    Overhauls

    Presented by

     Abhilash Chandra Aron

    Consultant, Turbogenerators

  • 8/20/2019 Generator Overhauling

    2/26

    Jump to first page

     

    General

    Define scope of mandatory works.

    Define possible areas of additional and unforseen work actiities.

    !ork out list of spares and consumables that shall or may be re"uired. This list to be as e#haustie as possible.

    Consult $%&' ( contractor well before.

    )chedule as many actiities in parallel as possible. )pecial task group may be made to gie emphasis to longest cycle actiity.

    !ithin the organi*ation, create and deelop specialists for main products. They should not only assist in oerhauls or

    operational emergencies,but also work for improements in + - areas of the product.

    C/T&/A 0+ +1&%A2') /nitial /nspection3  Dictated by stator end winding and stator slot support systems. )ynthetic and insulating material tend

    to flow4creep5 under pressure and temperature during initial period. Deficiencies of manuf. assembly or design can be corrected. )tart up stresses3 &ffects of e#pansion, friction on winding and insulation due to thermal centrifugal force cycles.

    )pecial ibratory forces arising when passing through natural fre"uencies of components.

      -aterial fatigue, especially of rotating parts resulting from centrifugal force cycles.

    6ormal recommendations for inspection interals apply to normal operation without any ma7or disturbances.

    +1&%A2')  1D&! &C+--&6DAT/+6)

    /6/T/A', )%+T, /6T&-&D/AT& A6D -A/6 /6)P&CT/+6)

    TEQIV  8 91 . T1 : 92 . T2 : n . T3  9;, T; 0ACT+(T/-&, T> 0ACT+( T/-& < &'AT/6G T+

    )TAT 2P

    ?@ -1A TG3 9; 8 ;., 9= 8 .B, T> 8 = @ -1A TG3 9; 8 ., 9= 8 .>, T> 8 ;

    =B -1A TG3  9; 8 .E, 9= 8 .;, T> 8 ; B -1A TG3 9; 8 .F, 9= 8 .;, T> 8 B

    0+''+!/6G '&AD T+ &A' /6)P63 0A2'T )6C%+6/)/6G

    C'+)& /6 ))T&- 0A2'T)

     A)6C%+6+2) +P&AT/+6

    %/G% 26$A'A6C&D '+AD)

     A')+ 0+''+!/6G 0ACT+)3

    !&A(D&T&/+AT/+6 +0 C+-P+6&6T) + 266/6G $&%A1/+2.

     '+AD &J&CT/+6), +T+ 0A2'T)...

  • 8/20/2019 Generator Overhauling

    3/26

    Jump to first page

     

    OVERHAULS - 3

    C%A6G& /6 C++'A6T 0'+! AT&).

    0+2'/6G /6 A/ C++'&D G&6&AT+).

    %D+G&6 + !AT& '&A9).

    )%A0T /6)2'AT/+6 D&T&/+AT/+6. &C+--&6DAT/+6) 0+ /6)P&CT/+6)

    TEQUIV < /6/T/A'3 ; < = T%+2 %)

    TEQUIV < -A/63 H < @ T%+2 %) +6& + -+& )%+T /6T&-&D/AT&

    /6)P&CT/+6 $& D+6& $&T!. = -A/6.

  • 8/20/2019 Generator Overhauling

    4/26

    Jump to first page

     

    OVERHAULS - 4 /6/T/A' -AJ+ 6&&D +T+ &-+1A' &GAD'&)) +0 A$+1&, 0+ ?=B -1A3

    -/6+ /6)P&CT/+6 /6 = ).

    -&D/2- /6)P&CT/+6 /6 B ).-AJ+ /6)P&CT/+6 /6 ; ).

    0+ =B -1A /6 >, @, ;= &A)

    C%&C9) 0+ /6/T/A' +T%& /6)P6. T+$& AG&&D !/T% -A620ACT2&

    26C%A%A < ;3 H@> T/P) $&T ;E

  • 8/20/2019 Generator Overhauling

    5/26Jump to first page

     0 10 20 30 40 50 60 70

    ACTUAL OPERATING HRS.: T  (10 )3

    90

    80

    70

    60

    50

    40

    30

    20

    10

    FIRST INSPECTION

    3

    FIRST MAOR INSPECTION

    TIME (!EARS)

    B

    "#$

    2

    4

    6

    8

    2

    4

    6

    8

    10

    12

    10

    8

    6

    4

    2

    100 STARTS%!R 300 ST%!R 

    10ST%!R 

      A. C. ARON

    &UI'.

    OPER.

    RS.

    T*+,

     10 H- 

    A

    10

    12

  • 8/20/2019 Generator Overhauling

    6/26Jump to first page

     

    OVERHAULS

    ;st /6)P&CT/+63 ; < = T%+2 %).

    )2$)&I2&6T3 H < @ T%+2 %).

    -/6+ /6)P&CT/+6) /6 $&T!&&6.

    DATA $&0+& )%2T D+!6.

