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-20 (4 - 5')I05/04/94F93307C, COG No: 9370

Report Date: 05/26/94Lab Number: 940500173Date Received: 05/05/94Client ID: 60688

001*.

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

170p.14 U'8.588.8

ug/kgmg/kgmg/kg

Page 193: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

002

** Electro-Voice.1 600 Cecil Streetm Buchanan MI 49107

Report Date: 11/18/94Lab Number: 94100479Date Received: 10/24/94Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-20 (4 - 5') I05/04/94F93307C, COG No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.500.01 U0.02 U

2 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 194: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-20 (4 - 5') I05/04/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100491Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.1

Units

s.u.

Page 195: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500194Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-21 (4-5)105/04/94F93307C, COG No: 9371

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

39000.2518

71.3

ug/kgmg/kgmg/kg

Page 196: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

otf

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-21 (4 - 5') I05/04/94F93307C, COG No: 9221

Report Date: 11/18/94Lab Number: 94100486Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

2 U0.630.4 U

0.01 U0.02 U

2 U0.04

ug/1mg/1ug/1mg/1mg/1ug/1mg/1

Page 197: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date; 11/03/94600 Cecil Street Lab Number: 94100498Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-21 (4 - 5')I05/04/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.3

Units

s.u.

Page 198: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600316Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-22 (0 - l')I05/04/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

20000.63

1179

ug/kgmg/kgmg/kg

Page 199: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/29/94600 Cecil Street Lab Number: 940700349Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-22 (0 - I7)I05/04/94F93307C, COC No: 6861

f Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

007

• Parameter Result

0.005 U

Units

mg/1Cyanide, Total

Page 200: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-22 (0 - 1'JI05/04/94F93307C, COC No: 6861

017

Report Date:. 07/20/94Lab Number: 940700359Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.8

Units

s.u.

Page 201: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oio

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100487Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-22 (0 - l')I05/04/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

2 U0.600.4 U0.01 U0.02 U

20.02

ug/1mg/1ug/1mg/1mg/1ug/1mg/1

Page 202: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-22 (0 - l')I05/04/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100499Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.3

Units* m V* "•* i

s.u.

Page 203: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500180Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-22 (4 - 5')I05/04/94F93307C, COC No: 9370

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2300.269.185.1

ug/kgmg/kgmg/kg

Page 204: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids/ Total

24001.314

77.4

ug/kgmg/kgrag/kg

014-

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600317Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-23 (0 - l')I05/05/94F93307C, COC No: 6814

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 205: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100488Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-23 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

2 U0.620.4 U

0.005 U0.01 U0.02 U

50.04

ug/1mg/1ug/img/1mg/1mg/1ug/1mg/1

Page 206: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr..Ron Graham

Sample ID: LSB-23 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100500Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.3

Units

s.u.

Page 207: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0!

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500182Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-23 (4 - 5'}I05/05/94F93307C, COC No: 9370

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

650.15 U

1185.9

ug/kgmg/kgmg/kg

Page 208: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Off

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600318Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-24 (0 - 1')*05/05/94F93307C, COC No: 6813

W* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Cadmium 360 ug/kgCyanide, T. 0.32 mg/kgchromium, T. 8.0 mg/kgSolids, Total 84.7 %

Page 209: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice600 Cecil StreetBuchanan MI 49107

Report Date: 11/18/94Lab Number: 94100480Date Received: 10/24/94Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-24 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.590.01 U0.02 U

2 U0.06

ug/1mg/1mg/1mg/1ug/1mg/1

Page 210: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-24 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100492Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.9

Units

s.u.

Page 211: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

017

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700343Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60683

Attention: Mr. Ron Graham

Sample ID: LSB-24 (2 - 3')I05/05/94F93307C, COG No: 6863

, * Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

450.15 U145.2

84.7

ug/kgmg/kgmg/kgs.u.

Page 212: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-24 (4 - 5') I05/05/94^F93307C, COG No: 9370

Report Date: 05/26/94Lab Number: 940500183Date Received: 05/05/94Client ID: 60688

012-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

340.14 U10

87.1

ug/kgmg/kgmg/kg

Page 213: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600319Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-25 (0 - l')I05/05/94F93307C, COC No: 6813

* Results reported with "U11 flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.chromium, T.Solids, Total

1900.2610

85.2

ug/kgmg/kgmg/kg

Page 214: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-25 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/18/94Lab Number: 94100482Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.710.01 U0.02 U

50.06

ug/1mg/1mg/1mg/1ug/1mg/1

Page 215: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Oil

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-25 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100494Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.9

Units

s.u.

Page 216: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-25 (4 - 5')I05/05/94F93307C, COC No: 9370

Report Date: 05/27/94Lab Number: 940500184Date Received: 05/05/94Client ID: 60688

013

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide,. T.Chromium, T.Solids, Total

1100.14 U6.990.4

ug/kgmg/kgmg/kg

Page 217: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-26 (0 - l')I05/02/94F93307C, COC No: 9397

017

Report Date: 10/20/94Lab Number: 94100273Date Received: 10/17/94Client ID: 60688

* Results reported with "U11 flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.6

Units•- . — —.*»«

s.u.

Page 218: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-26 (0 - I7) I05/02/94F93307C, COC No: 9555

Report Date: 12/30/94Lab Number: 941200535Date Received: 12/20/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Cyanide, Total

Result• 4VOV* A»M^«^»^B«B *

0.005 U

Units

mg/1

Page 219: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600320Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-26 (0 - l')I05/02/94F93307C, COC No: 6813

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

COS

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

7800.4112

79.6

ug/kgmg/kgmg/kg

Page 220: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100261Buchanan MI 49107 ' Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-26 (0 - l')I05/02/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.0

0.01 U0.02 U

30.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 221: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham4I Sample ID: SPLP/LSB-26 (4 - 5') I

05/02/94. F93307C, COC No: 6879

001

Report Date: 10/06/94Lab Number: 940900306Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.570.01 U0.02 U

1 U0.01

ug/lmg/lmg/1mg/lug/lmg/l

Page 222: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1100.14 U8.3

83.2

ug/kgmg/kgmg/kg

007 '

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500178Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-26 (4 - 5') I05/02/94F93307C, COC No: 9370

* Results reported with "U" flag, indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 223: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

E1ectro-Vo ice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (0 - l')I05/02/94F93307C, COG No: 6813

Report Date: 06/24/94Lab Number: 940600321Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

Cadmiumcyanide, T.Chromium, T.Solids, Total

1900.15 U11

84.8

Units

ug/kgmg/kgmg/kg

Page 224: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (0 - l'05/02/94F93307C

Report Date: 08/10/94Lab Number: 940700369Date Received: 07/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

44005214131750

ug/kgmg/kgmg/kgmg/kgmg/kgmg/kg

Page 225: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

01?

Report Date: 10/20/94Lab Number: 94100274Date Received: 10/17/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (0 - l')I05/02/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.1

Units

s.u.

Page 226: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100262Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688V

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-27 (0 - 1'JI05/02/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.990.01 U0.02 U19

0.14

ug/1mg/1mg/1mg/1ug/1mg/1

Page 227: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (0 - 1') I/Soil04/26/94F93307C, COC No: 9414

Report Date: 11/30/94Lab Number: 941100289Date Received: 11/15/94Client ID: 60688

007

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

LeadSolids, Total

1683.4

mg/kg%

Page 228: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014

Report Date: 08/02/94Lab Number: 940700340Date Received: 07/15/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (2 - 3')I05/02/94F93307C, COG No: 6863

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

1100.14 U7.16.186.5

ug/kgmg/kgmg/kgs.u.%

Page 229: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-27 (4-5)105/02/94F93307C, COC No: 9371

Report Date: 05/26/94Lab Number: 940500187Date Received: 05/05/94Client ID: 60688

Olfc

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

670.14 U6.8

90.5

ug/kgmg/kgmg/kg

Page 230: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oos

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900307Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-27 (4 - 5') I05/02/94F93307C, COC Ho: 6879

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.640.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 231: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

019

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500186Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-28 (4-5)105/02/94F93307C, COC No: 9371

