Gujarat Pollution Control Board - REGIONAL OFFICE Nr. Race Course, Ring Road, Rajkot-360 001 Website: www.a~cb.qov.iq
- 'ur
As per the provisions of Notification No. S.O. 1533 dated 14/09/2006 and its amendment S.O. 3067(E) dated 01/12/2009, Ministry of Environment and Forests, Government of India, New Delhi, Public Hearing is conducted for M/s. Suntouch Laminates Pvt. Ltd. for manufacturing of (1) Laminated Sheets 4.5 lakh numbers per month, (2) Phenol Formaldehyde Resin - 700 MTPM & (3) Melamine Formaldehyde Resin - 165 MTPM at Survey No. 24/p/l, Near Lilapar Road,Lakhadhir Nagar (Navagam), Taluka: Morbi, Dist: Rajkot, State: Gujarat, which is covered under Category 'A' as mentioned in their request application.
A copy of the draft Environment Impact Assessment Report and the Summary of Environment Impact Assessment Report was sent to the following authorities or offices for inspection to the public during normal office hours, till the Public Hearing is over.
1. The District Collector Office, Rajkot 2. District Development Office, Rajkot 3. District Industry Centre, Rajkot 4. Taluka Development Office, Tal: Morbi, Dist.: Rajkot. 5. The Chief Conservator of Forests, Ministry of Environment and Forest, GOI, Regional Office
(West Zone), Kendriya Paryavaran Bhavan, E-5, Arera Colony, Link Road-3, Ravisankar Colony, Bhopal 462 016.
6. Regional Office, Gujarat Pollution Control Board, Rajkot, Nr. Race course, Ring road, Rajkot-360 001. .
Other concerned persons having plausible stake in environmental aspects were requested to send their responses in writing to the concerned regulatory authorities. The Public Hearing was held on 28/04/2012 at 11:OO hrs. In Compound of MIS. Suntouch Laminates Pvt. Ltd., Survey No. 24/p/l, Near Lilapar Road Jakhadhirnagar (Navagam), Taluka: Morbi, Dist: Rajkot.
An advertisement in ~ngl ish was published in daily "The Indian Express" on 26/03/2012 and in Gujarati daily inWDivya Bhaskar" dated 26/03/2012.
Shri A. 8. Gor Additional District Collector, Rajkot supervised and presided over the entire public hearing process.
A statement showing participants present durlng the public hearing is enclosed as Annexure A.
A statement showing salient points highlighting issues raised by the participants and responded by the representative of the applicant during the public hearing in .English and Gujarati Languages is enclosed as Annexure B and 61.
A copies of responses received in writing frbm other persons having plausible stake in environmental asDects are enclosed herewith collectivelv as Annexure-C1 8 D l and the replies by applicants to the same are
Place: Lakhadhir Nagar 3. K. Vyas Dist.: Rajkot Regional Officer, Additional Dist ict Date: 28/04/2012 GPCB Rajkot
I Collector
as Representative of the Rajkot Member Secretary, GPCB
Encl: 1 Annexure A, B, 81, Cl,CZ,Dl & D2 as above. 2 Video CD of public hearing
As per the provision of notification no. S.0.1533 dated 14/09/2006 and its
amendment S.O. 3067(E) dated 01/12/2009, Ministry of Environment and
Forest, Government of India, New Delhi, public hearing is conducted on
28/04/2012 at 11.00 hrs. for manufacturing of Resins; (1) Phenol
Formaldehyde Resin - 700 M'rPM, (2) Melamine Formaldehyde Resin - 165
MTPM for Laminated Sheets at M/s. Suntouch Laminates Pvt. Ltd.,
Survey No. 24/p/l, Near Lilapar Road, Lakhdhir nagar (Navagam), Taluka:
Morbi, Dist: Rajkot, State: Gujarat, which is covered under category 'A' of
above referred notification.
The list showing participant present during the public hearing is as follows:
etiw a?~i?di vulq?~i qd riaic+u, Rc-dldi ~B?suis: Qa.4. ~ 3 3 , dl.
q~/oe/?oos wa w d a yUi?i aiadi M B ? s N ~ ~ a . 3058 ( t ) ) , dl.
