Overhauls
Presented by
Abhilash Chandra Aron
Consultant, Turbogenerators
8/20/2019 Generator Overhauling
2/26
Jump to first page
General
Define scope of mandatory works.
Define possible areas of additional and unforseen work actiities.
!ork out list of spares and consumables that shall or may be re"uired. This list to be as e#haustie as possible.
Consult $%&' ( contractor well before.
)chedule as many actiities in parallel as possible. )pecial task group may be made to gie emphasis to longest cycle actiity.
!ithin the organi*ation, create and deelop specialists for main products. They should not only assist in oerhauls or
operational emergencies,but also work for improements in + - areas of the product.
C/T&/A 0+ +1&%A2') /nitial /nspection3 Dictated by stator end winding and stator slot support systems. )ynthetic and insulating material tend
to flow4creep5 under pressure and temperature during initial period. Deficiencies of manuf. assembly or design can be corrected. )tart up stresses3 &ffects of e#pansion, friction on winding and insulation due to thermal centrifugal force cycles.
)pecial ibratory forces arising when passing through natural fre"uencies of components.
-aterial fatigue, especially of rotating parts resulting from centrifugal force cycles.
6ormal recommendations for inspection interals apply to normal operation without any ma7or disturbances.
+1&%A2') 1D&! &C+--&6DAT/+6)
/6/T/A', )%+T, /6T&-&D/AT& A6D -A/6 /6)P&CT/+6)
TEQIV 8 91 . T1 : 92 . T2 : n . T3 9;, T; 0ACT+(T/-&, T> 0ACT+( T/-& < &'AT/6G T+
)TAT 2P
?@ -1A TG3 9; 8 ;., 9= 8 .B, T> 8 = @ -1A TG3 9; 8 ., 9= 8 .>, T> 8 ;
=B -1A TG3 9; 8 .E, 9= 8 .;, T> 8 ; B -1A TG3 9; 8 .F, 9= 8 .;, T> 8 B
0+''+!/6G '&AD T+ &A' /6)P63 0A2'T )6C%+6/)/6G
C'+)& /6 ))T&- 0A2'T)
A)6C%+6+2) +P&AT/+6
%/G% 26$A'A6C&D '+AD)
A')+ 0+''+!/6G 0ACT+)3
!&A(D&T&/+AT/+6 +0 C+-P+6&6T) + 266/6G $&%A1/+2.
'+AD &J&CT/+6), +T+ 0A2'T)...
8/20/2019 Generator Overhauling
3/26
Jump to first page
OVERHAULS - 3
C%A6G& /6 C++'A6T 0'+! AT&).
0+2'/6G /6 A/ C++'&D G&6&AT+).
%D+G&6 + !AT& '&A9).
)%A0T /6)2'AT/+6 D&T&/+AT/+6. &C+--&6DAT/+6) 0+ /6)P&CT/+6)
TEQUIV < /6/T/A'3 ; < = T%+2 %)
TEQUIV < -A/63 H < @ T%+2 %) +6& + -+& )%+T /6T&-&D/AT&
/6)P&CT/+6 $& D+6& $&T!. = -A/6.
8/20/2019 Generator Overhauling
4/26
Jump to first page
OVERHAULS - 4 /6/T/A' -AJ+ 6&&D +T+ &-+1A' &GAD'&)) +0 A$+1&, 0+ ?=B -1A3
-/6+ /6)P&CT/+6 /6 = ).
-&D/2- /6)P&CT/+6 /6 B ).-AJ+ /6)P&CT/+6 /6 ; ).
0+ =B -1A /6 >, @, ;= &A)
C%&C9) 0+ /6/T/A' +T%& /6)P6. T+$& AG&&D !/T% -A620ACT2&
26C%A%A < ;3 H@> T/P) $&T ;E
8/20/2019 Generator Overhauling
5/26Jump to first page
0 10 20 30 40 50 60 70
ACTUAL OPERATING HRS.: T (10 )3
90
80
70
60
50
40
30
20
10
FIRST INSPECTION
3
FIRST MAOR INSPECTION
TIME (!EARS)
B
"#$
2
4
6
8
2
4
6
8
10
12
10
8
6
4
2
100 STARTS%!R 300 ST%!R
10ST%!R
A. C. ARON
&UI'.
OPER.
RS.
T*+,
10 H-
A
10
12
8/20/2019 Generator Overhauling
6/26Jump to first page
OVERHAULS
;st /6)P&CT/+63 ; < = T%+2 %).
)2$)&I2&6T3 H < @ T%+2 %).
-/6+ /6)P&CT/+6) /6 $&T!&&6.
