FS Rudder - Installation Manual

Embed Size (px)

Citation preview

  • 8/16/2019 FS Rudder - Installation Manual

    1/32

     

    INSTALLATION MANUAL

    Rolls-Royce RuddersType: FS

    Yard and hull no. :XXXX XXXUnit no. :XXXX/XX

  • 8/16/2019 FS Rudder - Installation Manual

    2/32

     

  • 8/16/2019 FS Rudder - Installation Manual

    3/32

     

    Page 1

    TABLE OF CONTENTS

    INTRODUCTION ...................................................................................... 2 

    1.1  Purpose .............................................................................................................................2 1.2  Warranty ............................................................................................................................2 1.3   Abbreviations .....................................................................................................................2 

    2  SAFETY ................................................................................................... 3 

    2.1  General statement .............................................................................................................3 2.2  Declaration of conformity ...................................................................................................4 2.3  Safety Annotations ............................................................................................................4 2.4  Safety instructions .............................................................................................................5 2.5  Marking of rudder parts .....................................................................................................6 

    3  TECHNICAL DATA .................................................................................. 7 

    3.1  Recommendations ............................................................................................................8 3.2  Bolt torques .......................................................................................................................9 

    4  HANDLING AND PRESERVATION ....................................................... 10 

    4.1  Delivery check .................................................................................................................10 4.2  Storage ............................................................................................................................10 

    5  FS RUDDER INSTALLATION ............................................................... 11 

    5.1  Clearance and wearing ...................................................................................................11 5.2  Installation of rudder trunk ...............................................................................................12 5.3

     

    Installation of rudder ........................................................................................................14 

    5.4  Locking of hydraulic nut ...................................................................................................21 5.5  Rudder hinge ...................................................................................................................22 5.6  Cathodic protection .........................................................................................................24 5.7  Painting and preservation ................................................................................................24 5.8  Hatch in rudder blade ......................................................................................................25 5.9  Lubrication in trunk ..........................................................................................................26 

    6  CONTACT INFORMATION .................................................................... 28 

    6.1  Ordering spare parts .......................................................................................................28 6.2  Preservation ....................................................................................................................28 

    FINAL INSPECTION AND TEST PROCEDURE ................................... 29 

    7.1  Function test ....................................................................................................................29 7.2  Precautions before launching ..........................................................................................29 7.3  Completion ......................................................................................................................29 

    8  DOCUMENTS, DRAWINGS AND DATASHEETS ................................. 30 

  • 8/16/2019 FS Rudder - Installation Manual

    4/32

     

    Page 2

    1 INTRODUCTION

    1.1 PurposeThis manual provides the information necessary to plan, maintenance and install the deliveredsystem safely and correctly. It also enables you to verify the functionality of the equipment.

     Also included are instructions for handling of the goods after they have been received at the yard. Itis important that the instructions be followed carefully to avoid problems during outfitting andcommissioning. Furthermore, this manual shall provide instructions for all activities necessary forpreparing the commissioning.

    Note!

    Installation and user manual is based on the same template. Installation manual reference to as-planned documentation and user manual to as-built documentation. It is customer’s responsibilityto transfer recorded values from installation to user manual.

    1.2 Warranty

    The product has a limited warranty. Please note that the warranty will be voided if the equipment ismisused or not handled in accordance with Rolls-Royce guidelines, i.e. dismantling of theequipment to a more detailed level than described.

    1.3 Abbreviations

    Specific abbreviations are listed below:

     Abbreviation Description

    ºC Centigrade (temperature)

    cSt Centistokes (oil viscosity)

    kg Kilogram (weight)

    mm Millimetres (lengths and diameters)

    WI Work Instruction

    IWS In-water survey

    Laser alignment tool Centering Device

    Neck Bearing Plain Bearing (Rudder Stock bearing)

  • 8/16/2019 FS Rudder - Installation Manual

    5/32

     

    Page 3 

    2 SAFETY

    Please take the time to read this chapter carefully, as it concerns your safety.