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

38000.6760

77.8

ug/kgmg/kgmg/kg

Page 232: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900308Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-28 (4 - 5')I05/02/94F93307C, COC No: 6879

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.3

0.01 U0.02 U

1 U0.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 233: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-28 (9 - 10') I06/22/94F93307C, COC No: 9101

Report Date: 07/13/94Lab Number: 940601026Date Received: 06/24/94Client ID: 60688

007

•• Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

79000.2620

86.6

ug/kgmg/kgrag/kg

Page 234: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-28 (9 - 10')06/22/94F93307C, COC No: 6876

Report Date: 10/04/94Lab Number: 940900281Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

21.7

0.020.02 U

30.19

ug/1mg/1mg/1mg/1ug/1mg/1

Page 235: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800076Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-28 (14 - 15')07/26/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

49000.40

1487.8

ug/kgmg/kgmg/kg

Page 236: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900287Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention:. Mr. Ron Graham

Sample ID: SPLP/LSB-28 (14-15')07/26/94F93307C, COC No: 6877

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBarium,CopperNickelLeadZinc

1 U0.470.010.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 237: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100462Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-28 (14 - 15')I05/02/94F93307C, COC No: 9117

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, Total

0.4 U0.006

ug/1mg/1

Page 238: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-28 (14 - 15')I05/02/94F93307C, COG No: 9117

Report Date: 11/02/94Lab Number: 94100474Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.1

Units

s .u.

Page 239: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-29 (4 - 5') I05/02/94F93307C, COC No: 9370

Report Date: 05/26/94Lab Number: 940500179Date Received: 05/05/94Client ID: 60688

00?

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

33000.5816

91.2

ug/kgmg/kgmg/kg

Page 240: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-29 (4 - 5')D05/02/94F93307C, COG No: 9370

Report Date: 05/27/94Lab Number: 940500181Date Received: 05/05/94Client ID: 60688

010'

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

25000.259.3

89.5

ug/kgmg/kgmg/kg

Page 241: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0\\

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100464Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-29 (4 - 5')I05/02/94F93307C, COC No: 9117

_- Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

2 U0.471.6

0.005 U0.010.02 U

2 U0.04

ug/1mg/1ug/1mg/1mg/1mg/1ug/1mg/1

Page 242: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-29 (4 - 5')D05/02/94F933Q7C, COG No: 9118

Report Date: 11/18/94Lab Number: 94100510Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

1 U0.380.4

0.005 U0.01 U0.02 U

2 U0.02

ug/1mg/1ug/1mg/1mg/1mg/1ug/1mg/1

Page 243: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100476Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-29 (4 - 5')I05/02/94F93307C, COG No: 9117

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.6

Units

s.u.

Page 244: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-29 (4 - 5')D05/02/94F93307C, COG No: 9118

Report Date: 11/16/94Lab Number: 94100518Date Received: 10/24/94Client ID: 60688

* Results reported with "IT" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.8

Units

s.u.

Page 245: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500235Buchanan MI 49107 Date Received: 05/06/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-30 (4 - 5') I05/06/94F93307C, COC No: 9369

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2700.14 U4.6

90.8

ug/kgmg/kgmg/kg%

Page 246: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-30 (4 - 5')I05/06/94F93307C, COC No: 9221

Report Date: 11/18/94Lab Number: 94100483Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.310.01 U0.02 U

2 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 247: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-30 (4 - 5') I05/06/94F93307C, COG No: 9221

Report Date: 11/03/94Lab Number: 94100495Date Received: 10/24/94Client ID: 60688

Otf

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.8

Units

s.u.

Page 248: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-31 (4-5') I05/06/94F93307C, COC No: 9369

Report Date: 06/01/94Lab Number: 940500236Date Received: 05/06/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

140000.38

7479.2

ug/kging/kgmg/kg

Page 249: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500231Buchanan MI 49107 Date Received: 05/06/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-32 (4 - 5') I05/05/94F93307C, COC No: 9369

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1670005.5250

77.5

ug/kgmg/kgmg/kg

Page 250: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-32 (4 - 5')I05/05/94F93307C

Report Date: 08/10/94Lab Number: 940700371Date Received: 07/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

220050

- 20066110990

ug/kgmg/kgmg/kgmg/kgmg/kgmg/kg

Page 251: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/13/94600 Cecil Street Lab Number: 940601022Buchanan MI 49107 Date Received: 06/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-32 (9 - 10') I06/21/94F93307C, COC No: 9101

* Results reported with "U" flag indicate the parameter was analyzed,. for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

12000.22

6480.1

ug/kgmg/kgmg/kg

Page 252: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

or

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-33 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/18/94Lab Number: 94100489Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalChromium, T.CopperNickelLeadZinc

30.4841

0.0240.100.030.02 U

140.19

ug/1mg/1ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 253: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/16/94600 Cecil Street Lab Number: 94100501Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-33 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

024

Parameter

PH

Result

7.4

Units* _ «•» «» » ^ •

s.u.

Page 254: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500234Buchanan MI 49107 Date Received: 05/06/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-33 (4-5') I05/05/94F93307C, COG No: 9369

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

23000.2735

84.7

ug/kgmg/kgmg/kg

Page 255: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-34 (4-5') I05/05/94F93307C, COG No: 9369

Report Date: 06/01/94Lab Number: 940500239Date Received: 05/06/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

13000.2730

83.9

ug/kgmg/kgmg/kg

OIC

Page 256: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/27/94600 Cecil Street Lab Number: 940700350Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-34 (4 - 5')I05/05/94F93307C, COC No: 6861

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Chromium, T.

Result

0.02 U

Units

mg/1

Page 257: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100490Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-34 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalChromium, T.CopperNickelLeadZinc

2 U0.51

190.0580.070.020.02 U

70.14

ug/1mg/1ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 258: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

r

Electro-Voice Report Date: 11/16/94600 Cecil Street Lab Number: 94100502Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-34 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result• ••••••••v**

7.4

units

s.u.

Page 259: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-34 (4 - 5')I05/05/94F93307C, COG No: 6861

Report Date: 07/20/94Lab Number: 940700360Date Received: 07/15/94Client ID: 60688

018

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.2

Units

s.u.

Page 260: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-35 (0 - l')I05/05/94F93307C, COG No: 6813

Report Date: 06/24/94Lab Number: 940600322Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

4300.14 U6.7

89.2

ug/kgmg/kgmg/kg

Page 261: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100481Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-35 (0 - l')I05/05/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.450.010.02 U

2 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 262: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-35 (0 - l')I05/05/94F93307C, COC No: 9221

Report Date: 11/03/94Lab Number: 94100493Date Received: 10/24/94Client ID: 60688

OlV

* Results reported with "0" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.7

Units

s.u.

Page 263: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500233Buchanan MI 49107 Date Received: 05/06/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-35 (4 - 5') I05/05/94F93307C, COG No: 9369

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

920.1514

83.4

ug/kgmg/kgmg/kg

Page 264: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oo;

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600323Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-36 (0 - l')I05/03/94F93307C, COG No: 6813

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1200.2412

82.7

ug/kgmg/kgmg/kg

Page 265: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00!

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100263Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-36 (0 - I')!05/03/94F93307C, COG No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.530.01 U0.02 U

2 U0.06

ug/1rag/1rag/1ing/1ug/1mg/1

Page 266: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-36 (0 - l')I05/03/94F93307C, COC No: 9397

Report Date: 10/20/94Lab Number: 94100275Date Received: 10/17/94Client ID: 60638

019

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.6

Units

s.u.

Page 267: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-36 (4-5)105/03/94F93307C, COG No: 9371

Report Date: 05/27/94Lab Number: 940500189Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

610.14 U6.592.1

ug/kgmg/kgmg/kg

Page 268: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-36 (4 - 5')I05/03/94F93307C, COC No: 6879

Report Date: 10/07/94Lab Number: 940900309Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.610.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 269: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500190Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-37 (4-5)105/03/94F93307C, COC No: 9371

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

CadmiumCyanide, T.Chromium, T.Solids, Total

950.48

1383.4

Units

ug/kg

ing/kg

Page 270: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-37 (4 - 5')I05/03/94F93307C, COG No: 6879

Report Date: 10/07/94Lab Number: 940900310Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.250.01 U0.02 U

1 U0.02

ug/lmg/1mg/1mg/1ug/lmg/1

Page 271: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100466Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-37 (4 - 5')I05/03/94F93307C, COC No: 9117

^ Results reported with "U" flag indicate the parameter was analyzed^ for but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U0.320.005 U0.01 U0.02 U

2 U0.03

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 272: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-37 (4 - 5')I05/03/94F93307C, COG No: 9117

Report Date: 11/03/94Lab Number: 94100478Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.1

Units

s. u.

