Glenmore LandfillProposed Fill PlanOpen House - February 21, 2017

Page 2: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Fill Plan Peak Design N

Quail Ridge

Page 3: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Fill Plan Peak DesignFill Plan Peak DesignN

UBCO

Page 4: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Fill Plan Comparisons2008 Comprehensive Site

Development Plan2017 Peak

Glenmore Road

Quail Ridge Quail Ridge

Glenmore Road

Page 5: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

New Peak Design Benefits

Increased landfill volume and life expectancy Max. capacity expectancy shifts from 2075 t0 2100

Minimizes user fee increases If we needed to move to alternate disposal method (i.e.

shipping waste out of region) fees would increase substantially

Economic Additional billion dollars worth of airspace

Would not affect smell or noise levels

Page 6: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

New Peak Design Benefits (cont.)

No major costs associated with shift to new fill plan Would only require minor changes to infrastructure

Visual impact would be minimized as landfill grows Progressive closure: side slopes would be revegetated as the

landfill grows in order to reduce aesthetic impacts. Blends into natural terrain of surrounding Tutt Mountain and

Bredin Hill

More flexibility City Council would have the option to adjust and slow

landfill growth at any time. The 20 meter elevation increase does not have to be fully

realized, but gives City Council’s of the future the option.

Page 7: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Leachate Lift StationAeration Treatment

Air Pollution Control System

Pumped to the Sanitary Sewer System

Leachate Lift Station

Emergency Backup Leachate Discharge Force main to Quail Ridge

Leachate Lift Station

Leachate Management

Page 8: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Landfill Gas CaptureIn Association with FortisBC Gas

2017

FlareBiogas Processing Plant

Moisture Separation & Blowers

Page 9: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Glenmore LandfillOpen House2017

Recently Completed Projects

Administrative Building

Completed in 2014 with innovative & sustainable features

New Lift Station

Pumps offsite away from Quail Ridge and includes

Leachate Pollution Control System

Landscaping

Additional trees planted on John Hindle Drive to provide

visual screening & environmental enhancement

Unattended Scale Terminals

For High Frequency Haulers

Reduces wait times for all customers

Wheel Wash (MobyDick)

Removes mud from vehicles preventing it from

leaving the site

Page 10: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Glenmore LandfillOpen House2017

2017 Enhancement Projects

Electronic Sign

Improved communication

& information to all haulers

New Website

Improvements on information

and instructions

Camera to show if there is a lineup

Leachate Recirculation (Phase 1)

Recirculation of leachate within the landfill will increase

the decomposition of the waste and increase production of

landfill gas

Landscaping

Future plantings to occur on John Hindle & Glenmore Road

Page 11: Glenmore Landfill Proposed Fill Plan...Fill Plan Comparisons 2008 Comprehensive Site Development Plan 2017 Peak Glenmore Road Quail Ridge Quail Ridge Glenmore Road New Peak Design

Glenmore LandfillOpen House2017

Proposed Changes for Receiving Areas

Non Organics

Org

anic

s

Reduction in distance to drop off area

Improved drop off area

Traffic volume reduction by separating drop off areas

Improve efficiencies process and maintenance

Long term project(2018-2025)