    2.1 General statement

    "UNDERTAKING ANY WORK ENVISAGED BY THIS DOCUMENT MAY EITHER DIRECTLY ORINDIRECTLY CREATE RISKS TO:

    [1] THE SAFETY AND HEALTH OF THE PERSON UNDERTAKING THE WORK OR,

    [2] THE PRODUCT AND/OR ITS COMPONENTS WHILST THE WORK IS BEING UNDERTAKEN.

    IT IS THE RESPONSIBILITY OF THE USER TO ENSURE THAT APPROPRIATE CONTROLS AND PRECAUTIONS ARE IDENTIFIED AND APPLIED IN RELATION TO THE WORK

    ENVISAGED BY THIS DOCUMENT IN ACCORDANCE WITH RELEVANT STATUTORY, LEGAL AND INDUSTRY REQUIREMENTS TO PROTECT THE HEALTH AND SAFETY OF THEPERSONS UNDERTAKING THE WORK.

    IT IS ALSO THE USER’S RESPONSIBILITY TO ENSURE THAT APPROPRIATE CONTROLS AND PRECAUTIONS ARE IDENTIFIED AND APPLIED IN RELATION TO WORK ENVISAGEDBY THIS DOCUMENT TO PROTECT AGAINST RISKS TO THE ROLLS-ROYCE TUNNELTHRUSTER AND/OR ITS COMPONENTS WHILST THE WORK IS BEING UNDERTAKEN.

    NEITHER THIS DOCUMENT, NOR ITS USE, IN ANY WAY ABSOLVES THE USER FROM THEIRRESPONSIBILITY TO ENSURE THAT THE CONTROLS AND PRECAUTION REFERRED TO ABOVE ARE IMPLEMENTED.

    IF, WHILST UNDERTAKING ANY WORK ENVISAGED BY THIS DOCUMENT, YOU BECOME AWARE OF ANY ROLLS-ROYCE MARINE PRODUCT DESIGN RELATED FEATURE WHICHCOULD CREATE RISK TO A PERSON UNDERTAKING WORK OR TO THE PRODUCT AND/ORITS COMPONENTS PLEASE CONTACT THE RESPECTIVE TECHNICAL PRODUCT MANAGER AT ROLLS-ROYCE MARINE AS IMMEDIATELY."

    It is the user’s responsibility to make all relevant hazard identifications and risk assessments of allthe activities associated with the use of this document.

    It is the user’s responsibility to design and implement safe systems of work and to supply safeequipment (including, without limitation, safety equipment) and training (including, withoutlimitation, health and safety training) to anyone using this document to work on products to which itrelates.

     A user without the relevant experience of working in accordance with this document or withproducts, or similar products, to which it relates, should seek appropriate advice to enable them toidentify the appropriate health and safety controls and precautions to protect against risks to theproduct and/or its components whilst work is being undertaken. Technical assistance can besought from Rolls-Royce and will be subject to Rolls-Royce’s terms and conditions.

  • 8/16/2019 FS Rudder - Installation Manual

    6/32

     

    Page 4

    2.2 Declaration of conformity

    Rolls-Royce Rudders are designed and built according to classification standards.

    2.3 Safety Annotations

     All safety directions must be respected in order to avoid damage to personnel, environment andequipment. In this manual the following annotations are used with belonging signification:

    Warning

    Indicates possibilities for hazards or unsafe practices, which COULD result in fatalor severe personnel injuries or substantial product or property damage, if therequired precautions are not taken.

    CAUTION!

    Indicates possibilities for hazards or unsafe practices, which COULD result in minor personnelinjuries and/or property damage, if the required precautions are not taken.

    Note

    Draws attention to specific information of technical significance which might not be obvious tospecialist personnel, or points at important remarks in the procedures to follow.

  • 8/16/2019 FS Rudder - Installation Manual

    7/32

     

    Page 5 

    2.4 Safety inst ructions

    2.4.1 During installation and maintenance

    Warning

      Never work alone when installing heavy components, even when using securelifting equipment such as lockable block and tackle. Most lifting devicesrequire at least two people, one to see to the lifting device and one to ensurethat the components do not get caught and damaged.