09/9/?00e, $23111 ''e Ni ~1411 &ql&+, Q. HdZU a m a ~ ~ Y18& ~ i [
4. w/Qfl 9, C ~ + L U ? 4 3 5 , cttn?d31?, (dq1311N), dlC.j51: 434, Rc<~:
?iodilz\tlld ClRaks snz ~ ~ k d i 2634 (9) 154~1 36~4916s 2634-800 QQ5 M
$3 ~ i a h d (?) Qc+i~i8d $l~ic4at)s 3634- t s ~ QQ5 zd 4 3 ~ i a d ~ G C U L E ~
~1241 qm-t U R ~ W L wa ~ 4 5 y4tq~n.j w l a ~ dl: ?t/OY/?Oq? 41 a% 9t00
SC+L$ ?lMc(ii(ktq .
Sr. No. Name & Organization/Village Signature 5 ~ i 5 Designation ~ ~ 1 / 3 1 1 N 33
Sr. No. m i 8
Name & Designation 41Y-w-t $la
Organization/Village ~~WL/JLLY
Signature a&
Signature - aa-
Organization/Village ~WL/JLLY
Sr. No. ~ r l i 8
Name & Designation .ILN\.I aa
Sr. No. Name & Organization/Village Signature Designation ~ ~ / Y L Y zk! ~ L Y ' Y ~ 3a
Sr. No. L
ANNEXURE - B tEncllish1
A statement showing issues raised by the participants and responded by the representative of the applicant during the Public Hearing.
- As per the provisions of Notification No. S.O. 1533 dated 14/09/2006 and its amendment S.O. 3067(E) dated 01/12/2009 issued by Ministry of Environment and Forests, Government of India, New Delhi, public hearing is conducted on 28/04/2012 at 11.00 hrs. for manufacturing of (1) Lamainated sheets 4.5 lakhs number per month, (2) Phenol Formaldehyde Resin - 700 MTPM & (3) Melamine Formaldehyde Resin - 165 MTPM for Laminated Sheets at M/s. Suntouch Laminates Pvt. Ltd., Survey No. 24/p/l, Near Lilapar Road Lakhadhir Nagar, (Navagam), Taluka: Morbi, Dist: Rajkot, State: Gujarat, which is covered under category 'A' of above referred notification under the supervision of Shri A. 8. Gor, Additional District Collector, Rajkot and Chairman of public hearing committee.
Shri J. K Vyas, Regional officer, GPCB, k j k o t and the representative of the Member Secretary, GPCB - a panel member of public hearing committee; welcomed all present to the public hearing. He outlined the various provisions of the Notification and briefed about the procedural details for conducting this public hearing including actions taken by GPCB for wide publicity of this public hearing and the advertisement given earlier in the local dailies. He announced that as oer the ~rovision of notification. onlv locallv affected Dersons will be allowed to make their representatjon in the Public ~ea r i ng while others having plausible stake may submit their representations in writing which would be included in the proceedings. He also made it clear to the gathering that the committee was responsible only for of proceedings of the meeting covering all the concerns raised during the public hearing.
He then opened the Public Hearing after due permission from the Additional District Collector. He invited the Project Proponent to give their introduction and to make the presentation of their project.
Ms Diti Patel on behalf of the company welcomed the gathering. Thereafter power point presentation in Gujarati language covering introduction of, the company, product profile, technical information, details of proposed project, Environmental Management System, its impact on environment along with proposed mitigation measures and Industry's activities towards Social Responsibilities was presented.
After the presentation by the project proponent, Regional Officer, GPCB with the due permission of the Additional Collector opened the forum for representations1 suggestions /objections from the locally affected people.
The statement showing issues/suggestions /objections/opinion raised by the participants during public hearing and also submitted in writing and responded to by the representative of the applicant during the public hearing is as under:
Issue raised by Sr. No.
1. complaint against this unit.
will be used?
Name
Shri Amarsibhai Detroja, Navagam
How much quantity o f waste water will be generated?
disposed them. And' how you ~
proponent
Project proponent informed that 17 KLPD water will be used. Waste Water generation 12.3 KLPD after expansion.
