H-1 Aggregates - PICKED UP BID TABULATION - Open May 12,2020 at 3:00 pm MDOT All States Asphalt / Mitchell Materials, LLC All States Asphalt / Trew Stone, LLC Delta Sand & Gravel, Inc. Eurovia Atlantic Coast, LLC Hathaway Construction Hilltown Sand & Gravel Ondrick Materials & Recycling, LLC Porter Transportation Co., Inc. Tonlino & Sons, LLC Zoar Stone & Gravel Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton John S. Lane & Son 1 6" Minus max type "a" aka Bank Run Gravel 1.03.0 8.00 $ No Bid 6.40 $ No Bid 11.65 $ W'fld 7.25 $ No Bid No Bid 5.33 $ 10.50 $ 10.80 $ 2 3” Minus max type “b” aka Bank Run Gravel /Processed Gravel for Subbase or Dense Graded Gravel) 1.03.1 10.00 $ No Bid 8.60 $ No Bid 11.65 $ W'fld 7.35 $ No Bid No Bid 6.66 $ 10.50 $ 10.00 $ 3 1 ½” Minus Screened Gravel –type “d” aka 2" minus screened 1.03.0 12.00 $ No Bid 8.60 $ 12.00 $ No Bid 7.55 $ 12.50 $ No Bid 10.00 $ No Bid 9.75 $ 4 3/4” Minus Screened Gravel- (aka 1” minus crushed gravel) 1.03.0 12.50 $ No Bid 10.90 $ 13.00 $ No Bid 7.55 $ No Bid No Bid 10.66 $ No Bid 9.75 $ 5 3” Minus Crushed Gravel (aka Processed Gravel for Subbase or Dense Graded Gravel) 1.03.1 12.00 $ No Bid No Bid 14.00 $ 11.65 $ W'fld 7.65 $ No Bid No Bid 7.33 $ 10.50 $ 10.00 $ 6 1 ½” Minus Crushed Gravel (aka Processed Gravel for Subbase or Dense Graded Gravel) 1.03.1 12.00 $ No Bid 10.90 $ 14.00 $ No Bid 7.35 $ 12.50 $ 10.20 $ 10.00 $ No Bid 9.75 $ 7 3/4” Minus Crushed Gravel 14.00 $ No Bid 10.90 $ 14.00 $ No Bid 7.65 $ 13.50 $ No Bid 10.66 $ No Bid 9.75 $ 8 1/2” Minus Crushed Gravel No Bid No Bid 10.15 $ No Bid No Bid No Bid 15.95 $ No Bid No Bid No Bid No Bid 9 Stone Screening/Stone Dust Natural/Brown Color 2.05.0 No Bid No Bid 7.40 $ No Bid No Bid No Bid No Bid No Bid 5.33 $ No Bid No Bid 10 Recycled Asphalt/Reclaimed Pavement/Hardpak 1.09.0 No Bid 18.25 $ 12.25 $ 8.00 $ 10.25 $ E'ton 7.80 $ No Bid No Bid 10.00 $ No Bid 10.50 $ 11 3/4” Minus Recycled Asphalt/Crushed/Driveway Millings No Bid 7.00 $ 12.25 $ 8.00 $ No Bid 7.80 $ No Bid No Bid No Bid No Bid 12.00 $ 12 1 ½” Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20 $ 11.65 $ No Bid 10.95 $ 11.50 $ No Bid No Bid No Bid No Bid 13 1 ½” Un-Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20 $ 11.65 $ No Bid 10.95 $ 10.50 $ No Bid 11.33 $ No Bid 13.50 $ 14 3/4” Washed Gravel Stone - Size #6 ASTM D448 No Bid No Bid 11.00 $ 11.65 $ 13.30 $ Pochassic 11.70 $ 12.75 $ No Bid No Bid No Bid No Bid 15 1/2” Washed Gravel Stone - Size #7 ASTM D448 No Bid No Bid 10.75 $ 11.65 $ No Bid 11.85 $ No Bid No Bid No Bid No Bid No Bid 16 3/8” Washed Gravel Stone - Size #8 ASTM D448 No Bid No Bid 14.45 $ 11.65 $ No Bid 11.20 $ 13.25 $ No Bid No Bid No Bid No Bid 17 1 ½” Crushed Stone Traprock 2.01.1 13.50 $ 15.00 $ 21.65 $ 15.50 $ 13.70 $ W'fld / Amherst No Bid 14.00 $ No Bid No Bid 12.50 $ 13.50 $ 18 3/4”Crushed Stone Traprock 2.01.4 13.50 $ 15.00 $ 21.65 $ 15.50 $ 14.00 $ W'fld / Amherst No Bid 15.00 $ No Bid No Bid 13.25 $ No Bid 19 ½” Crushed Stone Traprock 2.01.5 14.00 $ 16.00 $ No Bid 16.50 $ 13.95 $ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid 20 3/8” Crushed Stone Traprock 2.01.6 15.45 $ 15.45 $ 22.40 $ 16.50 $ 14.70 $ W'fld / Amherst No Bid 16.00 $ No Bid No Bid No Bid No Bid 21 1 ½” Dense Graded Crushed Stone Traprock for sub-base 2.01.7 11.50 $ 15.75 $ 22.40 $ 14.00 $ 12.40 $ W'fld / Amherst No Bid No Bid No Bid No Bid 11.75 $ 13.50 $ 22 3/4”Minus TRG Traprock Gravel No Bid 10.85 $ 18.30 $ 10.00 $ 12.40 $ W'fld / Amherst No Bid No Bid 11.50 $ No Bid 12.25 $ 14.50 $ 23 ½” Minus TRG Traprock gravel 11.50 $ 8.00 $ 17.25 $ No Bid 10.50 $ W'fld / Amherst No Bid No Bid No Bid No Bid 12.25 $ No Bid 24 Rip Rap 6” max 2.02.0 15.00 $ 15.75 $ No Bid 17.50 $ 18.55 $ W'fld / Amherst 15.25 $ No Bid No Bid 14.00 $ 12.50 $ 15.50 $ 25 Rockfill 2.02.1 14.00 $ 15.75 $ No Bid 17.50 $ 18.55 $ W'fld / Amherst 15.25 $ No Bid No Bid No Bid 14.50 $ No Bid 26 Dumped Rip Rap 2.02.2 14.00 $ 14.00 $ No Bid 17.50 $ 18.55 $ W'fld / Amherst 15.25 $ No Bid No Bid No Bid 14.50 $ No Bid 27 Stone for Pipe Ends 2.02.3 15.00 $ 15.75 $ No Bid 17.50 $ 18.55 $ W'fld / Amherst 15.25 $ No Bid No Bid No Bid 12.50 $ No Bid 28 Modified Rockfill 2.02.4 15.00 $ 17.00 $ 27.80 $ 17.50 $ 15.45 $ W'fld / Amherst 15.25 $ No Bid No Bid No Bid 12.50 $ No Bid 29 Quarry Stone Dust Blue/Grey Color 2.05.0 No Bid 10.00 $ 16.75 $ 14.00 $ 10.50 $ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid 30 Loam 1.05.0 No Bid No Bid 16.80 $ 25.00 $ 20.00 $ Easthampton 16.70 $ 22.00 $ No Bid 12.66 $ 22.00 $ No Bid 20 Payne Road, Winchester, NH 03470 901 River Road, Deerfield, MA 01342 562 Amherst Rd, Sunderland, MA 01375 216 Mt Hermon Station Road, Northfield, MA 01360 Westfield - 311 East M'tn Rd. Amherst - 1550 West Rd (Route 116) Easthampton - Arthur Street Pochassic Pit - 931 Pochassic Rd. Westfield 129 North Road Westhampton, MA 01027 87 Worthington Road Huntington, MA 01050 240 Chicopee St. Granby, MA 01033 61 Tully Road Orange, MA 01364 2188 Algerie Rd. East Otis, MA 01029 300 Zoar Road Charlemont, MA 01389 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X CONTACT # 6033570881 413-665-7021 413-665-4051 413-498-2956 413-246-0814 413-527-2324 4136675789 4135922566 9785750567 4133298083 4133394205

H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-1

Aggregates - PICKED UP

BID TABULATION - Open May 12,2020 at 3:00 pm

MDOT

All States

Asphalt /

Mitchell

Materials,

LLC

All States

Asphalt / Trew

Stone, LLC

Delta Sand &

Gravel, Inc.

Eurovia

Atlantic Coast,

LLC

Hathaway

Construction

Hilltown Sand

& Gravel

Ondrick

Materials &

Recycling,

LLC

Porter

Transportation

Co., Inc.

Tonlino &

Sons, LLC

Zoar Stone &

Gravel

Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton

John S. Lane & Son

1 6" Minus max type "a" aka Bank Run Gravel 1.03.0 8.00$ No Bid 6.40$ No Bid 11.65$ W'fld 7.25$ No Bid No Bid 5.33$ 10.50$ 10.80$

2

3” Minus max type “b” aka Bank Run Gravel /Processed

Gravel for Subbase or Dense Graded Gravel) 1.03.1 10.00$ No Bid 8.60$ No Bid 11.65$ W'fld 7.35$ No Bid No Bid 6.66$ 10.50$ 10.00$

3 1 ½” Minus Screened Gravel –type “d” aka 2" minus screened 1.03.0 12.00$ No Bid 8.60$ 12.00$ No Bid 7.55$ 12.50$ No Bid 10.00$ No Bid 9.75$

4 3/4” Minus Screened Gravel- (aka 1” minus crushed gravel) 1.03.0 12.50$ No Bid 10.90$ 13.00$ No Bid 7.55$ No Bid No Bid 10.66$ No Bid 9.75$

5

3” Minus Crushed Gravel (aka Processed Gravel for Subbase

or Dense Graded Gravel) 1.03.1 12.00$ No Bid No Bid 14.00$ 11.65$ W'fld 7.65$ No Bid No Bid 7.33$ 10.50$ 10.00$

6

1 ½” Minus Crushed Gravel (aka Processed Gravel for

Subbase or Dense Graded Gravel) 1.03.1 12.00$ No Bid 10.90$ 14.00$ No Bid 7.35$ 12.50$ 10.20$ 10.00$ No Bid 9.75$

7 3/4” Minus Crushed Gravel 14.00$ No Bid 10.90$ 14.00$ No Bid 7.65$ 13.50$ No Bid 10.66$ No Bid 9.75$

8 1/2” Minus Crushed Gravel No Bid No Bid 10.15$ No Bid No Bid No Bid 15.95$ No Bid No Bid No Bid No Bid

9 Stone Screening/Stone Dust Natural/Brown Color 2.05.0 No Bid No Bid 7.40$ No Bid No Bid No Bid No Bid No Bid 5.33$ No Bid No Bid

10 Recycled Asphalt/Reclaimed Pavement/Hardpak 1.09.0 No Bid 18.25$ 12.25$ 8.00$ 10.25$ E'ton 7.80$ No Bid No Bid 10.00$ No Bid 10.50$

11 3/4” Minus Recycled Asphalt/Crushed/Driveway Millings No Bid 7.00$ 12.25$ 8.00$ No Bid 7.80$ No Bid No Bid No Bid No Bid 12.00$

12 1 ½” Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 11.50$ No Bid No Bid No Bid No Bid

13 1 ½” Un-Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 10.50$ No Bid 11.33$ No Bid 13.50$

14 3/4” Washed Gravel Stone - Size #6 ASTM D448 No Bid No Bid 11.00$ 11.65$ 13.30$ Pochassic 11.70$ 12.75$ No Bid No Bid No Bid No Bid

15 1/2” Washed Gravel Stone - Size #7 ASTM D448 No Bid No Bid 10.75$ 11.65$ No Bid 11.85$ No Bid No Bid No Bid No Bid No Bid

16 3/8” Washed Gravel Stone - Size #8 ASTM D448 No Bid No Bid 14.45$ 11.65$ No Bid 11.20$ 13.25$ No Bid No Bid No Bid No Bid

17 1 ½” Crushed Stone Traprock 2.01.1 13.50$ 15.00$ 21.65$ 15.50$ 13.70$ W'fld / Amherst No Bid 14.00$ No Bid No Bid 12.50$ 13.50$

18 3/4”Crushed Stone Traprock 2.01.4 13.50$ 15.00$ 21.65$ 15.50$ 14.00$ W'fld / Amherst No Bid 15.00$ No Bid No Bid 13.25$ No Bid

19 ½” Crushed Stone Traprock 2.01.5 14.00$ 16.00$ No Bid 16.50$ 13.95$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid

20 3/8” Crushed Stone Traprock 2.01.6 15.45$ 15.45$ 22.40$ 16.50$ 14.70$ W'fld / Amherst No Bid 16.00$ No Bid No Bid No Bid No Bid

21 1 ½” Dense Graded Crushed Stone Traprock for sub-base 2.01.7 11.50$ 15.75$ 22.40$ 14.00$ 12.40$ W'fld / Amherst No Bid No Bid No Bid No Bid 11.75$ 13.50$

22 3/4”Minus TRG Traprock Gravel No Bid 10.85$ 18.30$ 10.00$ 12.40$ W'fld / Amherst No Bid No Bid 11.50$ No Bid 12.25$ 14.50$

23 ½” Minus TRG Traprock gravel 11.50$ 8.00$ 17.25$ No Bid 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid 12.25$ No Bid

24 Rip Rap 6” max 2.02.0 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid 14.00$ 12.50$ 15.50$

25 Rockfill 2.02.1 14.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid

26 Dumped Rip Rap 2.02.2 14.00$ 14.00$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid

27 Stone for Pipe Ends 2.02.3 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid

28 Modified Rockfill 2.02.4 15.00$ 17.00$ 27.80$ 17.50$ 15.45$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid

29 Quarry Stone Dust Blue/Grey Color 2.05.0 No Bid 10.00$ 16.75$ 14.00$ 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid

30 Loam 1.05.0 No Bid No Bid 16.80$ 25.00$ 20.00$ Easthampton 16.70$ 22.00$ No Bid 12.66$ 22.00$ No Bid

20 Payne Road,

Winchester, NH

03470

901 River Road,

Deerfield, MA

01342

562 Amherst Rd,

Sunderland, MA

01375

216 Mt Hermon

Station Road,

Northfield, MA

01360

Westfield - 311

East M'tn Rd.

Amherst - 1550

West Rd (Route

116)

Easthampton -

Arthur Street

Pochassic Pit -

931 Pochassic Rd.

Westfield

129 North Road

Westhampton,

MA 01027

87 Worthington

Road

Huntington, MA

01050

240 Chicopee St.

Granby, MA

01033

61 Tully Road

Orange, MA

01364

2188 Algerie Rd.

East Otis, MA

01029

300 Zoar Road

Charlemont, MA

01389

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

CONTACT # 603­357­0881 413-665-7021 413-665-4051 413-498-2956 413-246-0814 413-527-2324 413­667­5789 413­592­2566 978­575­0567 413­329­8083 413­339­4205

AWoods
Typewritten Text
SCROLL DOWN TO NEXT PAGE TO SEE DELIVERED PRICE ADD ON FOR EACH TOWN
AWoods
Typewritten Text
SPEC.
Page 2: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

REGION TOWNAll States

Asphalt /

Mitchell

Materials, LLC

All States

Asphalt / Trew

Stone, LLC

Delta Sand &

Gravel, Inc.

Eurovia

Atlantic

Coast, LLC

Hathaway

Construction

Hilltown Sand

& Gravel

Ondrick

Materials &

Recycling,

LLC

Porter

Transporta-

tion Co., Inc.

Tonlino &

Sons, LLC

Zoar Stone &

Gravel

Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton

1A Ashfield 896 Cape Street Ashfield, MA 8.00$ 6.75$ 6.00$ 9.00$ $ $ $ $ $ $ $1A Buckland 2 Sears Street Buckland, MA 7.50$ 6.75$ 6.00$ 6.50$ $ $ $ $ $ $ $1A Charlemont Factory Road Charlemont, MA 7.50$ 8.00$ 6.55$ 7.00$ $ $ $ $ $ $ 3.00$ 1A Colrain 51 Main Road Colrain, MA 6.50$ 8.00$ 6.00$ 5.50$ $ $ $ $ $ $ $1A Conway 40 Fournier Road Conway, MA 6.00$ 6.75$ 3.75$ 6.50$ 9.95$ From Amh $ $ $ $ $ $1A Cummington 20 Fairgrounds Road Cummington, MA 8.30$ 12.50$ 8.60$ 10.00$ $ 4.75$ 4.00$ $ $ $ $1A Goshen 8 Highland Road Goshen, MA 8.30$ 12.50$ 8.05$ 10.00$ 10.80$ From W'fld 4.00$ 4.75$ $ $ $ $1A Hawley 247 W. Hawley Road Hawley, MA 8.50$ 11.25$ 9.40$ 9.00$ $ $ $ $ $ $ 3.25$ 1A Heath 123 Branch Hill Road Heath, MA 8.30$ 11.25$ 8.45$ 7.50$ $ $ $ $ $ $ 3.25$ 1A Hinsdale 156 Maple Street Hindsale, MA 01235 13.00$ 13.50$ 10.30$ 11.25$ $ $ $ $ $ 5.85$ $1A Monroe 3C School Street Monroe, MA 10.00$ 11.25$ 11.25$ 9.00$ $ $ $ $ $ $ $1A Plainfield 184 East Main Street Plainfield, MA 9.00$ 10.00$ 8.45$ 10.00$ $ $ $ $ $ 10.85$ $1A Rowe 6 Sibley Road Rowe, MA 9.00$ 11.25$ 9.20$ 9.00$ $ $ $ $ $ $ 3.00$ 1A Savoy 720 Main Road Savoy, MA 10.00$ 10.00$ 11.25$ 10.00$ $ $ $ $ $ 10.45$ $1A Shelburne 24 Colrain Shelburne Road Shelburne, MA 5.00$ 6.75$ 5.25$ 6.50$ $ $ $ $ $ $ $1A Williamsburg 24R Main Street Williamsburg, MA 10.00$ 7.50$ 11.00$ 7.45$ From W'fld 3.30$ 4.50$ $ $ $ $

1B Blandford 114 Otis Stage Road Blandford, MA 12.50$ 9.40$ 13.00$ 9.10$ From W'fld $ 3.75$ $ $ 3.75$ $1B Chester 2 Town Road Chester, MA 12.50$ 9.40$ 13.00$ 5.95$ From W'fld $ 3.00$ $ $ 4.75$ $1B Chesterfield 164 Main Road Chesterfield, MA 11.25$ 7.50$ 14.00$ 9.95$ From Amh 3.50$ 4.00$ $ $ $ $1B Granville 69 Old Westfield Road Granville, MA 13.50$ 9.40$ 14.00$ 5.95$ From W'fld $ 4.50$ $ $ 5.25$ $1B Huntington 7 Mill Street Huntington, MA 10.00$ 9.40$ 14.00$ 7.45$ From W'fld $ 1.50$ $ $ 4.75$ $1B Middlefield 4 Bell Road Middlefield, MA 12.50$ 10.30$ 11.00$ 7.45$ From W'fld $ 4.00$ $ $ 3.75$ $1B Montgomery 160 Main Road Montgomery, MA 10.00$ 8.45$ 14.00$ 4.95$ From W'fld $ 2.00$ $ $ 7.25$ $1B Russell Frog Hollow Road Russell, MA 10.00$ 9.40$ 14.00$ 4.95$ From W'fld $ 3.50$ $ $ 4.25$ $1B Sandisfield 3 Silverbrook Road Sandisfield, MA 15.75$ 15.00$ 14.00$ $ $ 7.00$ $ $ 3.75$ $1B Tolland 162 Colebrook River Road Tolland, MA 13.50$ 11.25$ 14.00$ 7.45$ From W'fld $ 5.00$ $ $ 4.75$ $1B Worthington 64 Huntington Road Worthington, MA 12.00$ 10.00$ 9.40$ 14.00$ 7.95$ From W'fld $ 3.00$ $ $ 10.25$ $

2A Bernardston Nelson Road Bernardston, MA 4.50$ 5.50$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Deerfield 9 Merrigan Way So. Deerfield, MA 4.50$ 2.45$ 6.00$ $ $ $ $ $ $ $2A Erving 16 Public Works Blvd. Erving, MA 5.00$ 6.75$ 4.70$ 6.00$ $ $ $ $ $ $ $2A Gill 196C Main Road Gill, MA 5.00$ 6.75$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Greenfield 209 Wells Street Greenfield, MA 4.50$ 4.15$ 6.00$ $ $ $ $ $ $ $2A Leverett 95 Montague Road Leverett, MA 6.75$ 2.80$ 9.00$ $ $ $ $ $ $ $2A Leyden 16 West Leyden Road Leyden, MA 7.00$ 6.75$ 6.40$ 6.00$ $ $ $ $ $ $ $2A Montague 500 Avenue A Ext. Turners Falls, MA 6.75$ 3.75$ 7.00$ $ $ $ $ $ $ $2A New Salem 22 Wendell Road New Salem, MA 9.00$ 4.70$ 7.00$ $ $ $ $ 3.66$ $ $2A Northfield 41 Caldwell Road Northfield, MA 4.50$ 6.75$ 5.65$ 4.00$ $ $ $ $ $ $ $2A Orange 526 E. River Street Orange, MA 6.00$ 8.00$ 6.00$ 6.00$ $ $ $ $ 3.00$ $ $2A Shutesbury 59 Leverett Road Shutesbury, MA 9.00$ 4.15$ 9.00$ $ $ $ $ 4.00$ $ $2A Sunderland 111 River Road Sunderland, MA 5.50$ 2.25$ 9.00$ $ $ $ $ $ $2A Warwick 15 Garage Road Warwick, MA 5.00$ 10.00$ 7.50$ 6.00$ $ $ $ $ 3.66$ $ $2A Wendell Jackie Lane Wendell, MA 8.00$ 10.00$ 5.65$ 7.00$ $ $ $ $ 3.66$ $ $2A Whately 71 Christian Lane Whately, MA 5.50$ 2.80$ 6.00$ $ $ $ $ $ $ $

2B Belchertown 290 Jackson Street Belchertown, MA 9.00$ 4.90$ 14.00$ 5.95$ From Amh $ $ $ $ $ $2B Easthampton 30 Rear Northampton St. Easthampton, MA 10.00$ 6.40$ 11.00$ 4.95$ From W'fld 4.25$ 4.00$ $ $ $ $2B Granby 15 Crescent Street Granby, MA 10.00$ 5.65$ 11.00$ 3.15$ From Amh $ $ 2.85$ $ $ $2B Hadley 230 Middle Street Hadley, MA 6.75$ 3.40$ 11.00$ 3.65$ From Amh $ $ $ $ $ $2B Hatfield 10 Straits Road Hatfield, MA 6.75$ 2.80$ 11.00$ $ 6.00$ $ $ $ $ $2B Pelham 353 Amherst Road Pelham, MA 9.00$ 3.75$ 14.00$ $ $ $ $ $ $ $2B Southampton 8 Fomer Road Southampton, MA 11.25$ 5.65$ 11.00$ 4.95$ From W'fld 4.00$ 3.00$ $ $ $ $2B Westhampton 58 Hathaway Road Westhampton, MA 11.25$ 7.50$ 11.00$ 5.95$ From W'fld 1.70$ 3.00$ $ $ $ $

TOWN GARAGE LOCATION / DELIVERIES

John S. Lane & Son

Page 3: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H2 COLD PATCH

Open May 12, 2020 @ 1pm

Cold Mix Manufacturing

Corp. Crafco, Inc. Innovative Surface Solutions Eurovia / Northeast Paving Ondrick Natural Earth

Seaboard Asphalt Products

Company Warner Brothers

FOR JULY 1, 2020 TO JUNE 30, 202165 Edison Avenue Mount

Vernon, NY 10550

6165 W. Detroit St. Chandler,

AZ 85226

454 River Rd, Glenmont, NY

12077

216 Mount Hermon Station Rd.,

Northfield, MA 01360

729 Fuller Rd., Chicopee, MA

01020

3601 Fairfield Road, Baltimore, MD

21226

325 Amherst Rd Sunderland, MA

01375

Picked Up Product Tel 718-463-1444 602-276-0406 800-387-5777x101 413-498-2956 413-594-8803 410-355-0330 Tel 413-665-4055

[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

A. HIGH PERFORMANCE COLD PATCH Picked Up Estimates In Tons Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton

Total Estimated Tons 1,252 No Bid No Bid No Bid $115.00 $112.00 No Bid $118.00

PICK UP LOCATION N/A N/A N/A

216 Mount Hermon Rd., Northfield,

MA 01360 or 30 Willow Hill Road,

Lee, MA 01238 729 Fuller Rd. Chicopee, MA N/A 901 River Rd. East Deerfield,MA

Delivered Product

B. HIGH PERFORMANCE COLD PATCH Delivered Bags

Estimates In 50-

bag Pallets Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND

Total Estimated Tons 2,350

Region 1A 750 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 1B 700 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 2A 900 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 2B 0 0.188$ 0.200$ 0.156$ No Bid 0.155$ 0.132$ No Bid

50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 60 POUND BAGS

PRODUCT DETAILS

Product Name Greenpatch Crafco HP Asphalt Cold Patch Propatch QPR - Quality Pavement Repair EZ Street Bond-X Green duraPATCH

Brochures with Bid Yes Yes Yes Yes Yes Yes Yes

Comments 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet N/A 50 lb bags; 56 bags/pallet 60 lb bags; 49 bags/pallet N/A

Tax Compliance Signed? X X X X X X X

Non-Collusion Signed? X X X X X X X

Bid Signature Form signed? X X X X X X X

Page 4: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H3 GEOTEXTILES

Open May 12, 2020 @ 1pm

BID TABULATION

FOR JULY 1, 2020 TO JUNE 30, 2021

RENEWALS FOR TWO ADDT'L

YEARS AVAILABLE TO MAKE EJ PRESCOTT UNDERGROUND SUPPLY

THREE YEAR CONTRACTS 28C STATE RD., PO BOX 192 NORTH HATFIELD, MA 01093 413-665-2499 82 STATE RD., PO BOX 164 WHATELY, MA 01093 413-397-3412

HEAVY DUTY WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type

Size of Roll 12.5' x 360' 12.5' x 360' Mirafi 600x woven 12.5' x 360' 12.5' x 360' ADS GEOSYNTHETICS #601

Price Per Square yard $0.85 $0.75 Mirafi N series nonwoven $0.78 $0.83 500 sq yds/roll

Price Per Roll $425.00 $375.00 $390.00 $415.00

Delivery Charge Per Roll

Total Delivered Price Per Roll $425.00 $375.00 $390.00 $415.00

LIGHT DUTY

Size of Roll 12.5' x 432' 12.5' x 360' 12.5' x 432' 12.5' x 360' ADS GEOSYNTHETICS #401

Price Per Square yard $0.65 $0.75 $0.530 $0.58 500 sq yds/roll

Price Per Roll $390.00 $375.00 $318.00 $290.00

Delivery Charge Per Roll

Total Delivered Price Per Roll $390.00 $375.00 $318.00 $290.00

Location of Warehouse Location for Pick up: WHATELY, MA Location for Pick up: WHATELY, MA

Yes Yes

PARTICIPANTS ELIGIBLE: All with permission.