      Using other hydraulic oil than specified may cause personal injury andequipment damage.

       Always wear protective goggles if there is a risk of splinters, grinding sparks

    and splashes from acid or other chemicals. Your eyes are extremely sensitiveand an injury to them can result in you losing your sight.

    Caution!

      Most chemicals intended for the product (engine and gearbox oils, glycol,gasoline and diesel), or chemicals intended for the workshop (degreasing agent,paints and solvents) are harmful to your health. Read the instructions onpackaging carefully! Always follow protective measures (using a protective mask,goggles, gloves etc.). Make sure that other personnel are not unknowinglyexposed to harmful substances in the air that they breathe for example. Ensurethat ventilation is good. Deal with used and excess chemicals as directed.

      Plan in advance so that you have enough room for safe installation and (future)dismantling. Plan the compartments so that all service points are accessible.Coming into contact with rotating components, hot surfaces or sharp edgeswhen servicing and inspecting the rudder system must not be possible.

      Prior to welding, check that the electric system of the boat is disconnected.

      Ensure that the warning or information decals on the product are always visible.Replace decals that are damaged or painted over.

      Take care of the hydraulic oil when replacing parts in the hydraulic system. Anyoil spillage, even a small one, will cause environmental damage. Used filter

    elements and worn out hydraulic oil should be disposed safely.

      If hydraulic oil disappears from the system and there is a risk that this oil ispolluting the seawater, the system must be immediately shut down andinspected.

      Do not use the Rolls-Royce Product Name if local rules do not permit this.

    Note!

      Use spare parts produced by Rolls-Royce Marine, or by a manufacturerapproved or licensed by them. Use of other than approved spare parts will voidthe warranty and may result in system failure or reduced lifetime.

  • 8/16/2019 FS Rudder - Installation Manual

    8/32

     

    Page 6

    2.5 Marking of rudder parts

    Main parts, including the Hydraulic Nut, are marked with classification certificate identification

    number.

     According to sketch above, the marking is found as following:

      Rudder Blade: Starboard side of blade, in upper-front section

      Rudder Trunk: Lower flange end.

      Rudder Stock: On the top end

      Hydraulic Nut: On the side of nut.

     All numbers shall be identical with certificate or rudder numbers.

  • 8/16/2019 FS Rudder - Installation Manual

    9/32

     

    Page 7

    3 TECHNICAL DATA

    This chapter contains project specific data, and similar relevant information.

     Application information

    Rudder No xx

    Production Year xx

    Rudder Type xx

    Owner/Yard xx

    Name of Vessel/ Yard nos. xx

    Rudder System xx

    Rudder data

    Rudder Area xx m2 

    Chord Length xx m

    Height xx m

    Max. Rudder Angle 45o 

    Balance Ratio 41%

    Profile Thickness 24%

    Rudder coupling data

     All necessary detail information about coupling data is to be found in the general assemblydrawing.

    Rudder Trunk data

     Amount of grease in trunk xx litres

  • 8/16/2019 FS Rudder - Installation Manual

    10/32

     

    Page 8

    3.1 Recommendations

    .

    Warning

    Using oil/grease other than that specified by Rolls-Royce Marine may causemalfunctions when manoeuvring the boat. This may cause personal injury andequipment damage.

    3.1.1 Recommended grease

    Manufacturer Type NLGI-grade

    Esso Cazar K2 2

    Mobil Mobilgrease XHP222 2

    Castrol Spheerol SX2 2

    Shell  Alvania EP(LF) 2 2

    Texaco Starplex EP 2 2

    Texaco Multifak EP2 2

    BP MP-MG2 2

    Statoil Chassis Grease Winter 2

    3.1.2 Recommended liquid seals

    Manufacturer Type

    Permatex Hylomar

    Locktite 5922

    Epple-Chemie 33

    3.1.3 Approved hydraulic oil for Hydraulic Nut and conical connection

    Standard Grade

    ISO VG 32-68

    Viscosity at actual temperature should be between 20-75cSt.