The waste water will be completely evaporated through
Shri J. K Vyas, Regional officer, GPCB, Rajkot and Representative of the Member Secretary, GPCB informed the forum that written representations were received prior to the Public Hearing. The first was received from Mr. Mahesh Pandya-Paryavaran Mitra, Ahmedabad and second from Mr. Shrikant Patel RTI activist, Morbi, which would be included in the proceedings. The same are enclosed as Annexure C1 and C2 along with the replies submitted by the project proponent as Annexure D l and D2 respectively.
2.
Chairman of the public hearing has also given the following suggestions.
The project proponent shall voluntary submit analysis report indicating ambient air
quality and waste water discharge quality.
The project proponent shall invite GPCB for monitoring of the Environment Management
Shri Bharatbhai Gordhanbhai Aghara Sarpanch, Bhadiyad
System.
To impart the disaster management training to workers as well as all the official staff
including first aid training.
GPCB may carry out surprise monitoring of ensure compliance.
He inquired which provision kept for the safety o f the workers.
He concluded by appreciating the participation of the villagers in this Public Hearing and thanking them for the same.
evaporator. Project proponent informed that they shall provide safety belts, ear plugs, ear mufk and helmets to all workers.
The Public Hearing was concluded with the vote of thanks.
Place:- Lakhadhirnagar J. K. Vyas A. B. or\ 1 Dist. :- Rajkot Regional Officer, Additional District Date:- 28/04/2012 GPCB Rajkot Collector
. as Representative of the Raj kot Member Secretary, GPCB
c45 t j d i c l d l ~ i i l i a &-ui ~ $ i l 1 3 1 4 a i l 66iqiac4 YZL ua Q 9 w 4 1 Y R R ~ G R L
u l~q1?4 i i l lac4 Y ~ T L ? .
e t l i d ~ i ~ l i d ~ va.I~iw ua 44 ri;~~c=ia., dcfl E c 4 4 ~ w$ieuis: 3u.4. 9 ~ 3 3 , d l . \
~ v / o e / ? o o 5 u4 uda t j t l ~ i l HL~M w$ieuk 3~.4. 3058 (t)), dl . OY/Y/?OOC.,
Bbs~i l ui uuil &41ac4, il. w a u &li\aq~ y ~ t ) a a RR2s, ~3 4. s v / 9 4 Y.
c4lc-tiui as 4 3 5 , c 4 u t n i -IJI?. ( ~ Y I ~ I I N ) , ~ ~ L C ~ S L : 414, Red: 1 1 ~ 5 7 2 ~2 ( i )&R%s
PRZ 4.5 c 4 ~ u 431 yA YLH , ( 2 ) 15dc-1 $rlIc4$~t)s iB4-800 i l k 5 a 4 yR YLH ua (3)
ilc4lu~t)d $dc&a~t)s 3 1 3 4 - Y ~ Y 9 k 5 2 4 Y@ ~ L H ~ L 6 ~ ~ 1 ~ 4 ~ ~ 2 4 qRd v R 4 ~ d - t ~
U$ ~ 4 5 t j d 1 4 p n j ~ 1 4 D d d dl : ?CIOYROS? 41 3 Y 9Y:OO 5~413 '?@C<-ll 5&52? d a . ( n . 3 l i H l $ ~ 4 t u h t $ 6 ( ~ IIWQIY~ U L ~ C ~ .
(JAN+", .; ; . . \ . : .
' ~ ~ . l & e . B ) i i l + . ~ h , ~ r . ~ h . l l * ~ ~ & ~ ~ @ ! ~ h m - - ~ 8 5 8 !.
. . .,- : 0 =3?1.-1 . . . . - . , ., . . . y I q : ,,t)P&m,&',"@,&,@ 1
. . . . . . . 1. . . . . ., 1 - - . & h p ~ A n I n n & ' ' &to;-012 - . .
. . . To; . . Wligadikshah Mcmbs- . . . . ... . . h ~ m . m n & d i m .. '. . . . . . . . . . . ...... - .
. . . . . . . . . . . . . . . . /. -. . . . . :. . .