Estimates 22 rolls of WOVEN Heavy Duty and 3 NONWOVEN Heavy Duty and 10 rollls of WOVEN light duty and 3 rolls of NONWOVEN Light Duty

RENEWAL FOR YEARS TWO AND THREE, NO MORE THAN 2% MORE THAN THESE PROCESSES IF CATALOG PRICES HAVE INCREASED

Tax compliance, Non Collusion,

Signed Bid Forms?

Page 5: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE All States Asphalt

Innovative Municipal

US Inc

BID # H4 CALCIUM and MAG CHLORIDE

325 Amherst Road,

Sunderland, MA 01375

454 River Road,

Glenmont, NY 12077

Open May 12, 2020 @ 1pm RENEWALS FOR TWO ADDT'L Tel 413-665-7021 Tel 800-387-5777

Bid Tabulation YEARS AVAILABLE TO MAKE

THREE YEAR CONTRACTS Alan Chicoine Div. Mgr. Syed Ali

A. LIQUID CALC DELIVERED IN BULK Estimates Price Per Gallon Price Per Gallon

REGION 1A 16,000 $0.99 $1.00

REGION 2A 4,000 $0.99 $1.00

REGION 2B 3,000 $0.99 $1.00

REGION 1B NONE

total 23,000 $22,770.00 $23,000.00

Minimum Delivery? 1000 GALLONS 2000 GALLONS

Product Name

Liquidow Technical

Grade Calcium Chloride Promelt CAL 32

B. LIQUID MAGNESIUM DELIVERED IN BULK

REGION 1B Blandford 2x2500 5,000 $0.95

total 5,000 No Bid $4,750.00

Minimum Delivery? 1000 GALLONS 2000 GALLONS

Product Name Promelt MAG INH

C. CALCIUM CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#

Estimates

REGION 1B 1 PALLET

REGION 2A 3 PALLETS

REGION 2B 2 PALLETS

total 6 pallets No Bid No Bid

Minimum Delivery Amount?

D. MAG CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#

Estimates

REGION 1A 1 PALLET

TOTAL 1 PALLET No Bid No Bid

Minimum Delivery amount

Bid Signature Form Signed? X X

Tax Compliance Signed? X X

Non-Collusion Signed? X X

Page 6: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H5 CULVERTS RENEWALS FOR TWO ADDT'L

Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE

Bid Tabulation THREE YEAR CONTRACTS

DELIVERED PRICES

EJ PRESCOTT INC. UNDERGROUND SUPPLY, INC.

28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093 82 STATE RD., PO BOX 164 WHATELY, MA 01093

Single Wall Plastic Culverts Single Wall Plastic Culverts

estimates by type EJP UNDERGROUND

Price per FOOT delivered Price per FOOT delivered solid perf split watertigh

Inside Dia Solid Perf Split Inside Dia Solid Perf Split

6" $1.35 $4.00 6" $1.21 $1.21 $3.51 500 6 -$ 675.00$ 24.00$ -$ -$ $605.00 $21.06 -$

10" 10" $3.97 $3.97 $6.56 -$ -$ -$ -$ -$ $0.00 $0.00 -$

12" 12" $5.67 $5.67 $7.13 -$ -$ -$ -$ -$ $0.00 $0.00 -$

15" 15" $7.40 $7.40 $11.85 -$ -$ -$ -$ -$ $0.00 $0.00 -$

18" $10.75 18" $11.00 $11.00 $20.21 600 6,450.00$ -$ -$ -$ 6,600.00$ $0.00 $0.00 -$

24" $16.00 24" $16.60 $16.00 200 3,200.00$ -$ -$ -$ 3,320.00$ $0.00 $0.00 -$

Bidder will deliver to the following Regions: Bidder will deliver to the following Regions: 9,650.00$ 675.00$ 24.00$ -$ 9,920.00$ 605.00$ 21.06$ -$

1A_X__ 1B_X__ 2A_X__ 2B_X__ 1A_X__ 1B_X__ 2A_X__ 2B_X__ 10,349.00$ 10,546.06$

Bid Form Total 10,349.00$ 10,546.06$

Double Wall Plastic Culverts Double Wall Plastic Culverts

EJ PRESCOTT INC.

28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093

Price per FOOT delivered $0.00 Price per FOOT delivered estimates by type EJP UNDERGROUND

Inside Dia Solid Perf Split Watertight Inside Dia Solid Perf Split Watertight solid perf split watertight

6" 2.15$ 2.15$ 4.00$ 11.00$ 6" 2.10$ 2.10$ 3.51$ 11.18$ 100 3000 0 10 215.00$ 6,450.00$ -$ 110.00$ 210.00$ $6,300.00 $0.00 111.800$

10" 4.95$ 4.95$ 7.50$ 22.00$ 10" 4.84$ 4.84$ 6.56$ 22.50$ 104 951 80 1 514.80$ 4,707.45$ 600.00$ 22.00$ 503.36$ 4,602.84$ $524.80 22.50$

12" 6.00$ 6.00$ 8.00$ 60.00$ 12" 5.78$ 5.78$ 7.13$ 56.77$ 3616 3901 3 9 21,696.00$ 23,406.00$ 24.00$ 540.00$ 20,900.48$ 22,547.78$ $21.39 510.93$

15" 7.65$ 7.65$ 13.00$ 88.00$ 15" 7.44$ 7.44$ 11.85$ 85.86$ 4332 3001 25 31 33,139.80$ 22,957.65$ 325.00$ 2,728.00$ 32,230.08$ 22,327.44$ $296.25 2,661.66$

18" 11.25$ 11.25$ 22.00$ 152.00$ 18" 10.98$ 10.98$ 20.21$ 148.34$ 3459 321 49 35 38,913.75$ 3,611.25$ 1,078.00$ 5,320.00$ 37,979.82$ 3,524.58$ $990.29 5,191.90$

24" 17.50$ 17.50$ 30.00$ 225.00$ 24" 17.10$ 17.10$ 28.44$ 224.14$ 1253 0 22 25 21,927.50$ -$ 660.00$ 5,625.00$ 21,426.30$ -$ $625.68 5,603.50$

30" 25.50$ 25.50$ 70.00$ 492.00$ 30" 25.73$ 25.73$ 66.47$ 493.02$ 368 60 2 7 9,384.00$ 1,530.00$ 140.00$ 3,444.00$ 9,468.64$ 1,543.80$ $132.94 3,451.14$

36" 32.50$ 32.50$ 165.00$ 675.00$ 36" 33.04$ 33.04$ 94.00$ 675.42$ 420 60 1 2 13,650.00$ 1,950.00$ 165.00$ 1,350.00$ 13,876.80$ 1,982.40$ $94.00 1,350.84$

48" 53.00$ 53.00$ 48" 54.06$ 54.06$ 160.00$ 1,091.43$ 220 60 0 0 11,660.00$ 3,180.00$ -$ -$ 11,893.20$ 3,243.60$ $0.00 -$

151,100.85$ 67,792.35$ 2,992.00$ 19,139.00$ 148,488.68$ 66,072.44$ 2,685.35$ 18,904.27$

241,024.20$ 236,150.74$

Signed X X Bid Form Total 241,024.20$ 236,150.74$

Tax Comp X X

Non-Coll X X

Delivery terms:

82 STATE RD., PO BOX 164 WHATELY, MA 01093

UNDERGROUND SUPPLY, INC.

Delivery terms:

AWoods
Typewritten Text
This section is just for determining who is low price.
Page 7: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H6 GUARD RAIL PRODUCTS 1010 Turnpike Rd

Open May 12, 2020 @ 1pm Canton, MA 02021

Tel 781-821-5900

Premier Fence

THREE YEAR CONTRACTS IF RENEWED REG

ION

1A

REG

ION

1B

REG

ION

2A

REG

ION

2B

John Feerick

PRODUCTS includes delivery UNIT Total Est Prices Extensions

12.5' Straight rail sections galvanized w/steel postsea 26 0 40 10 76 $102.00 $7,752.00

12'5" Curved rail sections galvanized w/steel postsea 12 0 8 5 25 $158.15 $3,953.75

Steel Terminal Ends ea 24 0 0 8 32 $75.00 $2,400.00

6"6" Steel Posts, H Section, galv ea 35 0 132 0 167 $73.00 $12,191.00

6'6" Wood Posts, pressure treated ea 0 0 0 0 0 $0.00

Splice bolts, 1 1/2" per 100 2 0 5 0 7 $65.00 $455.00

Post bolts 2" per 100 3 0 5 0 8 $100.00 $800.00

Post bolts 5" per 100 2 0 2 0 4 $155.00 $620.00

Post bolts 8" per 100 2 0 2 0 4 $185.00 $740.00

Post bolts 10 1/2" per 100 2 0 2 0 4 $240.00 $960.00

Round washers, galv per lb 10 0 100 0 110 $13.00 $1,430.00

Hex nuts, galv per 100 4 0 16 0 20 $60.00 $1,200.00

Offset spacers, galv ea 25 0 100 0 125 $15.00 $1,875.00

Offset spacers, Pressure treated ea 10 0 0 0 10 $17.00 $170.00

Total Value of this Bid $34,546.75

Percent discount, picked up n/a

Bid Signature Form Signed? x

Tax Compliance Signed? x

Non-Collusion Signed? x

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxx
Page 8: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H7 PICKED UP HOT MIX ASPHALT

All States Asphalt,

Inc.

Eurovia/Northeast

Paving

Ondrick Materials &

Recycling, LLC Palmer Paving Corp All States Asphalt, Inc. Northeast Paving

Ondrick Materials &

Recycling, LLC Palmer Paving Corp

Open May 12, 2020 @ 1pm

325 Amherst Rd

Sunderland, MA 01375

216 Mt Hermon Station

Rd., Northfield, MA

01360

22 Industry Road

Chicopee, MA 01020

25 Blanchard St., Palmer,

MA 01069

325 Amherst Rd

Sunderland, MA 01375

216 Mt Hermon Station

Rd., Northfield, MA

01360

22 Industry Road

Chicopee, MA 01020

25 Blanchard St., Palmer,

MA 01069

Limited avail July 1 - Dec 15/Apr 1-June 30

Amount

Estimated

Tons 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354

ALL PARTICIPANTS 14,380 64.00$ 62.00$ 68.00$ 62.00$ 920,320.00$ 891,560.00$ 977,840.00$ 891,560.00$

PLANT PICK UP LOCATION

Warner Bros.:

Sunderland &

Deerfield, MA and

Mitchell Materials:

Winchester, NH

216 Mt. Hermon Station

Rd., Northfield, MA; 311

East Mountain Road,

Westfield, MA; 30

Willow Hill Rd., Lee, MA;

17 New Ludlow Rd.,

Granby, MA.

58 Industry Road,

Chicopee, MA

23 Arthur St.,

Easthampton, MA;

1000 Page Blvd.,

Springfield, MA; 25

Blanchard St., Palmer,

MA; 43 Old Coldbrook

Dr., Barre, MA

Tax Compliance / Non Collusion X X X X

Addendum 1 Bid Form X X X X

Page 9: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H8 SNOW PLOW AND GRADER BLADES RENEWALS FOR TWO ADDT'L

Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE

Bid Tabulation THREE YEAR CONTRACTS

DELIVERED PRICES

For information only/; bid rejected due to mim. order amount

Valk Maufacturing Co. Winter Equipment Co., Inc.

PO Box 428, 66 East Main St., New Kingstown, MA 17072 1900 Joseph Lloyd Parkway, Willoughby, OH 44060

Tel::717-766-0711 Email: [email protected] Tel:: 800-294-6837 Email: [email protected]

PLOW BLADES PLOW BLADES

Delivery terms: Delivery terms:

$5,500 minimum order per location

Price per FOOT delivered Price per FOOT delivered Price per FOOT delivered

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

5/8 x 6 100 $10.84 $1,084.00 5/8 x 6 100 $9.04 $904.00

3/4 x 6 36 $13.01 $468.36 3/4 x 6 36 $10.91 $392.76

1 x 6 18 $18.36 $330.48 1 x 6 18 $14.55 $261.90

5/8 x 8 250 $14.45 $3,612.50 5/8 x 8 250 $12.10 $3,025.00

3/4 x 8 1392 $17.34 $24,137.28 3/4 x 8 1392 $14.51 $20,197.92

1 x 8 22 $24.48 $538.56 1 x 8 22 $19.73 $434.06

GRADER BLADES GRADER BLADES

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

3/4 x 8 120 $16.48 $1,977.60 3/4 x 8 120 $14.10 $1,692.00

LOADER CUTTING EDGES LOADER CUTTING EDGES

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

1 X 12 Carbon

Dbl Bevel 56 $67.32 $3,769.92

1 X 12 Carbon

Dbl Bevel 56 No Bid

Each EachRound

Countersunk

Holes 8 $2.00 $16.00

Round

Countersunk

Holes 8 No Bid

total bid $35,934.70 total bid $26,907.64

Bid signature? X X

Tax Compliance? X X

Non-Collusion? X X

Lead time 35 - 40 days ARO Lead time 3-4 weeks ARO

Page 10: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H9A HIGHWAY LINE PAINTING

BID TABULATION

Open May 12, 2020 at 2:00pm

Markings Inc.

30 Riverside Dr

Pembroke, MA 02359

781-826-5171

BID PRICE PER FOOT

HIGHWAY LINE PAINTING REGION 1A REGION 1B REGION 2A REGION 2B TOTALS REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $ REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $

unit lf / sf

Waterborne Fast Dry White 4" lf 137,000 101,821 1,013,112 882,400 2,134,333 0.055$ 0.055$ 0.055$ 0.055$ 7,535.00$ 5,600.16$ 55,721.16$ 48,532.000$ 0.054$ 0.054$ 0.054$ 0.054$ $7,398.00 $5,498.33 $54,708.05 $47,649.60

Waterborne Fast Dry Yellow 4" lf 799,362 945,169 1,966,328 1,324,700 5,035,559 0.055$ 0.055$ 0.055$ 0.055$ 43,964.91$ 51,984.30$ 108,148.04$ 72,858.50$ 0.054$ 0.054$ 0.054$ 0.054$ $43,165.55 $51,039.13 $106,181.71 $71,533.80

Waterborne Fast Dry White 6" lf 0 50,000 14,300 0 64,300 0.082$ 0.082$ -$ 4,100.00$ 1,172.60$ -$ 0.075$ 0.075$ $0.00 $3,750.00 $1,072.50 $0.00

Waterborne Fast Dry Yellow 6" lf 0 180,000 0 0 180,000 0.082$ -$ 14,760.00$ -$ -$ 0.075$ $0.00 $13,500.00 $0.00 $0.00

Waterborne White Crosswalks 12" sf 0 2,100 25,730 2,600 30,430 0.680$ 0.680$ 0.680$ -$ 1,428.00$ 17,496.40$ 1,768.00$ 0.550$ 0.550$ 0.550$ $0.00 $1,155.00 $14,151.50 $1,430.00

White thermoplastic 4" lf 0 111,636 0 1,500 113,136 0.540$ 0.540$ -$ 60,283.44$ -$ 810.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $720.00

Yellow Thermoplastic 4" lf 0 111,636 0 2,500 114,136 0.540$ 0.540$ -$ 60,283.44$ -$ 1,350.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $1,200.00

White thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00

Yellow Thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00

TOTAL BID BY REGION Total for each region: 73,855.91$ 198,439.33$ 182,538.20$ 125,318.50$ Total for each region: 70,435.55$ 182,113.02$ 176,113.76$ 122,533.40$

Total all regions: 580,151.94$ Total all regions: 551,195.73$

Total Value This Bid 580,151.94 551,195.73

Minimum # of feet line painting must be no more than 2,000 1,000 1,000

MiN # of feet parking/crosswalks 500 500

Lead time required 1 week 2 weeks

Tax Compliance Signed? X X

Non-Collusion Signed? X X

Debarment Statement? X X

Osha Cert? X X

Prequal List? X X

Addenda? N/A N/A

Bid Bond? X X

* Note total rounded up one penny more than total stated on bid of $580,151.93.Comments

Hi-Way Safety Systems

9 Rockview Way

Rockland, MA 02370

781-982-9229

BID PRICE PER FOOT

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxx
Page 11: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE Hi-Way Safety Systems Roadsafe Traffic Systems

BID #H9B HIGHWAY LINE PAINTING 9 Rockview Way 55 Bodwell St

BID TABULATION Rockland, MA 02370 Avon, MA 02322

Open May 12, 2020 at 2:00pm 781-982-9229

UNIT PRICE EXTENSION

HIGHWAY LINE PAINTING Granby Rowe Warwick Whately TOTALS

Unit LF/SF

White Chlorinated Low VOC 4" LF 150,000 60,000 20,000 230,000 $0.055 $12,650.00

Yellow Chlorinated Low VOC 4" LF 150,000 19,000 60,000 70,000 299,000 $0.055 $16,445.00

Comments

Total Value This Bid $29,095.000

Lead time required 2 weeks

Minimum for line painting Must be no more than 2,000 2,000'

Minimum for crosswalks/pking

Tax Compliance Signed? X

Non-Collusion Signed? X

Debarment Signed? X

Osha Cert? X

Bid Bond N/A

Addenda? N/A

Page 12: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H10 GUARDRAIL INSTALLED Guardrail Solutions, LLC Premier Fence, LLC

BID TABULATION 108A Front St 1010 Turnpike St.

Open May 12, 2020 at 2:00 pm Springfield, MA 01089 Canton, MA 02021

413-310-2428 781-821-5900

ITEM DESCRIPTION TOTALS Unit Price Extension Unit Price Extension

Standard Steel straight w/ steel post per ft. 11,750 $25.25 $296,687.50 $31.80 $373,650.00

Standard Steel curved w/ steel post per ft. 727 $28.00 $20,356.00 $35.00 $25,445.00

Standard Steel straight w/ wood post 200 $28.00 $5,600.00 $33.00 $6,600.00

Standard Steel curved w/ wood post 220 $29.00 $6,380.00 $38.00 $8,360.00

Standard Steel Terminal Ends each 123 $65.00 $7,995.00 $65.00 $7,995.00

# of reflectors, installed (each) 327 $7.00 $2,289.00 $6.50 $2,125.50

Replace wooden post w/ steel post 100 $115.00 $11,500.00 $140.00 $14,000.00

Replace wooden post w/ wooden post 59 $155.00 $9,145.00 $150.00 $8,850.00

# of existing feet to be removed 600 $4.00 $2,400.00 $5.00 $3,000.00

Cor-ten Straight w/ steel posts per foot 1,240 $27.50 $34,100.00 $34.00 $42,160.00

Cor-ten Curved w/ steel posts per foot 92 $29.00 $2,668.00 $42.00 $3,864.00

Cor-ten Standard Terminal Ends each 10 $75.00 $750.00 $100.00 $1,000.00

Total Value This Bid $399,870.50 $497,049.50

Bid Deposit x x

Tax Compliance Signed? x x

Non-collusion signed? x x

Debarment Signed? x x

Prequalified? x x

OSHA Cert x x

Bid Tabulation H-10

Page 13: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H11 COMPREHENSIVE PAVEMENT PRESERVATION

BID TABULATION

Open May 12, 2020 at 2:00pm

SEALCOATING, INC. DBA INDUS FELIX MARINO

825 GRANITE STREET 32 CORWIN STREET

BRAINTREE, MA 02184 PEABODY, MA 01960

Art Baker [email protected] James Henebury [email protected]

781-428-3400 978-532-3838

CATEGORIES INELIGIBLE; for information only

H-11A-1 FIBER (PG)

Price Per Gallon Fiber 42,811 $10.12 $0.00

Day Rate for 1,000 gallons $8,050.00 $0.00

Day Rate above 1,000 gallons $4.25 $0.00

Total Bid Fiber $433,247.32 $0.00

H-11A-1 PCRM

Price Per Gallon 54,600 $12.29 $0.00

Day Rate for 800 gallons $8,375.00 $0.00

Day Rate above 800 gallons $4.87 $0.00

Total Bid PCRM $671,034.00 $0.00

H-11A - 2 HOT POURED MASTIC

Est Gallons Mastic 400

Price Per Gallon $27.25 $0.00

Day Rate for 200 gallons $8,635.00 $0.00

Day Rate above 200 gallons $10.50 $0.00

Total Bid Mastic $10,900.00 $0.00

H-11A - 3 COLD CRACK FILL

Est Gallons Crack Fill 500 No Bid

Day Rate w/ 2 person crew $0.00 $4,500.00

Date Rate per gallon $0.00 $15.95

Addtl pricing extre crew member $0.00 $950.00

Total Bid Crack Fill $0.00 $20,450.00

Page 14: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

SEALCOATING, INC. DBA INDUS FELIX MARINO

825 GRANITE STREET 32 CORWIN STREET

BRAINTREE, MA 02184 PEABODY, MA 01960

Art Baker [email protected] James Henebury [email protected]

781-428-3400 978-532-3838

CATEGORIES INELIGIBLE; for information only

H-11-B-1 MICROSURFACING HIMA

Est SQ YDS Microsurf HIMA 91,797

Price Per SQ YD Micros HIMA $5.20 $0.00

Total Bid Microsurf HIMA $477,344.40 $0.00

H-11-B-2 MICROSURFACING Conventional

Est SQ YDS Microsurf HIMA 19,000

Price Per SQ YD Micros Conv $4.68 $0.00

Total Value of Microsurf Conv $88,920.00 $0.00

H-11-C-1 FOG SEAL- Polymer Modified Rejuvenating

Est SQ YDS PMR FOG SEAL 181,006

Price Per SQ YD PMR FOG SEAL $1.23 $0.00

Total Bid PMR FOG SEAL $222,637.38 $0.00

H-11-C-1 FOG SEAL- Penetrating

Est SQ YDS Pen FOG SEAL 94,600 No Bid

Price Per SQ YD Pen FOG SEAL $0.00 $0.96

Total Bid Penetrating FOG SEAL $0.00 $90,816.00

H-11-D - CAPE SEAL

Est SQ YDS CAPE SEAL 41,705

Price Per SQ YD CAPE SEAL $6.87 $0.00

Total Bid CAPE SEAL $286,513.35 $0.00

Debarment Signed? X X

Addendum 1? X

Bid bond enclosed? X X

Prequalified? X

Acknowledge Addenda? X X

OSHA X X

Tax Compliance/Non Collusion X X

grand total of bid by co. $2,190,596.45 $111,266.00

Page 15: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-12 CALCIUM CHLORIDE APPLIED

BID TABULATION

Open May 12, 2020 at 2:00pm

TOWN

Est Volume Square

Yards Ph 413-665-7021

per sq. yd.