Page 273: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500193Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-38 (4 - 5)105/03/94F93307C, COG No: 9371

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

103000.4131

85.4

ug/kgmg/kgmg/kg

Page 274: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-38 (9 - 10') I06/22/94F93307C, COG No: 9101

Report Date: 07/13/94Lab Number: 940601025Date Received: 06/24/94Client ID: 60688

oot?

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

47000.3415

80.8

ug/kgmg/kgmg/kg

Page 275: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-38 (9 - 10')06/22/94F93307C, COC No: 6876

Report Date: 10/04/94Lab Number: 940900282Date Received: 09/19/94Client ID: 60688

oo<

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

41.6

0.020.02 U

40.13

ug/1mg/1mg/1mg/1ug/1mg/1

Page 276: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003 i

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800075Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-38 (14 - 15')07/25/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

22000.7013

89.4

ug/kgmg/kging/kg

Page 277: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

015

Electro-Voice Report Date: 10/04/94600 Cecil Street Lab Number: 940900288Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-38 (14 - 15')07/25/94F93307C, COG No: 6877

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.490.01 U0.02 U

1 U0.01 U

ug/lmg/1mg/1mg/1ug/lmg/1

Page 278: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

OK)

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-38 (14 - 15')I05/03/94F93307C, COG No: 9117

Report Date: 11/03/94Lab Number: 94100463Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, Total

0.50.005 U

ug/1mg/1

Page 279: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

C Electro-Voice Report Date: 11/02/94600 Cecil Street Lab Number: 94100475Buchanan MI 49107 Date Received: 10/24/94

H Client ID: 60688

Attention: Mr. Ron Graham

1^ Sample ID: LSB-38 (14 - 15') I• 05/03/94

F93307C, COC No: 9117

!;* Results reported with "U" flag indicate the parameter was analyzed

< ^ for but not detected in the sample above the detection limit.

Parameter Result Units

pH 7.3 s.u.

Page 280: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-39 (4-5') I05/06/94F93307C, COC No: 9369

Report Date: 06/01/94Lab Number: 940500237Date Received: 05/06/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

4400.288.8

88.2

ug/kgmg/kgmg/kg

Page 281: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100484Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-39 (4 - 5'} I ;05/06/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.530.01 U0.02 U

30.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 282: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-39 (4 - 5')I05/06/94F93307C, COG No: 9221

oft

Report Date: 11/03/94Lab Number: 94100496Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.7

Units

s.u.

Page 283: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-40 (4 - 5') I05/06/94F93307C, COG No: 9369

Report Date: 06/01/94Lab Number: 940500238Date Received: 05/06/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

190009.232

92.2

ug/kgmg/kgmg/kg

Page 284: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-41 (4-5')05/06/94F93307C, COC No: 9369

Report Date: 06/01/94Lab Number: 940500232Date Received: 05/06/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

3900.14 U7.6

89.0

ug/kgmg/kgmg/kg

Page 285: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice Report Date: 06/02/94600 Cecil Street • Lab Number: 940500307Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-42 (4 - 5') I05/09/94F93307C, COC No: 9373

Results reported with "U" flag indicate the parameter was analyzed^ for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

61001.389

86.1

ug/kgmg/kgmg/kg

Page 286: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-43 (4 - 5')I05/09/94F93307C, COC No: 9373

Report Date: 06/02/94Lab Number: 940500305Date Received: 05/11/94Client ID: 60688

01V-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

19002.5

1285.0

ug/kging/kgmg/kg

Page 287: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600324Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-44 (0 - l')I05/09/94F93307C, COC No: 6813

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide , T .Chromium, T.Solids, Total

610003.86686

ug/kgmg/kging/kg%

Page 288: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500309Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-44 (4 - 5') I05/09/94F93307C, COC No: 9374

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

015'

Parameter Result Units

CadmiumCyanide , T .Chromium, T.Solids, Total

810.15 U

1382.2

ug/kgmg/kgmg/kg%

Page 289: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Vo ice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-45 (0 - l')I05/03/94F93307C, COG No: 6813

Report Date: 06/24/94Lab Number: 940600325Date Received: 06/08/94Client ID: 60688

01C

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

rParameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1100.18

1283.3

ug/kgrag/kgmg/kg

Page 290: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

_1_

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-45 (0 - l')I05/03/94F93307C, COC No: 9397

Report Date: 10/31/94Lab Number: 94100264Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.970.010.02

20.04

U

UUU

ug/1mg/lmg/1mg/1ug/1mg/1

Page 291: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100276Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-45 (0 - l')I05/03/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.4

Units

s.u.

Page 292: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

on!

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-45 (4 - 5)105/03/94F93307C, COG No: 9371

Report Date: 05/27/94Lab Number: 9405001S8Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1200.14 U

989.9

ug/kgmg/kgmg/kg

Page 293: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-45 (4 - 5')D05/03/94F93307C, COG No: 9370

Report Date: 05/26/94Lab Number: 940500175Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1000.14 U9.289.4

ug/kgmg/kgmg/kg

004

Page 294: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

012s

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-45 (4 - 5')I05/03/94F93307C, COG No: 6879

Report Date: 10/07/94Lab Number: 940900311Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

10.820.01 U0.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 295: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00!)

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100386Buchanan MI 49107 Date Received: 10/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-45, 4-5'04/26/94F93307C, COC No: 9400

* Results reported with "U" flag indicate the parameter was analyzed., for but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

400089.7

Page 296: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-46 (0 - l')I05/03/94F93307C, COC No: 6813

Report Date: 06/24/94Lab Number: 940600326Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

3100.407.682.1

ug/kgmg/kgmg/kg%

Page 297: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004-

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-46 (0 - l')I05/03/94F93307C, COC No: 9396

Report Date: 10/28/94Lab Number: 94100239Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U0.710.005 U0,01 U0.02 U

5 U0.06

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 298: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-46 (0 - l')I05/03/94F93307C, COG No: 9396

Report Date: 10/20/94Lab Number: 94100249Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.8

Units

s.u.

Page 299: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014

Electro-Voice Report Date: 05/27/94600 Cecil Street Lab Number: 940500185Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-46 (4-5)105/03/94F93307C, COC No: 9371

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1100.14 U9.2

86.1

ug/kgmg/kgmg/kg

Page 300: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0\

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-46 (4 - 5') I05/03/94F93307C, COC No: 6879

Report Date: 10/07/94Lab Number: 940900312Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.260.010.02 U

1 U0.01

ug/1mg/1mg/1mg/1ug/1mg/1

Page 301: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700335Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-47 (0 - l')I05/03/94F93307C, COC No: 6862

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

1300002.376

7.281.1

ug/kgmg/kgnig/kgs.u.

Page 302: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Vo ice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-47 (4 - 5)105/03/94F93307C, COG No: 9371

Report Date: 05/27/94Lab Number: 940500191Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

22000.15

1285.1

ug/kgmg/kgrag/kg

Page 303: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100465Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-47 (4 - 5')I05/03/94F93307C, COC No: 9117

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

2 U0.660.50.01 U0.02 U

2 U0.04

ug/1mg/1ug/1mg/lmg/1ug/1mg/l

Page 304: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-47 (4 - 5'} I05/03/94F93307C, COG No: 9117

Report Date: 11/03/94Lab Number: 94100477Date Received: 10/24/94Client ID: 60688

024

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.0

Units

s.u.