SUNTOUCH LAMINATE PVT. LTD. Mfe.: Decorative Laminate Sheet
April 27,2012
To, Mahesh Pandya Pqavaran Mitra (CENTRE FOR SOCIAL JUSTICE - JANVMAS) Ahmedabad
Sub: EPH of Suntouch Laminates Pvt. Ltd. to be held at Plot No-241~1, near Lalpar road, Lakhdhi Nagar (Navagam), Taluka: Morbi, Disk- Rajkot on 28/04/2012.
Ref: Your letter no-PMlMPI931/2012, Dated 23-04-2012.
Respected Sir,
We are in receipt of a copy of your letter addressed to Hardik Shah, Member Semtary, Gujarat Pollution Control Board, Gandhinagar. We have studied the comments/suggestion~/obse~vation regarding project and EL4 report and would like to send our reply1 clarifications as under and if need, we will incorporate in our h a l EL4 report.
preparation team. Table 2.5 shows break up of water consumption and wastewater generation for proposed expansion. Please give the same for existing plant.
Points 1
Exiting activities by unit is manufactu&< Laminated Sheet and no process water require. Only Boiler water need for existing facilities. We enclosed herewith revised table which shows water consumptionlwastewater generation for both existing and proposed. P1. refer
Contents Please give the members name and qualification with experience of EIA
Response from Project Proponents Pl. refer Anaexure-a.
What will be quantity of Phenol in wastewater? How it will be treated?
effluent treatment plant? Will this be followed by primary treatment. Quantity of sufficient to treat after proposed effluent is very small i.e. Existing 700
Annexure-b. Phenol in effluent varies kom 1500-2000 mg/L it is difficult and commercially not viable to recover kom effluent.
,
Effluent contain Phenol will be evaporated in Vessel type evaporator so water will be evaporated fist and because of high boiling of Phenol i.e. 182°C Phenol remain as residue which finally collected and incinerated at Common Incinerated facility
C' luTOU(u SUNTOUCH LAMINATE PVT. LTD.
=*Dim Mfg.: Decorative Laminate Sheet
We come across EIA report of MIS Rainbow Laminates Pvt. Ltd. having the same products expansion in the same geographic location and EIAs have been prepared by SAN Envirotech Pvt. Ltd. -Ahmedabad. We have noticed discrepancies results of (Table-3.3) PMlo. P1. explain regarding these obsewations-
expansion? PI. gives the details.
evaporator is 1000 Ltlday. We regret to say that it was our typographical (Data entry) mistake. Corrected table enclosed herewith for your reference. PI. refer Amexve-c. Our general practice is, results enter from log sheet to register and finally tabulate for incorporate in EIA report. Due to Five report in same geographic location, numbers of location overlap in one study area to other study area and that was the
Lt/day to 12300 Lt/day. Primary be accordingly updated and evaporator remains same because cauacitv of
< A 1 of consent and authorization. 1 Pls rkfer ~nnekre-d . 7 1 TORS point 15: Commitment that no 1 We committed to use Mix fuel i.e. coal and
Whether Company has valid consolidated consent and Authorization of GPCB under various Act for its existing unit? P1. gives the CODY of CC&A and com~liance raort
lignite will be used. As compliance in this, table 1.9 (point no-15) shows - "we committed to use Mix fuel i.e. coal and lignite to considering concentration of SO2 emission in atmosphere". We have notice multiple times in EIA report that prnj&t proponent will use Lignite a s a fuel after expiation. i.e.
a. Table 1.9 (point 34, Compliance of TOR)
b. Table 2.1 1.2 Gaseous Emission - line 5-6
c. 2.12.2 Air pollution Control - line 2-3
d. 4.4 Source of Air Pollution - line 3 e. 10.5.1 Air Environment - A) Stack
I Emission -line 2 f. 11.8 Environmental Imoact &
reason for discrepancies. Yes, unit has valid CC&A under various acts for its existing unit. Vide order no. 44760, dated 15/12/2011, valid up to 24/08/2016. Copy of same is enclosed with com~liance revort of same.
lignite to considering concentration of SO2 emission in atmosphere. We correct it at all level in our final EIA report.