  • 8/16/2019 FS Rudder - Installation Manual

    11/32

     

    Page 9

    3.2 Bolt torques

    QUALITY A4-80

    Note!

    Given figures are with no lubrication. If lubrication is used multiply with 0,84.

    Size Torque [Nm]

    M10 47

    M12 81

    M16 197

    M20 385

    M24 681

    M30 1310

    Note!

    Lock Washer to be used to secure the bolts, ref. the installation drawings.

  • 8/16/2019 FS Rudder - Installation Manual

    12/32

     

    Page 10

    4 HANDLING AND PRESERVATION

    4.1 Delivery checkImmediately upon arrival, the equipment packing must be inspected. If there are any complaints,you must inform Rolls-Royce Marine as soon as possible.

    Preservation used on all surfaces - not primed nor painted - is Cortec VCI-369. This is a corrosioninhibitor prepared for temporary coating. The preservation needs only to be removed in contactareas. It can easily be removed using soap and water or similar.

    4.2 Storage

    Preservation of components is prepared for transport and short storage only. Please check the

    expiration date of this preservation on labels following the shipment. This is yellow stick-on labelsas shown below:

    Storage days are counted as delivery date to first start-up.

    During storage, it is important to protect the equipment against corrosion as well as moisture anddust. At the shipyard, store all goods indoors. Temporary built shelters with good ventilation can beused for some heavy components. All openings and pipes are to be sealed off at all times. Fill thepipes with oil to inhibit rust. Preferably use oil specified by Rolls-Royce Marine.

    Caution!

     

      If Rudder System is delivered with electronic In-water survey (IWS). Make sure to protectthe electronic components and wires from moisture, heat and impact.

  • 8/16/2019 FS Rudder - Installation Manual

    13/32

     

    Page 11

    5 FS RUDDER INSTALLATION

    This chapter describes all relevant maintenance procedures and activities to be carried out by the

    ship’s crew.

    Please read through all installation procedures before commencing any work.

    5.1 Clearance and wearing

    Please refer to enclosed drawing, dwg SM3627.

    Fig. no Code Design Clearance RecommendedOperationalClearance

    ClearanceMounting

    Clearance, laterinsp.

    Min.[mm] Max.[mm] Min.[mm] Max.[mm] Date: Date:

    Fig. 1

    Longitude: M1 – 1 0.8 1.07 0.6 3.0

    Transverse: M1 – 2 0.8 1.07 0.6 3.0

    Fig 2

     Axialbearing:

    M2 – 1 0.0 0.6 0.0 3.0 NA

    Radialbearing:

    M2 – 2 0.78 1.07 0.3 5.0 NA

    Fig. 3

    Upperbearing:

    M3 – 1 0.88 1.15 0.3 5.0 NA

    Lowerbearing:

    M3 – 3 0.88 1.2 0.3 5.0 NA

    Crosshead: M3 – 2 1.0 1.6 0.3 5.0

    Document bearing clearances during first installation in the “Clearance Mounting” column.

    Note!

      We recommend replacement of bearings when maximum recommendedoperational clearance is measured.

      Minimum recommended operational clearance to be considered as minimumclearance after completed installation.

      Design clearance is information of stacked production tolerances.

  • 8/16/2019 FS Rudder - Installation Manual

    14/32

     

    Page 12

    1. Use a dial gauge arranged to measure the movement between the rudder stock and the ruddertrunk to check neck bearing clearances [fig. 1].

    2. Force the rudder in transverse direction by using a jack or hoist pulley.

    3. Set point of zero.

    4. Force the rudder in opposite direction.

    5. Log the travel by reading of the dial gauge.

    6. Repeat this operation in longitudinal direction.

    Note!

    It is important to install the dial gauge as close to the bearing as possible.

    7. Make similar arrangements to measure rudder flap bearing clearances.

    8. Record all measurements in the table above.

    5.2 Installation of rudder trunk

    The rudder trunk is delivered with the neck bearing installed, but without any other connected partsassembled.