Page 305: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500301Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-48 (4 - 5') I05/09/94F93307C, COC No: 9373

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.•Solids, Total

8000.229.889.0

ug/kgmg/kgmg/kg

007

Page 306: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

DOS

Electro-Voice Report Date: 11/18/94600 Cecil Street Lab Number: 94100485Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-48 (4 - 5'} I05/09/94F93307C, COC No: 9221

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.250.01 U0.02 U

2 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 307: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-48 (4 - 5') I05/09/94F93307C, COG No: 9221

Report Date: 11/03/94Lab Number: 94100497Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.8

Units

s.u.

Page 308: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

CO/

Report Date: 06/01/94Lab Number: 940500296Date Received: 05/11/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-49 (4 - 5') I05/09/94F93307C, COG No: 9373

* Results reported with "U" flag indicate the parameter was analyzedfor taut not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2100.14 U3.9

87.2

ug/kgmg/kgmg/kg

Page 309: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-49 (4 - 5') I05/09/94F93307C, COC No: 9118

001

Report Date: 11/18/94Lab Number: 94100503Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.240.01 U0.02 U

2 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 310: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-49 (4-5)105/09/94F93307C, COC No: 9118

Report Date: 11/16/94Lab Number: 94100511Date Received: 10/24/94Client ID: 60688

010'

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

8.5

Units

s.u.

Page 311: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500297Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-50 (4 - 5') I05/09/94F93307C, COG No: 9373

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

25000.558.3

95.5

ug/kgmg/kgmg/kg

Page 312: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-51 (4 - 5')I05/09/94F933Q7C, COC No: 9373

Report Date: 06/02/94Lab Number: 940500304Date Received: 05/11/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

320009.8220

85.3

mg/kgmg/kg

Page 313: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 08/10/94600 Cecil Street Lab Number: 940700372Buchanan MI 49107 Date Received: 07/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-51 (4 - 5')I05/04/94F93307C

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

130069744311140

ug/kgmg/kgmg/kgmg/kgmg/kg

Page 314: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-52 (4 - 5') I05/09/94F93307C, COG No: 9374

Report Date: 06/02/94Lab Number: 940500308Date Received: 05/11/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor taut not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

5300.2024

89.2

ug/kgmg/kgmg/kg

Page 315: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Report Date: 07/27/94Lab Number: 940700351Date Received: 07/15/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-52 (4 - 5') I05/09/94F93307C, COC No: 6861

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Chromium, T.

Result

0.02 U

Units

mg/1

Page 316: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-52 (4 - 5')I05/09/94F93307C, COC No: 6861

Report Date: 07/20/94Lab Number: 940700361Date Received: 07/15/94Client ID: 60688

019

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

6.9

Units

s.u.

Page 317: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

012-

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600327Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-53 (0 - I')*05/04/94F93307C, COG No: 6813

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide , T .Chromium, T.Solids, Total

1500.15 U8.183.3

ug/kgmg/kgmg/kg%

Page 318: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

E1ectro-Vo ice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-53 (0 - l')I05/04/94F93307C, COC No: 9397

Report Date: 10/31/94Lab Number: 94100265Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U1.0

0.01 U0.02 U

40.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 319: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100277Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-53 (0 - l')I05/04/94F93307C, COG No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

6.5

Units

s.u.

Page 320: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-53 (4-5)105/04/94F93307C, COC No: 9371

Report Date: 05/27/94Lab Number: 940500192Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium , T .Solids, Total

820.14 U7.8

91.5

ug/kgmg/kgmg/kg%

Page 321: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

001

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-53 (4 - 5')I05/04/94F93307C, COC No: 6881

Report Date: 10/06/94Lab Number: 940900313Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.320.01 U0.02 U

1 U0.01

ug/1ntg/1mg/1mg/1ug/1mg/1

Page 322: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00'

Electro-Voice Report Date: 05/26/94600 Cecil Street Lab Number: 940500174Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-54 (4 - 5')I05/04/93F93307C, COC No: 9370

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

759.87.2

86.3

ug/kgmg/kgmg/kg

Page 323: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

(902-

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-54 (9 - 10')07/25/94F93307C, COG No: 9272

Report Date: 08/30/94Lab Number: 940800074Date Received: 08/04/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

390.165.8

94.9

ug/kgmg/kgmg/kg

Page 324: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-54 (9 - 10')07/25/94F93307C, COC No: 6876

Report Date: 10/04/94Lab Number: 940900283Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.560.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 325: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-55 (4 - 5') I05/10/94F93307C, COC No: 9373

Report Date: 06/01/94Lab Number: 940500302Date Received: 05/11/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

18000.4324

81.9

ug/kgmg/kgmg/kg

Page 326: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-55 (4 - 5')I05/10/94F93307C, COG No: 9118

Report Date: 11/18/94Lab Number: 94100509Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalChromium, T.CopperNickelLeadZinc

1 U0.300.2 U

0.005 U0.02 U0.01 U0.02 U

2 U0.01 U

ug/1mg/1ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 327: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-55 (4 - 5') I05/10/94F93307C, COC No: 9118

Report Date: 11/16/94Lab Number: 94100517Date Received: 10/24/94Client ID: 60688

Olt

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.7

Units

s.u.

Page 328: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-56 (4 - 5')I05/10/94F93307C, COG No: 9118

0

Report Date: 11/16/94Lab Number: 94100512Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.8

Units

s.u.

Page 329: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-57 (0 - l')I05/04/94F93307C, COG No: 6813

Report Date: 06/24/94Lab Number: 940600328Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2500.15 U6.2

84.7

ug/kgmg/kgmg/kg%

Page 330: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100266Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-57 (0 - 1'JI05/04/94F93307C, COG No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Arsenic 2 U ug/1Barium 1.3 mg/1Copper 0.01 U mg/1Nickel 0.02 U mg/1Lead 6 ug/1Zinc 0.04 mg/1

Page 331: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-57 (0 - l')I/Soil05/11/94F93307C, COC No: 9414

00?

Report Date: 11/30/94Lab Number: S41100290Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadSolids, Total

1184.9

Page 332: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

ow-

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-57 (0 - l')I05/04/94F93307C, COG No: 9397

Report Date: 10/20/94Lab Number: 94100278Date Received: 10/17/94Client ID: 60688

* Results reported with HU" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

5.8

Units

s.u.

Page 333: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 05/26/94600 Cecil Street Lab Number: 940500177Buchanan MI 49107 Date Received: 05/05/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-57 (4 - 5')I05/04/94F93307C, COC No: 9370

* Results reported with "IT" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

440.15 U11

84.5

ug/kgmg/kgmg/kg

Page 334: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

C03

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-57 (4 - 5')I05/04/94F93307C, COG No: 6881

Report Date: 10/06/94Lab Number: 940900314Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.440.01 U0.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 335: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-58 (0 - 1'JI05/04/94F93307C, COC No: 6813

Report Date: 06/24/94Lab Number: 940600329Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1800.14 U5.1

87.2

ug/kgmg/kgmg/kg

Page 336: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00?

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-58 (0 - l'05/04/94F93307C

Report Date: 08/10/94Lab Number: 940700373Date Received: 07/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

150027

5,86.49,333

ug/kgmg/kgmg/kgmg/kgmg/kgmg/kg

Page 337: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-58 (0 - I7)I05/04/94F93307C, COC No: 9197

Report Date: 11/03/94Lab Number: 94100296Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.420.01 U0.02 U

2 U0.05

ug/1mg/1mg/1mg/1ug/1mg/1

Page 338: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-58 (0 - l')I05/04/94F93307C, COC No: 9197

06?

Report Date: 10/21/94Lab Number: 94100300Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

4.9

Units

s.u.

Page 339: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

015

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700341Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-58 (2 - 3') I05/04/94F93307C, COG No: 6863

+ Results reported with "U" flag indicate the parameter was analyzed^ for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

590.1812

5.385.2

ug/kgmg/kgmg/kgs.u.

Page 340: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-58 (2 - 3')D05/04/94F93307C, COG No: 6863

Report Date: 08/02/94Lab Number: 940700342Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

620.15 U

105.3

85.9

ug/kging/kgmg/kgs.u.