Mitigation Measures - line 5 8 1 Please give the copy of GPCB visit I Enclosed as Annexure-e
report and air/water/solid waste sample analysis report for existing unit in last two years.
SUbITOUCH LAMINATE PW. LTD. Mfe.: Decorative Laminate Sheet
show cause noticelclosure orderlnotice under Water act-1974 or Air ACT- 198 1 or Environment protection act- 1986 from the starting of unit? If yes give copy of it. Please give the remedial measure has been taken tp
Enclosed as Annexure-f
restart operation? 'Ace Environmental Audit Reports Scheme hence not submitted. regularly to GPCB for existing plant? What where suaaestion of Auditor in
trees which &to b; planted-under around the-plant and will be planted add greenbelt development. 500 trees in greenbelt area. Main trees are
Please provide exact date for ambient air quality monitoring and surface water quality monitoring rather than n local s ices well survive in the area.
Baseline Monitoring period was 0211 11201 1 to 30/01/2012 I
I the ~oiembdr-2011 to ~&uar~-2011 I 1 13 ( Please give the name of TSDF site 1 TSDF Site-Saurashtra Envoro Project /
be sent. How many of local people will get employment? Please give after expansion including existing and classification skill and unskilled proposed. Out of which 20% are skilled, manpower. 15% semiskilled and 65% unskilled
where hazardous waste will be disposed and authorized recycler or trader to whom hazardous waste will
I hope the detailed clarification given by us will help you to assess our proposal and EIA report in
Limited-Samkhiyadi, Kutch. Authorized Recycler: Unity Petroleum- Ahmedabad
proper perspective.
Thanks & Regards
For, Suntouch Laminates Pvt. Ltd. -
Director
Annexurea
List of team member involve in the EIA report
( ~ a m e Qualification Position Contrlbution Experience
Ph.D. Sadaria
1 AP&SHW 1
expert
4. 1 Raiesh Solanki 1 B.E. Environment I In-house 1 Expert (WP, 1 9 years
Director
expert
22 years 2.
expert
I
3. 1 Mr. Mehul Panchal 1 B.E. Chemical ( In-house 1 Expert (WP) 1 5 years
5.
6.
7 .
8.
Coordinator & In-house
expert for AQ,
9.
22 years
Mr. Satish Borad
-
Mr. Paresh Poriya (under guidance of Dr. Indra Gadhavi) Mr. P.K. Shrivastava
Mr. Nirzar Lakhia
Mr. C. Lal
Empanel B.E. Civil .
-- Dr. Rupabhai Malakiya
Land Use (LU)
---- M.Sc. (Zoology)
8. Tech
(Chemical) ----
M.Sc., PGD
M.Sc.
Ph.D. I Empanel Expert (SE) expert
expert
In-house
expert
Empanel
expert
Empanel expert
Empanel
12 years
AP, RH & SHW)
Expert (EB)
Expert (RH)
-- Expert (HG &
GEO) Expert (SC)
3 years
40 years
11 years
22 years
Break up of Water consumption &wastewater generation
] Sr. 1 . Source Water Consumption, Lt/Day I I
I I I I
2. I Gardening
3.