Gill 17,600 $0.38 $6,688.00

Hatfield 8,600 $0.38 $3,268.00

Hawley 10,000 $0.38 $3,800.00

Rowe 9,000 $0.38 $3,420.00

Sandisfield 25,098 $0.38 $9,537.24

Shutesbury 20,000 $0.38 $7,600.00

Sunderland 4,000 $0.38 $1,520.00

Westhampton 48,000 $0.38 $18,240.00

Total 142,298

$54,073.24

Minimum Application Amt 4,000 sq yd confirmed via email 5-14-20

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

Prequalification? x

OSHA x

Bid bond x

All States Asphalt

PO Box 91, Sunderland, MA

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
AWoods
Typewritten Text
XXXXXXXXXXXXXXXXXXX
Page 16: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H13 STONE SEAL DUE TO FRCOG ERROR, ALL BIDS REJECTED - TO BE REBID

Open May 12, 2020 at 2:00pm

BID TABULATION

MaDOT Period Prices Apply MARCH 2020 $552.50/TON

All States Asphalt Inc. 325 Amherst Road,

P O Box 91, Sunderland, MA 01375

All States

Total Value

By Towns

Comer Contracting, Inc. 15 Holmes Rd

Newington, CT 06111-1709

Comer

Total Value

By Towns

Alan L. Chicoine Martin Comer

Division Manager President

TOWN Est Volume Square Yards

Tel 413-665-7021

Bid Price Per Square Yard

Old Work DoubleChip New Work Old Work DoubleChip New Work Old Work DoubleChip New Work

Chesterfield 25000 $ 6.25 $ 156,250.00 $ 6.10 $ 152,500.00

Gill 19000 2.48$ $ 47,120.00 2.10$ $ 39,900.00

Montague 14000 2.48$ $ 34,720.00 2.24$ $ 31,360.00

Southampton 75101 6000 2.42$ 4.60$ $ 209,344.42 1.89$ 4.20$ $ 167,140.89

Total 108,101 6,000 25,000 $447,434.42 $390,900.89

0

bid bond X X

OSHA X X

Debar X X

signed bid form/corp resolution X X

Prequald X

Tax compl Non Collus X X

Tel 860-677-0603

Bid Price Per Square Yard

FY21 Draft Bid Tabs H-2 through 23

Page 17: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

RUBBERIZED CHIP SEAL H14

Open May 12, 2020 at 2:00pm

BID TABULATION Alan L. Chicoine Tel 413-665-7021

Period Prices MaDOT Apply: MARCH 2020 $552.50/TON Division Manager

10% Rubber Product-One Coat total bid by town PER SQ YD

Ashfield 69000 $240,120.00 $3.48

Buckland 58411 $203,270.28 $3.48

Chesterfield 20000 $69,600.00 $3.48

Conway 63420 $220,701.60 $3.48

Shelburne 18500 $64,380.00 $3.48

Sunderland 18000 $62,640.00 $3.48

Williamsburg 11,517 $41,230.86 $3.58

Total 258,848 $901,942.74

20% Rubber Product-One Coat total bid by town PER SQ YD

Belchertown 85,962.00 $408,319.50 $4.75

Charlemont 15,253.00 $72,451.75 $4.75

Conway 24,000.00 $114,000.00 $4.75

Deerfield 63,286.00 $300,608.50 $4.75

Gill 19,000.00 $90,250.00 $4.75

Granby 15,685.00 $74,503.75 $4.75

Granville 96,175.00 $456,831.25 $4.75

Hadley 21,947.00 $104,248.25 $4.75

Hatfield 15,900.00 $75,525.00 $4.75

Montague 14,000.00 $66,500.00 $4.75

Northfield 10,000.00 $47,500.00 $4.75

Pelham 6,500.00 $32,175.00 $4.95

Savoy 49,600.00 $235,600.00 $4.75

Southampton 24,075.00 $114,356.25 $4.75

Sunderland 18,000.00 $85,500.00 $4.75

Total 479,383.00 $2,278,369.25

$3,180,311.99

$3,180,311.99

Pre-Qual? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Acknowledged Add 1 and Add 2? x

Bid deposit? x

All States Asphalt Inc. 325 Amherst Road, P O

Box 91, Sunderland, MA 01375

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
XXXXXXXXXXXXXXXX
Page 18: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Ashfield 1A TOTAL ROADWAYS 5,636 2,540

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 388,884.00$ 12,065.00$ 400,949.00$

NORTHEAST Unit Price Bid 72.65$ 5.50$ Total Bid

Extended Bid 409,455.40$ 13,970.00$ 423,425.40$

PALMER Unit Price Bid 69.30$ 4.50$ Total Bid

Extended Bid 390,574.80$ 11,430.00$ 402,004.80$

Charlemont 1A TOTAL ROADWAYS 2120

TOTAL DRIVEWAYS/PARKING LOTS 200

WARNER Unit Price Bid Roadways 70.50$

Unit Price Bid Driveways 125.00$ Total Bid

Extended Bid 174,460.00$ 174,460.00$

NORTHEAST Unit Price Bid Roadways 72.00$

Unit Price Bid Driveways 130.00$ Total Bid

Extended Bid 178,640.00$ 178,640.00$

PALMER Unit Price Bid Roadways 68.70$

Unit Price Bid Driveways 98.00$ Total Bid

Extended Bid 165,244.00$ 165,244.00$

Colrain 1A TOTAL ROADWAYS 10,801 4,695 105

WARNER Unit Price Bid 67.25$ 4.75$ 300 Total Bid

Extended Bid 726,367.25$ 22,301.25$ 31500 780,168.50$

NORTHEAST Unit Price Bid 69.00$ 4.15$ 350 Total Bid

Extended Bid 745,269.00$ 19,484.25$ 36750 801,503.25$

PALMER Unit Price Bid 67.70$ 4.35$ 250 Total Bid

Extended Bid 731,227.70$ 20,423.25$ 26250 777,900.95$

1

Page 19: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Conway 1A TOTAL ROADWAYS 2,080 25

TOTAL DRIVEWAYS/PARKING LOTS 185 25 42

WARNER Unit Price Bid Roadways 66.00$ 150.00$ 10.00$

Unit Price Bid Driveways 150.00$ 150.00$ 10.00$ Total Bid

Extended Bid 165,030.00$ 7,500.00$ 420.00$ 172,950.00$

NORTHEAST Unit Price Bid Roadways 67.50$ 155.00$

Unit Price Bid Driveways 135.00$ 155.00$ 17.00$ Total Bid

Extended Bid 165,375.00$ 7,750.00$ 714.00$ 173,839.00$

PALMER Unit Price Bid Roadways 63.95$ 150.00$ 13.00$

Unit Price Bid Driveways 110.00$ 150.00$ 13.00$ Total Bid

Extended Bid 153,366.00$ 7,500.00$ 546.00$ 161,412.00$

Cummington 1A TOTAL ROADWAYS 2,300 1350

WARNER Unit Price Bid 72.00$ 4.75$ Total Bid

Extended Bid 165,600.00$ 6,412.50$ 172,012.50$

NORTHEAST Unit Price Bid 74.00$ 4.75$ Total Bid

Extended Bid 170,200.00$ 6,412.50$ 176,612.50$

PALMER Unit Price Bid 66.90$ 3.85$ Total Bid

Extended Bid 153,870.00$ 5,197.50$ 159,067.50$

Goshen 1A TOTAL ROADWAYS 1,790 1,050

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 123,510.00$ 4,987.50$ 128,497.50$

NORTHEAST Unit Price Bid 71.25$ 4.00$ Total Bid

Extended Bid 127,537.50$ 4,200.00$ 131,737.50$

PALMER Unit Price Bid 69.40$ 4.25$ Total Bid

Extended Bid 124,226.00$ 4,462.50$ 128,688.50$

2

Page 20: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Hawley 1A TOTAL ROADWAYS 11,281

WARNER Unit Price Bid 65.00$ Total Bid

Extended Bid 733,265.00$ 733,265.00$

NORTHEAST Unit Price Bid 68.25$ Total Bid

Extended Bid 769,928.25$ 769,928.25$

PALMER Unit Price Bid 67.20$ Total Bid

Extended Bid 758,083.20$ 758,083.20$

Heath 1A TOTAL ROADWAYS 2,500 12 1,056

WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ Total Bid

Extended Bid 175,000.00$ 1,800.00$ 5,016.00$ 181,816.00$

NORTHEAST Unit Price Bid 73.00$ 155.00$ 5.40$ Total Bid

Extended Bid 182,500.00$ 1,860.00$ 5,702.40$ 190,062.40$

PALMER Unit Price Bid 67.65$ 175.00$ 4.50$ Total Bid

Extended Bid 169,125.00$ 2,100.00$ 4,752.00$ 175,977.00$

Monroe 1A TOTAL ROADWAYS 3,050 483

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 210,450.00$ 2,294.25$ 212,744.25$

NORTHEAST Unit Price Bid 73.50$ 5.50$ Total Bid

Extended Bid 224,175.00$ 2,656.50$ 226,831.50$

PALMER Unit Price Bid 69.25$ 4.75$ Total Bid

Extended Bid 211,212.50$ 2,294.25$ 213,506.75$

Plainfield 1A TOTAL ROADWAYS 2,600

WARNER Unit Price Bid 67.30$ Total Bid

Extended Bid 174,980.00$ 174,980.00$

NORTHEAST Unit Price Bid 67.25$ Total Bid

Extended Bid 174,850.00$ 174,850.00$

PALMER Unit Price Bid 62.30$ Total Bid

Extended Bid 161,980.00$ 161,980.00$

3

Page 21: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Rowe 1A TOTAL ROADWAYS 2,000 1,500 1

WARNER Unit Price Bid 71.00$ 4.75$ 500 Total Bid

Extended Bid 142,000.00$ 7,125.00$ 500 149,625.00$

NORTHEAST Unit Price Bid 70.00$ 3.60$ 350 Total Bid

Extended Bid 140,000.00$ 5,400.00$ 350 145,750.00$

PALMER Unit Price Bid 69.70$ 3.90$ NO BID Total Bid

Extended Bid 139,400.00$ 5,850.00$ INELIGIBLE BID 145,250.00$

Savoy 1A TOTAL ROADWAYS 880

WARNER Unit Price Bid 75.00$ Total Bid

Extended Bid 66,000.00$ 66,000.00$

NORTHEAST Unit Price Bid 76.00$ Total Bid

Extended Bid 66,880.00$ 66,880.00$

PALMER Unit Price Bid 69.96$ Total Bid

Extended Bid 61,564.80$ 61,564.80$

Shelburne 1A TOTAL ROADWAYS 4,410 2,010

WARNER Unit Price Bid 66.25$ 4.75$ Total Bid

Extended Bid 292,162.50$ 9,547.50$ 301,710.00$

NORTHEAST Unit Price Bid 68.65$ 5.50$ Total Bid

Extended Bid 302,746.50$ 11,055.00$ 313,801.50$

PALMER Unit Price Bid 68.10$ 4.45$ Total Bid

Extended Bid 300,321.00$ 8,944.50$ 309,265.50$

Williamsburg 1A TOTAL ROADWAYS 230 105 3

WARNER Unit Price Bid 72.00$ 5.00$ 300.00$ Total Bid

Extended Bid 16,560.00$ 525.00$ 900.00$ 17,985.00$

NORTHEAST Unit Price Bid 135.00$ 8.50$ 350.00$ Total Bid

Extended Bid 31,050.00$ 892.50$ 1,050.00$ 32,992.50$

PALMER Unit Price Bid 90.70$ 12.00$ 350.00$ Total Bid

Extended Bid 20,861.00$ 1,260.00$ 1,050.00$ 23,171.00$

4

Page 22: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

TOTAL BID REGION 1A WARNER 3,667,162.75$

TOTAL BID REGION 1A NORTHEAST 3,806,853.80$

TOTAL BID REGION 1A PALMER 3,643,116.00$

Chester 1B TOTAL ROADWAYS 3,500

WARNER Unit Price Bid 75.00$ Total Bid

Extended Bid 262,500.00$ 262,500.00$

NORTHEAST Unit Price Bid 67.25$ Total Bid

Extended Bid 235,375.00$ 235,375.00$

PALMER Unit Price Bid 63.70$ Total Bid

Extended Bid 222,950.00$ 222,950.00$

Chesterfield 1B TOTAL ROADWAYS 4,200 300 100 10

WARNER Unit Price Bid 67.65$ 100.00$ 125.00$ 300.00$ Total Bid

Extended Bid 284,130.00$ 30,000.00$ 12,500.00$ 3,000.00$ 329,630.00$

NORTHEAST Unit Price Bid 67.85$ 155.00$ 155.00$ 350.00$ Total Bid

Extended Bid 284,970.00$ 46,500.00$ 15,500.00$ 3,500.00$ 350,470.00$

PALMER Unit Price Bid 62.00$ 130.00$ 150.00$ 325.00$ Total Bid

Extended Bid 260,400.00$ 39,000.00$ 15,000.00$ 3,250.00$ 317,650.00$

Granville 1B TOTAL ROADWAYS 10,620

WARNER Unit Price Bid 77.00$ Total Bid

Extended Bid 817,740.00$ 817,740.00$

NORTHEAST Unit Price Bid 63.75$ Total Bid

Extended Bid 677,025.00$ 677,025.00$

PALMER Unit Price Bid 60.40$ Total Bid

Extended Bid 641,448.00$ 641,448.00$

5

Page 23: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Huntington 1B TOTAL ROADWAYS 1,950 870

WARNER Unit Price Bid 75.00$ 4.75$ Total Bid

Extended Bid 146,250.00$ 4,132.50$ 150,382.50$

NORTHEAST Unit Price Bid 82.50$ 5.75$ Total Bid

Extended Bid 160,875.00$ 5,002.50$ 165,877.50$

PALMER Unit Price Bid 67.67$ 4.75$ Total Bid

Extended Bid 131,956.50$ 4,132.50$ 136,089.00$

Middlefield 1B TOTAL ROADWAYS 8,500 7,557

TOTAL DRIVEWAYS/PARKING LOTS 660 186 19

WARNER Unit Price Bid Roadways 71.00$ 3.00$ 325

Unit Price Bid Driveways 90.00$ 10.00$ 325.00$ Total Bid

Extended Bid 662,900.00$ 24,531.00$ 6,175.00$ 693,606.00$

NORTHEAST Unit Price Bid Roadways 69.25$ 3.50$ 350

Unit Price Bid Driveways 99.00$ 3.50$ Total Bid

Extended Bid 653,965.00$ 27,100.50$ 6,650.00$ 687,715.50$

PALMER Unit Price Bid Roadways 66.70$ 3.50$ 325

Unit Price Bid Driveways 82.65$ 8.25$ 325.00$ Total Bid

Extended Bid 621,499.00$ 27,984.00$ 6,175.00$ 655,658.00$

Montgomery 1B TOTAL ROADWAYS 2,841 820

WARNER Unit Price Bid 75.00$ 4.75$ Total Bid

Extended Bid 213,075.00$ 3,895.00$ 216,970.00$

NORTHEAST Unit Price Bid 70.00$ 4.25$ Total Bid

Extended Bid 198,870.00$ 3,485.00$ 202,355.00$

PALMER Unit Price Bid 67.70$ 3.65$ Total Bid

Extended Bid 192,335.70$ 2,993.00$ 195,328.70$

6

Page 24: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Sandisfield 1B TOTAL ROADWAYS 3,824 20

WARNER Unit Price Bid 74.75$ 150.00$ Total Bid

Extended Bid 285,844.00$ 3,000.00$ 288,844.00$

NORTHEAST Unit Price Bid 69.75$ 155.00$ Total Bid

Extended Bid 266,724.00$ 3,100.00$ 269,824.00$

PALMER Unit Price Bid 71.70$ 165.00$ Total Bid

Extended Bid 274,180.80$ 3,300.00$ 277,480.80$

Tolland 1B TOTAL DRIVWAYS/PARKING LOTS 1,070

WARNER Unit Price Bid 115.00$ Total Bid

Extended Bid 123,050.00$ 123,050.00$

NORTHEAST Unit Price Bid 105.00$ Total Bid

Extended Bid 112,350.00$ 112,350.00$

PALMER Unit Price Bid 78.87$ Total Bid

Extended Bid 84,390.90$ 84,390.90$

Worthington 1B TOTAL ROADWAYS 2,665 220 713 20 3

WARNER Unit Price Bid 69.70$ 125.00$ 4.75$ 200.00$ 400.00$ Total Bid

Extended Bid 185,750.50$ 27,500.00$ 3,386.75$ 4,000.00$ 1,200.00$ 221,837.25$

NORTHEAST Unit Price Bid 69.00$ 155.00$ 4.50$ 155.00$ 350.00$ Total Bid

Extended Bid 183,885.00$ 34,100.00$ 3,208.50$ 3,100.00$ 1,050.00$ 225,343.50$

PALMER Unit Price Bid 64.90$ 150.00$ 3.85$ 180.00$ 350.00$ Total Bid

Extended Bid 172,958.50$ 33,000.00$ 2,745.05$ 3,600.00$ 1,050.00$ 213,353.55$

TOTAL BID REGION 1B WARNER 3,104,559.75$

TOTAL BID REGION 1B NORTHEAST 2,926,335.50$

TOTAL BID REGION 1B PALMER 2,744,348.95$

7

Page 25: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Deerfield 2A TOTAL ROADWAYS 1,722 502 24

WARNER Unit Price Bid 71.80$ 4.75$ 325.00$ Total Bid

Extended Bid 123,639.60$ 2,384.50$ 7,800.00$ 133,824.10$

NORTHEAST Unit Price Bid 78.85$ 6.00$ 350.00$ Total Bid

Extended Bid 135,779.70$ 3,012.00$ 8,400.00$ 147,191.70$

PALMER Unit Price Bid 110.00$ 8.00$ 600.00$ Total Bid

Extended Bid 189,420.00$ 4,016.00$ 14,400.00$ 207,836.00$

Gill 2A TOTAL ROADWAYS 2,136 1,716

TOTAL DRIVEWAY/PARKING LOTS 258 2 81

WARNER Unit Price Bid Roadways 70.00$ 150.00$ 4.75$

Unit Price Bid Driveways 110.00$ 150.00$ 10.00$ Total Bid

Extended Bid 177,900.00$ 300.00$ 8,961.00$ 187,161.00$

NORTHEAST Unit Price Bid Roadways 66.25$ 3.75$

Unit Price Bid Driveways 115.00$ 155.00$ 3.75$ Total Bid

Extended Bid 171,180.00$ 310.00$ 6,738.75$ 178,228.75$

PALMER Unit Price Bid Roadways 74.50$ 185.00$ 4.50$

Unit Price Bid Driveways 110.00$ 185.00$ 12.00$ Total Bid

Extended Bid 187,512.00$ 370.00$ 8,694.00$ 196,576.00$

Leverett 2A TOTAL ROADWAYS 2,200 1,325 3

WARNER Unit Price Bid 67.00$ 4.75$ 400.00$ Total Bid

Extended Bid 147,400.00$ 6,293.75$ 1,200.00$ 154,893.75$

NORTHEAST Unit Price Bid 73.50$ 4.75$ 350.00$ Total Bid

Extended Bid 161,700.00$ 6,293.75$ 1,050.00$ 169,043.75$

PALMER Unit Price Bid 72.00$ 5.00$ 500.00$ Total Bid

Extended Bid 158,400.00$ 6,625.00$ 1,500.00$ 166,525.00$

8

Page 26: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Leyden 2A TOTAL ROADWAYS 1,582 500

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 107,576.00$ 2,375.00$ 109,951.00$

NORTHEAST Unit Price Bid 66.65$ 5.50$ Total Bid

Extended Bid 105,440.30$ 2,750.00$ 108,190.30$

PALMER Unit Price Bid 71.50$ 6.00$ Total Bid

Extended Bid 113,113.00$ 3,000.00$ 116,113.00$

Co. Name Unit Price Bid Total Bid

Extended Bid -$ -$ -$

Montague 2A TOTAL ROADWAYS 1,500 500

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 102,000.00$ 2,375.00$ 104,375.00$

NORTHEAST Unit Price Bid 68.90$ 5.50$ Total Bid

Extended Bid 103,350.00$ 2,750.00$ 106,100.00$

PALMER Unit Price Bid 74.50$ 6.00$ Total Bid

Extended Bid 111,750.00$ 3,000.00$ 114,750.00$

New Salem 2A TOTAL ROADWAYS 1,990 875

WARNER Unit Price Bid 70.50$ 4.75$ Total Bid

Extended Bid 140,295.00$ 4,156.25$ 144,451.25$

NORTHEAST Unit Price Bid 78.00$ 4.75$ Total Bid

Extended Bid 155,220.00$ 4,156.25$ 159,376.25$

PALMER Unit Price Bid 73.00$ 5.50$ Total Bid

Extended Bid 145,270.00$ 4,812.50$ 150,082.50$

Northfield 2A TOTAL ROADWAYS 8,480 50 1,400 12

WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ 200.00$ Total Bid

Extended Bid 593,600.00$ 7,500.00$ 6,650.00$ 2,400.00$ 610,150.00$

NORTHEAST Unit Price Bid 63.65$ 155.00$ 6.00$ 155.00$ Total Bid

Extended Bid 539,752.00$ 7,750.00$ 8,400.00$ 1,860.00$ 557,762.00$

PALMER Unit Price Bid 68.90$ 180.00$ 4.50$ 195.00$ Total Bid

Extended Bid 584,272.00$ 9,000.00$ 6,300.00$ 2,340.00$ 601,912.00$

9

Page 27: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Orange 2A TOTAL ROADWAYS 1,875 450 75 40

WARNER Unit Price Bid 72.00$ 4.75$ 150.00$ 325.00$ Total Bid

Extended Bid 135,000.00$ 2,137.50$ 11,250.00$ 13,000.00$ 161,387.50$

NORTHEAST Unit Price Bid 68.95$ 6.00$ 155.00$ 350.00$ Total Bid

Extended Bid 129,281.25$ 2,700.00$ 11,625.00$ 14,000.00$ 157,606.25$

PALMER Unit Price Bid 67.25$ 6.25$ 155.00$ 260.00$ Total Bid

Extended Bid 126,093.75$ 2,812.50$ 11,625.00$ 10,400.00$ 150,931.25$

Shutesbury 2A TOTAL ROADWAYS 3,910 1,305

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 265,880.00$ 6,198.75$ 272,078.75$

NORTHEAST Unit Price Bid 70.00$ 4.75$ Total Bid

Extended Bid 273,700.00$ 6,198.75$ 279,898.75$

PALMER Unit Price Bid 69.90$ 5.75$ Total Bid

Extended Bid 273,309.00$ 7,503.75$ 280,812.75$

Sunderland 2A TOTAL ROADWAYS 1,711 30 800 100 20

WARNER Unit Price Bid 72.00$ 150.00$ 4.75$ 125.00$ 300.00$ Total Bid

Extended Bid 123,192.00$ 4,500.00$ 3,800.00$ 12,500.00$ 6,000.00$ 149,992.00$

NORTHEAST Unit Price Bid 80.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid

Extended Bid 136,880.00$ 4,650.00$ 4,000.00$ 15,500.00$ 7,000.00$ 168,030.00$

PALMER Unit Price Bid 85.00$ 250.00$ 6.00$ 175.00$ 575.00$ Total Bid

Extended Bid 145,435.00$ 7,500.00$ 4,800.00$ 17,500.00$ 11,500.00$ 186,735.00$

Warwick 2A TOTAL ROADWAYS 3,500 2,500

WARNER Unit Price Bid 69.00$ 3.00$ Total Bid

Extended Bid 241,500.00$ 7,500.00$ 249,000.00$

NORTHEAST Unit Price Bid 65.45$ 3.75$ Total Bid

Extended Bid 229,075.00$ 9,375.00$ 238,450.00$

PALMER Unit Price Bid 70.00$ 4.25$ Total Bid

Extended Bid 245,000.00$ 10,625.00$ 255,625.00$

10

Page 28: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Wendell 2A TOTAL ROADWAYS 5,500 1,500 9