    CA)& +0 6A+A +T+ < '+! /

    D&T&CT&D A0T& +T+ &/6)&T/+6.

    DATA A0T& &+''/6G.

  • 8/20/2019 Generator Overhauling

    7/26Jump to first page

     

    BEFORE OVERHAUL

    $&A/6G 1/$AT/+6) $& &C+D&D.

    C%&C9 $&A/6G )%A0T )&A' /6)2'N.

    +T+ !DG. /-P&D&6C& &)/)TA6C&.

    )TAT+ +T+ !/6D/6G / -&A)2&D.

    !/6D/6G T&-P, !AT& 0'+!) &C+D&D.

    GA) '&A9) )&A'

  • 8/20/2019 Generator Overhauling

    8/26Jump to first page

     

    DURING OVERHAUL

      INITIAL AND MAJOR  C+& C+6D/T/+6 &'C/D C+& T&)T.

    /0 0A2'T C2&6TK ? ; mA , A6D /0 A6 C+&

    DA-AG& 1/)2A'' )&&6, A6D ( + &PA/&D

    &TC., P+!& C+& '+)) T&)T T+ $& D+6&.

    )TAT+ &6D !/6D/6G )2PP+T ))T&- A6D

    +1&%A6G C+6D/T/+6.

    )TAT+ !/6D/6G /6)2'AT/+6 C+6D/T/+6. )TAT+ !/6D/6G /K A6D '&A9AG&).

  • 8/20/2019 Generator Overhauling

    9/26Jump to first page

     

    DURING OVERHAUL - 2

      INITIAL AND MAJOR  )TAT+ !&DG& T/G%T6&)).

    '&A9AG& T&)T +0 %D+G&6 ))T&-.

    )'/P /6G) $2)%G&A. C%&C9 A'' 2$$& GA)9&T).

    '&A9AG& T&)T) +6 )TAT+ !/6D/6G, !AT&

    ))T&-, 0/'T&) C'&A6/6G.

    $&A/6G '/6& $+D /6)P&CT/+6.

  • 8/20/2019 Generator Overhauling

    10/26Jump to first page

     

    DURING OVERHAUL - 3

      INITIAL AND MAJOR  +T+ &TA/6/6G /6G )20AC&).

    C%&C9 /0 +T+ )%A0T /) -AG6&T/)&D.

    26 +2T C%&C9) +6 +T+. C%&C9 &-+1&D +T+ 1/)2A''.

    +T+ !/6D/6G /K.

    +T+ $&A/6G )&A') J+26A'). P2G& T&)T)K +6 +T+.

    C%&C9 +T+ 0A6) 1/)2A''.

  • 8/20/2019 Generator Overhauling

    11/26Jump to first page

     

    DURING OVERHAUL - 4  INITIAL AND MAJOR 

    +T+ C.C. $+'T) 0+ '&A9AG&).

     A'' C++'&) T+ $& C'&A6&D C! )/D&.

    C%&C9 $&A/6G A6D )&A') /6)2'AT/+6. $&A/6G C'&AA6C&), $A$$/T, A'' +/'

    CATC%&), JAC9/6G +/' '/0T, TCs ( TDs.

    )P%&/CA' )20AC&) +0 $&A/6G.

    )'/D/6G C+6TACT 0AC&) +0 )&A' /6G), )&A'$+D, )%A0T )&A' C'&AA6C&).

  • 8/20/2019 Generator Overhauling

    12/26

    Jump to first page

     

    DURING OVERHAUL -

      INITIAL AND MAJOR C'&A6'/6&)) !%&6 $+L/6G 2P.

    '&A9AG&) /6 C+-P'&T& %= GA) ))T&-.

    026CT/+6 +0 T+TA' )&A' +/' ))T&-. )&A' +/' 0'+!) AT 02'' M&+ )P&&D

    C%&C9 $&A/6G 1AP+2 &L%A2)T&).

     A'' T&-P&AT2& GA2G&) A'A-).

    '/I2/D '&1&' A'A- )!/TC%&) &TC.

    C+6D/T/+6 +0 G+26D/6G $2)%&).

  • 8/20/2019 Generator Overhauling

    13/26

    Jump to first page

     

    !ra"#$"es  RE!LIES TO %UERRIES B& BHEL IN '()

    $ased on = replies to "ueries following

    maintenance planning periods obtained3

    otor, )tator, Au#iliary systems and$earings < for each < ;B days

    %ydrogen shaft seals > days

    )haft insulation and earthing B days $rush gear and slip rings = days

  • 8/20/2019 Generator Overhauling

    14/26

    Jump to first page

     

    !ra"#$"es - 2

     RE!LIES TO %UERRIES B& BHEL IN '()

    2sual actiities3)tator wedges tightness

    )tator core tightness, core flu# test

    %ydraulic tests on stator wdg.,coolers

    Purge tests on rotor and gastightness

    / on stator,rotor,bearing insulationGas tightness test on complete m(c

    +CC )CC after resynchroni*ation

  • 8/20/2019 Generator Overhauling

    15/26

    Jump to first page

     