1000 1000 I - 2000
Nil
8000
3000
I I
Industrial
11000
Nil
1000
3000
4000
Process
Boiler
Cooling make up
Total Industrial
Nil
7000
Nil
7000
4500 TOTAL (1 +Z + 3) 12500
Annexure-c Ambient Air Quality Status (PMgo)
(Period: November-11 to January-12)
Average -24 Hours Unit - ~rg/rn~
I I I I I I - I I I
Plant site(A,) 1 77.8 68.6 65.5 61.5 65.2 1 6.0
StationName Max
Lilapar (A2) 1 92.3 1 47.4 1 91.0
Ambient .A~T Quality Status (S02)
Min
Lal~ar ( 4 Morvi (AS)
(Period: November-11 to January-12)
Average -24 Hours Unit - ~rg/ rn~
74.8
98 Percentile
50 Percentile
69.4 76.1
75 Percentile
25 percentile
Avg
66.5
Jodhpurnadi (&) I 69.9
Ambient Air Quality Status (NOx)
SD
58.1 / 67.7 ( 13.0
57.0 58.6
i Lalpar ( ~ 4 ) , I I I I I I
(Period: November-11 to January-12)
57.1 I 68.6
25 percentile
17.0
15.7 ---
StationName
Plant site(A1)
Lilapar (A2)
Average -24 Hours Unit - pglm3
68.6 74.8
13.9 13.4 1 14.3 1 1.2 1 16.9 1 12.6 1 16.7
64.7
50 Percentile
17.8
16.6
Avg
17.9
16.4
Max
20.1
21.0
98 Percentile
20.1
20.6
14.9
60.8 69.6
SD
1.7
3.1
18.8 1 & w p m (A31
Min
13.7
5.7
75 Percentile
-------- 19.3
17.2
Morvi (AS) 1 18.6 / 13.5 ( 18.2
63.4
7
60.0 65.6
16.2 27.3
17.4
60.6
17.7 14.0 26.5
62.8
58.6 61.9 --
20.9
15.6 15.2 / 15.9 1 1.5
60.8 66.1
3.3 5.0
Annexure-d
Copy of CC&A and compliance report of consent and authorization
SUNTOUCH LAMINATE PVT. LTD. Mfg.: Decorative Laminate Sheet
~~
COMPLIANCE REPORT of
Consolidated Consent & Authorization Consent Order No. AWH- 44760 Date of issue 15/12/2011, valid up to
24/08/2016
Decorative Laminate sheet
SUhlTOUCH LAMINATE PVT. LTD. Mfg.: Decorative Laminate Sheet - - ~ p--....---p--.- - -- .-
- St. NO.
Stack Attached
to
Boiler
Stack Parameters
cyclone matter Separator & Dust
Limit
100 ppm 50 PPm
1 collector I
12 -- I Particulate 1 150 ma/^^'
1 I room and than averaged. 1 4.3.4 1 The D.G. set shall be ~rovided with DroDer exhaust muffler with insertion I Complied I
4.3.1
4.3.2
4.3.3
I
Complied ---
(500 KVA)
4.3.5
4.3.6
4.3.7
4.3.8
4.3.9 Follow the
norms
' matter so2 NO,
. . loss of minimum 25 ~ B ( A ) . All efforts shall e made to bring down the noise levels due to the D.G. Set outside the premises, within the ambient noise requirements by proper setting and control measures Installation of a D.G. Sets must be strictly in compliance with the recommendable the D. G. set manufacturer. A proper routine and preventive maintenance procedure for the D.G. set should set and followed in consultation with the D.G. set manufacturer which would prevent noise levels of the D.G. Set from deteriorating with use. There shall be no process emission from the manufacturing and other ancillary operations. The concentration of the following parameters in the ambient air within the premises of the industry shall not exceed the limits specified hereunder.
2.5 (PM2.5) I cubic meter I meter SO7 I 50 Microqram. per 1 80 Microqram per cubic
-.
100 ppm 50 ppm
The minimum height of stack to be provided with each of the generator set shall be ~=h+02(KVa)"~ where H=Total.stack height in meters, h=height of the building in meters where or by the side of which the generator set is installed.