WARNER Unit Price Bid 69.00$ 4.75$ 325.00$ Total Bid

Extended Bid 379,500.00$ 7,125.00$ 2,925.00$ 389,550.00$

NORTHEAST Unit Price Bid 66.95$ 6.00$ 350.00$ Total Bid

Extended Bid 368,225.00$ 9,000.00$ 3,150.00$ 380,375.00$

PALMER Unit Price Bid 66.60$ 4.25$ 325.00$ Total Bid

Extended Bid 366,300.00$ 6,375.00$ 2,925.00$ 375,600.00$

Whately 2A TOTAL ROADWAYS 1,100 70 60

WARNER Unit Price Bid 68.00$ 10.00$ 125.00$ Total Bid

Extended Bid 74,800.00$ 700.00$ 7,500.00$ 83,000.00$

NORTHEAST Unit Price Bid 74.45$ 15.00$ 155.00$ Total Bid

Extended Bid 81,895.00$ 1,050.00$ 9,300.00$ 92,245.00$

PALMER Unit Price Bid 78.85$ 30.00$ 185.00$ Total Bid

Extended Bid 86,735.00$ 2,100.00$ 11,100.00$ 99,935.00$

TOTAL BID REGION 2A WARNER 2,749,814.35$

TOTAL BID REGION 2A NORTHEAST 2,742,497.75$

TOTAL BID REGION 2A PALMER 2,903,433.50$

11

Page 29: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Belchertown 2B TOTAL ROADWAYS 12,019 6,796 290.5 93

WARNER Unit Price Bid 66.00$ 4.75$ 125.00$ 300.00$ Total Bid

Extended Bid 793,254.00$ 32,281.00$ 36,312.50$ 27,900.00$ 889,747.50$

NORTHEAST Unit Price Bid 71.85$ 4.15$ 155.00$ 350.00$ Total Bid

Extended Bid 863,565.15$ 28,203.40$ 45,027.50$ 32,550.00$ 969,346.05$

PALMER Unit Price Bid 64.20$ 3.25$ 130.00$ 230.00$ Total Bid

Extended Bid 771,619.80$ 22,087.00$ 37,765.00$ 21,390.00$ 852,861.80$

Easthampton 2B TOTAL ROADWAYS 8,700 245 3,950 43 168

WARNER Unit Price Bid 75.00$ 150.00$ 4.00$ 200.00$ 350.00$ Total Bid

Extended Bid 652,500.00$ 36,750.00$ 15,800.00$ 8,600.00$ 58,800.00$ 772,450.00$

NORTHEAST Unit Price Bid 71.00$ 155.00$ 4.15$ 155.00$ 350.00$ Total Bid

Extended Bid 617,700.00$ 37,975.00$ 16,392.50$ 6,665.00$ 58,800.00$ 737,532.50$

PALMER Unit Price Bid 63.30$ 135.00$ 4.05$ 135.00$ 230.00$ Total Bid

Extended Bid 550,710.00$ 33,075.00$ 15,997.50$ 5,805.00$ 38,640.00$ 644,227.50$

Granby 2B TOTAL ROADWAYS 8,922 650 75

WARNER Unit Price Bid 77.00$ 4.75$ 150.00$ Total Bid

Extended Bid 686,994.00$ 3,087.50$ 11,250.00$ 701,331.50$

NORTHEAST Unit Price Bid 65.45$ 4.75$ 155.00$ Total Bid

Extended Bid 583,944.90$ 3,087.50$ 11,625.00$ 598,657.40$

PALMER Unit Price Bid 60.90$ 4.25$ 145.00$ Total Bid

Extended Bid 543,349.80$ 2,762.50$ 10,875.00$ 556,987.30$

Hadley 2B TOTAL ROADWAYS 1,249 642

WARNER Unit Price Bid 72.00$ 4.00$ Total Bid

Extended Bid 89,928.00$ 2,568.00$ 92,496.00$

NORTHEAST Unit Price Bid 82.00$ 5.75$ Total Bid

Extended Bid 102,418.00$ 3,691.50$ 106,109.50$

PALMER Unit Price Bid 73.99$ 5.50$ Total Bid

Extended Bid 92,413.51$ 3,531.00$ 95,944.51$

12

Page 30: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Hatfield 2B TOTAL ROADWAYS 250 50 250 10 2

WARNER Unit Price Bid 75.00$ 125.00$ 4.00$ 150.00$ 400.00$ Total Bid

Extended Bid 18,750.00$ 6,250.00$ 1,000.00$ 1,500.00$ 800.00$ 28,300.00$

NORTHEAST Unit Price Bid 135.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid

Extended Bid 33,750.00$ 7,750.00$ 1,250.00$ 1,550.00$ 700.00$ 45,000.00$

PALMER Unit Price Bid 89.00$ 175.00$ 6.00$ 310.00$ 325.00$ Total Bid

Extended Bid 22,250.00$ 8,750.00$ 1,500.00$ 3,100.00$ 650.00$ 36,250.00$

Pelham 2B TOTAL ROADWAYS 2,050 710

WARNER Unit Price Bid 67.00$ 4.00$ Total Bid

Extended Bid 137,350.00$ 2,840.00$ 140,190.00$

NORTHEAST Unit Price Bid 76.00$ 6.50$ Total Bid

Extended Bid 155,800.00$ 4,615.00$ 160,415.00$

PALMER Unit Price Bid 73.00$ 5.25$ Total Bid

Extended Bid 149,650.00$ 3,727.50$ 153,377.50$

Southampton 2B TOTAL ROADWAYS 4,944 20 2,842 42

WARNER Unit Price Bid 68.00$ 150.00$ 4.00$ 300.00$ Total Bid

Extended Bid 336,192.00$ 3,000.00$ 11,368.00$ 12,600.00$ 363,160.00$

NORTHEAST Unit Price Bid 66.00$ 155.00$ 4.15$ 350.00$ Total Bid

Extended Bid 326,304.00$ 3,100.00$ 11,794.30$ 14,700.00$ 355,898.30$

PALMER Unit Price Bid 63.25$ 150.00$ 3.85$ 250.00$ Total Bid

Extended Bid 312,708.00$ 3,000.00$ 10,941.70$ 10,500.00$ 337,149.70$

13

Page 31: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Westhampton 2B TOTAL ROADWAYS 2,659 1,244

2B TOTAL DRIVEWAY/PARKING LOTS 220

WARNER Unit Price Bid Roadways 68.00$ 4.75$

Unit Price Bid Driveways 120.00$ Total Bid

Extended Bid 207,212.00$ 5,909.00$ 213,121.00$

NORTHEAST Unit Price Bid Roadways 66.95$ 4.25$

Unit Price Bid Driveways 88.00$ Total Bid

Extended Bid 197,380.05$ 5,287.00$ 202,667.05$

PALMER Unit Price Bid Roadways 65.30$ 4.40$

Unit Price Bid Driveways 95.00$ 6.00$ Total Bid

Extended Bid 194,532.70$ 5,473.60$ 200,006.30$

TOTAL BID REGION 2B WARNER 3,200,796.00$

TOTAL BID REGION 2B NORTHEAST 3,175,625.80$

TOTAL BID REGION 2B PALMER 2,876,804.61$

WARNER 12,722,332.85$

NORTHEAST 12,651,312.85$

PALMER 12,167,703.06$

GRAND TOTAL BID (for bid bond)

GRAND TOTAL BID (for bid bond)

GRAND TOTAL BID (for bid bond)

14

Page 32: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H16 LIQUID ASPHALT

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply

All States Asphalt Inc.

325 Amherst Rd. PO Box 91

Sunderland, MA 01375

Tel 413-665-7021

Fax 413-665-9027

MC Cutback Asphalt Applied-in-place Price Per gal. Total by Town

Hawley 3,520 $3.65 $12,848.00

Westhampton 8,806 $3.65 $32,141.90

$44,989.90

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Cert Signed? x

OSHA Cert? x

Pre-Qual? x

MARCH 2020 $552.50/TON

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxx
Page 33: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

TOWN Region

Total Estimated

Square Yards

Reclaim

Pavement

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY Cost

/ SY

PALMER Cost /

SY

RAFFERTY

Cost / SY

Reclaim

Pavement

w/fine grading

& vibratory

compacition

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY

Cost / SY

PALMER Cost

/ SY

RAFFERTY

Cost / SY

Structures

Lowered

Qty in EA

ALL STATES

Cost / Each

GARRITY Cost

/ Each

MURRAY Cost

/ Each

PALMER Cost

/ Each

RAFFERTY

Cost / Each

Addition of

Calcium at 1 gal

per SY unless

otherwise noted

Quantity in SY

ALL STATES

Cost / ga

GARRITY Cost /

ga

MURRAY Cost

/ ga

PALMER Cost

/ ga

RAFFERTY

Cost / ga

Injection of

Emulsion *

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY Cost

/ SY

PALMER Cost /

SY

RAFFERTY

Cost / SY

ALL STATES ASPHALT-

Sunderland, MA Total Bid

GARRITY ASPHALT

RECLAIMING Bloomfield,

CT Total Bid

MURRAY PAVING and

RECLAMATION

Holliston, MA Total Bid

PALMER PAVING CORP

Palmer, MA Total Bid

RAFFERTY FINE

GRADING Enfield,

CT Total Bid

Charlemont 1A 27000.00 27000.00 0.69 0.85 0.63 0.70 0.84 18,630.00$ 22,950.00$ 17,010.00$ 18,900.00$ 22,680.00$

Conway 1A 15000.00 15000.00 1.24 2.60 1.57 1.65 1.52 15000.00 1.00 1.40 1.00 2.45 1.34 33,600.00$ 60,000.00$ 38,550.00$ 61,500.00$ 42,900.00$

Hawley 1A 28160.00 28160.00 2.60 3.00 NoBid 1.50 2.22 28160.00 3.25 4.00 NoBid 4.20 4.00 164,736.00$ 197,120.00$ NO BID 160,512.00$ 175,155.20$

Monroe 1A 21103.00 21103.00 1.24 2.60 1.95 1.60 1.32 13532.00 1.00 1.40 1.00 2.55 1.44 39,699.72$ 73,812.60$ 54,682.85$ 68,271.40$ 47,342.04$

Savoy 1A 8000.00 8000.00 1.70 2.60 2.11 1.85 1.74 8000.00 1.00 1.40 1.00 2.65 1.54 21,600.00$ 32,000.00$ 24,880.00$ 36,000.00$ 26,240.00$

Shelburne 1A 9900.00 9900.00 1.42 3.00 1.69 1.71 1.74 14,058.00$ 29,700.00$ 16,731.00$ 16,929.00$ 17,226.00$

TOTAL BID REGION 1A 292,323.72$ 415,582.60$ 151,853.85$ 362,112.40$ 331,543.24$

Chesterfield 1B 11000.00 11000.00 1.26 2.60 1.69 1.75 1.64 11000.00 1.04 1.40 1.00 2.62 1.54 25,300.00$ 44,000.00$ 29,590.00$ 48,070.00$ 34,980.00$

Granville 1B 63350.00 63350.00 2.60 3.00 NoBid 1.70 2.22 63350.00 3.25 4.00 NoBid 4.25 4.00 370,597.50$ 443,450.00$ NO BID 376,932.50$ 394,037.00$

Montgomery 1B 12790.00 12790.00 1.34 2.60 1.69 1.70 1.54 12790.00 1.04 1.40 1.00 2.60 1.54 30,440.20$ 51,160.00$ 34,405.10$ 54,997.00$ 39,393.20$

Sandisfield 1B 22225.00 22225.00 1.16 2.60 1.89 1.65 1.18 22225.00 1.04 1.40 1.00 2.75 1.14 48,895.00$ 88,900.00$ 64,230.25$ 97,790.00$ 51,562.00$

Worthington 1B 12000.00 12000.00 2.60 3.50 NoBid 1.65 4.50 12000.00 3.25 4.00 NoBid 4.70 6.00 70,200.00$ 90,000.00$ NO BID 76,200.00$ 126,000.00$

TOTAL BID REGION 1B 545,432.70$ 717,510.00$ 128,225.35$ 653,989.50$ 645,972.20$

Northfield 2A 19398.00 19398.00 0.74 0.85 0.68 0.80 0.88 14,354.52$ 16,488.30$ 13,190.64$ 15,518.40$ 17,070.24$

Orange 2A 7100.00 7100.00 2.15 2.60 1.69 3.60 1.54 40.00 150.00 500.00 200.00 750.00 650.00 7100.00 1.00 1.40 1.00 3.75 1.54 28,365.00$ 48,400.00$ 27,099.00$ 82,185.00$ 47,868.00$

TOTAL BID REGION 2A 42,719.52$ 64,888.30$ 40,289.64$ 97,703.40$ 64,938.24$

Belchertown 2B 25100.00 25100.00 1.16 2.60 1.69 2.80 1.24 28.00 150.00 500.00 200.00 750.00 650.00 25100.00 1.00 1.40 1.00 4.10 1.14 58,416.00$ 114,400.00$ 73,119.00$ 194,190.00$ 77,938.00$

Easthampton 2B 9600.00 9600.00 1.49 2.60 1.69 3.00 1.94 24.00 150.00 500.00 200.00 775.00 650.00 9600.00 1.04 1.40 1.00 3.75 1.54 27,888.00$ 50,400.00$ 30,624.00$ 83,400.00$ 49,008.00$

Granby 2B 34708.00 34708.00 0.72 0.85 0.63 0.75 0.84 24,989.76$ 29,501.80$ 21,866.04$ 26,031.00$ 29,154.72$

Hadley 2B 10533.00 10533.00 0.84 0.85 0.63 0.80 0.98 8,847.72$ 8,953.05$ 6,635.79$ 8,426.40$ 10,322.34$

TOTAL BID REGION 2B 120,141.48$ 203,254.85$ 132,244.83$ 312,047.40$ 166,423.06$

GRAND TOTAL ALL REGIONS 1,000,617.42$ 1,401,235.75$ 452,613.67$ 1,425,852.70$ 1,208,876.74$

* For Reclamation with Injection of Emulsion: Additional, if needed and approved by Town – Liquid Asphalt Adjustment after Mix Design $_______/Gall $3.25/GAL $4.00/GA N/A $4.65/GALLON $12.00/GA

TAX COMPLIANCE? X X X X X

NON COLLUSION? X X X X X

PREQUALIFIED? X X X X X

ACKNOWLEDGE ADD.? X X X X X

DBARMENT? X X X X X

OSHA? X X X X X

BID DEPOSIT? X X X X X

H-17 RECLAMATION BID / FY21 - ADDENDUM 1

AWoods
Typewritten Text
Bid Tabulation
Page 34: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-19 Hot In Place Recycling

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply $552.50 per ton base price

2258 Rte 22, Brewster, NY 10509

TOWN

Est Volume Square

Yards 845-278-9645 total

per sq. yd.

GRANBY 38174 $ 5.16 $ 196,977.84

Pre-Qual? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Bid deposit? x

Highway Rehabilitation Corp

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxxx
Page 35: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID TABULATION

Open May 12, 2020 at 2:00pm

COLD

PLANING/MILLING-

H20A Standard Milling

Rafferty Fine

Grading

Total SY Structures

Total

Structures

Contractor

Removes

Millings?

Town Retains

Millings?

Town/Road PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for

SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURETown

Belchertown

25900 61

A- Town

Retains 1.94$ 250.00$ 65,496.00$ 1.73$ 10.00$ 45,417.00$ 2.65$ 75.00$ 73,210.00$ 1.90$ 25.00$ 50,735.00$

Gill -$ -$ -$ -$

19500 0

A- Town

Retains 2.44$ 47,580.00$ 1.57$ 30,615.00$ 1.70$ 33,150.00$ 1.92$ 25.00$ 37,440.00$

Easthampton -$ -$ -$ -$

28900 144

A- Town

Retains 2.44$ 250.00$ 106,516.00$ 1.80$ 10.00$ 53,460.00$ 2.25$ 75.00$ 75,825.00$ NO BID -$

Granby -$ -$ -$ -$

18939

C- Contractor

Removes

A- Town

Retains 2.44$ 46,211.16$ 1.75$ 33,143.25$ 1.85$ 35,037.15$ NO BID -$

Hadley -$ -$ -$ -$

9533 49

A-Town

Retains 3.54$ 250.00$ 45,996.82$ 1.98$ 10.00$ 19,365.34$ 1.95$ 75.00$ 22,264.35$ NO BID -$

Huntington -$ -$ -$ -$

3900

A-Town

Retains 12.00$ 46,800.00$ 3.75$ 14,625.00$ 4.00$ 15,600.00$ NO BID -$

Leverett -$ -$ -$ -$

8448 1

A-Town

Retains 6.54$ 250.00$ 55,499.92$ 2.24$ 10.00$ 18,933.52$ 2.20$ 75.00$ 18,660.60$ 1.85$ 25.00$ 15,653.80$

Montague -$ -$ -$ -$

31,000 32

Split

millings

between Town

& Contractor 2.44$ 250.00$ 83,640.00$ 1.49$ 10.00$ 46,510.00$ 1.85$ 75.00$ 59,750.00$ 1.79$ 25.00$ 56,290.00$

Montgomery -$ -$ -$ -$

11736 0

A-Town

Retains 6.54$ 76,753.44$ 1.82$ 21,359.52$ 1.85$ 21,711.60$ NO BID -$

Sunderland -$ -$ -$ -$

13493 25

A-Town

Retains 3.54$ 250.00$ 54,015.22$ 1.76$ 10.00$ 23,997.68$ 1.95$ 75.00$ 28,186.35$ 1.75$ 25.00$ 24,237.75$

Whately -$ -$ -$ -$

1350 14 25.00$ 250.00$ 37,250.00$ 11.00$ 10.00$ 14,990.00$ 10.30$ 75.00$ 14,955.00$ 9.00$ 25.00$ 12,500.00$

TOTAL 172699 326 665,758.56$ 322,416.31$ 398,350.05$ 196,856.55$

COLD PLANING/MILLING BID H20

PO Box 91, Sunderland, MA 01375

Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.Garrity Asphalt Reclaiming

57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxx
AWoods
Typewritten Text
SCROLL TO NEXT PAGE FOR FINE MILLING
Page 36: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

COLD

PLANING/MILLING-

H20B Micro Milling Total SY Structures

Total

Structures

Contractor

Removes

Millings?

Town Retains

Millings?

Rafferty

Fine Grading

Town/Road

PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for

Chesterfield SQ YD STRUCTURETown SQ YD STRUCTURE Town SQ YD STRUCTURETown SQ YD STRUCTURETown

20000 10 10

TOWN

RETAINS 2.84$ 250.00$ 59,300.00$ NO BID 1.85$ 75.00$ 37,750.00$ NO BID

Conway -$ NO BID -$ NO BID

8115 3 3

TOWN

RETAINS 3.94$ 250.00$ 32,723.10$ NO BID 2.15$ 75.00$ 17,672.25$ NO BID

Deerfield -$ NO BID -$ NO BID

11700

TOWN

RETAINS 3.84$ 44,928.00$ NO BID 2.95$ 34,515.00$ NO BID

Gill -$ NO BID -$ NO BID

19500

TOWN

RETAINS 2.84$ 55,380.00$ NO BID 1.70$ 33,150.00$ NO BID

Middlefield -$ NO BID -$ NO BID

75568 19

TOWN

RETAINS 2.74$ 250.00$ 211,806.32$ NO BID 1.70$ 75.00$ 129,890.60$ NO BID

Northfield -$ NO BID -$ NO BID

20228 3 2.94$ 250.00$ 60,220.32$ NO BID 1.70$ 75.00$ 34,612.60$ NO BID

-$ NO BID -$ NO BID

Sunderland -$ NO BID -$ NO BID

13493 25

TOWN

RETAINS 3.38$ 250.00$ 51,856.34$ NO BID 1.95$ 75.00$ 28,186.35$ NO BID

NO BID -$ NO BID

TOTAL 168,604 60 516,214.08$ NO BID -$

315,776.80$

Pre-Qual? X X X X

Addendum 1? X X X X

Tax Compliance Signed? X X X X

Non-Collusion Signed? X X X X

Debarment Signed? X X X X

OSHA X X X X

Bid bond X X X X

57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085 PO Box 91, Sunderland, MA 01375

Garrity Asphalt Reclaiming Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxx
AWoods
Typewritten Text
Page 37: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-21 Cold In Place Recycling

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply

825 Granite St., Braintree,

MA 02184

TOWN

Est Volume Square

Yards Ph 781-428-3400 total

per sq. yd.

Colrain 34,222 $ 5.30 $ 181,376.60

Deerfield 60,000 $ 4.87 $ 292,200.00

Gill 19,066 $ 6.25 $ 119,162.50

TOTAL $ 592,739.10

Additional items, if needed Aggregate 35.00$ ton

Portland Cement 210.00$ ton

Liquid Asphalt Adjustment 3.43$ gallon

Pre-Qual? x

Addendum 1? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Bid deposit? x

Sealcoating, Inc. dba Indus

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxxxx
Page 38: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Bucket Truck Operator Laborer (Tree Removal) 60' Aerial Lift 65' Aerial Lift 75' Alpine Unit

Log loader & Operator -

(Prentice 120 C log

loader on a

Log-hauler truck with at

least a

50 cubic yard capacity)

or equal

Blandford 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Chester 200 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Chesterfield 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Conway 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Deerfield 150 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Easthampton 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Gill 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Granby 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Granville 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Hadley 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Middlefield 12 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Sunderland 24 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Westhampton 8 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Williamsburg 16 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Worthington 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Bid Form X Tax Compliance/Non-Collusion X OSHA Statement X

Bid Signature X Debarment Form X 5% Bid Bond X

BID TABULATION

H-22 TREE WORK FY2021

Tree Removal

Vendors may bid per hour for all towns, a single town, or any group of towns.

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

Franklin Regional Collective Open May 12, 2020 at 2pm

1 of 3

Page 39: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Climber / Trimmer

operator

( A )

60' Aerial Lift Bucket

truck w/dump chipper

box

( B )

Total Per Hour Bucket

Truck and Operator

( A + B )

Hydraulic Disc chipper

w/capacity for 12" limb

( C )

Ground person

( D )

Total Bucket Truck,

Trimmer, Chipper and

Ground Person Per Hour

(A + B + C + D)

Blandford 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Chesterfield 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Easthampton 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Goshen 80 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Granby 20 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Hadley 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Heath 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Middlefield 8 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Sunderland 24 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Tolland 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Worthington 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Tree Trimming

BID TABULATION

H-22 TREE WORK FY2021

Vendors may bid per hour for all towns, a single town, or any group of towns.

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

2 of 3

Page 40: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Chipper Crew:

Foreman/operator

Dump truck With 10 cu

yd chip box

Laborer/Chainsaw

operator

Hydraulic Disc Chipper

w/capacity for 12” limb

Log loader & Operator

(Prentice 120 C log

loader on a Log-

hauler/debris hauling

truck w min. 50 cubic

yard capacity) or equal.

Truck must be equipped

with solid sides to allow

loading of brush and

debris.

Horizontal Grinder CBI

1000H.P. or equal

Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Granby 30 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Westhampton 8 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Stump Grinder (12” to

48” grinding capacity)

Granby 20 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

Granville 32 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

Worthington 40 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

BID TABULATION

H-22 TREE WORK FY2021

Vendors may bid per hour for all towns, a single town, or any group of towns.

