I-405 Express Toll Lanes45 MONTHS OF OPERATIONS
THIS REPORT REVIEWS DATA FROM THE FIRST 45 MONTHS OF OPERATIONS (OCTOBER 2015 ndash JUNE 2019) OF THE EXPRESS TOLL LANES
OCTOBER 2015 ndash JUNE 2019
TABLE OF CONTENTS
I-405 Express Toll Lanes 45 Month Update October 2015 ndash June 2019 1
Executive Summary1 Goals 1
Legislative Performance Measures 2
Average Corridor Speeds 4
Transit Travel Times 5
Revenue 6
Toll Rates 7
Maximum Toll 8
Appendix A Legislative Performance Measures 10 Detailed General Purpose Lane Travel Time Data 14
Detailed Volume Data 27
Detailed Speed Data 28
Appendix B Additional Traffic Performance Data 52
Appendix C Express Toll Lane Guide 56 Operational Parameters 56
How Express Toll Lanes Work 56
Design 57
Vehicle Limitations 57
Dynamic Tolling 57
How the Signs Work58
1
Washington State Department of Transportation
I-405 EXPRESS TOLL LANES 45 MONTH UPDATE OCTOBER 2015 ndashJUNE 2019
EXECUTIVE SUMMARY The express toll lanes are continuing to meet the three goals that the Washington State Department of Transportation set for them
GOAL 1 Provide a choice to people bull 59000 vehicles use the express toll lanes each day 39000 drivers choose to pay a toll and 20000 vehicles drive toll-free
bull Drivers pay an average toll rate of $479 for peak period peak direction trips
GOAL 2 Provide a faster more predictable trip Drivers saved an average of 11 minutes using the express toll lanes compared to the general purpose lanes on trips between Bellevue and Lynnwood during peak periods
I-405 now carries up to 23 percent more vehicles each weekday during the peak periods when compared to before tolling began Using the most recent occupancy data from 2018 I-405 also carries up to 16 percent more people when compared to before tolling began
Even though I-405 is carrying many more vehicles average speeds in the express toll lanes have increased by as much as 17 mph while general purpose lanes have improved by as much as 3 mph compared to pretolling in some areas
Every day 7750 people ride buses in the express toll lanes This is an increase of 9 percent for King County Metro and 2 percent for Community Transit when compared to before tolling began
bull
bull
bull
bull
GOAL 3 Generate revenue to reinvest in the corridor bull In 45 months the express toll lanes generated $995 million in total revenue While $328 million has been used to maintain and operate the lanes the remaining $668 million has been dedicated to be reinvested back into the I-405 Corridor including Complete $115 million for the peak use shoulder lane on northbound I-405 in Bothell Under way Funding for preliminary engineering environmental review processes and construction for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange
2
Washington State Department of Transportation
Legislative Performance Measures The legislation that authorized the construction and operation of the I-405 express toll lanes requires WSDOT to report quarterly on several performance measures including
bull Whether the express toll lanes generated sufficient revenue to pay for all express toll lane-related operating costs
bull Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods and any alternate metric determined by the department in conjunction with the federal highway administration Revenue The express toll lanes have consistently generated more revenue than is necessary to fund operational costs During the 2019 spring quarter the express toll lanes generated $93 million in total revenue which was more than enough to cover the $52 million in expenditures This brings the total revenue generated through 45 months of operations to $995 million with the total cost of operating and maintaining the lanes at $328 million
The Legislature specified that net revenue must be used to improve the corridor WSDOT has already reinvested $115 million into the peak use shoulder lane Additional revenue was allocated by the Legislature to fund preliminary engineering and environmental review processes for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange Construction for this
3
Washington State Department of Transportation
8016
4
6236
2
MPH0-29
45 +
30-44
6236
2
MPH0-29
45 +
30-44
8016
4
project is scheduled to begin in 2021 with an anticipated three to four year construction period
Speed reliability While the express toll lanes have reduced travel times and increased speeds during peak periods in most sections of the corridor some sections have fallen short of the second legislative performance measure of maintaining speeds of 45 mph or faster 90 percent of the time during peak periods However the southbound dual lane section and the northbound single lane section are both surpassing the 90 percent goal WSDOT reports this measure in six month increments in order to be consistent with reporting to the Federal Highway Administration
Overall the express toll lanes are meeting the speed target 80 percent of the time during peak periods from January 2019 to June 2019 despite the fact that I-405 is carrying up to 23 percent more vehicles each weekday when compared to before tolling began This is a significant improvement compared to the old HOV lanes which only met the goal 62 percent of the time during the same time of year in 2015 before they were turned into express toll lanes
The southbound lanes move at 45 mph 71 percent of the time during peak periods due to a lack of capacity in the single lane section and increasing traffic volumes The northbound lanes met the speed goal 89 percent of the time due to heavy demand between Bellevue and Bothell Percent of peak time periods Express toll lanes Pre-Tolling HOV
JAN 2019 - JUNE 2019 JAN 2015- JUNE 2015 when the lanes move vehicles within each speed range
MPH0-29
45 +
30-44
8016
4
62 36
2
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
TABLE OF CONTENTS
I-405 Express Toll Lanes 45 Month Update October 2015 ndash June 2019 1
Executive Summary1 Goals 1
Legislative Performance Measures 2
Average Corridor Speeds 4
Transit Travel Times 5