Page 341: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-58 (4 - 5')I05/04/94F93307C, COC No: 9370

Report Date: 05/26/94Lab Number: 940500176Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

580.14 U6.9

92.2

ug/kgmg/kgmg/kg

Page 342: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Olfi

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-59 (0 - l')I05/10/94F93307C, COG No: 6812

Report Date: 06/24/94Lab Number: 940600330Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

320003.874

90.0

ug/kgmg/kgmg/kg

Page 343: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700336Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-59 (2 - 3') I05/10/94F93307C, COC No: 6862

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

5300.17

9.77.5

87.2

ug/kgmg/kgmg/kgs.u.

Page 344: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-59 (2 - 3')I05/10/94F93307C, COC No: 9118

Report Date: 11/18/94Lab Number: 94100505Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.580.01 U0.02 U

2 U0.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 345: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-59 (2 - 3') I05/10/94F93307C, COC No: 9118

Report Date: 11/16/94Lab Number: 94100513Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.3

Units

s.u.

Page 346: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-59 (4 - 5') I05/10/94F93307C, COG No: 9374

Report Date: 06/02/94Lab Number: 940500310Date Received: 05/11/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

6100.27

1383.6

ug/kgmg/kgmg/kg

Page 347: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/01/94600 Cecil Street Lab Number: 940500298Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-60 (4 - 5')I05/10/94F93307C, COC No: 9373

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

18000.229.7

89.3

ug/kgmg/kging/kg

004

Page 348: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-60 (4 - 5')I05/10/94F93307C, COC No: 9118

005

Report Date: 11/18/94Lab Number: 94100506Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

2 U0.450.2

0.01 U0.02 U

2 U0.02

ug/1mg/1ug/1mg/1mg/1ug/1mg/1

Page 349: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

•J

Electro-Voice Report Date: 11/16/94600 Cecil Street Lab Number: 94100514Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-60 (4 - 5')I05/10/94F93307C, COC No: 9118

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.9

Units

s.u.

Page 350: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-61 (0 - l')I05/04/94F93307C, COG No: 6812

Report Date: 06/24/94Lab Number: 940600331Date Received: 06/08/94Client ID: 60688

OKi

* Results reported with "UM flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2100.398.984.3

ug/kgmg/kgmg/kg

Page 351: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oi\

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100267Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-61 (0 - l')I05/04/94F93307C, COC No: 9397

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

21.10.010.02

40-07

U

UU

ug/1mg/1mg/1mg/1ug/1mg/1

Page 352: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-61 (0 - l')I05/04/94F93307C, COC No: 9397

Report Date: 10/20/94Lab Number: 94100279Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.4

Units

s.u.

Page 353: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-61 (4 - 5)1

F93307C, COC No: 9371

C24

Report Date: 06/01/94Lab Number: 940500195Date Received: 05/05/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

390.225.2

91.7

ug/kgmg/kgmg/kg

Page 354: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-61 (4 - 5')I05/04/94F93307C, COC No: 6881

Report Date: 10/06/94Lab Number: 940900315Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.620.01 U0.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 355: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

017

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600332Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-62 (0 - l')I05/10/94F93307C, COC No: 6812

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

10000.15

1183.9

ug/kgmg/kgmg/kg

Page 356: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-62 (0 - l')I05/10/94F93307C, COG No: 9197

Report Date: 11/03/94Lab Number: 94100297Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.550.01 U0.02 U

2 U0.12

ug/1mg/1mg/1mg/1ug/1mg/1

Page 357: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00k

Electro-Voice Report Date: 05/24/94600 Cecil Street Lab Number: 940400668Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-69 (2 - 3')I04/25/94F93307C, COC No: 9216

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, T.Chromium , T .CopperNickelLeadSolids, TotalZinc

21002741

0.14 U5.26.46.36.1

88.326

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 358: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

._i_

oc;

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-70 (0 - l')I04/25/94F93307C, COC No: 9216

Report Date: 05/24/94Lab Number: 940400669Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, T.Chromium, T.CopperNickelLeadSolids, TotalZinc

2800492000.14 U7.08.08.415

86.936

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 359: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00?

Electro-Voice Report Date: 10/21/94600 Cecil Street Lab Number: 94100301Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-62 (0 - l')I05/10/94F93307C, COC No: 9197

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

5.2

Units

s.u.

Page 360: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-62 (4 - 5') I05/10/94F93307C, COC No: 9373

Report Date: 06/01/94Lab Number: 940500299Date Received: 05/11/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

340.134.1

94.8

ug/kgmg/kgmg/kg

Page 361: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-63 (0 - I'}*05/10/94F93307C, COC No: 6862

Report Date: 08/02/94Lab Number: 940700337Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide , T .Chromium , T .pHSolids, Total

1900004.81806.990

ug/kgmg/kgmg/kgs.u.%

Page 362: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-63 (2 - 3')I05/10/94F93307C, COG No: 6862

Report Date: 08/02/94Lab Number: 940700338Date Received: 07/15/94Client ID: 60688

Oil

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

210005.3547.489.4

ug/kgmg/kgmg/kgs.u.%

Page 363: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

012-

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500306Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-63 (4 - 5')I05/10/94F93307C, COC No: 9373

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

31000.39

1382 .9

ug/kging/kging/kg

Page 364: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-63 (4 - 5') I05/10/94F93307C, COG No: 9118

Report Date: 11/18/94Lab Number: 94100507Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

1 U0.430.2 U0.01 U0.02 U

2 U0.02

ug/1mg/1ug/1mg/1mg/1ug/1mg/1

Page 365: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

s

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-63 (4 - 5')I05/10/94F93307C, COG No: 9118

Report Date: 11/16/94Lab Number: 94100515Date Received: 10/24/94Client ID: 60688

014-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.7

Units

s.u.

Page 366: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-64 (0 - l')I05/11/94F93307C, COC No: 6812

Report Date: 06/24/94Lab Number: 940600333Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

9200.528.9

82.1

ug/kgmg/kgmg/kg

Page 367: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/28/94600 Cecil Street Lab Number: 94100241Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-64 (0 - l')I05/11/94F93307C, COC No: 9396

Results reported with "U" flag indicate the parameter was analyzeds for but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U0.630.005 U0.01 U0.02 U

5 U0.05

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 368: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100251Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-64 (0 - l')I05/11/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

4.9

Units

s.u.

Page 369: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500311Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-64 (4 - 5') I05/11/94F93307C, COC No: 9374

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

610.15 U8.884.1

ug/kgmg/kgmg/kg

Page 370: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-64 (4 - 5') I05/11/94F93307C, COC No: 6881

Report Date: 10/06/94Lab Number: 940900316Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.340.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 371: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

015

Electro-Voice Report Date: 11/16/94600 Cecil Street Lab Number: 94100516Buchanan MI 49107 Date Received: 10/24/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-65 (0 - l')I05/10/94F93307C, COC No: 9118

* Results reported with "XT" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.6

Units

s.u.

Page 372: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49X07

Attention: Mr. Ron Graham

Sample ID: LSB-65 (4 - 5')I05/10/94F93307C, COG No: 9373

CO?

Report Date: 06/01/94Lab Number: 940500303Date Received: 05/11/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1700.15 U11

83.7

ug/kgmg/kgmg/kg

Page 373: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

018

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500312Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-66 (4- 5')I05/11/94F93307C, COC No: 9374

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

12000.23

1386.3

ug/kging/kgmg/kg

Page 374: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

WO'

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-67 (0 - l')I05/11/94F93307C, COG No: 6812

Report Date: 06/24/94Lab Number: 940600335Date Received: 06/08/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

20000.818.7

89.8

ug/kgmg/kgmg/kg

Page 375: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100245Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-67 (0 - l')I05/11/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

2 U1.30.5

0.005 U0.01 U0.02 U16

0.06

ug/1mg/1ug/1mg/1mg/1mg/1ug/1mg/1

Page 376: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr- Ron Graham

Sample ID: LSB-67 (0 - l')I05/11/94F93307C, COG No: 9396

Report Date: 10/20/94Lab Number: 94100255Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit*

Parameter

pH

Result

7.6

Units

s.u.

