Manufacturing Facility

• 50,000 ft2

– 45,000 ft2 is manufacturing & warehouse

• State of the art• Indoor tank farm• Capacity of 150,000 #

per day

Page 5: General Thoughts on Roof Restoration
Page 6: General Thoughts on Roof Restoration
Page 7: General Thoughts on Roof Restoration
Page 8: General Thoughts on Roof Restoration
Page 9: General Thoughts on Roof Restoration
Page 10: General Thoughts on Roof Restoration
Page 11: General Thoughts on Roof Restoration

System Costs and Modules ERSystems

Page 12: General Thoughts on Roof Restoration

Restoration

• Trends & Economics• Increasing material prices of installed

roofs• Increasing competition• Diminishing labor market-higher labor

costs• Increasing Insurance-workers comp costs• Decreasing return- lower margins to the

contractor

Page 13: General Thoughts on Roof Restoration

Restoration

• Why Not?– Decrease overhead– Decrease crew size– Save on insurance– Save landfill expense– INCREASE Profits and ROI

Page 14: General Thoughts on Roof Restoration

Metal Restoration

• Millions of square feet restored annually through ERSystems Contractors

• Most cost effective and labor saving system for metal in the industry

• HER is still the only product that consistently performs without Fabric

• Since 1977!!

Page 15: General Thoughts on Roof Restoration

Metal Restoration

• Benefits to the contractor and building owner:– Installation labor is easier, faster, saves $– White finish is reflective and great emitter of

heat saving energy– Manufacturer guarantee that is renewable

every 5-10 years

Page 16: General Thoughts on Roof Restoration

Metal Restoration

• Installation in just a few easy steps– Remove foreign material– Tighten loose fasteners– Pressure wash– Prime (if needed)– HER seams, screws, and penetrations– Finish coating

Page 17: General Thoughts on Roof Restoration

Metal Restoration

Common seam issue

Page 18: General Thoughts on Roof Restoration

Metal Restoration

HER 2000 Extruded

Page 19: General Thoughts on Roof Restoration

Metal Restoration

Brushing HER 2000

Page 20: General Thoughts on Roof Restoration

Metal Restoration

Brushing HER 2000

Page 21: General Thoughts on Roof Restoration

Metal Restoration

Seam Sealed

With HER

Page 22: General Thoughts on Roof Restoration

Metal Restoration

HER 2000

Complete

Page 23: General Thoughts on Roof Restoration

Metal Restoration

1st Finish

Page 24: General Thoughts on Roof Restoration

Metal Restoration

Restored

Penetration

Page 25: General Thoughts on Roof Restoration

Metal Restoration

Metal

Restoration

Before

Page 26: General Thoughts on Roof Restoration

Metal Restoration

Metal

Restoration

After

Page 27: General Thoughts on Roof Restoration

Metal Restoration

Before

Page 28: General Thoughts on Roof Restoration

Metal Restoration

After

Page 29: General Thoughts on Roof Restoration

Metal Restoration

• PowerWash $.05-$.20 per sq ft=$.12 per sq ft• Primer $.10-$.15 per sq ft=$.12 per sq ft• HER $.08-$.20 per sq ft=$.14 per sq ft• Basecoat field $.10-$.25=$.17 per sq ft• Finish Coat $.10-$.25=$.17 per sq ft

Labor cost $.43- $1.05 per sq ft

Page 30: General Thoughts on Roof Restoration

Metal Restoration

• Acrylic/Polyurethane System– Eraguard 2000 Primer $.13 per sq ft– HER seam and fasteners $.23 per sq ft– Eraguard 1000 Finish coat $.45 per sq ft

Total $.81 per sq ft

Page 31: General Thoughts on Roof Restoration

Metal Restoration

System Summary• Material Cost $.81 per sq ft• Labor Cost $.43-$1.05 per sq ft• $1.24-$1.86 per sq ft plus your

Margin/Markup/Profit

Jobs are sold at $1.60-$3.75

Page 32: General Thoughts on Roof Restoration

Thermoset Restoration

• ERSystems was the first to warrant a system to restore Thermoset material

• First to warrant Hybrid systems utilizing spray foam as flashing material

• EPDM, Hypalon, other?

Page 33: General Thoughts on Roof Restoration

Thermoset Restoration

• Understand the system you are restoring

• EPDM vs. Hypalon– Weak/failure points

• System must be in watertight condition before coating application

Page 34: General Thoughts on Roof Restoration

Thermoset Restoration

• Assess system condition-– Moisture level of insulation-remove wet

areas.• Address problem areas

– Transitions– Flashings– Seams– Penetrations

• Power wash• Prime-as necessary• Coat

Page 35: General Thoughts on Roof Restoration

Thermoset Restoration

Priming seams

Page 36: General Thoughts on Roof Restoration

Thermoset Restoration

Taped Seams

Page 37: General Thoughts on Roof Restoration

First layer of

Finish Coat

Page 38: General Thoughts on Roof Restoration

Thermoset Restoration

Eraguard 1000

Finish Coat applied in center;

Perimeter to be rolled.

