Upload
vuongdien
View
222
Download
0
Embed Size (px)
Citation preview
Hybrid Airships
02/15/2011 Page-1 Distribution Statement A: Approved for Public Release
Hybrid Airships
15 February 2011
The Honorable Zachary J. Lemnios
Assistant Secretary of Defense for
Research and Engineering
Hybrid Airships
02/15/2011 Page-2 Distribution Statement A: Approved for Public Release
AT&L Organization
DIRECTOR,
SPECIAL PROGRAMS
Maj Gen William McCasland
DIRECTOR,
ADMINISTRATION
Ms. Judy Dahlgren
EXEC DIRECTOR,
DEFENSE SCIENCE
BOARD
Mr. Brian Hughes
DIRECTOR,
TEST RESOURCE
MANAGEMENT CENTER
Dr. John Foulkes
DIRECTOR,
ACQUISITION
RESOURCES & ANALYSIS
Dr. Nancy Spruill
ASSISTANT
SECRETARY OF DEFENSE
(ACQUISITION)
(Performing Duties)
Mr. Shay Assad
ASSISTANT
SECRETARY OF DEFENSE
(LOGISTICS & MATERIEL
READINESS) (Performing Duties)
Mr. Alan Estevez
DEPUTY UNDER SECRETARY
OF DEFENSE
(INSTALLATIONS &
ENVIRONMENT)
Dr. Dorothy Robyn
ASSISTANT
SECRETARY OF DEFENSE
(NUCLEAR & CHEMICAL
& BIOLOGICAL DEFENSE)
Honorable Andrew Weber
DIRECTOR,
INTERNATIONAL
COOPERATION
Mr. Alfred Volkman
ASSISTANT SECRETARY
OF DEFENSE
(RESEARCH & ENGINEERING)
Honorable Zachary Lemnios
DIRECTOR,
MISSILE DEFENSE
AGENCY
LTG Patrick J. O’Reilly
DIRECTOR,
HUMAN
CAPITAL INITIATIVES
Mr. Garry Shafovaloff
(Acting)
DIRECTOR,
CORROSION
POLICY & OVERSIGHT
Mr. Daniel J. Dunmire
ASSISTANT SECRETARY
OF DEFENSE
(OPERATIONAL ENERGY
PLANS & PROGRAMS)
Honorable Sharon Burke
DIRECTOR,
DEFENSE
PROCUREMENT
& ACQUISITION POLICY
Mr. Shay Assad
UNDER SECRETARY OF DEFENSE
(ACQUISITION, TECHNOLOGY AND LOGISTICS)
The Honorable Ashton B. Carter
PRINCIPAL DEPUTY
The Honorable Frank Kendall, III
DIRECTOR,
SMALL BUSINESS
PROGRAMS
Mrs. Linda Oliver
(Acting)
Updated 02/14/2011
DIRECTOR,
JOINT RAPID FIELDING
Mr. Tom Dee
Hybrid Airships
02/15/2011 Page-3 Distribution Statement A: Approved for Public Release
General Timeline of DoD Hybrid Aircraft Interest
Navy investigates
airships for fleet air
defense
Interest in “classic”
airships (primarily Navy)
As AF interest
grows, Navy
withdraws
Joint Staff J-4 sees SkyKitten,
commissions SkyCat 1000
Engineering Study
DUSD (AT&L) sees
technology—asks
DARPA to test
DARPA Walrus
initiated
DARPA Walrus
cancelled
1920s-1950s late 1980s early 1990s 2000 2003 2006 ‘08 ’09 2010 2011
“HAMR” and “HULA”
concepts developed
Akron, Macon,
Shenandoah, etc.