Stump Grinding

Debris Removal

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

3 of 3

Page 41: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H23 Catch Basin Cleaning

Open May 12, 2020 @ 1pm

Bid Tabulation

Company J.R. Sweeping Service Wind River Environmental Eastern Pipe Service LLC

28 Moylan Lane, Agawam, MA 01001 46 Lizotte Dr, Marlborough, MA 01752 2 Thibeault Drive, Bow, NH 03304

Contact Person James Ricco, Owner/Mgr Steve Ciras Richard Berthiaume

Tel/Fax or Email Tel 413-786-2168 Fax 413-789-3738 Tel 978-875-3290 Tel 603-424-4600

Machine Descriptions 1: 2006 Vac-Con Model V312IAH/1000 8 cy, 12,000 CFM DOESN'T MEET SPEC

1: 2012 Kenworth Vactor 2100, 12 cy, 1200 gallon, 4460 CFM

1: 2015 Vactor Model 2115-EQ8886 15 cy, 3800 CFM 1500 gallon

2001 Vactor 2100 8 cy, DOESN'T MEET SPEC

2: 2012 Freightliner Vactor 2100 Plus, 12 cy capacity, 1200 gallon, 4460 CFM

2: 2013 Vactor Model 2115 Plus-EQ6287 15 cy, 4460 CFM, 1500 gallon

3: 2015 Freightliner VacCon 5450 CFM, 10 yd capacity 1500 gall DOESN’T MEET

SPEC

3: 2012 Freightliner Vactor Model 2115 Plus - EQ 5914 15 cy, 3800 CFM, 1500 gall

Bid per hr REGION 1A Cleaning/Jetting $225.00 $269.00 $219.00

Bid per hr REGION 1B Cleaning/Jetting $210.00 $269.00 $219.00

Lateral Cleaning $210.00 $269.00 $219.00

Bid per hr REGION 2A Cleaning/Jetting $225.00 $269.00 $219.00

Lateral Cleaning $225.00 $269.00 $219.00

Bid per hr REGION 2B Cleaning/Jetting $200.00 $269.00 $219.00

Lateral Cleaning $200.00 $269.00 $219.00

Total Hrs x Bid Price = $358,345 Total Hrs x Bid Price $459,183.00 Total Hrs x Bid Price = $373,833

Emergency Response Time? 24 HOURS

3-4 HOURS 48 HOURS

References if not worked for FRCOG COLLECTIVEtax compliance, non collusion, signature,

TOWN ESTIMATES

REGION 1A CLEAN/JE 164 HRS APPROXIMATELY Required Docs JR SWEEP WIND RIV EASTERN

REGION 1A LATERAL 0 HRS APPROXIMATELY Bid Form X

Addendum X

REGION 1B CLEAN/JE 236 HRS APPROXIMATELY Tax Comp XREGION 1B LATERAL 36 HRS APPROXIMATELY Non Collus X

OSHA XREGION 2A CLEAN/JE 403 HRS APPROXIMATELY Debarment XREGION 2A LATERAL 2 HRS APPROXIMATELY Corp Auth X

REGION 2B CLEAN/JE 728 HRS APPROXIMATELYREGION 2B LATERAL 138 HRS APPROXIMATELY

1707

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxx
AWoods
Typewritten Text
AWoods
Typewritten Text
Page 42: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-1

Aggregates - PICKED UP

BID TABULATION - Open May 12,2020 at 3:00 pm

MDOT

All States

Asphalt /

Mitchell

Materials,

LLC

All States

Asphalt / Trew

Stone, LLC

Delta Sand &

Gravel, Inc.

Eurovia

Atlantic Coast,

LLC

Hathaway

Construction

Hilltown Sand

& Gravel

Ondrick

Materials &

Recycling,

LLC

Porter

Transportation

Co., Inc.

Tonlino &

Sons, LLC

Zoar Stone &

Gravel

Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton

John S. Lane & Son

1 6" Minus max type "a" aka Bank Run Gravel 1.03.0 8.00$ No Bid 6.40$ No Bid 11.65$ W'fld 7.25$ No Bid No Bid 5.33$ 10.50$ 10.80$

2

3” Minus max type “b” aka Bank Run Gravel /Processed

Gravel for Subbase or Dense Graded Gravel) 1.03.1 10.00$ No Bid 8.60$ No Bid 11.65$ W'fld 7.35$ No Bid No Bid 6.66$ 10.50$ 10.00$

3 1 ½” Minus Screened Gravel –type “d” aka 2" minus screened 1.03.0 12.00$ No Bid 8.60$ 12.00$ No Bid 7.55$ 12.50$ No Bid 10.00$ No Bid 9.75$

4 3/4” Minus Screened Gravel- (aka 1” minus crushed gravel) 1.03.0 12.50$ No Bid 10.90$ 13.00$ No Bid 7.55$ No Bid No Bid 10.66$ No Bid 9.75$

5

3” Minus Crushed Gravel (aka Processed Gravel for Subbase

or Dense Graded Gravel) 1.03.1 12.00$ No Bid No Bid 14.00$ 11.65$ W'fld 7.65$ No Bid No Bid 7.33$ 10.50$ 10.00$

6

1 ½” Minus Crushed Gravel (aka Processed Gravel for

Subbase or Dense Graded Gravel) 1.03.1 12.00$ No Bid 10.90$ 14.00$ No Bid 7.35$ 12.50$ 10.20$ 10.00$ No Bid 9.75$

7 3/4” Minus Crushed Gravel 14.00$ No Bid 10.90$ 14.00$ No Bid 7.65$ 13.50$ No Bid 10.66$ No Bid 9.75$

8 1/2” Minus Crushed Gravel No Bid No Bid 10.15$ No Bid No Bid No Bid 15.95$ No Bid No Bid No Bid No Bid

9 Stone Screening/Stone Dust Natural/Brown Color 2.05.0 No Bid No Bid 7.40$ No Bid No Bid No Bid No Bid No Bid 5.33$ No Bid No Bid

10 Recycled Asphalt/Reclaimed Pavement/Hardpak 1.09.0 No Bid 18.25$ 12.25$ 8.00$ 10.25$ E'ton 7.80$ No Bid No Bid 10.00$ No Bid 10.50$

11 3/4” Minus Recycled Asphalt/Crushed/Driveway Millings No Bid 7.00$ 12.25$ 8.00$ No Bid 7.80$ No Bid No Bid No Bid No Bid 12.00$

12 1 ½” Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 11.50$ No Bid No Bid No Bid No Bid

13 1 ½” Un-Washed Gravel Stone - Size #4 ASTM D448 No Bid No Bid 12.20$ 11.65$ No Bid 10.95$ 10.50$ No Bid 11.33$ No Bid 13.50$

14 3/4” Washed Gravel Stone - Size #6 ASTM D448 No Bid No Bid 11.00$ 11.65$ 13.30$ Pochassic 11.70$ 12.75$ No Bid No Bid No Bid No Bid

15 1/2” Washed Gravel Stone - Size #7 ASTM D448 No Bid No Bid 10.75$ 11.65$ No Bid 11.85$ No Bid No Bid No Bid No Bid No Bid

16 3/8” Washed Gravel Stone - Size #8 ASTM D448 No Bid No Bid 14.45$ 11.65$ No Bid 11.20$ 13.25$ No Bid No Bid No Bid No Bid

17 1 ½” Crushed Stone Traprock 2.01.1 13.50$ 15.00$ 21.65$ 15.50$ 13.70$ W'fld / Amherst No Bid 14.00$ No Bid No Bid 12.50$ 13.50$

18 3/4”Crushed Stone Traprock 2.01.4 13.50$ 15.00$ 21.65$ 15.50$ 14.00$ W'fld / Amherst No Bid 15.00$ No Bid No Bid 13.25$ No Bid

19 ½” Crushed Stone Traprock 2.01.5 14.00$ 16.00$ No Bid 16.50$ 13.95$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid

20 3/8” Crushed Stone Traprock 2.01.6 15.45$ 15.45$ 22.40$ 16.50$ 14.70$ W'fld / Amherst No Bid 16.00$ No Bid No Bid No Bid No Bid

21 1 ½” Dense Graded Crushed Stone Traprock for sub-base 2.01.7 11.50$ 15.75$ 22.40$ 14.00$ 12.40$ W'fld / Amherst No Bid No Bid No Bid No Bid 11.75$ 13.50$

22 3/4”Minus TRG Traprock Gravel No Bid 10.85$ 18.30$ 10.00$ 12.40$ W'fld / Amherst No Bid No Bid 11.50$ No Bid 12.25$ 14.50$

23 ½” Minus TRG Traprock gravel 11.50$ 8.00$ 17.25$ No Bid 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid 12.25$ No Bid

24 Rip Rap 6” max 2.02.0 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid 14.00$ 12.50$ 15.50$

25 Rockfill 2.02.1 14.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid

26 Dumped Rip Rap 2.02.2 14.00$ 14.00$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 14.50$ No Bid

27 Stone for Pipe Ends 2.02.3 15.00$ 15.75$ No Bid 17.50$ 18.55$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid

28 Modified Rockfill 2.02.4 15.00$ 17.00$ 27.80$ 17.50$ 15.45$ W'fld / Amherst 15.25$ No Bid No Bid No Bid 12.50$ No Bid

29 Quarry Stone Dust Blue/Grey Color 2.05.0 No Bid 10.00$ 16.75$ 14.00$ 10.50$ W'fld / Amherst No Bid No Bid No Bid No Bid No Bid No Bid

30 Loam 1.05.0 No Bid No Bid 16.80$ 25.00$ 20.00$ Easthampton 16.70$ 22.00$ No Bid 12.66$ 22.00$ No Bid

20 Payne Road,

Winchester, NH

03470

901 River Road,

Deerfield, MA

01342

562 Amherst Rd,

Sunderland, MA

01375

216 Mt Hermon

Station Road,

Northfield, MA

01360

Westfield - 311

East M'tn Rd.

Amherst - 1550

West Rd (Route

116)

Easthampton -

Arthur Street

Pochassic Pit -

931 Pochassic Rd.

Westfield

129 North Road

Westhampton,

MA 01027

87 Worthington

Road

Huntington, MA

01050

240 Chicopee St.

Granby, MA

01033

61 Tully Road

Orange, MA

01364

2188 Algerie Rd.

East Otis, MA

01029

300 Zoar Road

Charlemont, MA

01389

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X

AWoods
Typewritten Text
SCROLL DOWN TO NEXT PAGE TO SEE DELIVERED PRICE ADD ON FOR EACH TOWN
AWoods
Typewritten Text
SPEC.
Page 43: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

REGION TOWNAll States

Asphalt /

Mitchell

Materials, LLC

All States

Asphalt / Trew

Stone, LLC

Delta Sand &

Gravel, Inc.

Eurovia

Atlantic

Coast, LLC

Hathaway

Construction

Hilltown Sand

& Gravel

Ondrick

Materials &

Recycling,

LLC

Porter

Transporta-

tion Co., Inc.

Tonlino &

Sons, LLC

Zoar Stone &

Gravel

Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton Price/Ton

1A Ashfield 896 Cape Street Ashfield, MA 8.00$ 6.75$ 6.00$ 9.00$ $ $ $ $ $ $ $1A Buckland 2 Sears Street Buckland, MA 7.50$ 6.75$ 6.00$ 6.50$ $ $ $ $ $ $ $1A Charlemont Factory Road Charlemont, MA 7.50$ 8.00$ 6.55$ 7.00$ $ $ $ $ $ $ 3.00$ 1A Colrain 51 Main Road Colrain, MA 6.50$ 8.00$ 6.00$ 5.50$ $ $ $ $ $ $ $1A Conway 40 Fournier Road Conway, MA 6.00$ 6.75$ 3.75$ 6.50$ 9.95$ From Amh $ $ $ $ $ $1A Cummington 20 Fairgrounds Road Cummington, MA 8.30$ 12.50$ 8.60$ 10.00$ $ 4.75$ 4.00$ $ $ $ $1A Goshen 8 Highland Road Goshen, MA 8.30$ 12.50$ 8.05$ 10.00$ 10.80$ From W'fld 4.00$ 4.75$ $ $ $ $1A Hawley 247 W. Hawley Road Hawley, MA 8.50$ 11.25$ 9.40$ 9.00$ $ $ $ $ $ $ 3.25$ 1A Heath 123 Branch Hill Road Heath, MA 8.30$ 11.25$ 8.45$ 7.50$ $ $ $ $ $ $ 3.25$ 1A Hinsdale 156 Maple Street Hindsale, MA 01235 13.00$ 13.50$ 10.30$ 11.25$ $ $ $ $ $ 5.85$ $1A Monroe 3C School Street Monroe, MA 10.00$ 11.25$ 11.25$ 9.00$ $ $ $ $ $ $ $1A Plainfield 184 East Main Street Plainfield, MA 9.00$ 10.00$ 8.45$ 10.00$ $ $ $ $ $ 10.85$ $1A Rowe 6 Sibley Road Rowe, MA 9.00$ 11.25$ 9.20$ 9.00$ $ $ $ $ $ $ 3.00$ 1A Savoy 720 Main Road Savoy, MA 10.00$ 10.00$ 11.25$ 10.00$ $ $ $ $ $ 10.45$ $1A Shelburne 24 Colrain Shelburne Road Shelburne, MA 5.00$ 6.75$ 5.25$ 6.50$ $ $ $ $ $ $ $1A Williamsburg 24R Main Street Williamsburg, MA 10.00$ 7.50$ 11.00$ 7.45$ From W'fld 3.30$ 4.50$ $ $ $ $

1B Blandford 114 Otis Stage Road Blandford, MA 12.50$ 9.40$ 13.00$ 9.10$ From W'fld $ 3.75$ $ $ 3.75$ $1B Chester 2 Town Road Chester, MA 12.50$ 9.40$ 13.00$ 5.95$ From W'fld $ 3.00$ $ $ 4.75$ $1B Chesterfield 164 Main Road Chesterfield, MA 11.25$ 7.50$ 14.00$ 9.95$ From Amh 3.50$ 4.00$ $ $ $ $1B Granville 69 Old Westfield Road Granville, MA 13.50$ 9.40$ 14.00$ 5.95$ From W'fld $ 4.50$ $ $ 5.25$ $1B Huntington 7 Mill Street Huntington, MA 10.00$ 9.40$ 14.00$ 7.45$ From W'fld $ 1.50$ $ $ 4.75$ $1B Middlefield 4 Bell Road Middlefield, MA 12.50$ 10.30$ 11.00$ 7.45$ From W'fld $ 4.00$ $ $ 3.75$ $1B Montgomery 160 Main Road Montgomery, MA 10.00$ 8.45$ 14.00$ 4.95$ From W'fld $ 2.00$ $ $ 7.25$ $1B Russell Frog Hollow Road Russell, MA 10.00$ 9.40$ 14.00$ 4.95$ From W'fld $ 3.50$ $ $ 4.25$ $1B Sandisfield 3 Silverbrook Road Sandisfield, MA 15.75$ 15.00$ 14.00$ $ $ 7.00$ $ $ 3.75$ $1B Tolland 162 Colebrook River Road Tolland, MA 13.50$ 11.25$ 14.00$ 7.45$ From W'fld $ 5.00$ $ $ 4.75$ $1B Worthington 64 Huntington Road Worthington, MA 12.00$ 10.00$ 9.40$ 14.00$ 7.95$ From W'fld $ 3.00$ $ $ 10.25$ $

2A Bernardston Nelson Road Bernardston, MA 4.50$ 5.50$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Deerfield 9 Merrigan Way So. Deerfield, MA 4.50$ 2.45$ 6.00$ $ $ $ $ $ $ $2A Erving 16 Public Works Blvd. Erving, MA 5.00$ 6.75$ 4.70$ 6.00$ $ $ $ $ $ $ $2A Gill 196C Main Road Gill, MA 5.00$ 6.75$ 4.70$ 4.00$ $ $ $ $ $ $ $2A Greenfield 209 Wells Street Greenfield, MA 4.50$ 4.15$ 6.00$ $ $ $ $ $ $ $2A Leverett 95 Montague Road Leverett, MA 6.75$ 2.80$ 9.00$ $ $ $ $ $ $ $2A Leyden 16 West Leyden Road Leyden, MA 7.00$ 6.75$ 6.40$ 6.00$ $ $ $ $ $ $ $2A Montague 500 Avenue A Ext. Turners Falls, MA 6.75$ 3.75$ 7.00$ $ $ $ $ $ $ $2A New Salem 22 Wendell Road New Salem, MA 9.00$ 4.70$ 7.00$ $ $ $ $ 3.66$ $ $2A Northfield 41 Caldwell Road Northfield, MA 4.50$ 6.75$ 5.65$ 4.00$ $ $ $ $ $ $ $2A Orange 526 E. River Street Orange, MA 6.00$ 8.00$ 6.00$ 6.00$ $ $ $ $ 3.00$ $ $2A Shutesbury 59 Leverett Road Shutesbury, MA 9.00$ 4.15$ 9.00$ $ $ $ $ 4.00$ $ $2A Sunderland 111 River Road Sunderland, MA 5.50$ 2.25$ 9.00$ $ $ $ $ $ $2A Warwick 15 Garage Road Warwick, MA 5.00$ 10.00$ 7.50$ 6.00$ $ $ $ $ 3.66$ $ $2A Wendell Jackie Lane Wendell, MA 8.00$ 10.00$ 5.65$ 7.00$ $ $ $ $ 3.66$ $ $2A Whately 71 Christian Lane Whately, MA 5.50$ 2.80$ 6.00$ $ $ $ $ $ $ $

2B Belchertown 290 Jackson Street Belchertown, MA 9.00$ 4.90$ 14.00$ 5.95$ From Amh $ $ $ $ $ $2B Easthampton 30 Rear Northampton St. Easthampton, MA 10.00$ 6.40$ 11.00$ 4.95$ From W'fld 4.25$ 4.00$ $ $ $ $2B Granby 15 Crescent Street Granby, MA 10.00$ 5.65$ 11.00$ 3.15$ From Amh $ $ 2.85$ $ $ $2B Hadley 230 Middle Street Hadley, MA 6.75$ 3.40$ 11.00$ 3.65$ From Amh $ $ $ $ $ $2B Hatfield 10 Straits Road Hatfield, MA 6.75$ 2.80$ 11.00$ $ 6.00$ $ $ $ $ $2B Pelham 353 Amherst Road Pelham, MA 9.00$ 3.75$ 14.00$ $ $ $ $ $ $ $2B Southampton 8 Fomer Road Southampton, MA 11.25$ 5.65$ 11.00$ 4.95$ From W'fld 4.00$ 3.00$ $ $ $ $2B Westhampton 58 Hathaway Road Westhampton, MA 11.25$ 7.50$ 11.00$ 5.95$ From W'fld 1.70$ 3.00$ $ $ $ $

TOWN GARAGE LOCATION / DELIVERIES

John S. Lane & Son

Page 44: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H2 COLD PATCH

Open May 12, 2020 @ 1pm

Cold Mix Manufacturing

Corp. Crafco, Inc. Innovative Surface Solutions Eurovia / Northeast Paving Ondrick Natural Earth

Seaboard Asphalt Products

Company Warner Brothers

FOR JULY 1, 2020 TO JUNE 30, 202165 Edison Avenue Mount

Vernon, NY 10550

6165 W. Detroit St. Chandler,

AZ 85226

454 River Rd, Glenmont, NY

12077

216 Mount Hermon Station Rd.,

Northfield, MA 01360

729 Fuller Rd., Chicopee, MA

01020

3601 Fairfield Road, Baltimore, MD

21226

325 Amherst Rd Sunderland, MA

01375

Picked Up Product Tel 718-463-1444 602-276-0406 800-387-5777x101 413-498-2956 413-594-8803 410-355-0330 Tel 413-665-4055

[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

A. HIGH PERFORMANCE COLD PATCH Picked Up Estimates In Tons Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton Price Per Ton

Total Estimated Tons 1,252 No Bid No Bid No Bid $115.00 $112.00 No Bid $118.00

PICK UP LOCATION N/A N/A N/A

216 Mount Hermon Rd., Northfield,

MA 01360 or 30 Willow Hill Road,

Lee, MA 01238 729 Fuller Rd. Chicopee, MA N/A 901 River Rd. East Deerfield,MA

Delivered Product

B. HIGH PERFORMANCE COLD PATCH Delivered Bags

Estimates In 50-

bag Pallets Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND Price Per POUND

Total Estimated Tons 2,350

Region 1A 750 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 1B 700 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 2A 900 0.188$ 0.200$ 0.156$ No Bid 0.160$ 0.132$ No Bid

Region 2B 0 0.188$ 0.200$ 0.156$ No Bid 0.155$ 0.132$ No Bid

50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 50 POUND BAGS 60 POUND BAGS

PRODUCT DETAILS

Product Name Greenpatch Crafco HP Asphalt Cold Patch Propatch QPR - Quality Pavement Repair EZ Street Bond-X Green duraPATCH

Brochures with Bid Yes Yes Yes Yes Yes Yes Yes

Comments 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet 50 lb bags; 56 bags/pallet N/A 50 lb bags; 56 bags/pallet 60 lb bags; 49 bags/pallet N/A

Tax Compliance Signed? X X X X X X X

Non-Collusion Signed? X X X X X X X

Bid Signature Form signed? X X X X X X X

Page 45: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H3 GEOTEXTILES

Open May 12, 2020 @ 1pm

BID TABULATION

FOR JULY 1, 2020 TO JUNE 30, 2021

RENEWALS FOR TWO ADDT'L

YEARS AVAILABLE TO MAKE EJ PRESCOTT UNDERGROUND SUPPLY

THREE YEAR CONTRACTS 28C STATE RD., PO BOX 192 NORTH HATFIELD, MA 01093 413-665-2499 82 STATE RD., PO BOX 164 WHATELY, MA 01093 413-397-3412

HEAVY DUTY WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type WOVEN - 16 estimated NONWOVEN -3 estimated info on manufacturer/type

Size of Roll 12.5' x 360' 12.5' x 360' Mirafi 600x woven 12.5' x 360' 12.5' x 360' ADS GEOSYNTHETICS #601

Price Per Square yard $0.85 $0.75 Mirafi N series nonwoven $0.78 $0.83 500 sq yds/roll

Price Per Roll $425.00 $375.00 $390.00 $415.00

Delivery Charge Per Roll

Total Delivered Price Per Roll $425.00 $375.00 $390.00 $415.00

LIGHT DUTY

Size of Roll 12.5' x 432' 12.5' x 360' 12.5' x 432' 12.5' x 360' ADS GEOSYNTHETICS #401

Price Per Square yard $0.65 $0.75 $0.530 $0.58 500 sq yds/roll

Price Per Roll $390.00 $375.00 $318.00 $290.00

Delivery Charge Per Roll

Total Delivered Price Per Roll $390.00 $375.00 $318.00 $290.00

Location of Warehouse Location for Pick up: WHATELY, MA Location for Pick up: WHATELY, MA

Yes Yes

PARTICIPANTS ELIGIBLE: All with permission.

Estimates 22 rolls of WOVEN Heavy Duty and 3 NONWOVEN Heavy Duty and 10 rollls of WOVEN light duty and 3 rolls of NONWOVEN Light Duty

RENEWAL FOR YEARS TWO AND THREE, NO MORE THAN 2% MORE THAN THESE PROCESSES IF CATALOG PRICES HAVE INCREASED

Tax compliance, Non Collusion,

Signed Bid Forms?

Page 46: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE All States Asphalt

Innovative Municipal

US Inc

BID # H4 CALCIUM and MAG CHLORIDE

325 Amherst Road,

Sunderland, MA 01375

454 River Road,

Glenmont, NY 12077

Open May 12, 2020 @ 1pm RENEWALS FOR TWO ADDT'L Tel 413-665-7021 Tel 800-387-5777

Bid Tabulation YEARS AVAILABLE TO MAKE

THREE YEAR CONTRACTS Alan Chicoine Div. Mgr. Syed Ali

A. LIQUID CALC DELIVERED IN BULK Estimates Price Per Gallon Price Per Gallon

REGION 1A 16,000 $0.99 $1.00

REGION 2A 4,000 $0.99 $1.00

REGION 2B 3,000 $0.99 $1.00

REGION 1B NONE

total 23,000 $22,770.00 $23,000.00

Minimum Delivery? 1000 GALLONS 2000 GALLONS

Product Name

Liquidow Technical

Grade Calcium Chloride Promelt CAL 32

B. LIQUID MAGNESIUM DELIVERED IN BULK

REGION 1B Blandford 2x2500 5,000 $0.95

total 5,000 No Bid $4,750.00

Minimum Delivery? 1000 GALLONS 2000 GALLONS

Product Name Promelt MAG INH

C. CALCIUM CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#

Estimates

REGION 1B 1 PALLET

REGION 2A 3 PALLETS

REGION 2B 2 PALLETS

total 6 pallets No Bid No Bid

Minimum Delivery Amount?

D. MAG CHLORIDE 50# BAGS DELIVERED Price Per 50# Price Per 50#

Estimates

REGION 1A 1 PALLET

TOTAL 1 PALLET No Bid No Bid

Minimum Delivery amount

Bid Signature Form Signed? X X

Tax Compliance Signed? X X

Non-Collusion Signed? X X

Page 47: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H5 CULVERTS RENEWALS FOR TWO ADDT'L

Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE

Bid Tabulation THREE YEAR CONTRACTS

DELIVERED PRICES

EJ PRESCOTT INC. UNDERGROUND SUPPLY, INC.