Page 377: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-67 (0 - 1'} I/Soil07/28/94F93307C, COC No: 9414

Report Date: 11/30/94Lab Number: 941100294Date Received: '11/15/94Client ID: 60688

013-

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadi Solids, Total

10089.8

Page 378: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-67 (2 - 37)I05/11/94F93307C, COG No: 6863

Report Date: 08/02/94Lab Number: 940700339Date Received: 07/15/94Client ID: 60688

013

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgCadmiumCyanide, T.Chromium, T.PHSolids, Total

2400.15 U6.17.4

83.7

mg/kgs.u.

Page 379: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

019

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500313Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-67 (4 - 5')I05/11/94F93307C, COC No: 9374

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Cadmium 43 ug/kgCyanide, T. 0.14 mg/kgChromium, T. 8.7 mg/kgSolids, Total 87.0 %

Page 380: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Report Date: 10/06/94Lab Number: 940900317Date Received: 09/19/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-67 (4 - 5')I05/11/94F93307C, COC No: 6881

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.590.01 U0.02 U

1 U0.01 U

ug/1rag/1mg/1mg/1ug/1mg/1

Page 381: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-68 (0 - l')I04/25/94F93307C, COC No: 9216

Report Date: 05/24/94Lab Number: 940400665Date Received: 04/29/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium , T .CopperNickelLeadSolids, TotalZinc

370059280

0.15 U11111120

84.359

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 382: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

004

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-68 (2 - 3')I04/25/94F93307C, COC No: 9216

Report Date: 05/24/94Lab Number: 940400666Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium , T .CopperNickelLeadSolids, TotalZinc

40005064

0.15 U1213137.8

84.140

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 383: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/02/94600 Cecil Street Lab Number: 940500315Buchanan MI 49107 Date Received: 05/11/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-68 (4.5 - 5')I05/11/94F93307C, COC No: 9374

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Cadmium 66 ug/kgCyanide, T. 0.14 U mg/kgChromium, T. 9.1 mg/kgSolids, Total 90.2 %

Page 384: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

GOiJ

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-69 (0 - l')I04/25/94F93307C, COC No: 9216

Report Date: 05/24/94Lab Number: 940400667Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium, T.CopperNickelLeadSolids, TotalZinc

260048280

0.15 U6.08.17.119

85.340

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 385: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-70 (7.5 - 8') I05/11/94F93307C, COC No: 9374

Report Date: 06/02/94Lab Number: 940500314Date Received: 05/11/94Client ID: 60688

Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

390.158.383.9

ug/kgmg/kgmg/kg

Page 386: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

OOS i

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-70 (3 - 4')I04/25/94F93307C, COG No: 9216

Report Date: 05/24/94Lab Number: 940400670Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium , T .CopperNickelLeadSolids, TotalZinc

260094220

0.15 U118.1138.3

83.240

ug/kgmg/kgug/kgrag/kgmg/kgmg/kgmg/kgmg/kg%.mg/kg

Page 387: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-71 (2 - 3') I04/25/94F93307C, COG No: 9216

Report Date: 05/24/94Lab Number: 940400671Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T ,Chromium , T .CopperNickelLeadSolids, TotalZinc

27004882

0.14 U7.47.49.411

86.934

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 388: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oic

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-71 (3 - 4')I04/25/94F93307C, COG No: 9216

Report Date: 05/24/94Lab Number: 940400672Date Received: 04/29/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium , T .CopperNickelLeadSolids, TotalZinc

56005970

0.15 U15162015

83.467

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 389: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

01

Electro-Voice Report Date: 05/24/94600 Cecil Street Lab Number: 940400673Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-72 (1 - 2')I04/25/94F93307C, COC No: 9216

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium , T .CopperNickelLeadSolids, TotalZinc

380089190

0.21128.81417

83.256

ug/kgrag/ kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%ma/ka

Page 390: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

012

Electro-Voice Report Date: 05/24/94600 Cecil Street Lab Number: 940400674Buchanan MI 49107 Date Received: 04/29/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-72 (3 - 4')I04/25/94F93307C, COG No: 9216

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide , T .Chromium, T.CopperNickelLeadSolids, TotalZinc

41003035

0.35111313

9.084.343

ug/kgmg/kgug/kgmg/kgmg/kgmg/kgmg/kgmg/kg%mg/kg

Page 391: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Report Date: 08/02/94Lab Number: 940700352Date Received: 07/15/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-73 (0 -l')I06/23/94F93307C, COC No: 6861

* Results reported with "U" flag indicate the parameter was analyzed• for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, TotalChromium, T.

0.2 U0.005 U0.02 U

ug/1mg/1mg/1

Page 392: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-73 (0 - l')I06/23/94F93307C, COG No: 6861

Report Date: 07/20/94Lab Number: 940700362Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.1

UnitsP ••» m m~ w —— -

s.u.

Page 393: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Report Date: 08/19/94Lab Number: 940800105Date Received: 08/04/94Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-73 (0 - l')I06/23/94F93307C, COC No: 9277

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

019

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

6300.2910

86.9

ug/kgmg/kgmg/kg

Page 394: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-73 (0 - l')I06/23/94F93307C, COG No: 9397

Report Date: 10/31/94Lab Number: 94100268Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.890.01 U0.02 U13

0.10

ug/1mg/1mg/1mg/1ug/1mg/1

Page 395: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

c005

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100291Buchanan MI 49107 Date Received: 11/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-73 (0 - 1')I/Soil07/27/94F93307C, COC No: 9414

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadSolids, Total

4288.2

Page 396: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-73 (4 - 5')I06/23/94F93307C, COG No: 6862

OC'

Report Date: 08/02/94Lab Number: 940700329Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

1000.15166.4

84.4

ug/kgmg/kgmg/kgs.u.

Page 397: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900318Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-73 (4 - 5')I06/23/94F93307C, COC No: 6881

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

13601 U

U0.0.0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 398: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-73 (9 -10')I06/23/94F93307C, COC No: 9102

Report Date: 07/13/94Lab Number: 940601033Date Received: 06/24/94Client ID: 60688

014

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2100.14 U8.889.6

ug/kgmg/kgmg/kg

Page 399: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700353Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-74 (0 -l')I06/23/94F93307C, COC No: 6861

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, TotalChromium, T.

0.2 U0.005 U0.02 U

ug/1mg/1mg/1

Page 400: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

J_

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-74 (0 - l')I06/23/94F93307C, COC No: 6861

Report Date: 07/20/94Lab Number: 940700363Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.2

Units

s.u.

Page 401: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

VU)

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-74 (0 - l')I06/23/94F93307C, COC No: 9277

Report Date: 08/19/94Lab Number: 940800106Date Received: 08/04/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

6300.1610

93.6

ug/kgmg/kgmg/kg

Page 402: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-74 (0 - l')I06/23/94F93307C, COC No: 9397

Report Date: 10/31/94Lab Number: 94100269Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.530.01 U0.02 U

50.05

ug/1mg/1mg/1mg/1ug/1mg/1

Page 403: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-74 (0 - l')I06/23/94F93307C, COC No: 9397

Report Date: 10/20/94Lab Number: 94100281Date Received: 10/17/94Client ID: 60688

02-5

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

8.0

Units

s.u.

Page 404: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-74 (0 - 1')I/Soil06/23/94F93307C, COC No: 9414

Report Date: 11/30/94Lab Number: 941100292Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadSolids, Total

7794.7

Page 405: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-74 (4 - 5') I06/23/94F93307C, COC No: 6862

Report Date: 08/02/94Lab Number: 940700330Date Received: 07/15/94Client ID: 60688

004

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.pHSolids, Total

3300.21

137.5

82.8

ug/kgmg/kging/kgs.u.

Page 406: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

008

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900319Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-74 (4 - 5')*06/23/94F93307C, COC No: 6881

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U1.4

0.01 U0.02 U

1 U0.07

ug/1mg/1mg/1mg/1ug/1mg/1

Page 407: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 07/13/94600 Cecil Street Lab Number: 940601034

» Buchanan MI 49107 Date Received: 06/24/94Client ID: 60688

! Attention: Mr. Ron Graham

i Sample ID: LSB-74 (9 - 10') I06/23/94F93307C, COC No: 9102

i, v Results reported with "U" flag indicate the parameter was analyzed

for but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2500.14 U8.590.1

ug/kgmg/kgmg/kg

Page 408: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oc

Electro-Voice600 Cecil streetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-75 (0 - l')I06/23/94F93307C, COG No: 6862

Report Date: 08/02/94Lab Number: 940700328Date Received: 07/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

4600.229.47.7

91.9

ug/kgmg/kgmg/kgs.u.