DATA $&0+& )%2T D+!6.
CA)& +0 6A+A +T+ < '+! /
D&T&CT&D A0T& +T+ &/6)&T/+6.
DATA A0T& &+''/6G.
8/20/2019 Generator Overhauling
7/26Jump to first page
BEFORE OVERHAUL
$&A/6G 1/$AT/+6) $& &C+D&D.
C%&C9 $&A/6G )%A0T )&A' /6)2'N.
+T+ !DG. /-P&D&6C& &)/)TA6C&.
)TAT+ +T+ !/6D/6G / -&A)2&D.
!/6D/6G T&-P, !AT& 0'+!) &C+D&D.
GA) '&A9) )&A'
8/20/2019 Generator Overhauling
8/26Jump to first page
DURING OVERHAUL
INITIAL AND MAJOR C+& C+6D/T/+6 &'C/D C+& T&)T.
/0 0A2'T C2&6TK ? ; mA , A6D /0 A6 C+&
DA-AG& 1/)2A'' )&&6, A6D ( + &PA/&D
&TC., P+!& C+& '+)) T&)T T+ $& D+6&.
)TAT+ &6D !/6D/6G )2PP+T ))T&- A6D
+1&%A6G C+6D/T/+6.
)TAT+ !/6D/6G /6)2'AT/+6 C+6D/T/+6. )TAT+ !/6D/6G /K A6D '&A9AG&).
8/20/2019 Generator Overhauling
9/26Jump to first page
DURING OVERHAUL - 2
INITIAL AND MAJOR )TAT+ !&DG& T/G%T6&)).
'&A9AG& T&)T +0 %D+G&6 ))T&-.
)'/P /6G) $2)%G&A. C%&C9 A'' 2$$& GA)9&T).
'&A9AG& T&)T) +6 )TAT+ !/6D/6G, !AT&
))T&-, 0/'T&) C'&A6/6G.
$&A/6G '/6& $+D /6)P&CT/+6.
8/20/2019 Generator Overhauling
10/26Jump to first page
DURING OVERHAUL - 3
INITIAL AND MAJOR +T+ &TA/6/6G /6G )20AC&).
C%&C9 /0 +T+ )%A0T /) -AG6&T/)&D.
26 +2T C%&C9) +6 +T+. C%&C9 &-+1&D +T+ 1/)2A''.
+T+ !/6D/6G /K.
+T+ $&A/6G )&A') J+26A'). P2G& T&)T)K +6 +T+.
C%&C9 +T+ 0A6) 1/)2A''.
8/20/2019 Generator Overhauling
11/26Jump to first page
DURING OVERHAUL - 4 INITIAL AND MAJOR
+T+ C.C. $+'T) 0+ '&A9AG&).
A'' C++'&) T+ $& C'&A6&D C! )/D&.
C%&C9 $&A/6G A6D )&A') /6)2'AT/+6. $&A/6G C'&AA6C&), $A$$/T, A'' +/'
CATC%&), JAC9/6G +/' '/0T, TCs ( TDs.
)P%&/CA' )20AC&) +0 $&A/6G.
)'/D/6G C+6TACT 0AC&) +0 )&A' /6G), )&A'$+D, )%A0T )&A' C'&AA6C&).
8/20/2019 Generator Overhauling
12/26
Jump to first page
DURING OVERHAUL -
INITIAL AND MAJOR C'&A6'/6&)) !%&6 $+L/6G 2P.
'&A9AG&) /6 C+-P'&T& %= GA) ))T&-.
026CT/+6 +0 T+TA' )&A' +/' ))T&-. )&A' +/' 0'+!) AT 02'' M&+ )P&&D
C%&C9 $&A/6G 1AP+2 &L%A2)T&).
A'' T&-P&AT2& GA2G&) A'A-).
'/I2/D '&1&' A'A- )!/TC%&) &TC.
C+6D/T/+6 +0 G+26D/6G $2)%&).