    The vessel must be prepared with a hole in the steering gear deck according to the top plate orupper pipe in the trunk, and a similar hole in the hull. The trunk is designed to fit the aft-shipstructure according to received drawing from yard or ship consultant. Find enclosed drawing for“Rudder Trunk Complete”.

    1. Lift the trunk into the vessel to correct height, and align the direction between the centreline ofthe trunk and the centreline of the vessel. Do NOT exceed +/- 1.

    2. Welding of trunk according to enclosed sketch “Installation of trunk”. “Temperature MarkingChocks” should be used. High heat input may cause ovality and misalignment in the NeckBearing.

    Warning

    Heat around the neck bearing must NOT exceed 100 degrees!

    3. Check horizontal and vertical alignment of the trunk after finished welding.

    4. Check ovality in neck bearing and misalignment in trunk. Record findings in the table below:

    Ovality Abeam Alongside

    Top

    Middle

    Bottom

     Abeam Alongside

    Misalignment

  • 8/16/2019 FS Rudder - Installation Manual

    15/32

     

    Page 13

    5. Install lubrication pipes with fittings as shown on the illustration. The inlets in the end of thepipes must be prepared for a grease-filling device, and we recommend a swan’s neck pipe in

    the ventilation hole. Check that grease is penetrating through the inlets.

    6. Clean the trunk inside after installation and paint fix with a two component zinc substantialepoxy primer.

    Note!

    Make sure that the neck bearing and the grease inlets will not be painted!

  • 8/16/2019 FS Rudder - Installation Manual

    16/32

     

    Page 14

    5.3 Installation of rudder

    This procedure describes the entire process of installing the rudder.

    5.3.1 Mounting of rudder blade

    Note!

    Before the seal housing is mounted, it is very important to:

      Set the sealings with grease.

       Apply liquid gasket on all flange connections and grease all O-Rings.

  • 8/16/2019 FS Rudder - Installation Manual

    17/32

     

    Page 15

    Note!

    For vessels with twin rudders, make sure that Rudder Stock is corresponding to correct RudderBlade. See chapter “Marking of rudder parts”

    7. Fit Lip seals on the Rudder Stock against underside trunk. See drawing Rudder System forreference.

    8. Prepare the hull with brackets, according to sketch below.

    9. Clean the cone surface in the Rudder Blade and Rudder Stock.

    10. Mount the Seal Housing partly without tightening the screws. Remember to apply liquid gasket

    on all flange connecting surfaces.

    11. Mount the Locking Collar and related O-Ring on top of the Rudder Blade. Tighten the screws.Remember to use lock washers and apply liquid gasket on all flange connecting surfaces andgrease O-Ring.

    12. Lift the Rudder Blade using brackets welded to the hull, connected to shafts through the holesin the blade or alternatively the ligting eyes welded to the rudder blade, ref. Shipping Data.

    13. Lift the blade until the Rudder Stock is entering the hub.

    Note!

    Carefully clean and lubricate the threads on the Rudder Stock and the Hydraulic Nut beforemounting Hydraulic Nut on Rudder Stock.

  • 8/16/2019 FS Rudder - Installation Manual

    18/32

     

    Page 16

    14. Lower the Rudder Stock into the Rudder Blade hub and mount the Hydraulic Nut and theThrust Washer.

    15. Remove one of the two plugs for the P1 inlet and the P2 inlet.

    16. Connect one pump to the P2 inlet and reach the P2 pre-pressure.

    17. Connect one pump to the P1 inlet.

    Note!

    Use of one inlet is sufficient – but then the other inlet is to be plugged.

    18. Start pumping pressure in the P1 inlet, and continue increasing pressure in both P1 and P2until the required pull-up length is reached. Use measure gauge. Pull-up length is found in“Rudder Coupling Data” in the enclosed Rudder System drawings.

    Note!

      Hydraulic oil to be used: ALWAYS use oil that is suitable for hydraulic mounting.

