HCAL Front End Boards
HCAL – Technical Meeting 24.2.2005
• Status of the FE Boards
• Parameter Shift Register
• Time Schedule
• Test Setup
Mathias Reinecke
HCAL Base Board - HBAB
Mathias Reinecke HCAL – Technical Meeting 1
Features :
- Base board for 6 Analog Boards (HAB)
- Communication with DAQ (CERC)
- Trigger for CMB board
- Two versions : ECAL left and right populated
Status :
- 2 Boards in production (‚right populated‘), production + assembly : 3-4 weeks
- design of ‚left-populated‘ : finished in 1 week
HCAL Base Board - HBAB
Mathias Reinecke HCAL – Technical Meeting 2
‚Left-Populated‘
Dimensions :47.5 x 19 cm²
Height (Board + Components) :15.5 mm
HCAL Analog Board - HAB
Mathias Reinecke HCAL – Technical Meeting 3
Features :
- Carries one LAL ASIC (18 SiPM channels)
- HV filtering and SiPM biasing
- Communication with HCAL Base Board
- Temperature monitor on board
Status :
- 2 Boards fully assembled
- 26 Boards available (not assembled)
HCAL Analog Board - HAB
Mathias Reinecke HCAL – Technical Meeting 4
Connector to Base Board
Temperature Monitor
Analog Test Output
ASIC
Analog Line Driver
Parameter Shift-Reg
Dimensions :
9 x 6.2 cm²
HCAL Testboard
Mathias Reinecke HCAL – Technical Meeting 5
Status :
- 2 boards fully assembled
- one board unassembled (spare)
Features :
- Base board for one HAB
- Interfaces 18 SiPMs
- Corresponds to ECAL ‚Left Populated‘
- Charge injection inputs (test)
HCAL Testboard
SiPM Interface, 18 chns.
Charge Injection
Power CMB Control
Test Outputs (SRIN, TCALIB)
Mathias Reinecke HCAL – Technical Meeting 6
DAQ Interface
Dimensions:
16 x 16 cm²
HAB
Parameter Shift Register
Mathias Reinecke HCAL – Technical Meeting 7
Task : Definition of operating parameters
Total length : 960 bits (one shift reg. for 6 HABs)
Loading clock : 1..10 kHz
Loading time @ 1 kHz : 1 sec per Base Board Switch : physics /
calibration mode
Timeline
Mathias Reinecke HCAL – Technical Meeting 8
Risks / Delays :
• Test of series production : board by board till mid August 2005 (500 HABs, 80 HBABs). Manpower for DAQ software and series test ?
• Design errors on HBABs (delay per redesign : 7 weeks)
• A lot of unknown features : Noise, temp.-stability, dynamic range, mechanical interface to SiPM cassette, CMB interface (ground loops etc.)
Test Setup
Mathias Reinecke HCAL – Technical Meeting 9
Series Board Tests (HAB) :
- Power dissipation
- Loading shift register
- Noise/Pedestal level
- Calibration pulse / Readout
- HV strength
Test of HBABs with HABs :
- Communication with DAQ
- HV strength
ChargeInjection
Summary
Mathias Reinecke HCAL – Technical Meeting 10
• System concept can be tested now !!
• Characterization with SiPMs : 2nd half of March
• First HCAL layer (series production) : July 2005
• Time schedule is tight : no redesigns included, implies full access to manpower and resources,
needed time for series test not clear • Preliminary user manual available : https://www.desy.de/~sefkow/HCALelectronics.html