Upload
gwendoline-thompson
View
216
Download
2
Embed Size (px)
Citation preview
Girls Program
Learn to PlayTravel Program
House Program
Feb 20th Meeting Agenda
1. Committee Reports
2. Election procedure (McLaren and Staby)
3. Appointment of new disciplinary committee (issues arising)
4. Annual Calendar- I will bring a write on calendar. My intent is to white board all activities and assign leads
5. Budget (Paxton) - yes Virginia we actually have one.
6. Mite and mini-Mite planning for next season
7. Ice fee’s and renegotiation of our contract (Mark/Jimmy have requested our P&L as well as balance sheet)
8. Set the date for our annual meeting reserve the church for the meeting?
9. Financials and action items to clean up and vote on
Purpose
The fundamental purpose for moving towards electronic voting and surveying is to improve the efficiency, speed, accuracy and user friendliness of elections.
While the manual voting system has served us well over the years, it is necessary to consider what improvements can be made, especially for the voter, and how the availability of new technologies can be used to further develop our election process.
Top Ten Benefits to Electronic Voting
1. Cost savings2. Increased participation rates3. Better informed voters4. Reduced administration5. Create and deploy ballot quickly and with ease6. Integrity of the vote7. Instant runoffs8. Last minute changes to the ballot9. Elimination of human error in the vote counting10. No need for recounts
Drivers
1. Cost (Free vs Paying for Software/Hosting)2. Flexibility/Scability of use3. User Friendly4. Accessibility - Web Base Solution5. Security - Only Association Members Participate6. Audit - Universal verifiability of the integrity of the
election outcomes
Potential Solutions – Free Online Surveys
Analysis1. Free Version is very limited2. Good for Simple listing3. No logic to stop from
selecting to many entries4. Does not have the
functionality to have Pictures/Bio
Potential Solutions – Free Online Surveys
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Potential Solutions – Ballot Bin
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Potential Solutions – Survey Monkey
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
http://www.surveymonkey.com/pricing/details?t=0
Potential Solutions – Free Online Surveys
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Potential Solutions – Free Online Surveys
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Potential Solutions – Free Online Surveys
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Potential Solutions – Free Online Surveys
Analysis1. Reporting is basic2. Results can be printed or
Exported3. Survey can be posted to
site4. Can be Shared, Tweet,
Post or blogged to Face book, blog sites and Linked in.
5. No Cost to Association
Ataway’s Implementation methodology Ataway’s implementation methodology is based on PeopleSoft Compass methodology.
Our Project Team will use this methodology and adapt it to Och-Ziff implementation strategy and culture.
The following slides present the detail phases and activities with estimated start and end dates.
These estimates will be refined during the Plan phase.
Implementation methodology, high level phases:
14
Phase I : Plan
15
Activity Description of Activity Est. Date Team Members Involved
Project Start Activity Self Explanatory 03/03/2008 Project Management
Develop Initial Project Plan and Project Register
Activity Self Explanatory03/03/08
to 03/14/08Project Management
Architecture Design
Prepare high level functional architecture of the solution. Finalize In Scope / Out of Scope and define implementation and integration approach.
03/10/08 to 03/21/08
Project Management
Project Kick-Off Activity Self Explanatory 03/24/2008
Steering Committee
Project Management
Functional Experts
Phase IV : Test and Teach
16
Activity Description of Activity Est. Date Team Members involved
System Test preparation
Prepare and document Test Plan and Test Scenarios
06/09/08 to 06/20/08
Functional Experts
System TestPerform System Test (including full integration with Financials and 3rd Party Software
07/07/08 to 07/25/08
Functional Experts
Training PreparationPrepare Training Content and User Procedures.
06/23/07 to 07/04/08
Functional Experts
User Acceptance Testing
Perform User Acceptance Testing (including parallel testing of at least 1 month worth of data and payroll).
07/28/08 to 08/15/08
User Acceptance Testers
Functional Experts
End-User Training Deliver End-User Training08/18/08 to
08/20/08End-Users
Functional Experts
Quality Review Checkpoint
Milestone – End of phase 08/20/08Project Management
Functional Experts
Phase V : Deploy
17
Activity Description of Activity Est. Date Team Members involved
Conversion Strategy
Document scope of conversion and methodology
05/30/08 Project Management
Test ConversionExecute conversion and reconciliation in test environment
07/07/08 to 07/11/08
(TST)and
07/28/08 to 07/30/08
(UAT)
Functional ExpertsDevelopers
Deployment PlanDocument deployment methodology, timing, cut-over and team involvement in different locations
07/25/08 Project Management
Test Move to Production
Rehearsal of the deployment plan to validate timing, sequence of tasks, roles and responsibilities and validation points.
08/21/08 to 08/22/08
Project ManagementFunctional ExpertsBusiness Owners
Go Live
Execute deployment plan in the Production database. Perform all conversion and validations. Get sign-off from Steering Committee to Go Live.
08/31/08
Business OwnersProject ManagementFunctional ExpertsDevelopers
Post-Go Live support
Stabilize system and support users.Ongoing
after Go LiveSupport Team
Timeline
18
Appendices