    Pump pressure and pull-up length should be recorded:

    Rudder Coupling -Control Sheet

    1. time mounting Later mountings

    Max pressure, P1

    Max pressure, P2

    Pull-up length ”A”

    1 N/mm² = 1 MPa = 10,2 kp/cm² = 145 psi = 10 bar

  • 8/16/2019 FS Rudder - Installation Manual

    19/32

     

    Page 17

    19. When correct position is reached, drain the pressure from P1 and disconnect oil hoses. Installenclosed drain plugs.

    20. Keep pressure in P2 for about 60 minutes after pressure in P1 is drained.

    21. Disconnect oil hoses. Install enclosed drain plugs for P1 inlets.

    22. Drain the P2 pressure in the nut.

    23. Tighten the nut with approx. 500Nm.

    24. Disconnect oil hoses. Install enclosed drain plugs for P2 inlet

    25. Tighten screws for the Seal Housing on the Rudder Trunk.

    26. Adjust height of Rudder Stock / Blade to reach the given jumping lock distance. (See Rudder

    System drawing)

    27. Install Hydraulic Nut Cover

    28. Install the steering gear according to the manufacturer’s installations procedures.

    Note!

    The steering gear is to be centred to the trunk to avoid leakage in the rudder sealings. Maximumaccepted tolerance between centrelines is 1mm.

  • 8/16/2019 FS Rudder - Installation Manual

    20/32

     

    Page 18

    5.3.2 Mounting of link mechanism

    The link mechanism consists of three main parts:

      Crosshead

      Link support

      Slide Rod.

     After the Rudder Blade is installed, these parts shall be mounted as follows.

    29. Crosshead with lower bearing is assembled to the trunk at delivery.

    Note!

    It is important to make sure that the crosshead is turned with the “FWD” mark in forward direction,

    see below sketch and the installation drawings.

    30. Turn the Rudder Blade 40 degrees.

    31. Install the Slide Rod, through the Crosshead, to the rudder flap.

    32. Finish installation using the procedure “Slide Rod Installation”

  • 8/16/2019 FS Rudder - Installation Manual

    21/32

     

    Page 19

    5.3.3 Slide rod installation

    The standard steps of our link mechanisms are divided in steps by Slide Rod diameter. The

    following pull-up is to be used for the different steps:

    Slide Rod diameter Pull-up

  • 8/16/2019 FS Rudder - Installation Manual

    22/32

     

    Page 20

    5.3.4 Dismounting of rudder blade

    Note

    First step for dismounting of Rudder Blade is disconnecting the link mechanism. Please performthe mounting instruction sequence reverse.

    Further the following procedure is to be performed.

    43. Open both hatches in Rudder Blade and remove nut cover. Loosen the locking devicebetween Rudder Stock and nut.

    44. Open the nut to the distance of the pull-up +2-3 mm.

    45. Connect pump to the P2 inlet and reach the recorded P2 pressure from last mounting.

    46. Connect a second pump to the P1 inlets and reach the recorded P1 pressure.

    47. Discharge the P2 pressure and keep a pressure in P1.

    48. The hub will now slide from the shaft taper and the cone coupling will be disconnected.

    49. Remove plugs from holes in the Rudder Blade and insert shafts.

    50. Connect these shafts to brackets in the hull with wires and tackles.

    51. If rudder is delivered with Promas: Turn the rudder about 30º, using the tackles, to avoid anycontact between bulb and hubcap.

    52. Remove the nut and lower the Rudder Blade.

  • 8/16/2019 FS Rudder - Installation Manual

    23/32

     

    Page 21

    5.4 Locking of hydraulic nut

     After the Hydraulic Nut is tightened it must be secured. For this purpose a flat iron is connectedbetween the nut and lower end of the Rudder Stock.

    Sketch above showing underside of the Hydraulic Nut. Flat bar to be connected to undersideRudder Stock by welding (spec. on Rudder System).

    Sketch is for guidance only, but by welding the length per weld (4 pcs.) on underside Rudder Stockto be min. 20% of the thread diameter.

