Technical Title IAC document Note reference
Response to item 1 of the IAC request for information dated 13 July 2016 3
2 Public Off-Street Parking Facilities within the Parkville Precinct; Response to 3 item 2 of the IAC request for information dated 13 July 2016
3 Dust dispersion modelling - Eastern Portal; Response to item 3 of the IAC 3 request for information dated 13 July 2016
4 Heilig and Partners Peer Review; Response to item 4 of the IAC request for 3 information dated 13 July 2016
5 Landscape Plan at Eastern Portal; Response to item 5 of the IAC request for 3 information dated 13 July 2016
6 Flood Risk; Response to item 6 of the IAC request for information dated 13 3 July 2016
7 Structures at which protective measures may be required; Response to item 3 7 of the IAC request for information dated 13 July 2016
8 Soil and Rock Bore Logs; Response to item 8 of the IAC request dated 13 3 July 2016; Potential Modification to vertical alignment at CBD South
g Western Portal Option A - Construction of a temporary access ramp for the 3 Lloyd Street Business Park between Tennyson Street and McClure Road
10 Additional construction area in Franklin Street (east) between Swanston 3 Street and Victoria Street
11 Provision for electrical adit between Franklin Street and Swanston Street 3
56357928.20 Index to technical notes page 1
HERBERT SMITH FREEH ILLS
Technical Title IAC document Note reference
12 Franklin Street Legacy Condition ; Franklin Street (east of Swanston Street) 3 to be re-opened to traffic post-construction (in response to City of Melbourne request)
13 Additional Construction Areas in Flinders Street and Federation Square 3
14 CBD South Station Entrance: Properties located at 65 and 67-73 Swanston 3 Street no longer required as potential station entrance
15 Additional Construction Areas in Domain; Albert Road, Bowen Lane, Bowen 3 Crescent and Bromby Street
16 Modification - Removal of the Fawkner Park TBM southern launch site 3
17 Service Structures Within Albert Road 3
18 Clarification of construction timeframes at the Eastern Portal 3
19 Technical investigations and analysis re Parkville and Domain precincts 7 undertaken since the TIA exhibited with the EES was prepared, information relating to the impact on trams at the Royal Parade and College Crescent intersection, further technical investigations and analysis relating to Swanston Street outside the University of Melbourne
20 Responses to issues raised by the peer review of the Transport Impact 7 Assessment
21 Supplementary technical note to TN 13 in relation to traffic impacts 7 associated with construction of the Federation Square Entrance.
22 Transmission Line Relocation Options 7
23 Borelog data and geological long sections as described in TN008. 7
24 Revised station cavern construction methodology 7
56357928 Index to technical notes
)
page 2
)
HERBERT SMITH FREEH ILLS
Technical Title IAC document Note reference
25 Melbourne Metro Rail Project Traffic and Transport Working Group 21
26 Transport - HSF Questions (Shaun Smedley) 7
27 RFI 25 July - Section 2 (Transport) rr 1-9 21
28 RFI 25 July- Section 3 (Land use and planning) rr 10-14 21
29 RFI 25 July - Section 4 (Social and community) rr 15-20 21
30 RFI 25 July - Section 5 (Business) r 21 21
31 RFI 25 July - Section 6 (Air quality) rr 22-26 21
32 RFI 25 July - Section 7 (Noise and vibration) rr 27-38 21
33 RFI 25 July - Section 8 (Historical cultural heritage) rr 39-44 21
34 RFI 25 July - Section 9 (Aboriginal heritage) rr 45-49 21
35 RFI 25 July - Section 10 (Landscape and visual) rr 50-55 21
36 RFI 25 July - Section 11 (Surface water) rr 57-59 21
37 RFI 25 July- Section 12 (Groundwater) rr 56, 60-70 21
38 RFI 25 July - Section 13 Ground movement) rr 71-80 21
39 RFI 25 July - Section 14 (Contaminated land) rr 81-86 21
40 RFI 25 July - Section 15 (Arboriculture) rr 87-92 21
56357928 Index to technical notes page 3
HERBERT SMITH FREEH ILLS
echnical Title IAC document Note reference
41 RFI 25 July - Section 16 (EMF) rr 93-97 21
42 Response to Dr John Heilig's Request for Further Information (Noise and 21 Vibration)
43 Residential impact mitigation guidelines for construction 21
44 Parkville precinct reference group 21
45 Business support plan 21
46 Communications, stakeholder engagement and complaints response 21
47 Ground stabilisation works 41
48 Access ramp to the Lloyd Street Business Park - Dimensions of the Franklin 50 Street adit
49 Schedule of construction works for Melbourne Metro 53
50 Documents relating to South Yarra Station 64
51 Eastern Portal Precinct - land tenure in the Eastern Portal Precinct and 62 utility protection measures for Osborne Street, South Yarra
52 Western Portal Pedestrian Access 74
53 Updated geological interpretation - modelling of effects on EES 69 assessments of ground movement and future development loading
54 Response to David Anderson's Request for Further Information 70
55 Emergency Access Shafts 81
56357928 Index to technical notes
)
page 4
)
HERBERT SMITH FREEHILLS
Technical Title IAC document Note reference
56 Updated Draft Planning Scheme Amendment 92
57 Recommendations on the Urban Design Strategy 140
58 SoundPLAN Noise Modelling for Airborne Construction Noise 168
59 Response to the 'Matters for further consideration and/or clarification' 210 request dated 12 September 2016 (iii) Silica
60 Response to the 'Matters for further consideration and/or clarification' 211 request dated 12 September 2016 (v) Early works
61 Response to the 'Matters for further consideration and/or clarification' 212 request dated 12 September 2016 (vi) Lloyd Street Temporary Access Ramp
62 Response to the 'Matters for further consideration and/or clarification' 213 request dated 12 September 2016 (vii) Groundwater
63 Response to the 'Matters for further consideration and/or clarification' 227 request dated 12 September 2016 (ii) Domain precinct traffic modelling
64 Response to the 'Matters for further consideration and/or clarification' 244 request dated 12 September 2016 (xiv) Vibration
65 Response to the 'Matters for further consideration and/or clarification' 254 request dated 12 September 2016 (i) Domain Parklands and St Ki Ida Road boulevard
66 Response to the 'Matters for further consideration and/or clarification' 255 request dated 12 September 2016 (xi) Technical Notes
67 Response to the 'Matters for further consideration and/or clarification' 324 request dated 12 September 2016 (x) Urban design/heritage
68 Response to the 'Matters for further consideration and/or clarification' 311 request dated 12 September 2016 (xii) Planning
56357928 Index to technical notes page 5
HERBERT SMITH FREEH ILLS
Technical Title IAC document Note reference
69 Response to the 'Matters for further consideration and/or clarification' 312 request dated 12 September 2016 (xiii) Independent Auditor
70 Response to the 'Matters for further consideration and/or clarification' 313 request dated 12 September 2016 (xv) Arden Precinct
71 Trees in Osborne Street, South Yarra 325
72 Clarification of impacts on trees 326
73 MMRA Creative Strategy 327
74 Response to the 'Matters for further consideration and/or clarification' 328 request dated 12 September 2016 (viii) Station boxes and shafts -consideration for buoyancy uplift on tanked structures
75 Response to the 'Matters for further consideration and/or clarification' TBA request dated 12 September 2016 (iv) Air quality
76 Response to the 'Matters for further consideration and/or clarification' TBA request dated 12 September 2016 (ix) Surface water
77 Approach to sustainability in Melbourne Metro TBA
78 Acquisition of 1/8 William Street, South Yarra TBA
79 Response to request by AMIT regarding revenue estimate TBA