    !ra"#$"es-Fre*ue+", . Ma$+#e+a+"eRE!LIES TO %UERRIES B& BHEL IN '()

    $earing /nspn.E

  • 8/20/2019 Generator Overhauling

    16/26

    Jump to first page

     

    Me##ur ' / Overhaul s"0e

    Total running hours upto Aug ;> 3 >H,F Preious -a7or oerhaul done 3 6o ;E

    6umber of start ups so far =>E

      )ince last oerhaul F 'P rear bearing ibration was high3 >@%, =B1

    %igh eccentricity problem3 >E -icron at start up

    and later on load ;; -icrons. cessie bearing clearances and change in

    catenary oer period of time was reported

  • 8/20/2019 Generator Overhauling

    17/26

    Jump to first page

     

    Me##ur ' / Overhaul s"0e - 2 $earing ; liner replacement, cutting of F nos.

    sei*ed cap nuts on %P /P.

    Generator rotor replacement by the spare rotor

    < T6&$ decision because of its low /. 'P rotor =th,=th stage, /P =>rd stage lacing wire

    old bra*ing was debra*ed and rebra*ed. $lades

    natural fre"uency check performed.

    -inor works on front pedestal, -+P, 1ales,

    &7ector and cam shaft assembly were done.

  • 8/20/2019 Generator Overhauling

    18/26

    Jump to first page

     

    Me##ur ' / Overhaul s"0e - 3 )tator 3 >N wedges found loose

  • 8/20/2019 Generator Overhauling

    19/26

    Jump to first page

     

    Me##ur I / 10le#$+ a,s2+ 1a0$#al verhaul / 's# Au # '4#h O"# '((3

    2nit tripped < on barring gear  F )lip ring machining incl. grooe  cutting, dismantling started.

    ;= 'ifting of top 'P casing. ;H Generator rotor threaded out. ;B 'ifting of top /P casing. ;E 'ifting of top %P casing == Dismantling works completed. > 'P bo# up >= )tator slot wedge tightening.

  • 8/20/2019 Generator Overhauling

    20/26

    Jump to first page

     

    Me##ur I "0le#$+ a,s -2

    H; /P bo# up HH Generator rotor threaded in. B %P bo# up

    @ Generator re

  • 8/20/2019 Generator Overhauling

    21/26

    Jump to first page

     

    Ne,val$-4 2'5 M6 / S"0e

     OVERHAUL IN O1T - DE1 '((4

    'P module, Generator, Turbine ales, C% 61,

    seromotors, Turning gear and -+P bearings,

    -ain %% strainers, ollcheck $umpcheck of

    %P and /P, %anger supports, Goerning rack, 'P$yepass rack mechanical components only.

    'ub oil coolers tank < filters < pumps, Coolers

  • 8/20/2019 Generator Overhauling

    22/26

    Jump to first page

     

    Ne,val$-4 2'5 M6 / S"0e - 2 eplacement of rubber grommets around

    teflon tubes of winding in stator. 4&rection

    point < pending from $%&' side5

     After dismantling, in 'P turbine '%) %)clearances found une"ual. These were

    corrected by shifting 'P inner outer casing

    unning hours upto oerhaul 3 ;E,@ 6umber of trips upto oerhaul =F

     After o(haul3 All bearings ibrations reduced

  • 8/20/2019 Generator Overhauling

    23/26

    Jump to first page

     

    Ne,val$-4 2'5 M6 / S"0e - 3Ge+era#r

    otor purge test, gas tightness < leak in

    small CC bolts < nuts tightened. DPT of fan

    blades and retaining rings done. otor

     7ournals were polished.

    FBN stator wedges loose < retightened.

    H= swollen teflon tubes rubber grometsreplaced without opening nose 7oints.

    )tator oerhang was in7ected with glue.

  • 8/20/2019 Generator Overhauling

    24/26

    Jump to first page

     

    Ne,val$-4 2'5 M6 / 10le#$+

    )et tripped.

    E )toppage of barring gear.

    ;; Generator rotor threaded out. ;= Dismantling of 'P.

    ;E Purge test on generator rotor.

    >; 'P $o#ed up. HB Generator rotor threaded in.

    BH Generator assembly completed.

  • 8/20/2019 Generator Overhauling

    25/26

    Jump to first page

     

    Ne,val$-4 2'5 M6/10le#$+-2

    @F +il flushing started. F +il flushing completed.

    $arring gear operation started.

    F )et steam rolled. E )ynchroni*ed

    E> Achiees full load smoothly.

    $arring gear date got delayed by => days 3 )tatorworks held rotor threading by ;B days. 'P<Generator holes were reamed for ;= days Q

  • 8/20/2019 Generator Overhauling

    26/26

    Jump to first page

     

    AFSHA CLASS 5

    G++D $& Q

    T+ A'' +0 2