28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093 82 STATE RD., PO BOX 164 WHATELY, MA 01093

Single Wall Plastic Culverts Single Wall Plastic Culverts

estimates by type EJP UNDERGROUND

Price per FOOT delivered Price per FOOT delivered solid perf split watertigh

Inside Dia Solid Perf Split Inside Dia Solid Perf Split

6" $1.35 $4.00 6" $1.21 $1.21 $3.51 500 6 -$ 675.00$ 24.00$ -$ -$ $605.00 $21.06 -$

10" 10" $3.97 $3.97 $6.56 -$ -$ -$ -$ -$ $0.00 $0.00 -$

12" 12" $5.67 $5.67 $7.13 -$ -$ -$ -$ -$ $0.00 $0.00 -$

15" 15" $7.40 $7.40 $11.85 -$ -$ -$ -$ -$ $0.00 $0.00 -$

18" $10.75 18" $11.00 $11.00 $20.21 600 6,450.00$ -$ -$ -$ 6,600.00$ $0.00 $0.00 -$

24" $16.00 24" $16.60 $16.00 200 3,200.00$ -$ -$ -$ 3,320.00$ $0.00 $0.00 -$

Bidder will deliver to the following Regions: Bidder will deliver to the following Regions: 9,650.00$ 675.00$ 24.00$ -$ 9,920.00$ 605.00$ 21.06$ -$

1A_X__ 1B_X__ 2A_X__ 2B_X__ 1A_X__ 1B_X__ 2A_X__ 2B_X__ 10,349.00$ 10,546.06$

Bid Form Total 10,349.00$ 10,546.06$

Double Wall Plastic Culverts Double Wall Plastic Culverts

EJ PRESCOTT INC.

28C STATE RD,. PO BOX 192 NORTH HATFIELD, MA 01093

Price per FOOT delivered $0.00 Price per FOOT delivered estimates by type EJP UNDERGROUND

Inside Dia Solid Perf Split Watertight Inside Dia Solid Perf Split Watertight solid perf split watertight

6" 2.15$ 2.15$ 4.00$ 11.00$ 6" 2.10$ 2.10$ 3.51$ 11.18$ 100 3000 0 10 215.00$ 6,450.00$ -$ 110.00$ 210.00$ $6,300.00 $0.00 111.800$

10" 4.95$ 4.95$ 7.50$ 22.00$ 10" 4.84$ 4.84$ 6.56$ 22.50$ 104 951 80 1 514.80$ 4,707.45$ 600.00$ 22.00$ 503.36$ 4,602.84$ $524.80 22.50$

12" 6.00$ 6.00$ 8.00$ 60.00$ 12" 5.78$ 5.78$ 7.13$ 56.77$ 3616 3901 3 9 21,696.00$ 23,406.00$ 24.00$ 540.00$ 20,900.48$ 22,547.78$ $21.39 510.93$

15" 7.65$ 7.65$ 13.00$ 88.00$ 15" 7.44$ 7.44$ 11.85$ 85.86$ 4332 3001 25 31 33,139.80$ 22,957.65$ 325.00$ 2,728.00$ 32,230.08$ 22,327.44$ $296.25 2,661.66$

18" 11.25$ 11.25$ 22.00$ 152.00$ 18" 10.98$ 10.98$ 20.21$ 148.34$ 3459 321 49 35 38,913.75$ 3,611.25$ 1,078.00$ 5,320.00$ 37,979.82$ 3,524.58$ $990.29 5,191.90$

24" 17.50$ 17.50$ 30.00$ 225.00$ 24" 17.10$ 17.10$ 28.44$ 224.14$ 1253 0 22 25 21,927.50$ -$ 660.00$ 5,625.00$ 21,426.30$ -$ $625.68 5,603.50$

30" 25.50$ 25.50$ 70.00$ 492.00$ 30" 25.73$ 25.73$ 66.47$ 493.02$ 368 60 2 7 9,384.00$ 1,530.00$ 140.00$ 3,444.00$ 9,468.64$ 1,543.80$ $132.94 3,451.14$

36" 32.50$ 32.50$ 165.00$ 675.00$ 36" 33.04$ 33.04$ 94.00$ 675.42$ 420 60 1 2 13,650.00$ 1,950.00$ 165.00$ 1,350.00$ 13,876.80$ 1,982.40$ $94.00 1,350.84$

48" 53.00$ 53.00$ 48" 54.06$ 54.06$ 160.00$ 1,091.43$ 220 60 0 0 11,660.00$ 3,180.00$ -$ -$ 11,893.20$ 3,243.60$ $0.00 -$

151,100.85$ 67,792.35$ 2,992.00$ 19,139.00$ 148,488.68$ 66,072.44$ 2,685.35$ 18,904.27$

241,024.20$ 236,150.74$

Signed X X Bid Form Total 241,024.20$ 236,150.74$

Tax Comp X X

Non-Coll X X

Delivery terms:

82 STATE RD., PO BOX 164 WHATELY, MA 01093

UNDERGROUND SUPPLY, INC.

Delivery terms:

AWoods
Typewritten Text
This section is just for determining who is low price.
Page 48: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H6 GUARD RAIL PRODUCTS 1010 Turnpike Rd

Open May 12, 2020 @ 1pm Canton, MA 02021

Tel 781-821-5900

Premier Fence

THREE YEAR CONTRACTS IF RENEWED REG

ION

1A

REG

ION

1B

REG

ION

2A

REG

ION

2B

John Feerick

PRODUCTS includes delivery UNIT Total Est Prices Extensions

12.5' Straight rail sections galvanized w/steel postsea 26 0 40 10 76 $102.00 $7,752.00

12'5" Curved rail sections galvanized w/steel postsea 12 0 8 5 25 $158.15 $3,953.75

Steel Terminal Ends ea 24 0 0 8 32 $75.00 $2,400.00

6"6" Steel Posts, H Section, galv ea 35 0 132 0 167 $73.00 $12,191.00

6'6" Wood Posts, pressure treated ea 0 0 0 0 0 $0.00

Splice bolts, 1 1/2" per 100 2 0 5 0 7 $65.00 $455.00

Post bolts 2" per 100 3 0 5 0 8 $100.00 $800.00

Post bolts 5" per 100 2 0 2 0 4 $155.00 $620.00

Post bolts 8" per 100 2 0 2 0 4 $185.00 $740.00

Post bolts 10 1/2" per 100 2 0 2 0 4 $240.00 $960.00

Round washers, galv per lb 10 0 100 0 110 $13.00 $1,430.00

Hex nuts, galv per 100 4 0 16 0 20 $60.00 $1,200.00

Offset spacers, galv ea 25 0 100 0 125 $15.00 $1,875.00

Offset spacers, Pressure treated ea 10 0 0 0 10 $17.00 $170.00

Total Value of this Bid $34,546.75

Percent discount, picked up n/a

Bid Signature Form Signed? x

Tax Compliance Signed? x

Non-Collusion Signed? x

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxx
Page 49: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H7 PICKED UP HOT MIX ASPHALT

All States Asphalt,

Inc.

Eurovia/Northeast

Paving

Ondrick Materials &

Recycling, LLC Palmer Paving Corp All States Asphalt, Inc. Northeast Paving

Ondrick Materials &

Recycling, LLC Palmer Paving Corp

Open May 12, 2020 @ 1pm

325 Amherst Rd

Sunderland, MA 01375

216 Mt Hermon Station

Rd., Northfield, MA

01360

22 Industry Road

Chicopee, MA 01020

25 Blanchard St., Palmer,

MA 01069

325 Amherst Rd

Sunderland, MA 01375

216 Mt Hermon Station

Rd., Northfield, MA

01360

22 Industry Road

Chicopee, MA 01020

25 Blanchard St., Palmer,

MA 01069

Limited avail July 1 - Dec 15/Apr 1-June 30

Amount

Estimated

Tons 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354 413-655-7021 Tel 413-498-2956 Tel 413-592-2566 Tel 413-283-8354

ALL PARTICIPANTS 14,380 64.00$ 62.00$ 68.00$ 62.00$ 920,320.00$ 891,560.00$ 977,840.00$ 891,560.00$

PLANT PICK UP LOCATION

Warner Bros.:

Sunderland &

Deerfield, MA and

Mitchell Materials:

Winchester, NH

216 Mt. Hermon Station

Rd., Northfield, MA; 311

East Mountain Road,

Westfield, MA; 30

Willow Hill Rd., Lee, MA;

17 New Ludlow Rd.,

Granby, MA.

58 Industry Road,

Chicopee, MA

23 Arthur St.,

Easthampton, MA;

1000 Page Blvd.,

Springfield, MA; 25

Blanchard St., Palmer,

MA; 43 Old Coldbrook

Dr., Barre, MA

Tax Compliance / Non Collusion X X X X

Addendum 1 Bid Form X X X X

Page 50: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H8 SNOW PLOW AND GRADER BLADES RENEWALS FOR TWO ADDT'L

Open May 12, 2020 @ 1pm YEARS AVAILABLE TO MAKE

Bid Tabulation THREE YEAR CONTRACTS

DELIVERED PRICES

For information only/; bid rejected due to mim. order amount

Valk Maufacturing Co. Winter Equipment Co., Inc.

PO Box 428, 66 East Main St., New Kingstown, MA 17072 1900 Joseph Lloyd Parkway, Willoughby, OH 44060

Tel::717-766-0711 Email: [email protected] Tel:: 800-294-6837 Email: [email protected]

PLOW BLADES PLOW BLADES

Delivery terms: Delivery terms:

$5,500 minimum order per location

Price per FOOT delivered Price per FOOT delivered Price per FOOT delivered

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

5/8 x 6 100 $10.84 $1,084.00 5/8 x 6 100 $9.04 $904.00

3/4 x 6 36 $13.01 $468.36 3/4 x 6 36 $10.91 $392.76

1 x 6 18 $18.36 $330.48 1 x 6 18 $14.55 $261.90

5/8 x 8 250 $14.45 $3,612.50 5/8 x 8 250 $12.10 $3,025.00

3/4 x 8 1392 $17.34 $24,137.28 3/4 x 8 1392 $14.51 $20,197.92

1 x 8 22 $24.48 $538.56 1 x 8 22 $19.73 $434.06

GRADER BLADES GRADER BLADES

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

3/4 x 8 120 $16.48 $1,977.60 3/4 x 8 120 $14.10 $1,692.00

LOADER CUTTING EDGES LOADER CUTTING EDGES

Size est ft. Bid Price Extension Size est ft. Bid Price Extension

1 X 12 Carbon

Dbl Bevel 56 $67.32 $3,769.92

1 X 12 Carbon

Dbl Bevel 56 No Bid

Each EachRound

Countersunk

Holes 8 $2.00 $16.00

Round

Countersunk

Holes 8 No Bid

total bid $35,934.70 total bid $26,907.64

Bid signature? X X

Tax Compliance? X X

Non-Collusion? X X

Lead time 35 - 40 days ARO Lead time 3-4 weeks ARO

Page 51: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H9A HIGHWAY LINE PAINTING

BID TABULATION

Open May 12, 2020 at 2:00pm

Markings Inc.

30 Riverside Dr

Pembroke, MA 02359

781-826-5171

BID PRICE PER FOOT

HIGHWAY LINE PAINTING REGION 1A REGION 1B REGION 2A REGION 2B TOTALS REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $ REG 1A REG 1B REG 2A REG 2B REG 1A $ REG 1B $ REG 2A $ REG 2B $

unit lf / sf

Waterborne Fast Dry White 4" lf 137,000 101,821 1,013,112 882,400 2,134,333 0.055$ 0.055$ 0.055$ 0.055$ 7,535.00$ 5,600.16$ 55,721.16$ 48,532.000$ 0.054$ 0.054$ 0.054$ 0.054$ $7,398.00 $5,498.33 $54,708.05 $47,649.60

Waterborne Fast Dry Yellow 4" lf 799,362 945,169 1,966,328 1,324,700 5,035,559 0.055$ 0.055$ 0.055$ 0.055$ 43,964.91$ 51,984.30$ 108,148.04$ 72,858.50$ 0.054$ 0.054$ 0.054$ 0.054$ $43,165.55 $51,039.13 $106,181.71 $71,533.80

Waterborne Fast Dry White 6" lf 0 50,000 14,300 0 64,300 0.082$ 0.082$ -$ 4,100.00$ 1,172.60$ -$ 0.075$ 0.075$ $0.00 $3,750.00 $1,072.50 $0.00

Waterborne Fast Dry Yellow 6" lf 0 180,000 0 0 180,000 0.082$ -$ 14,760.00$ -$ -$ 0.075$ $0.00 $13,500.00 $0.00 $0.00

Waterborne White Crosswalks 12" sf 0 2,100 25,730 2,600 30,430 0.680$ 0.680$ 0.680$ -$ 1,428.00$ 17,496.40$ 1,768.00$ 0.550$ 0.550$ 0.550$ $0.00 $1,155.00 $14,151.50 $1,430.00

White thermoplastic 4" lf 0 111,636 0 1,500 113,136 0.540$ 0.540$ -$ 60,283.44$ -$ 810.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $720.00

Yellow Thermoplastic 4" lf 0 111,636 0 2,500 114,136 0.540$ 0.540$ -$ 60,283.44$ -$ 1,350.00$ 0.480$ 0.480$ $0.00 $53,585.28 $0.00 $1,200.00

White thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00

Yellow Thermoplastic 6" lf 13,800 0 0 0 13,800 0.810$ 11,178.00$ -$ -$ -$ 0.720$ $9,936.00 $0.00 $0.00 $0.00

TOTAL BID BY REGION Total for each region: 73,855.91$ 198,439.33$ 182,538.20$ 125,318.50$ Total for each region: 70,435.55$ 182,113.02$ 176,113.76$ 122,533.40$

Total all regions: 580,151.94$ Total all regions: 551,195.73$

Total Value This Bid 580,151.94 551,195.73

Minimum # of feet line painting must be no more than 2,000 1,000 1,000

MiN # of feet parking/crosswalks 500 500

Lead time required 1 week 2 weeks

Tax Compliance Signed? X X

Non-Collusion Signed? X X

Debarment Statement? X X

Osha Cert? X X

Prequal List? X X

Addenda? N/A N/A

Bid Bond? X X

* Note total rounded up one penny more than total stated on bid of $580,151.93.Comments

Hi-Way Safety Systems

9 Rockview Way

Rockland, MA 02370

781-982-9229

BID PRICE PER FOOT

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxx
Page 52: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE Hi-Way Safety Systems Roadsafe Traffic Systems

BID #H9B HIGHWAY LINE PAINTING 9 Rockview Way 55 Bodwell St

BID TABULATION Rockland, MA 02370 Avon, MA 02322

Open May 12, 2020 at 2:00pm 781-982-9229

UNIT PRICE EXTENSION

HIGHWAY LINE PAINTING Granby Rowe Warwick Whately TOTALS

Unit LF/SF

White Chlorinated Low VOC 4" LF 150,000 60,000 20,000 230,000 $0.055 $12,650.00

Yellow Chlorinated Low VOC 4" LF 150,000 19,000 60,000 70,000 299,000 $0.055 $16,445.00

Comments

Total Value This Bid $29,095.000

Lead time required 2 weeks

Minimum for line painting Must be no more than 2,000 2,000'

Minimum for crosswalks/pking

Tax Compliance Signed? X

Non-Collusion Signed? X

Debarment Signed? X

Osha Cert? X

Bid Bond N/A

Addenda? N/A

Page 53: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H10 GUARDRAIL INSTALLED Guardrail Solutions, LLC

BID TABULATION 108A Front Street

Open May 12, 2020 at 2:00pm West Springfield, MA 01089

413-310-2428

ITEM DESCRIPTION TOTALS Unit Price Extension

Standard Steel straight w/ steel post per ft. 11,750 $25.25 $296,687.50

Standard Steel curved w/ steel post per ft. 727 $28.00 $20,356.00

Standard Steel straight w/ wood post 200 $28.00 $5,600.00

Standard Steel curved w/ wood post 220 $29.00 $6,380.00

Standard Steel Terminal Ends each 123 $65.00 $7,995.00

# of reflectors, installed (each) 327 $7.00 $2,289.00

Replace wooden post w/ steel post 100 $115.00 $11,500.00

Replace wooden post w/ wooden post 59 $155.00 $9,145.00

# of existing feet to be removed 600 $4.00 $2,400.00

Cor-ten Straight w/ steel posts per foot 1,240 $27.50 $34,100.00

Cor-ten Curved w/ steel posts per foot 92 $29.00 $2,668.00

Cor-ten Standard Terminal Ends each 10 $75.00 $750.00

Total Value This Bid $399,870.50

Bid Deposit X

Tax Compliance Signed? X

Non-collusion signed? X

Debarment Signed? X

Prequalified? X

OSHA Cert X

Page 54: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H11 COMPREHENSIVE PAVEMENT PRESERVATION

BID TABULATION

Open May 12, 2020 at 2:00pm

SEALCOATING, INC. DBA INDUS FELIX MARINO

825 GRANITE STREET 32 CORWIN STREET

BRAINTREE, MA 02184 PEABODY, MA 01960

Art Baker [email protected] James Henebury [email protected]

781-428-3400 978-532-3838

CATEGORIES INELIGIBLE; for information only

H-11A-1 FIBER (PG)

Price Per Gallon Fiber 42,811 $10.12 $0.00

Day Rate for 1,000 gallons $8,050.00 $0.00

Day Rate above 1,000 gallons $4.25 $0.00

Total Bid Fiber $433,247.32 $0.00

H-11A-1 PCRM

Price Per Gallon 54,600 $12.29 $0.00

Day Rate for 800 gallons $8,375.00 $0.00

Day Rate above 800 gallons $4.87 $0.00

Total Bid PCRM $671,034.00 $0.00

H-11A - 2 HOT POURED MASTIC

Est Gallons Mastic 400

Price Per Gallon $27.25 $0.00

Day Rate for 200 gallons $8,635.00 $0.00

Day Rate above 200 gallons $10.50 $0.00

Total Bid Mastic $10,900.00 $0.00

H-11A - 3 COLD CRACK FILL

Est Gallons Crack Fill 500 No Bid

Day Rate w/ 2 person crew $0.00 $4,500.00

Date Rate per gallon $0.00 $15.95

Addtl pricing extre crew member $0.00 $950.00

Total Bid Crack Fill $0.00 $20,450.00

Page 55: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

SEALCOATING, INC. DBA INDUS FELIX MARINO

825 GRANITE STREET 32 CORWIN STREET

BRAINTREE, MA 02184 PEABODY, MA 01960

Art Baker [email protected] James Henebury [email protected]

781-428-3400 978-532-3838

CATEGORIES INELIGIBLE; for information only

H-11-B-1 MICROSURFACING HIMA

Est SQ YDS Microsurf HIMA 91,797

Price Per SQ YD Micros HIMA $5.20 $0.00

Total Bid Microsurf HIMA $477,344.40 $0.00

H-11-B-2 MICROSURFACING Conventional

Est SQ YDS Microsurf HIMA 19,000

Price Per SQ YD Micros Conv $4.68 $0.00

Total Value of Microsurf Conv $88,920.00 $0.00

H-11-C-1 FOG SEAL- Polymer Modified Rejuvenating

Est SQ YDS PMR FOG SEAL 181,006

Price Per SQ YD PMR FOG SEAL $1.23 $0.00

Total Bid PMR FOG SEAL $222,637.38 $0.00

H-11-C-1 FOG SEAL- Penetrating

Est SQ YDS Pen FOG SEAL 94,600 No Bid

Price Per SQ YD Pen FOG SEAL $0.00 $0.96

Total Bid Penetrating FOG SEAL $0.00 $90,816.00

H-11-D - CAPE SEAL

Est SQ YDS CAPE SEAL 41,705

Price Per SQ YD CAPE SEAL $6.87 $0.00

Total Bid CAPE SEAL $286,513.35 $0.00

Debarment Signed? X X

Addendum 1? X

Bid bond enclosed? X X

Prequalified? X

Acknowledge Addenda? X X

OSHA X X

Tax Compliance/Non Collusion X X

grand total of bid by co. $2,190,596.45 $111,266.00

Page 56: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-12 CALCIUM CHLORIDE APPLIED

BID TABULATION

Open May 12, 2020 at 2:00pm

TOWN

Est Volume Square

Yards Ph 413-665-7021

per sq. yd.

Gill 17,600 $0.38 $6,688.00

Hatfield 8,600 $0.38 $3,268.00

Hawley 10,000 $0.38 $3,800.00

Rowe 9,000 $0.38 $3,420.00

Sandisfield 25,098 $0.38 $9,537.24

Shutesbury 20,000 $0.38 $7,600.00

Sunderland 4,000 $0.38 $1,520.00

Westhampton 48,000 $0.38 $18,240.00

Total 142,298

$54,073.24

Minimum Application Amt 4,000 sq yd confirmed via email 5-14-20

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

Prequalification? x

OSHA x

Bid bond x

All States Asphalt

PO Box 91, Sunderland, MA

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
AWoods
Typewritten Text
XXXXXXXXXXXXXXXXXXX
Page 57: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H13 STONE SEAL DUE TO FRCOG ERROR, ALL BIDS REJECTED - TO BE REBID

Open May 12, 2020 at 2:00pm

BID TABULATION

MaDOT Period Prices Apply MARCH 2020 $552.50/TON

All States Asphalt Inc. 325 Amherst Road,

P O Box 91, Sunderland, MA 01375

All States

Total Value

By Towns

Comer Contracting, Inc. 15 Holmes Rd

Newington, CT 06111-1709

Comer

Total Value

By Towns

Alan L. Chicoine Martin Comer

Division Manager President

TOWN Est Volume Square Yards

Tel 413-665-7021

Bid Price Per Square Yard

Old Work DoubleChip New Work Old Work DoubleChip New Work Old Work DoubleChip New Work

Chesterfield 25000 $ 6.25 $ 156,250.00 $ 6.10 $ 152,500.00

Gill 19000 2.48$ $ 47,120.00 2.10$ $ 39,900.00

Montague 14000 2.48$ $ 34,720.00 2.24$ $ 31,360.00

Southampton 75101 6000 2.42$ 4.60$ $ 209,344.42 1.89$ 4.20$ $ 167,140.89

Total 108,101 6,000 25,000 $447,434.42 $390,900.89

0

bid bond X X

OSHA X X

Debar X X

signed bid form/corp resolution X X

Prequald X

Tax compl Non Collus X X

Tel 860-677-0603

Bid Price Per Square Yard

FY21 Draft Bid Tabs H-2 through 23

Page 58: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

RUBBERIZED CHIP SEAL H14

Open May 12, 2020 at 2:00pm

BID TABULATION Alan L. Chicoine Tel 413-665-7021

Period Prices MaDOT Apply: MARCH 2020 $552.50/TON Division Manager

10% Rubber Product-One Coat total bid by town PER SQ YD

Ashfield 69000 $240,120.00 $3.48

Buckland 58411 $203,270.28 $3.48

Chesterfield 20000 $69,600.00 $3.48

Conway 63420 $220,701.60 $3.48

Shelburne 18500 $64,380.00 $3.48

Sunderland 18000 $62,640.00 $3.48

Williamsburg 11,517 $41,230.86 $3.58

Total 258,848 $901,942.74

20% Rubber Product-One Coat total bid by town PER SQ YD

Belchertown 85,962.00 $408,319.50 $4.75

Charlemont 15,253.00 $72,451.75 $4.75

Conway 24,000.00 $114,000.00 $4.75

Deerfield 63,286.00 $300,608.50 $4.75

Gill 19,000.00 $90,250.00 $4.75

Granby 15,685.00 $74,503.75 $4.75

Granville 96,175.00 $456,831.25 $4.75

Hadley 21,947.00 $104,248.25 $4.75

Hatfield 15,900.00 $75,525.00 $4.75

Montague 14,000.00 $66,500.00 $4.75

Northfield 10,000.00 $47,500.00 $4.75

Pelham 6,500.00 $32,175.00 $4.95

Savoy 49,600.00 $235,600.00 $4.75

Southampton 24,075.00 $114,356.25 $4.75

Sunderland 18,000.00 $85,500.00 $4.75

Total 479,383.00 $2,278,369.25

$3,180,311.99

$3,180,311.99

Pre-Qual? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Acknowledged Add 1 and Add 2? x