Page 409: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

ooz

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100282Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-75 (0 - l')I06/23/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

40.400.01 U0.02 U

2 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 410: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00$

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-75 (0 - l')I06/23/94F93307C, COC No: 9398

Report Date: 10/21/94Lab Number: 94100288Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.5

Units

s.u.

Page 411: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 06/24/94600 Cecil Street Lab Number: 940600334Buchanan MI 49107 Date Received: 06/08/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-65 (0 - l')I05/10/94F93307C, COC No: 6812

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

81000.229.390.7

ug/kgmg/kgmg/kg

Page 412: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-65 (0 - l')I05/10/94F93307C, COC No: 9118

Report Date: 11/18/94Lab Number: 94100508Date Received: 10/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCopperNickelLeadZinc

1 U0.290.2 U0.01 U0.02 U

2 U0.01

ug/1mg/1ug/1mg/1mg/1ug/1mg/1

Page 413: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/23/94600 Cecil Street Lab Number: 941100285Buchanan MI 49107 Date Received: 11/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-75 (0 - 1')I/Soil05/02/94F93307C, COC No: 9414

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

680091.7

Page 414: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/02/94600 Cecil Street Lab Number: 940700331Buchanan MI 49107 Date Received: 07/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-75 (4 - 5')I06/23/94F93307C, COC No: 6862

* Results reported with "U" flag indicate the parameter was analyEedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.PHSolids, Total

1200.15 U177.383.9

ug/kgmg/kgmg/kgs.u.

Page 415: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-75 (4 - 5') I06/23/94F93307C, COC No: 6881

Report Date: 10/06/94Lab Number: 940900320Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.490.01 U0.02 U

1 U0.01

ug/1mg/1mg/1mg/1ug/1mg/1

Page 416: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-75 (9 -10')I06/23/94F93307C, COG No: 9102

Olk»

Report Date: 07/13/94Lab Number: 940601035Date Received: 06/24/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1100.14 U6.5

92.2

ug/kgmg/kging/kg

Page 417: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

014-

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800086Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-76 (0-1')07/28/94F93307C, COC No: 9275

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide , T.Chromium, T.Solids, Total

3700.328.484.4

ug/kgmg/kgmg/kg

Page 418: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100283Buchahan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-76 (0 - l')I07/28/94F93307C, COC No: 9398

* Results reported with I!U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

Arse-nicBariumCopperNickelLeadZinc

60.500.01 U0.02 U

2 U0.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 419: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 10/21/94600 Cecil Street Lab Number: 94100289Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-76 (0 - l')I07/28/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

6.0

Units

s.u.

Page 420: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/23/94600 Cecil Street Lab Number: 941100286Buchanan MI 49107 Date Received: 11/15/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-76 (0 - 1')I/Soil05/04/94F93307C, COC No: 9414

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

1100085.3

Page 421: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

) Electro-Voice*• 600 Cecil Street

Buchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-76 (4 - 5'}I07/26/94F93307C, COG No: 6881

010

Report Date: 10/06/94Lab Number: 940900321Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.480.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 422: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800090Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-77 (0-1')07/28/94F93307C, COC No: 9275

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

7400.3711

86.5

ug/kgmg/kgmg/kg

Page 423: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oof

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100284Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-77 (0 - 1'JI07/28/94F93307C, COC No: 9398

* Results reported with "U11 flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.330.01 U0.02 U

2 U0.05

ug/1mg/1mg/1mg/1ug/1mg/1

Page 424: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-77 (0 - l')I07/28/94F93307C, COG No: 9398

Report Date: 10/21/94Lab Number: 94100290Date Received: 10/17/94Client ID: 60688

010

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

4.9

Units

s.u.

Page 425: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Oil

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900322Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-77 (4 - 5')I07/28/94F93307C, COC No: 6881

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

13601 U

U000.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 426: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-78 (0-1')07/27/94F93307C, COC No: 9272

013'

Report Date: 08/19/94Lab Number: 940800085Date Received: 08/04/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2400.149.389.0

ug/kgmg/kgmg/kg

Page 427: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100285Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-78 (0 - l')I07/28/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

110.490.01 U0.02 U

2 U0.04

ug/1mg/1mg/1mg/1ug/1mg/1

Page 428: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-78 (0 - l')I07/28/94F93307C, COG No: 9398

0

Report Date: 10/21/94Lab Number: 94100291Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

7.0

Units•» •* m »*»«

s.u.

Page 429: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00'

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-78 (0 - 1')I/Soil06/23/94F93307C, COC No: 9414

Report Date: 11/23/94Lab Number: 941100287Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicSolids, Total

900088.5

ug/kg%

Page 430: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Oil

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900323Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-78 (4 - 5') I07/27/94F93307C, COC No: 6881

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.810.01 U0.02 U

1 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 431: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800089Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-79 (0 - 1')07/28/94F93307C, COC No: 9275

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

38000.40

1287.1

ug/kgmg/kgmg/kg

Page 432: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-79 (0 - l')I07/28/94F93307C, COC No: 9398

Report Date: 10/21/94Lab Number: 94100292Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

5.4

Units

s.u.

Page 433: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100286Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-79 (0 - l')I07/28/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

2 U0.580.01 U0.02 U

2 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 434: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

002-

Electro-Voice Report Date: 01/06/95600 Cecil Street Lab Number: 941200531Buchanan MI 49107 ' Date Received: 12/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-79 (0 - l')I07/28/94F93307C, COG No: 9555

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, Total

0.50.005 U

ug/1mg/1

Page 435: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-79 (4 - 5') I07/28/94F93307C, COC No: 6881

Report Date: 10/06/94Lab Number: 940900324Date Received: 09/19/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.450.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 436: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800084Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-80 (0-1')07/27/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

5400.209.2

87.4

ug/kgmg/kgmg/kg

Page 437: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

I

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100287Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-80 (0 - 1'JI07/28/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

50.520.01 U0.02 U

2 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 438: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

013

Electro-Voice Report Date: 10/21/94600 Cecil Street Lab Number: 94100293Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-80 (0 - l')I07/28/94F93307C, COC No: 9398

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

pH

Result

7.7

Units

s.u.

Page 439: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-80 (0 - l')I/Soil06/23/94F93307C, COC No: 9414

001?

Report Date: 11/23/94Lab Number: 941100288Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ug/kgArsenicSolids, Total

730087.2

Page 440: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

OK

Report Date: 10/06/94Lab Number: 940900325Date Received: 09/19/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-80 (4 - 5')I

F93307C, COC No: 6882

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.750.01 U0.02 U

1 U0.02

ug/1mg/1mg/1mg/1ug/1mg/1

Page 441: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800087Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-81 (0 - 1')07/28/94F93307C, COC No: 9275

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1700.14 U8.1

90.8

ug/kging/kgmg/kg

Page 442: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 08/19/94600 Cecil Street Lab Number: 940800088Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-81 (0 - 1')Duplicate07/28/94F93307C, COC No: 9275

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

1800.14 U8.390.9

ug/kgmg/kgmg/kg

Page 443: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

002.

Electro-Voice Report Date: 11/03/94600 Cecil Street Lab Number: 94100294Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-81 (0 - l')I07/28/94F93307C, COC No: 9197

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the samole above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

20.560.010.02

20.03

U

UUU

ug/1mg/1mg/1mg/1ug/1mg/1

Page 444: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-81 (0 - l')I07/28/94F93307C, COG No: 9197

Report Date: 10/21/94Lab Number: 94100298Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

5.8

Units

s.u.