8/20/2019 Generator Overhauling
13/26
Jump to first page
!ra"#$"es RE!LIES TO %UERRIES B& BHEL IN '()
$ased on = replies to "ueries following
maintenance planning periods obtained3
otor, )tator, Au#iliary systems and$earings < for each < ;B days
%ydrogen shaft seals > days
)haft insulation and earthing B days $rush gear and slip rings = days
8/20/2019 Generator Overhauling
14/26
Jump to first page
!ra"#$"es - 2
RE!LIES TO %UERRIES B& BHEL IN '()
2sual actiities3)tator wedges tightness
)tator core tightness, core flu# test
%ydraulic tests on stator wdg.,coolers
Purge tests on rotor and gastightness
/ on stator,rotor,bearing insulationGas tightness test on complete m(c
+CC )CC after resynchroni*ation
8/20/2019 Generator Overhauling
15/26
Jump to first page
!ra"#$"es-Fre*ue+", . Ma$+#e+a+"eRE!LIES TO %UERRIES B& BHEL IN '()
$earing /nspn.E
8/20/2019 Generator Overhauling
16/26
Jump to first page
Me##ur ' / Overhaul s"0e
Total running hours upto Aug ;> 3 >H,F Preious -a7or oerhaul done 3 6o ;E
6umber of start ups so far =>E
)ince last oerhaul F 'P rear bearing ibration was high3 >@%, =B1
%igh eccentricity problem3 >E -icron at start up
and later on load ;; -icrons. cessie bearing clearances and change in
catenary oer period of time was reported
8/20/2019 Generator Overhauling
17/26
Jump to first page
Me##ur ' / Overhaul s"0e - 2 $earing ; liner replacement, cutting of F nos.
sei*ed cap nuts on %P /P.
Generator rotor replacement by the spare rotor
< T6&$ decision because of its low /. 'P rotor =th,=th stage, /P =>rd stage lacing wire
old bra*ing was debra*ed and rebra*ed. $lades
natural fre"uency check performed.
-inor works on front pedestal, -+P, 1ales,
&7ector and cam shaft assembly were done.
8/20/2019 Generator Overhauling
18/26
Jump to first page
Me##ur ' / Overhaul s"0e - 3 )tator 3 >N wedges found loose
8/20/2019 Generator Overhauling
19/26
Jump to first page
Me##ur I / 10le#$+ a,s2+ 1a0$#al verhaul / 's# Au # '4#h O"# '((3
2nit tripped < on barring gear F )lip ring machining incl. grooe cutting, dismantling started.
;= 'ifting of top 'P casing. ;H Generator rotor threaded out. ;B 'ifting of top /P casing. ;E 'ifting of top %P casing == Dismantling works completed. > 'P bo# up >= )tator slot wedge tightening.
8/20/2019 Generator Overhauling
20/26
Jump to first page
Me##ur I "0le#$+ a,s -2
H; /P bo# up HH Generator rotor threaded in. B %P bo# up
@ Generator re
8/20/2019 Generator Overhauling
21/26
Jump to first page
Ne,val$-4 2'5 M6 / S"0e
OVERHAUL IN O1T - DE1 '((4
'P module, Generator, Turbine ales, C% 61,
seromotors, Turning gear and -+P bearings,
-ain %% strainers, ollcheck $umpcheck of
%P and /P, %anger supports, Goerning rack, 'P$yepass rack mechanical components only.
'ub oil coolers tank < filters < pumps, Coolers
8/20/2019 Generator Overhauling
22/26
Jump to first page
Ne,val$-4 2'5 M6 / S"0e - 2 eplacement of rubber grommets around
teflon tubes of winding in stator. 4&rection
point < pending from $%&' side5
After dismantling, in 'P turbine '%) %)clearances found une"ual. These were
corrected by shifting 'P inner outer casing
unning hours upto oerhaul 3 ;E,@ 6umber of trips upto oerhaul =F
After o(haul3 All bearings ibrations reduced
8/20/2019 Generator Overhauling
23/26
Jump to first page
Ne,val$-4 2'5 M6 / S"0e - 3Ge+era#r
otor purge test, gas tightness < leak in
small CC bolts < nuts tightened. DPT of fan
blades and retaining rings done. otor
7ournals were polished.
FBN stator wedges loose < retightened.
H= swollen teflon tubes rubber grometsreplaced without opening nose 7oints.
)tator oerhang was in7ected with glue.
8/20/2019 Generator Overhauling
24/26
Jump to first page
Ne,val$-4 2'5 M6 / 10le#$+
)et tripped.
E )toppage of barring gear.
;; Generator rotor threaded out. ;= Dismantling of 'P.
;E Purge test on generator rotor.
>; 'P $o#ed up. HB Generator rotor threaded in.
BH Generator assembly completed.
8/20/2019 Generator Overhauling
25/26
Jump to first page
Ne,val$-4 2'5 M6/10le#$+-2
@F +il flushing started. F +il flushing completed.
$arring gear operation started.
F )et steam rolled. E )ynchroni*ed
E> Achiees full load smoothly.
$arring gear date got delayed by => days 3 )tatorworks held rotor threading by ;B days. 'P<Generator holes were reamed for ;= days Q