Bid deposit? x

All States Asphalt Inc. 325 Amherst Road, P O

Box 91, Sunderland, MA 01375

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
XXXXXXXXXXXXXXXX
Page 59: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Ashfield 1A TOTAL ROADWAYS 5,636 2,540

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 388,884.00$ 12,065.00$ 400,949.00$

NORTHEAST Unit Price Bid 72.65$ 5.50$ Total Bid

Extended Bid 409,455.40$ 13,970.00$ 423,425.40$

PALMER Unit Price Bid 69.30$ 4.50$ Total Bid

Extended Bid 390,574.80$ 11,430.00$ 402,004.80$

Charlemont 1A TOTAL ROADWAYS 2120

TOTAL DRIVEWAYS/PARKING LOTS 200

WARNER Unit Price Bid Roadways 70.50$

Unit Price Bid Driveways 125.00$ Total Bid

Extended Bid 174,460.00$ 174,460.00$

NORTHEAST Unit Price Bid Roadways 72.00$

Unit Price Bid Driveways 130.00$ Total Bid

Extended Bid 178,640.00$ 178,640.00$

PALMER Unit Price Bid Roadways 68.70$

Unit Price Bid Driveways 98.00$ Total Bid

Extended Bid 165,244.00$ 165,244.00$

Colrain 1A TOTAL ROADWAYS 10,801 4,695 105

WARNER Unit Price Bid 67.25$ 4.75$ 300 Total Bid

Extended Bid 726,367.25$ 22,301.25$ 31500 780,168.50$

NORTHEAST Unit Price Bid 69.00$ 4.15$ 350 Total Bid

Extended Bid 745,269.00$ 19,484.25$ 36750 801,503.25$

PALMER Unit Price Bid 67.70$ 4.35$ 250 Total Bid

Extended Bid 731,227.70$ 20,423.25$ 26250 777,900.95$

1

Page 60: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Conway 1A TOTAL ROADWAYS 2,080 25

TOTAL DRIVEWAYS/PARKING LOTS 185 25 42

WARNER Unit Price Bid Roadways 66.00$ 150.00$ 10.00$

Unit Price Bid Driveways 150.00$ 150.00$ 10.00$ Total Bid

Extended Bid 165,030.00$ 7,500.00$ 420.00$ 172,950.00$

NORTHEAST Unit Price Bid Roadways 67.50$ 155.00$

Unit Price Bid Driveways 135.00$ 155.00$ 17.00$ Total Bid

Extended Bid 165,375.00$ 7,750.00$ 714.00$ 173,839.00$

PALMER Unit Price Bid Roadways 63.95$ 150.00$ 13.00$

Unit Price Bid Driveways 110.00$ 150.00$ 13.00$ Total Bid

Extended Bid 153,366.00$ 7,500.00$ 546.00$ 161,412.00$

Cummington 1A TOTAL ROADWAYS 2,300 1350

WARNER Unit Price Bid 72.00$ 4.75$ Total Bid

Extended Bid 165,600.00$ 6,412.50$ 172,012.50$

NORTHEAST Unit Price Bid 74.00$ 4.75$ Total Bid

Extended Bid 170,200.00$ 6,412.50$ 176,612.50$

PALMER Unit Price Bid 66.90$ 3.85$ Total Bid

Extended Bid 153,870.00$ 5,197.50$ 159,067.50$

Goshen 1A TOTAL ROADWAYS 1,790 1,050

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 123,510.00$ 4,987.50$ 128,497.50$

NORTHEAST Unit Price Bid 71.25$ 4.00$ Total Bid

Extended Bid 127,537.50$ 4,200.00$ 131,737.50$

PALMER Unit Price Bid 69.40$ 4.25$ Total Bid

Extended Bid 124,226.00$ 4,462.50$ 128,688.50$

2

Page 61: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Hawley 1A TOTAL ROADWAYS 11,281

WARNER Unit Price Bid 65.00$ Total Bid

Extended Bid 733,265.00$ 733,265.00$

NORTHEAST Unit Price Bid 68.25$ Total Bid

Extended Bid 769,928.25$ 769,928.25$

PALMER Unit Price Bid 67.20$ Total Bid

Extended Bid 758,083.20$ 758,083.20$

Heath 1A TOTAL ROADWAYS 2,500 12 1,056

WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ Total Bid

Extended Bid 175,000.00$ 1,800.00$ 5,016.00$ 181,816.00$

NORTHEAST Unit Price Bid 73.00$ 155.00$ 5.40$ Total Bid

Extended Bid 182,500.00$ 1,860.00$ 5,702.40$ 190,062.40$

PALMER Unit Price Bid 67.65$ 175.00$ 4.50$ Total Bid

Extended Bid 169,125.00$ 2,100.00$ 4,752.00$ 175,977.00$

Monroe 1A TOTAL ROADWAYS 3,050 483

WARNER Unit Price Bid 69.00$ 4.75$ Total Bid

Extended Bid 210,450.00$ 2,294.25$ 212,744.25$

NORTHEAST Unit Price Bid 73.50$ 5.50$ Total Bid

Extended Bid 224,175.00$ 2,656.50$ 226,831.50$

PALMER Unit Price Bid 69.25$ 4.75$ Total Bid

Extended Bid 211,212.50$ 2,294.25$ 213,506.75$

Plainfield 1A TOTAL ROADWAYS 2,600

WARNER Unit Price Bid 67.30$ Total Bid

Extended Bid 174,980.00$ 174,980.00$

NORTHEAST Unit Price Bid 67.25$ Total Bid

Extended Bid 174,850.00$ 174,850.00$

PALMER Unit Price Bid 62.30$ Total Bid

Extended Bid 161,980.00$ 161,980.00$

3

Page 62: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Rowe 1A TOTAL ROADWAYS 2,000 1,500 1

WARNER Unit Price Bid 71.00$ 4.75$ 500 Total Bid

Extended Bid 142,000.00$ 7,125.00$ 500 149,625.00$

NORTHEAST Unit Price Bid 70.00$ 3.60$ 350 Total Bid

Extended Bid 140,000.00$ 5,400.00$ 350 145,750.00$

PALMER Unit Price Bid 69.70$ 3.90$ NO BID Total Bid

Extended Bid 139,400.00$ 5,850.00$ INELIGIBLE BID 145,250.00$

Savoy 1A TOTAL ROADWAYS 880

WARNER Unit Price Bid 75.00$ Total Bid

Extended Bid 66,000.00$ 66,000.00$

NORTHEAST Unit Price Bid 76.00$ Total Bid

Extended Bid 66,880.00$ 66,880.00$

PALMER Unit Price Bid 69.96$ Total Bid

Extended Bid 61,564.80$ 61,564.80$

Shelburne 1A TOTAL ROADWAYS 4,410 2,010

WARNER Unit Price Bid 66.25$ 4.75$ Total Bid

Extended Bid 292,162.50$ 9,547.50$ 301,710.00$

NORTHEAST Unit Price Bid 68.65$ 5.50$ Total Bid

Extended Bid 302,746.50$ 11,055.00$ 313,801.50$

PALMER Unit Price Bid 68.10$ 4.45$ Total Bid

Extended Bid 300,321.00$ 8,944.50$ 309,265.50$

Williamsburg 1A TOTAL ROADWAYS 230 105 3

WARNER Unit Price Bid 72.00$ 5.00$ 300.00$ Total Bid

Extended Bid 16,560.00$ 525.00$ 900.00$ 17,985.00$

NORTHEAST Unit Price Bid 135.00$ 8.50$ 350.00$ Total Bid

Extended Bid 31,050.00$ 892.50$ 1,050.00$ 32,992.50$

PALMER Unit Price Bid 90.70$ 12.00$ 350.00$ Total Bid

Extended Bid 20,861.00$ 1,260.00$ 1,050.00$ 23,171.00$

4

Page 63: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

TOTAL BID REGION 1A WARNER 3,667,162.75$

TOTAL BID REGION 1A NORTHEAST 3,806,853.80$

TOTAL BID REGION 1A PALMER 3,643,116.00$

Chester 1B TOTAL ROADWAYS 3,500

WARNER Unit Price Bid 75.00$ Total Bid

Extended Bid 262,500.00$ 262,500.00$

NORTHEAST Unit Price Bid 67.25$ Total Bid

Extended Bid 235,375.00$ 235,375.00$

PALMER Unit Price Bid 63.70$ Total Bid

Extended Bid 222,950.00$ 222,950.00$

Chesterfield 1B TOTAL ROADWAYS 4,200 300 100 10

WARNER Unit Price Bid 67.65$ 100.00$ 125.00$ 300.00$ Total Bid

Extended Bid 284,130.00$ 30,000.00$ 12,500.00$ 3,000.00$ 329,630.00$

NORTHEAST Unit Price Bid 67.85$ 155.00$ 155.00$ 350.00$ Total Bid

Extended Bid 284,970.00$ 46,500.00$ 15,500.00$ 3,500.00$ 350,470.00$

PALMER Unit Price Bid 62.00$ 130.00$ 150.00$ 325.00$ Total Bid

Extended Bid 260,400.00$ 39,000.00$ 15,000.00$ 3,250.00$ 317,650.00$

Granville 1B TOTAL ROADWAYS 10,620

WARNER Unit Price Bid 77.00$ Total Bid

Extended Bid 817,740.00$ 817,740.00$

NORTHEAST Unit Price Bid 63.75$ Total Bid

Extended Bid 677,025.00$ 677,025.00$

PALMER Unit Price Bid 60.40$ Total Bid

Extended Bid 641,448.00$ 641,448.00$

5

Page 64: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Huntington 1B TOTAL ROADWAYS 1,950 870

WARNER Unit Price Bid 75.00$ 4.75$ Total Bid

Extended Bid 146,250.00$ 4,132.50$ 150,382.50$

NORTHEAST Unit Price Bid 82.50$ 5.75$ Total Bid

Extended Bid 160,875.00$ 5,002.50$ 165,877.50$

PALMER Unit Price Bid 67.67$ 4.75$ Total Bid

Extended Bid 131,956.50$ 4,132.50$ 136,089.00$

Middlefield 1B TOTAL ROADWAYS 8,500 7,557

TOTAL DRIVEWAYS/PARKING LOTS 660 186 19

WARNER Unit Price Bid Roadways 71.00$ 3.00$ 325

Unit Price Bid Driveways 90.00$ 10.00$ 325.00$ Total Bid

Extended Bid 662,900.00$ 24,531.00$ 6,175.00$ 693,606.00$

NORTHEAST Unit Price Bid Roadways 69.25$ 3.50$ 350

Unit Price Bid Driveways 99.00$ 3.50$ Total Bid

Extended Bid 653,965.00$ 27,100.50$ 6,650.00$ 687,715.50$

PALMER Unit Price Bid Roadways 66.70$ 3.50$ 325

Unit Price Bid Driveways 82.65$ 8.25$ 325.00$ Total Bid

Extended Bid 621,499.00$ 27,984.00$ 6,175.00$ 655,658.00$

Montgomery 1B TOTAL ROADWAYS 2,841 820

WARNER Unit Price Bid 75.00$ 4.75$ Total Bid

Extended Bid 213,075.00$ 3,895.00$ 216,970.00$

NORTHEAST Unit Price Bid 70.00$ 4.25$ Total Bid

Extended Bid 198,870.00$ 3,485.00$ 202,355.00$

PALMER Unit Price Bid 67.70$ 3.65$ Total Bid

Extended Bid 192,335.70$ 2,993.00$ 195,328.70$

6

Page 65: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Sandisfield 1B TOTAL ROADWAYS 3,824 20

WARNER Unit Price Bid 74.75$ 150.00$ Total Bid

Extended Bid 285,844.00$ 3,000.00$ 288,844.00$

NORTHEAST Unit Price Bid 69.75$ 155.00$ Total Bid

Extended Bid 266,724.00$ 3,100.00$ 269,824.00$

PALMER Unit Price Bid 71.70$ 165.00$ Total Bid

Extended Bid 274,180.80$ 3,300.00$ 277,480.80$

Tolland 1B TOTAL DRIVWAYS/PARKING LOTS 1,070

WARNER Unit Price Bid 115.00$ Total Bid

Extended Bid 123,050.00$ 123,050.00$

NORTHEAST Unit Price Bid 105.00$ Total Bid

Extended Bid 112,350.00$ 112,350.00$

PALMER Unit Price Bid 78.87$ Total Bid

Extended Bid 84,390.90$ 84,390.90$

Worthington 1B TOTAL ROADWAYS 2,665 220 713 20 3

WARNER Unit Price Bid 69.70$ 125.00$ 4.75$ 200.00$ 400.00$ Total Bid

Extended Bid 185,750.50$ 27,500.00$ 3,386.75$ 4,000.00$ 1,200.00$ 221,837.25$

NORTHEAST Unit Price Bid 69.00$ 155.00$ 4.50$ 155.00$ 350.00$ Total Bid

Extended Bid 183,885.00$ 34,100.00$ 3,208.50$ 3,100.00$ 1,050.00$ 225,343.50$

PALMER Unit Price Bid 64.90$ 150.00$ 3.85$ 180.00$ 350.00$ Total Bid

Extended Bid 172,958.50$ 33,000.00$ 2,745.05$ 3,600.00$ 1,050.00$ 213,353.55$

TOTAL BID REGION 1B WARNER 3,104,559.75$

TOTAL BID REGION 1B NORTHEAST 2,926,335.50$

TOTAL BID REGION 1B PALMER 2,744,348.95$

7

Page 66: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Deerfield 2A TOTAL ROADWAYS 1,722 502 24

WARNER Unit Price Bid 71.80$ 4.75$ 325.00$ Total Bid

Extended Bid 123,639.60$ 2,384.50$ 7,800.00$ 133,824.10$

NORTHEAST Unit Price Bid 78.85$ 6.00$ 350.00$ Total Bid

Extended Bid 135,779.70$ 3,012.00$ 8,400.00$ 147,191.70$

PALMER Unit Price Bid 110.00$ 8.00$ 600.00$ Total Bid

Extended Bid 189,420.00$ 4,016.00$ 14,400.00$ 207,836.00$

Gill 2A TOTAL ROADWAYS 2,136 1,716

TOTAL DRIVEWAY/PARKING LOTS 258 2 81

WARNER Unit Price Bid Roadways 70.00$ 150.00$ 4.75$

Unit Price Bid Driveways 110.00$ 150.00$ 10.00$ Total Bid

Extended Bid 177,900.00$ 300.00$ 8,961.00$ 187,161.00$

NORTHEAST Unit Price Bid Roadways 66.25$ 3.75$

Unit Price Bid Driveways 115.00$ 155.00$ 3.75$ Total Bid

Extended Bid 171,180.00$ 310.00$ 6,738.75$ 178,228.75$

PALMER Unit Price Bid Roadways 74.50$ 185.00$ 4.50$

Unit Price Bid Driveways 110.00$ 185.00$ 12.00$ Total Bid

Extended Bid 187,512.00$ 370.00$ 8,694.00$ 196,576.00$

Leverett 2A TOTAL ROADWAYS 2,200 1,325 3

WARNER Unit Price Bid 67.00$ 4.75$ 400.00$ Total Bid

Extended Bid 147,400.00$ 6,293.75$ 1,200.00$ 154,893.75$

NORTHEAST Unit Price Bid 73.50$ 4.75$ 350.00$ Total Bid

Extended Bid 161,700.00$ 6,293.75$ 1,050.00$ 169,043.75$

PALMER Unit Price Bid 72.00$ 5.00$ 500.00$ Total Bid

Extended Bid 158,400.00$ 6,625.00$ 1,500.00$ 166,525.00$

8

Page 67: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Leyden 2A TOTAL ROADWAYS 1,582 500

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 107,576.00$ 2,375.00$ 109,951.00$

NORTHEAST Unit Price Bid 66.65$ 5.50$ Total Bid

Extended Bid 105,440.30$ 2,750.00$ 108,190.30$

PALMER Unit Price Bid 71.50$ 6.00$ Total Bid

Extended Bid 113,113.00$ 3,000.00$ 116,113.00$

Co. Name Unit Price Bid Total Bid

Extended Bid -$ -$ -$

Montague 2A TOTAL ROADWAYS 1,500 500

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 102,000.00$ 2,375.00$ 104,375.00$

NORTHEAST Unit Price Bid 68.90$ 5.50$ Total Bid

Extended Bid 103,350.00$ 2,750.00$ 106,100.00$

PALMER Unit Price Bid 74.50$ 6.00$ Total Bid

Extended Bid 111,750.00$ 3,000.00$ 114,750.00$

New Salem 2A TOTAL ROADWAYS 1,990 875

WARNER Unit Price Bid 70.50$ 4.75$ Total Bid

Extended Bid 140,295.00$ 4,156.25$ 144,451.25$

NORTHEAST Unit Price Bid 78.00$ 4.75$ Total Bid

Extended Bid 155,220.00$ 4,156.25$ 159,376.25$

PALMER Unit Price Bid 73.00$ 5.50$ Total Bid

Extended Bid 145,270.00$ 4,812.50$ 150,082.50$

Northfield 2A TOTAL ROADWAYS 8,480 50 1,400 12

WARNER Unit Price Bid 70.00$ 150.00$ 4.75$ 200.00$ Total Bid

Extended Bid 593,600.00$ 7,500.00$ 6,650.00$ 2,400.00$ 610,150.00$

NORTHEAST Unit Price Bid 63.65$ 155.00$ 6.00$ 155.00$ Total Bid

Extended Bid 539,752.00$ 7,750.00$ 8,400.00$ 1,860.00$ 557,762.00$

PALMER Unit Price Bid 68.90$ 180.00$ 4.50$ 195.00$ Total Bid

Extended Bid 584,272.00$ 9,000.00$ 6,300.00$ 2,340.00$ 601,912.00$

9

Page 68: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Orange 2A TOTAL ROADWAYS 1,875 450 75 40

WARNER Unit Price Bid 72.00$ 4.75$ 150.00$ 325.00$ Total Bid

Extended Bid 135,000.00$ 2,137.50$ 11,250.00$ 13,000.00$ 161,387.50$

NORTHEAST Unit Price Bid 68.95$ 6.00$ 155.00$ 350.00$ Total Bid

Extended Bid 129,281.25$ 2,700.00$ 11,625.00$ 14,000.00$ 157,606.25$

PALMER Unit Price Bid 67.25$ 6.25$ 155.00$ 260.00$ Total Bid

Extended Bid 126,093.75$ 2,812.50$ 11,625.00$ 10,400.00$ 150,931.25$

Shutesbury 2A TOTAL ROADWAYS 3,910 1,305

WARNER Unit Price Bid 68.00$ 4.75$ Total Bid

Extended Bid 265,880.00$ 6,198.75$ 272,078.75$

NORTHEAST Unit Price Bid 70.00$ 4.75$ Total Bid

Extended Bid 273,700.00$ 6,198.75$ 279,898.75$

PALMER Unit Price Bid 69.90$ 5.75$ Total Bid

Extended Bid 273,309.00$ 7,503.75$ 280,812.75$

Sunderland 2A TOTAL ROADWAYS 1,711 30 800 100 20

WARNER Unit Price Bid 72.00$ 150.00$ 4.75$ 125.00$ 300.00$ Total Bid

Extended Bid 123,192.00$ 4,500.00$ 3,800.00$ 12,500.00$ 6,000.00$ 149,992.00$

NORTHEAST Unit Price Bid 80.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid

Extended Bid 136,880.00$ 4,650.00$ 4,000.00$ 15,500.00$ 7,000.00$ 168,030.00$

PALMER Unit Price Bid 85.00$ 250.00$ 6.00$ 175.00$ 575.00$ Total Bid

Extended Bid 145,435.00$ 7,500.00$ 4,800.00$ 17,500.00$ 11,500.00$ 186,735.00$

Warwick 2A TOTAL ROADWAYS 3,500 2,500

WARNER Unit Price Bid 69.00$ 3.00$ Total Bid

Extended Bid 241,500.00$ 7,500.00$ 249,000.00$

NORTHEAST Unit Price Bid 65.45$ 3.75$ Total Bid

Extended Bid 229,075.00$ 9,375.00$ 238,450.00$

PALMER Unit Price Bid 70.00$ 4.25$ Total Bid

Extended Bid 245,000.00$ 10,625.00$ 255,625.00$

10

Page 69: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Wendell 2A TOTAL ROADWAYS 5,500 1,500 9

WARNER Unit Price Bid 69.00$ 4.75$ 325.00$ Total Bid

Extended Bid 379,500.00$ 7,125.00$ 2,925.00$ 389,550.00$

NORTHEAST Unit Price Bid 66.95$ 6.00$ 350.00$ Total Bid

Extended Bid 368,225.00$ 9,000.00$ 3,150.00$ 380,375.00$

PALMER Unit Price Bid 66.60$ 4.25$ 325.00$ Total Bid

Extended Bid 366,300.00$ 6,375.00$ 2,925.00$ 375,600.00$

Whately 2A TOTAL ROADWAYS 1,100 70 60

WARNER Unit Price Bid 68.00$ 10.00$ 125.00$ Total Bid

Extended Bid 74,800.00$ 700.00$ 7,500.00$ 83,000.00$

NORTHEAST Unit Price Bid 74.45$ 15.00$ 155.00$ Total Bid

Extended Bid 81,895.00$ 1,050.00$ 9,300.00$ 92,245.00$

PALMER Unit Price Bid 78.85$ 30.00$ 185.00$ Total Bid

Extended Bid 86,735.00$ 2,100.00$ 11,100.00$ 99,935.00$

TOTAL BID REGION 2A WARNER 2,749,814.35$

TOTAL BID REGION 2A NORTHEAST 2,742,497.75$

TOTAL BID REGION 2A PALMER 2,903,433.50$

11

Page 70: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Belchertown 2B TOTAL ROADWAYS 12,019 6,796 290.5 93

WARNER Unit Price Bid 66.00$ 4.75$ 125.00$ 300.00$ Total Bid

Extended Bid 793,254.00$ 32,281.00$ 36,312.50$ 27,900.00$ 889,747.50$

NORTHEAST Unit Price Bid 71.85$ 4.15$ 155.00$ 350.00$ Total Bid

Extended Bid 863,565.15$ 28,203.40$ 45,027.50$ 32,550.00$ 969,346.05$

PALMER Unit Price Bid 64.20$ 3.25$ 130.00$ 230.00$ Total Bid

Extended Bid 771,619.80$ 22,087.00$ 37,765.00$ 21,390.00$ 852,861.80$

Easthampton 2B TOTAL ROADWAYS 8,700 245 3,950 43 168

WARNER Unit Price Bid 75.00$ 150.00$ 4.00$ 200.00$ 350.00$ Total Bid

Extended Bid 652,500.00$ 36,750.00$ 15,800.00$ 8,600.00$ 58,800.00$ 772,450.00$

NORTHEAST Unit Price Bid 71.00$ 155.00$ 4.15$ 155.00$ 350.00$ Total Bid

Extended Bid 617,700.00$ 37,975.00$ 16,392.50$ 6,665.00$ 58,800.00$ 737,532.50$

PALMER Unit Price Bid 63.30$ 135.00$ 4.05$ 135.00$ 230.00$ Total Bid

Extended Bid 550,710.00$ 33,075.00$ 15,997.50$ 5,805.00$ 38,640.00$ 644,227.50$

Granby 2B TOTAL ROADWAYS 8,922 650 75

WARNER Unit Price Bid 77.00$ 4.75$ 150.00$ Total Bid

Extended Bid 686,994.00$ 3,087.50$ 11,250.00$ 701,331.50$

NORTHEAST Unit Price Bid 65.45$ 4.75$ 155.00$ Total Bid

Extended Bid 583,944.90$ 3,087.50$ 11,625.00$ 598,657.40$

PALMER Unit Price Bid 60.90$ 4.25$ 145.00$ Total Bid

Extended Bid 543,349.80$ 2,762.50$ 10,875.00$ 556,987.30$

Hadley 2B TOTAL ROADWAYS 1,249 642

WARNER Unit Price Bid 72.00$ 4.00$ Total Bid

Extended Bid 89,928.00$ 2,568.00$ 92,496.00$

NORTHEAST Unit Price Bid 82.00$ 5.75$ Total Bid

Extended Bid 102,418.00$ 3,691.50$ 106,109.50$

PALMER Unit Price Bid 73.99$ 5.50$ Total Bid

Extended Bid 92,413.51$ 3,531.00$ 95,944.51$

12

Page 71: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Hatfield 2B TOTAL ROADWAYS 250 50 250 10 2

WARNER Unit Price Bid 75.00$ 125.00$ 4.00$ 150.00$ 400.00$ Total Bid

Extended Bid 18,750.00$ 6,250.00$ 1,000.00$ 1,500.00$ 800.00$ 28,300.00$

NORTHEAST Unit Price Bid 135.00$ 155.00$ 5.00$ 155.00$ 350.00$ Total Bid

Extended Bid 33,750.00$ 7,750.00$ 1,250.00$ 1,550.00$ 700.00$ 45,000.00$

PALMER Unit Price Bid 89.00$ 175.00$ 6.00$ 310.00$ 325.00$ Total Bid

Extended Bid 22,250.00$ 8,750.00$ 1,500.00$ 3,100.00$ 650.00$ 36,250.00$

Pelham 2B TOTAL ROADWAYS 2,050 710

WARNER Unit Price Bid 67.00$ 4.00$ Total Bid

Extended Bid 137,350.00$ 2,840.00$ 140,190.00$

NORTHEAST Unit Price Bid 76.00$ 6.50$ Total Bid

Extended Bid 155,800.00$ 4,615.00$ 160,415.00$

PALMER Unit Price Bid 73.00$ 5.25$ Total Bid

Extended Bid 149,650.00$ 3,727.50$ 153,377.50$

Southampton 2B TOTAL ROADWAYS 4,944 20 2,842 42

WARNER Unit Price Bid 68.00$ 150.00$ 4.00$ 300.00$ Total Bid

Extended Bid 336,192.00$ 3,000.00$ 11,368.00$ 12,600.00$ 363,160.00$

NORTHEAST Unit Price Bid 66.00$ 155.00$ 4.15$ 350.00$ Total Bid

Extended Bid 326,304.00$ 3,100.00$ 11,794.30$ 14,700.00$ 355,898.30$

PALMER Unit Price Bid 63.25$ 150.00$ 3.85$ 250.00$ Total Bid

Extended Bid 312,708.00$ 3,000.00$ 10,941.70$ 10,500.00$ 337,149.70$

13

Page 72: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

H-15 Hot Mix Asphalt Applied FY21 - BID TABULATION

Town

Regi

onBidder Name Detail on Applied/Location Appr.# tons Handwork in Tons Tack Coat in gallons Berm/tons

Number of raised

castings

Westhampton 2B TOTAL ROADWAYS 2,659 1,244

2B TOTAL DRIVEWAY/PARKING LOTS 220

WARNER Unit Price Bid Roadways 68.00$ 4.75$

Unit Price Bid Driveways 120.00$ Total Bid

Extended Bid 207,212.00$ 5,909.00$ 213,121.00$

NORTHEAST Unit Price Bid Roadways 66.95$ 4.25$

Unit Price Bid Driveways 88.00$ Total Bid

Extended Bid 197,380.05$ 5,287.00$ 202,667.05$

PALMER Unit Price Bid Roadways 65.30$ 4.40$

Unit Price Bid Driveways 95.00$ 6.00$ Total Bid

Extended Bid 194,532.70$ 5,473.60$ 200,006.30$

TOTAL BID REGION 2B WARNER 3,200,796.00$

TOTAL BID REGION 2B NORTHEAST 3,175,625.80$

TOTAL BID REGION 2B PALMER 2,876,804.61$

WARNER 12,722,332.85$

NORTHEAST 12,651,312.85$

PALMER 12,167,703.06$

GRAND TOTAL BID (for bid bond)

GRAND TOTAL BID (for bid bond)

GRAND TOTAL BID (for bid bond)

14

Page 73: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID #H16 LIQUID ASPHALT

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply

All States Asphalt Inc.