    Welding between the flat bar and Hydraulic Nut must be full width of the Flat Bar.

  • 8/16/2019 FS Rudder - Installation Manual

    24/32

     

    Page 22

    5.5 Rudder hinge

    The rudder is delivered with the flap and main blade connected with a hinge. For disconnecting the

    flap from the blade, the hinge has to be opened. See sketch and follow procedure below.

    Pos. Component

    1 Upper hinge shaft

    2 Radial bearing

    3 Collar bearing

    4 Collar support

    5 End stopper

    6 Lower hinge shaft

    7 End stopper

  • 8/16/2019 FS Rudder - Installation Manual

    25/32

     

    Page 23

    For dismounting the Hinge follow this procedure:

    The flap can only be dismounted from the rudder, when the rudder is dismounted from the vessel.

    53. The upper hinge-shaft can be pulled upwards using the radial holes after removing the spotwelded top plate.

    54. To dismount the lower hinge-shaft lift hinge-shaft and end support 40-50 mm upwards.

    55. Remove end support sideward.

    56. Pull the hinge-shafts down using the radial holes.

    57. The flap may now be pulled backwards.

  • 8/16/2019 FS Rudder - Installation Manual

    26/32

     

    Page 24

    5.6 Cathodic protection

     As for the hull itself, cathodic protection has to be performed also for the rudder blade. Werecommend 1kg anode per 1m

    2 of the rudder blade area, for two years operation. This is 0,5kg per

    1m2 surface area.

    Placing of anodes for a 16 m2 rudder:

    Rudder blade: 10 pcs a 1kg anodes divided on both sides

    Rudder flap: 6 pcs a 1 kg anodes divided on both sides

    For this example, see recommendation of placing below:

    The quantities will vary according to rudder blade area (b x h) and requiredlifetime.

    Note!

    If the vessel has installed an impressed current system, make sure that the current is transmittedalso to the rudder stock and flap. An additional cathodic protection is not required, but should stillbe considered.

    5.7 Paint ing and preservation

    Note

      Visually inspect surfaces for scratches and damages. Repaint if necessary.

    58. Sealing arrangement: Clean the Seal Housing and Jumping Collar after installation and paintfix with a two component zinc substantial epoxy primer.

    59. Slide Rod: Clean the Lock Nut, Thrust Washer, nut locking bar and Seal Ring afterinstallation and paint fix with a two component zinc substantial epoxy primer.

    60. Hydraulic Nut: Wrap the Hydraulic Nut and thrust washer with protective oil paper, or clean

    the Hydraulic Nut and thrust washer after installation and paint fix with a two component zincsubstantial epoxy primer.

  • 8/16/2019 FS Rudder - Installation Manual

    27/32

     

    Page 25

    5.8 Hatch in rudder blade

    Closing and opening of hatch according to illustration below. The hatches are a part of our delivery.

    CAUTION!

    Chamber must be carefully coated against seawater.

    Pos. Component

    1 No welding

    2 No wt. closing

    3 Cover plate

    4 Flat bar

    5 Welded to cover plate

    6 Welded to rubber plating

    7 For dismounting, cut here.

  • 8/16/2019 FS Rudder - Installation Manual

    28/32

     

    Page 26

    5.9 Lubrication in trunk

    In the steering gear room it will now be one inlet (3) for lubrication of Neck Bearing, one inlet (2) for

    first time filling and outlet (1).

    5.9.1 Marking of inlets

    Make sure marking of the inlets in the steering gear room is visible. This is to simplify and assurefuture use. The marking should be near the inlet.

    Pos. Marking Component

    1 Ventilation

    2 “GF” (Grease Filling) Filling of Trunk

    3 “LPB” (Lubrication Plain Bearing) Neck Bearing

    Note

    Inlets to be marked as shown above.

  • 8/16/2019 FS Rudder - Installation Manual

    29/32

     

    Page 27

    5.9.2 First time fil ling

    Before first time filling of grease, make sure the inside of the trunk is sufficiently cleaned. Findrecommended grease types below.