Revenue 6
Toll Rates 7
Maximum Toll 8
Appendix A Legislative Performance Measures 10 Detailed General Purpose Lane Travel Time Data 14
Detailed Volume Data 27
Detailed Speed Data 28
Appendix B Additional Traffic Performance Data 52
Appendix C Express Toll Lane Guide 56 Operational Parameters 56
How Express Toll Lanes Work 56
Design 57
Vehicle Limitations 57
Dynamic Tolling 57
How the Signs Work58
1
Washington State Department of Transportation
I-405 EXPRESS TOLL LANES 45 MONTH UPDATE OCTOBER 2015 ndashJUNE 2019
EXECUTIVE SUMMARY The express toll lanes are continuing to meet the three goals that the Washington State Department of Transportation set for them
GOAL 1 Provide a choice to people bull 59000 vehicles use the express toll lanes each day 39000 drivers choose to pay a toll and 20000 vehicles drive toll-free
bull Drivers pay an average toll rate of $479 for peak period peak direction trips
GOAL 2 Provide a faster more predictable trip Drivers saved an average of 11 minutes using the express toll lanes compared to the general purpose lanes on trips between Bellevue and Lynnwood during peak periods
I-405 now carries up to 23 percent more vehicles each weekday during the peak periods when compared to before tolling began Using the most recent occupancy data from 2018 I-405 also carries up to 16 percent more people when compared to before tolling began
Even though I-405 is carrying many more vehicles average speeds in the express toll lanes have increased by as much as 17 mph while general purpose lanes have improved by as much as 3 mph compared to pretolling in some areas
Every day 7750 people ride buses in the express toll lanes This is an increase of 9 percent for King County Metro and 2 percent for Community Transit when compared to before tolling began
bull
bull
bull
bull
GOAL 3 Generate revenue to reinvest in the corridor bull In 45 months the express toll lanes generated $995 million in total revenue While $328 million has been used to maintain and operate the lanes the remaining $668 million has been dedicated to be reinvested back into the I-405 Corridor including Complete $115 million for the peak use shoulder lane on northbound I-405 in Bothell Under way Funding for preliminary engineering environmental review processes and construction for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange
2
Washington State Department of Transportation
Legislative Performance Measures The legislation that authorized the construction and operation of the I-405 express toll lanes requires WSDOT to report quarterly on several performance measures including
bull Whether the express toll lanes generated sufficient revenue to pay for all express toll lane-related operating costs
bull Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods and any alternate metric determined by the department in conjunction with the federal highway administration Revenue The express toll lanes have consistently generated more revenue than is necessary to fund operational costs During the 2019 spring quarter the express toll lanes generated $93 million in total revenue which was more than enough to cover the $52 million in expenditures This brings the total revenue generated through 45 months of operations to $995 million with the total cost of operating and maintaining the lanes at $328 million
The Legislature specified that net revenue must be used to improve the corridor WSDOT has already reinvested $115 million into the peak use shoulder lane Additional revenue was allocated by the Legislature to fund preliminary engineering and environmental review processes for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange Construction for this
3
Washington State Department of Transportation
8016
4
6236
2
MPH0-29
45 +
30-44
6236
2
MPH0-29
45 +
30-44
8016
4
project is scheduled to begin in 2021 with an anticipated three to four year construction period
Speed reliability While the express toll lanes have reduced travel times and increased speeds during peak periods in most sections of the corridor some sections have fallen short of the second legislative performance measure of maintaining speeds of 45 mph or faster 90 percent of the time during peak periods However the southbound dual lane section and the northbound single lane section are both surpassing the 90 percent goal WSDOT reports this measure in six month increments in order to be consistent with reporting to the Federal Highway Administration
Overall the express toll lanes are meeting the speed target 80 percent of the time during peak periods from January 2019 to June 2019 despite the fact that I-405 is carrying up to 23 percent more vehicles each weekday when compared to before tolling began This is a significant improvement compared to the old HOV lanes which only met the goal 62 percent of the time during the same time of year in 2015 before they were turned into express toll lanes
The southbound lanes move at 45 mph 71 percent of the time during peak periods due to a lack of capacity in the single lane section and increasing traffic volumes The northbound lanes met the speed goal 89 percent of the time due to heavy demand between Bellevue and Bothell Percent of peak time periods Express toll lanes Pre-Tolling HOV
JAN 2019 - JUNE 2019 JAN 2015- JUNE 2015 when the lanes move vehicles within each speed range
MPH0-29
45 +
30-44
8016
4
62 36
2
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
1
Washington State Department of Transportation
I-405 EXPRESS TOLL LANES 45 MONTH UPDATE OCTOBER 2015 ndashJUNE 2019
EXECUTIVE SUMMARY The express toll lanes are continuing to meet the three goals that the Washington State Department of Transportation set for them
GOAL 1 Provide a choice to people bull 59000 vehicles use the express toll lanes each day 39000 drivers choose to pay a toll and 20000 vehicles drive toll-free
bull Drivers pay an average toll rate of $479 for peak period peak direction trips