Page 39: General Thoughts on Roof Restoration

Finished

Section

Page 40: General Thoughts on Roof Restoration

Thermoset Restoration

Before

Page 41: General Thoughts on Roof Restoration
Page 42: General Thoughts on Roof Restoration

ThermoSet Restoration

• Material Cost

• Primer 1=$.10 / square ft• Seam Tape=$.62 / lin. ft.

– Basecoat over seams=$.40 / lin ft• Basecoat field=$.32 / sq ft• Finish Coat =$.21 / sq ft

Page 43: General Thoughts on Roof Restoration

ThermoSet Continue

• 20,000 sq ft project 20x100 rolls– Primer 1=$2,000– Seam Tape/coating=$1,428– Base Coat=$6400– Finish coat=$4200

Total material cost=14,028=$.70 / sq ft

Page 44: General Thoughts on Roof Restoration

ThermoSet Restoration

Labor Cost• Power wash $.05-$.15 per sq ft=$.10 / sq ft• Primer $.08-$.20 per sq ft=$.14 / sq ft• Seam Tape$.08-$.20=$.14 / sq ft• Basecoat field $.10-$.25=$.17 / sq ft• Finish Coat $.10-$.25=$.17 / sq ft

Labor cost $.41- $.1.05 per sq ft

Page 45: General Thoughts on Roof Restoration

ThermoSet Restoration

Job Summary• Material Cost $.70 / sq ft• Labor Cost $.41-1.05 / sq ft• $1.11-1.75 / sq ft plus your Margin

/Markup/Profit

Jobs are sold at $1.45-$3.50

Page 46: General Thoughts on Roof Restoration

Thermoplastic Restoration

• Understand the membrane being restored– What are the failure points of the

system

• PVC-Tends to become brittle with time, surface crazing (varies widely with formulation). Heat-welded seams.

• TPO-early formulations stiff, crack, chalk, seam issues.

Page 47: General Thoughts on Roof Restoration

Thermoplastic Restoration

• Assess system condition-– Moisture level of insulation-remove wet

areas.• Address problem areas

– Transitions– Flashings– Seams– Penetrations

• Power wash• Prime-as necessary• Coat

Page 48: General Thoughts on Roof Restoration

Thermoplastic Restoration

Cleaning

Page 49: General Thoughts on Roof Restoration

Thermoplastic Restoration

Basecoat

Page 50: General Thoughts on Roof Restoration

Thermoplastic Restoration

Finish-

Coat

Page 51: General Thoughts on Roof Restoration

Thermoplastic Restoration

Polyurethane

Or Acrylic

Coating systems

Page 52: General Thoughts on Roof Restoration

Thermoplastic Restoration

Completed Acrylic system

Page 53: General Thoughts on Roof Restoration

Thermoplastic Restoration

Material Cost• Barrier Coat = $.21 / sq ft• Primer 1=$.10 / sq ft• Basecoat field=$.32 / sq ft• Finish Coat =$.21 / sq ft

Total $.63-.73 per sq ft in material based on Primer I

Page 54: General Thoughts on Roof Restoration

Thermoplastic Restoration

Labor Cost• PowerWash $.05-$.15 per sq ft=$.10 / sq ft• Primer $.08-$.20 per sq ft=$.14 / sq ft• Basecoat field $.10-$.25=$.17 / sq ft• Finish Coat $.10-$.25=$.17 / sq ft

Labor cost $.33- $.85 / sq ft

Page 55: General Thoughts on Roof Restoration

Thermoplastic Restoration

Job Summary• Material Cost $.63 / sq ft• Labor Cost $.33-$.85 / sq ft• $.96-1.48 per sq ft plus your

Margin/Markup/Profit

Jobs are sold at $1.25-$3.00

Page 56: General Thoughts on Roof Restoration

Asphalt Restoration

• What asphalt systems can be restored?

• SMOOTH BUR• SMOOTH MODIFIED BITUMEN• GRANULATED MODIFIED BITUMEN

Page 57: General Thoughts on Roof Restoration

Asphalt Roof Performance

• UV deterioration-alligatoring, splits, cracks, hard, brittle.

• Hot, low reflectivity.• Flashings, transitions tend to fail,

no elongation, high tensile strength.

• Long performance history.