Page 445: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

01-

Electro-Voice Report Date: 12/05/94600 Cecil Street Lab Number: 941100416Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60638

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-82 (6 - 7')11/17/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide, TotalChromium, T.CopperNickelZinc

1.40.3

0.005 U0.02 U0.010.02 U0.06

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 446: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

oco

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100408Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-82 (6 - 7')11/17/94F93307C, COG No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicLeadSolids, Total

37007.286.4

ug/kgmg/kg

Page 447: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0!

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-83 (6 - 7')11/17/94F93307C, COC No: 9546

Report Date: 12/05/94Lab Number: 941100415Date Received: 11/18/94Client ID: 60638

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide, TotalChromium, T.CopperNickelZinc

0.770.2 U

0.005 U0.02 U0.010.02 U0.04

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 448: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-83 (6 - 7')11/17/94F93307C, COC No: 9546

Report Date: 11/30/94Lab Number: 941100407Date Received: 11/18/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

ArsenicLeadSolids, Total

380010

85.0

Units

ug/kgmg/Xg

Page 449: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Report Date: 12/05/94Lab Number: 941100414Date Received: 11/18/94Client ID: 60688

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-84 (8 - 9')11/17/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Resul' Units

BariumCadmiumCyanide, TotalChromium, T.CopperNickelZinc

0.770.2 U

0.005 U0.02 U0.01 U0.02 U0.01

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 450: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-84 (8 - 9')11/17/94F93307C, COC No: 9546

Report Date: 11/30/94Lab Number: 941100406Date Received: 11/18/94Client ID: 60688

Parameter Result Units

ArsenicLeadSolids, Total

390011

87.2

ug/kgmg/kg

005

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Page 451: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 12/05/94600 Cecil Street Lab Number: 941100413Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-85 (3-4')11/16/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide, TotalChromium, T.CopperNickelZinc

0.320.2 U

0.005 U0.02 U0.01 U0.02 U0.01 U

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 452: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100405Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-85 (3 - 4')11/16/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicLeadSolids, Total

19007.8

83.1

ug/kgmg/kg

Page 453: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800080Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-86 (0 - 1')07/27/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

2900.54

7 . 088.2

ug/kging/kgmg/kg

Page 454: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

005

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-86 (0 - l')I07/27/94F93307C, COC No: 9396

Report Date: 10/28/94Lab Number: 94100240Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U0.630.005 U0.01 U0.02 U

5 U0.05

Units

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 455: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100250Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-86 (0 - l')I07/27/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

4.9

Units

s.u.

Page 456: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

007

Electro-Voice Report Date: 10/28/94600 Cecil Street Lab Number: 94100242Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-87 (0 - l')I07/27/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U0.400.005 U0.01 U0.02 U

5 U0.20

ug/1mg/1mg/1mg/1mg/1ug/1mg/1

Page 457: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100252Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-87 (0 - l')I07/27/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

PH

Result

4.7

Units

s.u.

Page 458: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900327Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-87 (4 - 5')I07/27/94F93307C, COC No: 6882

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCopperNickelLeadZinc

1 U0.250.01 U0.02 U

1 U0.03

ug/1mg/1mg/1mg/1ug/1mg/1

Page 459: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

010

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800082Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-88 (0 - 1')07/27/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

30000.759.690.1

ug/kgmg/kgmg/kg

Page 460: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

DO'S

Electro-Voice Report Date: 10/31/94600 Cecil Street Lab Number: 94100243Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-88 (0 - l')I07/27/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCadmiumCyanide, TotalCopperNickelLeadZinc

2 U0.670.4 U

0.005 U0.01 U0.02 U

5 U0.02

ug/lmg/lug/lmg/lmg/lmg/lug/lmg/l

Page 461: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/20/94600 Cecil Street Lab Number: 94100253Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-88 (0 - l')I07/27/94F93307C, COG No: 9396

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

ParameterWB*B^^^B*BB ^——^ •

pH

Result

7.3

Units

s.u.

Page 462: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

0

Electro-Voice Report Date: 10/06/94600 Cecil Street Lab Number: 940900328Buchanan MI 49107 Date Received: 09/19/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-88 (4 - 5')I07/27/94F93307C, COC No: 6882

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result units

ArsenicBariumCopperNickelLeadZinc

1 U0.490.01 U0.02 U

1 U0.01 U

ug/1mg/1mg/1mg/1ug/1mg/1

Page 463: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

009

Electro-Voice Report Date: 08/30/94600 Cecil Street Lab Number: 940800081Buchanan MI 49107 Date Received: 08/04/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-89 (0 - 1')07/27/94F93307C, COC No: 9272

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

CadmiumCyanide, T.Chromium, T.Solids, Total

4400.568.3

88.2

ug/kgmg/kging/kg

Page 464: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 10/28/94600 Cecil Street Lab Number: 94100246Buchanan MI 49107 Date Received: 10/17/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-89 (0 - l')I07/27/94F93307C, COC No: 9396

* Results reported with "U" flag indicate the parameter was analyzed'for but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicBariumCyanide, TotalCopperNickelLeadZinc

2 U1.1

0.005 U0.01 U0.02 U14

0.06

ug/1mg/1mg/1mg/img/1ug/1mg/1

Page 465: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-89 (0 - l')I07/27/94F93307C, COC No: 9396

Report Date: 10/20/94Lab Number: 94100256Date Received: 10/17/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

ParameterVB ^H ^B «* *• HWB4

pH

Result

7.3

Units

s.u.

Page 466: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: LSB-89 (0 - 1')I/Soil07/28/94F93307C, COC No: 9414

Report Date: 11/30/94Lab Number: 941100295Date Received: 11/15/94Client ID: 60688

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

mg/kgLeadSolids, Total

4488.4

Page 467: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 12/05/94600 Cecil Street Lab Number: 941100417Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-90 (4-5')11/17/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide , TotalChromium, T.CopperNickelZinc

1.20.2 U

0.005 U0.02 U0.01 U0.02 U0.03

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 468: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100409Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-90 (4 - 5')11/17/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicLeadSolids, Total

600013

88.0

ug/kgmg/kg

Page 469: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

003

Electro-Voice Report Date: 01/06/95600 Cecil Street Lab Number: 941200532Buchanan MI 49107 Date Received: 12/20/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-90 (4 - 5') I11/17/94F93307C, COC No: 9555

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter

Arsenic

ResultP. •• V* H W* <

2 U

Units

ug/1

Page 470: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

01'

Electro-Voice600 Cecil StreetBuchanan MI 49107

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-91 (4 - 5')11/17/94F93307C, COC No: 9546

Report Date: 12/05/94Lab Number: 941100418Date Received: 11/18/94Client ID: 60638

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide, TotalChromium, T.CopperNickelZinc

0.350.2 U

0.005 U0.02 U0.01 U0.02 U0.01 U

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 471: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

00'

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100410Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: LSB-91 (4 - 5')11/17/94F93307C, COC No: 9546

* Results reported with "Un flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicLeadSolids, Total

420014

90.1

ug/kgmg/kg

Page 472: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 12/05/94600 Cecil Street Lab Number: 941100419Buchanan MI 49107 Date Received: 11/18/94

Client ID: 60688

Attention: Mr. Ron Graham

Sample ID: SPLP/LSB-92 (4 - 5')11/17/94F93307C, COC No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

BariumCadmiumCyanide , TotalChromium , T .CocperNickelZinc

0.250.2 U

0.005 U0.02 U0.01 U0.02 U0.01 U

mg/1ug/1mg/1mg/1mg/1mg/1mg/1

Page 473: fishbeck, thompson, carr & huber · 2016. 6. 11. · PHASE I REMEDIAL DESIGN ADDITIONAL STUDIES REPORT FOR ELECTRO-VOICE, INC. Buchanan, Michigan April 1995 Project No. F93307D 1995

Electro-Voice Report Date: 11/30/94600 Cecil Street Lab Number: 941100411Buchanan MI 49107 Date Received: 11/18/94

Client ID; 60688

Attention: Mr. Ron Graham

Sample ID: LSB-92 (4 - 5')11/17/94F93307C, COG No: 9546

* Results reported with "U" flag indicate the parameter was analyzedfor but not detected in the sample above the detection limit.

Parameter Result Units

ArsenicLeadSolids, Total

23008.993.9

ug/kgmg/kg