Noise from D.G. set shall be controlled by providing an acoustic enclosure or by treatinq the room acoustically at the users end. The acoustic enclosure of acoustic treatment of the room shall be designed for minimum 25 dB(A) insertion loss or for meeting the ambient noise standards whichever is on the higher side (if the actual ambient noise is on the higher side may not be possible to check the performance of the acoustic enclosure/acoustic treatment. Under such circumstances the performance may be checked for noise reduction up to actual ambient noise level, preferably, in the night time). The measurement for insertion loss may be done at different points at 0.5 m from the acoustic enclosure/
Parameter
Particulate Matter- 10 (PMla) Particulate Matter-
Complied
Complied
- Complied
Permissible L imi t Annual
Permissible L imi t 24 h rs average --
60 Microgram per cubic meter 40 Microgram per 60 Microgram per cubic
SUI\ITOUCH LAMINATE PVT. LTD. Mfg.: Decorative Laminate Sheet
- - - - - - - - - - . - .. - - - -
I cubic meter I meter 1 1 1 NO. 1 40 Microgram ~ e r 1 80 Microgram ~ e r cubic
5
its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75 dB(A) during day time and 70 dB (A) during night time. Daytime is reckoned I between 6 a.m. and 10 p.m. and nighttime is reckoned between 10 p.m. and 6 a.m. General Conditions
Any change in personnel, equipment or working conditions as mentioned in the Consents formlorder should immediately be intimated to this Board. Applicant shall also comply with the general conditions given in annexure-
1
I. I conditions Industrv shall have to dis~lav on-line data outside the main factorv gate I Com~lied
for monitoring the air emissions and the same shall be open for inspection 1 toland for use of Board's staff. The chirnnev(s) vents attached to various
- I cubic mete; I meter The applicant shall provide portholes, ladder, platforms etc at chimney(s) Complied
6
1995 dated 14* October 2003. Authorization for the Manaaement & Handlina of Hazardous Wastes form-2 (See
with regard to quantity and nature of hazardous chemicals being hanzled in the plant including wastewater and air emissions and solid hazardous waste generated within the factory premises. Industry shall have to display the relevant information with regard to hazardous waste as indicated in the Hon. Supreme order in w.p. no. 657 of
rule 3(c) & 5(5) form for giant of authorization for occupier or operator handling hazardous wastes under Hazardous wastes (M, H & TM) Rules, 2008
sdurces of emission shall be designed by nimbers such as S-1, 5-2, etc. and these shall be painted1 displayed to facilitate identification. The industrv shall take adeauate measures for control of noise levels from
Complied
Form for grant of a u t h o g o n foroccupier or okrator handfinehazardous waste. 1 8.1 1 Number of authorization: AWH-4760 Date of issue: 15/12/2011, MIS. 1 Complied --I
Complied
Complied
Suntouch Laminate M. Ltd. is hereby granted an authorization to operate facility for following hazardous wastes on the premises situated at Lilapar Road, Lakhdhirnagar.363641, Tal: Morbi, Dist-Rajkot.
Sr. NO. 1
2
3
The authorization is granted to operate a facility for collection, Storage within factory premises transportation and ultimate disposal of ~azardous wastes by sellinq to the Registered Re-processors/Recyclers having valid
Quality
0.100 MtiYr
1.0 MTfYr
0.066 MTfYr
Waste
ETP
Used Oil
Discarded Containers1 Bags
Schedule-I Process No.
1-34.3
1-5.1
1-33.3
Facility
Collection, Storage, transportation disposal at approved TSDF Collection, Storage, transportation, disposal by selling to registered Reprocessom/ recyclers Collection, Storage, and disposal to the authorized Recyclers1 Reprocessors after Decontamination
SUhLTOUCH LAMINATE PVT. LTD. Mfe.: Decorative Laminate Sheet
I Gujarat Pollution control Board. 1 d l I Anv unauthorized chanae in ~ersonnel. eaui~ment or workina conditions as I Noted and
8.3 8.4
9
b) The authorization shall be produced for inspection at the request of an Complied officer authorized by the Gujarat Pollution control Board.
transport the hazardous wastes without obtaining prior permission of the agreed
The authorization shall be valid up to 24/8/2016. The authorization is subject to the conditions stated below and such other conditions as may be specified in the rules from time to time under the Environment (Protection) Act - 1986. Terms and Conditions o f Authorization
9.1
a)
b)
-- Complied
mentioned in the authorization order tiy' the persons aithorized shall constitute a breach of this authorization. ' I n addition to above terms and conditions Industry shall also comply following directives issued by the Supreme Court of India dated 14.10.2003. Industry shall have to display the relevant information with regard to hazardous waste indicated in the Court's order in W.P. No. 657 of 1995 dated 14* October 2003. Industry shall have to display on-line data outside the main factory gate with regard quantity and nature of hazardous chemicals being handled in the plant including wastewater and air emission and solid hazardous wastes generated within the factory premises.
agreed
Complied
Follow the condition
Follow the condition
Annexure-e
Copy of GPCB visit report
Annexure-f
Show cause notice/closure order
SUNTOUCH LAMINATE P K . LTD. Mfg.: Occorative Laminate Shecl
m a 1' @