325 Amherst Rd. PO Box 91

Sunderland, MA 01375

Tel 413-665-7021

Fax 413-665-9027

MC Cutback Asphalt Applied-in-place Price Per gal. Total by Town

Hawley 3,520 $3.65 $12,848.00

Westhampton 8,806 $3.65 $32,141.90

$44,989.90

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Cert Signed? x

OSHA Cert? x

Pre-Qual? x

MARCH 2020 $552.50/TON

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxx
Page 74: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

TOWN Region

Total Estimated

Square Yards

Reclaim

Pavement

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY Cost

/ SY

PALMER Cost /

SY

RAFFERTY

Cost / SY

Reclaim

Pavement

w/fine grading

& vibratory

compacition

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY

Cost / SY

PALMER Cost

/ SY

RAFFERTY

Cost / SY

Structures

Lowered

Qty in EA

ALL STATES

Cost / Each

GARRITY Cost

/ Each

MURRAY Cost

/ Each

PALMER Cost

/ Each

RAFFERTY

Cost / Each

Addition of

Calcium at 1 gal

per SY unless

otherwise noted

Quantity in SY

ALL STATES

Cost / ga

GARRITY Cost /

ga

MURRAY Cost

/ ga

PALMER Cost

/ ga

RAFFERTY

Cost / ga

Injection of

Emulsion *

Quantity in SY

ALL STATES

Cost / SY

GARRITY Cost

/ SY

MURRAY Cost

/ SY

PALMER Cost /

SY

RAFFERTY

Cost / SY

ALL STATES ASPHALT-

Sunderland, MA Total Bid

GARRITY ASPHALT

RECLAIMING Bloomfield,

CT Total Bid

MURRAY PAVING and

RECLAMATION

Holliston, MA Total Bid

PALMER PAVING CORP

Palmer, MA Total Bid

RAFFERTY FINE

GRADING Enfield,

CT Total Bid

Charlemont 1A 27000.00 27000.00 0.69 0.85 0.63 0.70 0.84 18,630.00$ 22,950.00$ 17,010.00$ 18,900.00$ 22,680.00$

Conway 1A 15000.00 15000.00 1.24 2.60 1.57 1.65 1.52 15000.00 1.00 1.40 1.00 2.45 1.34 33,600.00$ 60,000.00$ 38,550.00$ 61,500.00$ 42,900.00$

Hawley 1A 28160.00 28160.00 2.60 3.00 NoBid 1.50 2.22 28160.00 3.25 4.00 NoBid 4.20 4.00 164,736.00$ 197,120.00$ NO BID 160,512.00$ 175,155.20$

Monroe 1A 21103.00 21103.00 1.24 2.60 1.95 1.60 1.32 13532.00 1.00 1.40 1.00 2.55 1.44 39,699.72$ 73,812.60$ 54,682.85$ 68,271.40$ 47,342.04$

Savoy 1A 8000.00 8000.00 1.70 2.60 2.11 1.85 1.74 8000.00 1.00 1.40 1.00 2.65 1.54 21,600.00$ 32,000.00$ 24,880.00$ 36,000.00$ 26,240.00$

Shelburne 1A 9900.00 9900.00 1.42 3.00 1.69 1.71 1.74 14,058.00$ 29,700.00$ 16,731.00$ 16,929.00$ 17,226.00$

TOTAL BID REGION 1A 292,323.72$ 415,582.60$ 151,853.85$ 362,112.40$ 331,543.24$

Chesterfield 1B 11000.00 11000.00 1.26 2.60 1.69 1.75 1.64 11000.00 1.04 1.40 1.00 2.62 1.54 25,300.00$ 44,000.00$ 29,590.00$ 48,070.00$ 34,980.00$

Granville 1B 63350.00 63350.00 2.60 3.00 NoBid 1.70 2.22 63350.00 3.25 4.00 NoBid 4.25 4.00 370,597.50$ 443,450.00$ NO BID 376,932.50$ 394,037.00$

Montgomery 1B 12790.00 12790.00 1.34 2.60 1.69 1.70 1.54 12790.00 1.04 1.40 1.00 2.60 1.54 30,440.20$ 51,160.00$ 34,405.10$ 54,997.00$ 39,393.20$

Sandisfield 1B 22225.00 22225.00 1.16 2.60 1.89 1.65 1.18 22225.00 1.04 1.40 1.00 2.75 1.14 48,895.00$ 88,900.00$ 64,230.25$ 97,790.00$ 51,562.00$

Worthington 1B 12000.00 12000.00 2.60 3.50 NoBid 1.65 4.50 12000.00 3.25 4.00 NoBid 4.70 6.00 70,200.00$ 90,000.00$ NO BID 76,200.00$ 126,000.00$

TOTAL BID REGION 1B 545,432.70$ 717,510.00$ 128,225.35$ 653,989.50$ 645,972.20$

Northfield 2A 19398.00 19398.00 0.74 0.85 0.68 0.80 0.88 14,354.52$ 16,488.30$ 13,190.64$ 15,518.40$ 17,070.24$

Orange 2A 7100.00 7100.00 2.15 2.60 1.69 3.60 1.54 40.00 150.00 500.00 200.00 750.00 650.00 7100.00 1.00 1.40 1.00 3.75 1.54 28,365.00$ 48,400.00$ 27,099.00$ 82,185.00$ 47,868.00$

TOTAL BID REGION 2A 42,719.52$ 64,888.30$ 40,289.64$ 97,703.40$ 64,938.24$

Belchertown 2B 25100.00 25100.00 1.16 2.60 1.69 2.80 1.24 28.00 150.00 500.00 200.00 750.00 650.00 25100.00 1.00 1.40 1.00 4.10 1.14 58,416.00$ 114,400.00$ 73,119.00$ 194,190.00$ 77,938.00$

Easthampton 2B 9600.00 9600.00 1.49 2.60 1.69 3.00 1.94 24.00 150.00 500.00 200.00 775.00 650.00 9600.00 1.04 1.40 1.00 3.75 1.54 27,888.00$ 50,400.00$ 30,624.00$ 83,400.00$ 49,008.00$

Granby 2B 34708.00 34708.00 0.72 0.85 0.63 0.75 0.84 24,989.76$ 29,501.80$ 21,866.04$ 26,031.00$ 29,154.72$

Hadley 2B 10533.00 10533.00 0.84 0.85 0.63 0.80 0.98 8,847.72$ 8,953.05$ 6,635.79$ 8,426.40$ 10,322.34$

TOTAL BID REGION 2B 120,141.48$ 203,254.85$ 132,244.83$ 312,047.40$ 166,423.06$

GRAND TOTAL ALL REGIONS 1,000,617.42$ 1,401,235.75$ 452,613.67$ 1,425,852.70$ 1,208,876.74$

* For Reclamation with Injection of Emulsion: Additional, if needed and approved by Town – Liquid Asphalt Adjustment after Mix Design $_______/Gall $3.25/GAL $4.00/GA N/A $4.65/GALLON $12.00/GA

TAX COMPLIANCE? X X X X X

NON COLLUSION? X X X X X

PREQUALIFIED? X X X X X

ACKNOWLEDGE ADD.? X X X X X

DBARMENT? X X X X X

OSHA? X X X X X

BID DEPOSIT? X X X X X

H-17 RECLAMATION BID / FY21 - ADDENDUM 1

AWoods
Typewritten Text
Bid Tabulation
Page 75: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-19 Hot In Place Recycling

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply $552.50 per ton base price

2258 Rte 22, Brewster, NY 10509

TOWN

Est Volume Square

Yards 845-278-9645 total

per sq. yd.

GRANBY 38174 $ 5.16 $ 196,977.84

Pre-Qual? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Bid deposit? x

Highway Rehabilitation Corp

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxxx
Page 76: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID TABULATION

Open May 12, 2020 at 2:00pm

COLD

PLANING/MILLING-

H20A Standard Milling

Rafferty Fine

Grading

Total SY Structures

Total

Structures

Contractor

Removes

Millings?

Town Retains

Millings?

Town/Road PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for

SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURE Town SQ YD STRUCTURETown

Belchertown

25900 61

A- Town

Retains 1.94$ 250.00$ 65,496.00$ 1.73$ 10.00$ 45,417.00$ 2.65$ 75.00$ 73,210.00$ 1.90$ 25.00$ 50,735.00$

Gill -$ -$ -$ -$

19500 0

A- Town

Retains 2.44$ 47,580.00$ 1.57$ 30,615.00$ 1.70$ 33,150.00$ 1.92$ 25.00$ 37,440.00$

Easthampton -$ -$ -$ -$

28900 144

A- Town

Retains 2.44$ 250.00$ 106,516.00$ 1.80$ 10.00$ 53,460.00$ 2.25$ 75.00$ 75,825.00$ NO BID -$

Granby -$ -$ -$ -$

18939

C- Contractor

Removes

A- Town

Retains 2.44$ 46,211.16$ 1.75$ 33,143.25$ 1.85$ 35,037.15$ NO BID -$

Hadley -$ -$ -$ -$

9533 49

A-Town

Retains 3.54$ 250.00$ 45,996.82$ 1.98$ 10.00$ 19,365.34$ 1.95$ 75.00$ 22,264.35$ NO BID -$

Huntington -$ -$ -$ -$

3900

A-Town

Retains 12.00$ 46,800.00$ 3.75$ 14,625.00$ 4.00$ 15,600.00$ NO BID -$

Leverett -$ -$ -$ -$

8448 1

A-Town

Retains 6.54$ 250.00$ 55,499.92$ 2.24$ 10.00$ 18,933.52$ 2.20$ 75.00$ 18,660.60$ 1.85$ 25.00$ 15,653.80$

Montague -$ -$ -$ -$

31,000 32

Split

millings

between Town

& Contractor 2.44$ 250.00$ 83,640.00$ 1.49$ 10.00$ 46,510.00$ 1.85$ 75.00$ 59,750.00$ 1.79$ 25.00$ 56,290.00$

Montgomery -$ -$ -$ -$

11736 0

A-Town

Retains 6.54$ 76,753.44$ 1.82$ 21,359.52$ 1.85$ 21,711.60$ NO BID -$

Sunderland -$ -$ -$ -$

13493 25

A-Town

Retains 3.54$ 250.00$ 54,015.22$ 1.76$ 10.00$ 23,997.68$ 1.95$ 75.00$ 28,186.35$ 1.75$ 25.00$ 24,237.75$

Whately -$ -$ -$ -$

1350 14 25.00$ 250.00$ 37,250.00$ 11.00$ 10.00$ 14,990.00$ 10.30$ 75.00$ 14,955.00$ 9.00$ 25.00$ 12,500.00$

TOTAL 172699 326 665,758.56$ 322,416.31$ 398,350.05$ 196,856.55$

COLD PLANING/MILLING BID H20

PO Box 91, Sunderland, MA 01375

Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.Garrity Asphalt Reclaiming

57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxx
AWoods
Typewritten Text
SCROLL TO NEXT PAGE FOR FINE MILLING
Page 77: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

COLD

PLANING/MILLING-

H20B Micro Milling Total SY Structures

Total

Structures

Contractor

Removes

Millings?

Town Retains

Millings?

Rafferty

Fine Grading

Town/Road

PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for PRICE PER PRICE PER Total for

Chesterfield SQ YD STRUCTURETown SQ YD STRUCTURE Town SQ YD STRUCTURETown SQ YD STRUCTURETown

20000 10 10

TOWN

RETAINS 2.84$ 250.00$ 59,300.00$ NO BID 1.85$ 75.00$ 37,750.00$ NO BID

Conway -$ NO BID -$ NO BID

8115 3 3

TOWN

RETAINS 3.94$ 250.00$ 32,723.10$ NO BID 2.15$ 75.00$ 17,672.25$ NO BID

Deerfield -$ NO BID -$ NO BID

11700

TOWN

RETAINS 3.84$ 44,928.00$ NO BID 2.95$ 34,515.00$ NO BID

Gill -$ NO BID -$ NO BID

19500

TOWN

RETAINS 2.84$ 55,380.00$ NO BID 1.70$ 33,150.00$ NO BID

Middlefield -$ NO BID -$ NO BID

75568 19

TOWN

RETAINS 2.74$ 250.00$ 211,806.32$ NO BID 1.70$ 75.00$ 129,890.60$ NO BID

Northfield -$ NO BID -$ NO BID

20228 3 2.94$ 250.00$ 60,220.32$ NO BID 1.70$ 75.00$ 34,612.60$ NO BID

-$ NO BID -$ NO BID

Sunderland -$ NO BID -$ NO BID

13493 25

TOWN

RETAINS 3.38$ 250.00$ 51,856.34$ NO BID 1.95$ 75.00$ 28,186.35$ NO BID

NO BID -$ NO BID

TOTAL 168,604 60 516,214.08$ NO BID -$

315,776.80$

Pre-Qual? X X X X

Addendum 1? X X X X

Tax Compliance Signed? X X X X

Non-Collusion Signed? X X X X

Debarment Signed? X X X X

OSHA X X X X

Bid bond X X X X

57 S Rd., Enfield, CT 06082 22 Peters Rd., Bloomfield, CT 06002 311 East Mtn Road, Westfield, MA 01085 PO Box 91, Sunderland, MA 01375

Garrity Asphalt Reclaiming Eurovia Atlantic Coast/Northeast Paving All States Asphalt Inc.

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxx
AWoods
Typewritten Text
Page 78: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

H-21 Cold In Place Recycling

BID TABULATION

Open May 12, 2020 at 2:00pm

MaDOT Period Prices Apply

825 Granite St., Braintree,

MA 02184

TOWN

Est Volume Square

Yards Ph 781-428-3400 total

per sq. yd.

Colrain 34,222 $ 5.30 $ 181,376.60

Deerfield 60,000 $ 4.87 $ 292,200.00

Gill 19,066 $ 6.25 $ 119,162.50

TOTAL $ 592,739.10

Additional items, if needed Aggregate 35.00$ ton

Portland Cement 210.00$ ton

Liquid Asphalt Adjustment 3.43$ gallon

Pre-Qual? x

Addendum 1? x

Tax Compliance Signed? x

Non-Collusion Signed? x

Debarment Signed? x

OSHA x

Bid deposit? x

Sealcoating, Inc. dba Indus

FY21 Draft Bid Tabs H-2 through 23

AWoods
Typewritten Text
xxxxxxxxxxxxxxxxxxxxx
Page 79: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Bucket Truck Operator Laborer (Tree Removal) 60' Aerial Lift 65' Aerial Lift 75' Alpine Unit

Log loader & Operator -

(Prentice 120 C log

loader on a

Log-hauler truck with at

least a

50 cubic yard capacity)

or equal

Blandford 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Chester 200 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Chesterfield 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Conway 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Deerfield 150 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Easthampton 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Gill 80 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Granby 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Granville 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Hadley 120 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Middlefield 12 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Sunderland 24 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Westhampton 8 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Williamsburg 16 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Worthington 40 hours Cost Per HourNormal Shift 95.00$ 95.00$ 50.00$ 50.00$ 65.00$ 190.00$

Emergency/

Overtime120.00$ 120.00$ 50.00$ 50.00$ 65.00$ 240.00$

Bid Form X Tax Compliance/Non-Collusion X OSHA Statement X

Bid Signature X Debarment Form X 5% Bid Bond X

BID TABULATION

H-22 TREE WORK FY2021

Tree Removal

Vendors may bid per hour for all towns, a single town, or any group of towns.

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

Franklin Regional Collective Open May 12, 2020 at 2pm

1 of 3

Page 80: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Climber / Trimmer

operator

( A )

60' Aerial Lift Bucket

truck w/dump chipper

box

( B )

Total Per Hour Bucket

Truck and Operator

( A + B )

Hydraulic Disc chipper

w/capacity for 12" limb

( C )

Ground person

( D )

Total Bucket Truck,

Trimmer, Chipper and

Ground Person Per Hour

(A + B + C + D)

Blandford 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Chesterfield 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Easthampton 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Goshen 80 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Granby 20 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Hadley 120 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Heath 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Middlefield 8 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Sunderland 24 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Tolland 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Worthington 40 hours Cost Per HourNormal Shift 85.00$ 60.00$ 145.00$ 25.00$ 85.00$ 255.00$

Emergency/

Overtime120.00$ 60.00$ 180.00$ 25.00$ 120.00$ 325.00$

Tree Trimming

BID TABULATION

H-22 TREE WORK FY2021

Vendors may bid per hour for all towns, a single town, or any group of towns.

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

2 of 3

Page 81: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

Chipper Crew:

Foreman/operator

Dump truck With 10 cu

yd chip box

Laborer/Chainsaw

operator

Hydraulic Disc Chipper

w/capacity for 12” limb

Log loader & Operator

(Prentice 120 C log

loader on a Log-

hauler/debris hauling

truck w min. 50 cubic

yard capacity) or equal.

Truck must be equipped

with solid sides to allow

loading of brush and

debris.

Horizontal Grinder CBI

1000H.P. or equal

Deerfield 150 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Granby 30 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Westhampton 8 hours Cost Per HourNormal Shift 85.00$ 40.00$ 85.00$ 25.00$ 180.00$ 850.00$

Emergency/

Overtime120.00$ 40.00$ 120.00$ 25.00$ 235.00$ 1,200.00$

Stump Grinder (12” to

48” grinding capacity)

Granby 20 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

Granville 32 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

Worthington 40 hours Cost Per HourNormal Shift 175.00$

Emergency/

Overtime225.00$

BID TABULATION

H-22 TREE WORK FY2021

Vendors may bid per hour for all towns, a single town, or any group of towns.

Stump Grinding

Debris Removal

Bidder Name: Northern Tree Service, Inc. 1290 Park St., PO Box 790, Palmer, MA 01069

3 of 3

Page 82: H-1 Aggregates - PICKED UP ˇ ˘ˆ ˙˙ 413-665-4051 413-498 ... · 5/12/2020  · $ 10.00 $ 9.40 14.00 4.95 From W'fld $3.50 4.25. 1B Sandisfield 3 Silverbrook Road Sandisfield,

FRANKLIN REGIONAL COLLECTIVE

BID # H23 Catch Basin Cleaning

Open May 12, 2020 @ 1pm

Bid Tabulation

Company J.R. Sweeping Service Wind River Environmental Eastern Pipe Service LLC

28 Moylan Lane, Agawam, MA 01001 46 Lizotte Dr, Marlborough, MA 01752 2 Thibeault Drive, Bow, NH 03304

Contact Person James Ricco, Owner/Mgr Steve Ciras Richard Berthiaume

Tel/Fax or Email Tel 413-786-2168 Fax 413-789-3738 Tel 978-875-3290 Tel 603-424-4600

Machine Descriptions 1: 2006 Vac-Con Model V312IAH/1000 8 cy, 12,000 CFM DOESN'T MEET SPEC

1: 2012 Kenworth Vactor 2100, 12 cy, 1200 gallon, 4460 CFM

1: 2015 Vactor Model 2115-EQ8886 15 cy, 3800 CFM 1500 gallon

2001 Vactor 2100 8 cy, DOESN'T MEET SPEC

2: 2012 Freightliner Vactor 2100 Plus, 12 cy capacity, 1200 gallon, 4460 CFM

2: 2013 Vactor Model 2115 Plus-EQ6287 15 cy, 4460 CFM, 1500 gallon

3: 2015 Freightliner VacCon 5450 CFM, 10 yd capacity 1500 gall DOESN’T MEET

SPEC

3: 2012 Freightliner Vactor Model 2115 Plus - EQ 5914 15 cy, 3800 CFM, 1500 gall

Bid per hr REGION 1A Cleaning/Jetting $225.00 $269.00 $219.00

Bid per hr REGION 1B Cleaning/Jetting $210.00 $269.00 $219.00

Lateral Cleaning $210.00 $269.00 $219.00

Bid per hr REGION 2A Cleaning/Jetting $225.00 $269.00 $219.00

Lateral Cleaning $225.00 $269.00 $219.00

Bid per hr REGION 2B Cleaning/Jetting $200.00 $269.00 $219.00

Lateral Cleaning $200.00 $269.00 $219.00

Total Hrs x Bid Price = $358,345 Total Hrs x Bid Price $459,183.00 Total Hrs x Bid Price = $373,833

Emergency Response Time? 24 HOURS

3-4 HOURS 48 HOURS

References if not worked for FRCOG COLLECTIVEtax compliance, non collusion, signature,

TOWN ESTIMATES

REGION 1A CLEAN/JE 164 HRS APPROXIMATELY Required Docs JR SWEEP WIND RIV EASTERN

REGION 1A LATERAL 0 HRS APPROXIMATELY Bid Form X

Addendum X

REGION 1B CLEAN/JE 236 HRS APPROXIMATELY Tax Comp XREGION 1B LATERAL 36 HRS APPROXIMATELY Non Collus X

OSHA XREGION 2A CLEAN/JE 403 HRS APPROXIMATELY Debarment XREGION 2A LATERAL 2 HRS APPROXIMATELY Corp Auth X

REGION 2B CLEAN/JE 728 HRS APPROXIMATELYREGION 2B LATERAL 138 HRS APPROXIMATELY

1707