    Use a grease pump and carry out following procedure:

    61. Make sure the ventilation on top (marked 1) is open.

    62. Make sure the grease pipes are filled with grease

    63. Connect grease pump to “Neck Bearing” inlet (marked 3) and fill 20-30 litre. Do not exceed 1BAR pressure.

    64. Plug the Neck Bearing inlet and connect grease pump to the “Filling of trunk” inlet (marked2). Do not exceed 1 BAR pressure.

    65. Fill until grease is leaking from the ventilation hole.

    66. Plug the “Filling of trunk” inlet, and plug or mount a swan’s neck pipe in ventilation hole.

    0.

    Note

    Make sure that the trunk is complete filled with grease as long as the rudder is mounted in thevessel.

    5.9.3 Automatic lubrication system

    If an automatic lubrication system is delivered, an addition will be part of the manual regardingtechnical information. A sketch for installation of this system is also added.

    Note

    When this device is installed, it is very important to fill all related pipes and hoses with grease. Donot plug the ventilation (marked 1). We recommend installing a receiver for the overflow grease.

    Periodically control of function is demanded.

    5.9.4 Manual lubrication

    Manually lubricate the Neck Bearing, approx once a week, by loosen the Ventilation plug and pumpgrease through the Neck Bearing inlet (marked 3) until grease is leaking from the ventilation hole.

    This also lubricates the lower and upper sealing arrangement.

  • 8/16/2019 FS Rudder - Installation Manual

    30/32

     

    Page 28

    6 CONTACT INFORMATION

    SERVICE AND SPARE PARTS 

    Country Address Telephone Fax

    Norway

    Rolls-Royce Marine ServicesDeck machinery & Steering SystemsP.O. Box 1522

    N-6025 AalesundNORWAY

    [email protected]

    http://www.rolls-royce.com

    +47 815 20 075

    24h service :+47 911 85 818

    +47 70 20 87 00

    6.1 Ordering spare parts

    When ordering spare parts, the following information must be given:

      Rudder number, vessel’s name and owner’s name.

      Shipping address and invoicing address.

      Drawing Number, Position Number, Article Number (Art.no.) and Quantity.

    Note!

    Use spare parts produced by Rolls-Royce Marine, or by a manufacturer approved or licensedby them. Use of other than approved spare parts will void the warranty and may result insystem failure or reduced lifetime.

    6.2 Preservation

    Spare parts should be kept in a dry and dust free environment.

  • 8/16/2019 FS Rudder - Installation Manual

    31/32

     

    Page 29

    7 FINAL INSPECTION AND TEST PROCEDURE

    7.1 Function testPerform a controlled maximum manoeuvring of the rudder to both sides.

    Rudder angle: ± 45°

    Note

    The rudder has to be observed during this manoeuvre.

    7.2 Precautions before launching

      Inspect sealings for leakages.

      For correct alignment, ensure that steering gear in 0 degree position gives rudder and flap 0degrees.

      If delivered with Promas Solution:

    o  Make sure that Bulb centre and Hub-cap centre is aligned.

    o  Make sure clearance (Ref. Rudder System draw.) between Bulb and Hub-cap iscorrect.

    7.3 Completion

      Ensure that all bolts are tightened and that lock washers are used.

      Ensure that plugs for oil inlets to cone connection are installed.

      Ensure that cover for Hydraulic Nut is installed.

      Ensure that rudder covers are installed.

      Ensure that the lifting holes in Rudder Blade are plugged.

      Visually inspect surfaces for scratches and damages. Repaint if necessary.

  • 8/16/2019 FS Rudder - Installation Manual

    32/32

     

    8 DOCUMENTS, DRAWINGS AND DATASHEETS

    The following documents should be used as reference.

    Drawing/ document Document number

    Rudder System

    Rudder Trunk

    Rudder Assembly

    Rudder blade & flap

    Installation of Rudder Trunk SM3760

    Bearing Clearances SM3627

    Shipping Data

    Nordlock Washer Ds0008