Page 58: General Thoughts on Roof Restoration

Asphalt Restoration

• Inspect for general condition of system

• Be certain the roof is restorable, – CAUTION: Asphalt BUR, Modified

Bitumens and asphalt adhesives are highly VARIABLE in composition, adhesion tests recommended

• Repair deficiencies, – Key to repair of asphalt systems is to

use ‘Like’ materials if possible• Be sure roof is clean, dry,

structurally sound• Wash-with Enviro-Wash

Page 59: General Thoughts on Roof Restoration

Asphalt Repair Materials

• Common repair materials, use “like” materials where possible–Modified bit single-ply–Plastic Cement, fabric–Emulsion, fabric–Spray Polyurethane Foam

(flashings)

Page 60: General Thoughts on Roof Restoration

Asphalt Restoration

Modified

Repair

Page 61: General Thoughts on Roof Restoration

Asphalt Restoration

Emulsion

and

Fabric

Page 62: General Thoughts on Roof Restoration

Asphalt Restoration

Erathane 300 Base

/ Polysoft II

Page 63: General Thoughts on Roof Restoration

Asphalt Restoration

Mod Bit

T-Patch / 300

Basecoat

Page 64: General Thoughts on Roof Restoration

Asphalt Restoration

Valley w/

Erathane 300

Basecoat &

Polysoft II

Page 65: General Thoughts on Roof Restoration

Asphalt Restoration

Valley Complete

300 Base &

300 Finish AL

Page 66: General Thoughts on Roof Restoration

Asphalt Restoration

Erlastic Basecoat

Eraguard 1000 Finish

Page 67: General Thoughts on Roof Restoration

Asphalt Restoration

Acrylic system

Erlastic /Eraguard 1000

Page 68: General Thoughts on Roof Restoration

Asphalt Restoration

Acrylic System

Page 69: General Thoughts on Roof Restoration

Asphalt Restoration

Before

Page 70: General Thoughts on Roof Restoration

Asphalt Restoration

After

Page 71: General Thoughts on Roof Restoration

Asphalt Restoration

Material Cost

• Basecoat =$.20 / sq ft• Finish Coat =$.45 / sq ft

Total $.65 cents per sq ft in material

Page 72: General Thoughts on Roof Restoration

Asphalt Restoration

• Labor Cost

• PowerWash $.05-$.15 per sq ft=$.10 / sq ft• Basecoat field $.10-$.25=$.17 / sq ft• Finish Coat $.10-$.25=$.17 / sq ft

Labor cost $.25- $.65 per sq ft

Page 73: General Thoughts on Roof Restoration

Asphalt Restoration

Job Summary• Material Cost $.64 / sq ft• Labor Cost $.25-$.65 / sq ft• $.89-$1.29 / sq ft plus your Margin/Markup/Profit

Jobs are sold at $1.20-$3.00

Page 74: General Thoughts on Roof Restoration

Replace vs. Restore

40,000 sq ft EPDMYR. Old Way New Way

1 $160,000 New roof $160,000 New roof

5 $2,000 repair/maintain $2,000 repair/maintain

10 $5,000 repair/maintain $5,000 repair/maintain

15 $240,000 replace $80,000 restore

20 $2,000 repair/maintain $2,000 repair/maintain

$409,000 cost $249,000 cost25-30 year Cost Analysis—OWNER

Page 75: General Thoughts on Roof Restoration

Value to the Contractor

• REPLACE• 40,000 square feet

– $160,000 job revenue– $80,000 material cost– 2 week project 6 man

• 480 hrs*50/hr=$24,000• Overhead = $5000

– $160,000 Revenue-$80,000 Material

-$29,000 Labor/Overhead

$51,000 Net Profit

• RESTORE• 40,000 square feet

– $80,000 job revenue– $25,000 material cost– 5 day project 3 man

• 120 hrs*50/hr=$6,000• Overhead = $2,500

– $80,000 revenue-$25,000 material

-$8,500 Labor/Overhead

$46,500 Net Profit

Page 76: General Thoughts on Roof Restoration

Restoration with Foam

• Asphalt roof in restorable condition and ADDITIONAL INSULATION DESIRED.

• SPRAY POLYURETHANE FOAM is an excellent option.– Insulates, waterproofs, reflective- all in one

operation.– Proven history– Effective option to adding insulation board

and second asphalt roof.

Page 77: General Thoughts on Roof Restoration

Restoration With Foam

• Important Features–Best R-Value / Inch of insulation–Flashing curbs, walls, difficult

areas–Eliminates tear off in some

situations–Great over metal where more

insulation is needed

Page 78: General Thoughts on Roof Restoration

Spray Foam

Spray foam

direct to metal

Page 79: General Thoughts on Roof Restoration

Spray Foam

Foam to metal

Page 80: General Thoughts on Roof Restoration

Spray Foam Over BUR

Flashing skylight

Page 81: General Thoughts on Roof Restoration

Spray Foam Over BUR

Page 82: General Thoughts on Roof Restoration
Page 83: General Thoughts on Roof Restoration
Page 84: General Thoughts on Roof Restoration

Restoration Summary

• Benefits of Restoration– Decrease overhead– Decrease crew size– Save on insurance– Save landfill expense

–INCREASE Profits and ROI

Page 85: General Thoughts on Roof Restoration

Restoration Summary

• Does Restoration fit in your business?• Is restoration in your 2009 plans?