Westinghouse
Sentinel 1000
L-M “AeroCraft”
ATG
SkyCat series
L-M ADP
P-791
Aeros Int’l
Aeroscraft
DARPA continues
Aeros risk reduction
NASA & OSD begin
Project Pelican
LEMV Contract
Award
Hybrid Airships
02/15/2011 Page-4 Distribution Statement A: Approved for Public Release
An air vehicle which combines:
• Aerostatic lift (buoyant) with
• Aerodynamic lift (wing-borne) and
• sometimes, direct (propulsive) lift
Hybrid Airships
Aerostatic Lift (60-100%)
Generated by helium gas Aerodynamic Lift (up to 40%)
Generated by lifting body hull
in cruise flight
Vectored Thrust Lift (up to 25%)
Take off & landing & zero airspeed
Hybrid Airships
02/15/2011 Page-5 Distribution Statement A: Approved for Public Release
Potential Mission Sets
• Heavy Cargo Airlift
– Carry large loads directly from point-of-origin to
point-of-need
– Faster closure times to point-of-need
– Operate independent of most fixed infrastructure
– Ship to Shore cargo operations
• Intelligence Surveillance Reconnaissance /
Communications
– Tactical communications network backbone
– Cell tower in the sky
– Robust sensor payloads
– Ability to stay aloft for days-weeks
Hybrid Airships
02/15/2011 Page-6 Distribution Statement A: Approved for Public Release
Pelican Technology Demonstrator
• ASD(R&E) and NASA joint effort
• Builds on DARPA investments
• Reduces risk
– Develop Variable Buoyancy system
– Develop modern rigid structure tech
– Study scalability & survivability
• Objectives
– Ballast-free operations
– Vertical Take Off and Landing (VTOL) at
maximum gross weight
– Rigid Structure
• Status
– Funding request in PB FY12
– Flight demonstration FY2013
Perhaps add another image
of the structure being built in
the hangar
Hybrid Airships
02/15/2011 Page-7 Distribution Statement A: Approved for Public Release
Approx. 300L X 150W X 80H (ft)
Long Endurance Multi-Int Vehicle (LEMV)
Technology Demonstrator
• US Army and ISR TF joint effort
• Builds on previous JCTD
investment
• Performance Objectives
– 21 days aloft with 2,500lb payload
– 20,000 ft Mean Sea Level Altitude
– 20 knots cruise/80 knots dash
• Sensor Suite
– Full Motion Video
– Signal Intelligence (SIGINT)
– Tactical Data Link(s)
– Communication Relay
– Ground Moving Target Indicator (GMTI)
Radar
• Scheduled to fly late summer 2011
Hybrid Airships
02/15/2011 Page-8 Distribution Statement A: Approved for Public Release
Payload vs. Endurance
0
100
200
300
400
500
600
100 1,000 10,000 100,000 1,000,000
En
du
ran
ce
(H
ou
rs)
Payload (Pounds)
Small Hybrid
~20 – 80 Tons
Heavy Lift
Global Observer
Magic
Small Hybrid
~ 20-80 Tons
Medium Hybrid
~ 80-200 Tons
Large Hybrid
~ 200-500 Tons
ORION
MQ-1B YMQ-18A MC-12
LEMV
(20K feet)
PELICAN
ISR (Risk reduction
Tech Demo)
Endurance in Days and Weeks
MQ-9A
Hybrid Airships
02/15/2011 Page-9 Distribution Statement A: Approved for Public Release
5 10 20 30 50 100 200 300 500 1000
Maximum Speed (mph)
Merchant Ship
A3XX Jet
Transports
Propeller Transports
C-130
C-121
P-3
747
C-5
Air
Sea
BoxWing
Hybrid
Aircraft
0.30
0.20
0.10
0.05 0.04
0.03
0.02
0.01
0.005 0.004
0.003
Sp
ecif
ic R
esis
tan
ce,
(P /
W*V
)
Co
st p
er t
on
-mile
Land Truck
Train
Courtesy: ASME, Journal of Mechanical Engineering, Volume 72, 1950, Pages 775-781, “What Price Speed – Specific Power Required for Propulsion of
Vehicles” by Gabrielli and Von Karman
Cost versus Speed
Hybrid Airships
02/15/2011 Page-10 Distribution Statement A: Approved for Public Release
Fully Burdened Cost as a Critical Performance Parameter
An
nu
al C
os
t
Time
Investment
Operations &
Support
Disposal
• Research & Development – Concept to first production
– Design, integration, test, demo
– Prototype
• Investment – Production & Deployment
– Initial training, spares, repair
• Operations & Support – Maintenance
– Operating personnel footprint
– Deployment cost
– Equipment, supplies
• Disposal – Demilitarization
R&D
Hybrid Airships
02/15/2011 Page-11 Distribution Statement A: Approved for Public Release
Challenges Forward
• Technical: – Structural material limitations
– Buoyancy Control
– Integration
– Scale
• Operational/CONOPS: – Weather
– Maintenance support
– Manned, Unmanned, or
Optionally Manned
– Survivability
– Ground operations
– On/Off load operations
– Cost
Hybrid Airships
02/15/2011 Page-12 Distribution Statement A: Approved for Public Release
Hybrid Airships
15 February 2011
The Honorable Zachary J. Lemnios
Assistant Secretary of Defense for
Research and Engineering