GOAL 2 Provide a faster more predictable trip Drivers saved an average of 11 minutes using the express toll lanes compared to the general purpose lanes on trips between Bellevue and Lynnwood during peak periods
I-405 now carries up to 23 percent more vehicles each weekday during the peak periods when compared to before tolling began Using the most recent occupancy data from 2018 I-405 also carries up to 16 percent more people when compared to before tolling began
Even though I-405 is carrying many more vehicles average speeds in the express toll lanes have increased by as much as 17 mph while general purpose lanes have improved by as much as 3 mph compared to pretolling in some areas
Every day 7750 people ride buses in the express toll lanes This is an increase of 9 percent for King County Metro and 2 percent for Community Transit when compared to before tolling began
bull
bull
bull
bull
GOAL 3 Generate revenue to reinvest in the corridor bull In 45 months the express toll lanes generated $995 million in total revenue While $328 million has been used to maintain and operate the lanes the remaining $668 million has been dedicated to be reinvested back into the I-405 Corridor including Complete $115 million for the peak use shoulder lane on northbound I-405 in Bothell Under way Funding for preliminary engineering environmental review processes and construction for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange
2
Washington State Department of Transportation
Legislative Performance Measures The legislation that authorized the construction and operation of the I-405 express toll lanes requires WSDOT to report quarterly on several performance measures including
bull Whether the express toll lanes generated sufficient revenue to pay for all express toll lane-related operating costs
bull Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods and any alternate metric determined by the department in conjunction with the federal highway administration Revenue The express toll lanes have consistently generated more revenue than is necessary to fund operational costs During the 2019 spring quarter the express toll lanes generated $93 million in total revenue which was more than enough to cover the $52 million in expenditures This brings the total revenue generated through 45 months of operations to $995 million with the total cost of operating and maintaining the lanes at $328 million
The Legislature specified that net revenue must be used to improve the corridor WSDOT has already reinvested $115 million into the peak use shoulder lane Additional revenue was allocated by the Legislature to fund preliminary engineering and environmental review processes for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange Construction for this
3
Washington State Department of Transportation
8016
4
6236
2
MPH0-29
45 +
30-44
6236
2
MPH0-29
45 +
30-44
8016
4
project is scheduled to begin in 2021 with an anticipated three to four year construction period
Speed reliability While the express toll lanes have reduced travel times and increased speeds during peak periods in most sections of the corridor some sections have fallen short of the second legislative performance measure of maintaining speeds of 45 mph or faster 90 percent of the time during peak periods However the southbound dual lane section and the northbound single lane section are both surpassing the 90 percent goal WSDOT reports this measure in six month increments in order to be consistent with reporting to the Federal Highway Administration
Overall the express toll lanes are meeting the speed target 80 percent of the time during peak periods from January 2019 to June 2019 despite the fact that I-405 is carrying up to 23 percent more vehicles each weekday when compared to before tolling began This is a significant improvement compared to the old HOV lanes which only met the goal 62 percent of the time during the same time of year in 2015 before they were turned into express toll lanes
The southbound lanes move at 45 mph 71 percent of the time during peak periods due to a lack of capacity in the single lane section and increasing traffic volumes The northbound lanes met the speed goal 89 percent of the time due to heavy demand between Bellevue and Bothell Percent of peak time periods Express toll lanes Pre-Tolling HOV
JAN 2019 - JUNE 2019 JAN 2015- JUNE 2015 when the lanes move vehicles within each speed range
MPH0-29
45 +
30-44
8016
4
62 36
2
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
2
Washington State Department of Transportation
Legislative Performance Measures The legislation that authorized the construction and operation of the I-405 express toll lanes requires WSDOT to report quarterly on several performance measures including
bull Whether the express toll lanes generated sufficient revenue to pay for all express toll lane-related operating costs
bull Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods and any alternate metric determined by the department in conjunction with the federal highway administration Revenue The express toll lanes have consistently generated more revenue than is necessary to fund operational costs During the 2019 spring quarter the express toll lanes generated $93 million in total revenue which was more than enough to cover the $52 million in expenditures This brings the total revenue generated through 45 months of operations to $995 million with the total cost of operating and maintaining the lanes at $328 million
The Legislature specified that net revenue must be used to improve the corridor WSDOT has already reinvested $115 million into the peak use shoulder lane Additional revenue was allocated by the Legislature to fund preliminary engineering and environmental review processes for the I-405 - SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project which will increase capacity and improve mobility north of the SR 522 interchange Construction for this
3
Washington State Department of Transportation
8016
4
6236
2
MPH0-29
45 +
30-44
6236
2
MPH0-29
45 +
30-44
8016
4
project is scheduled to begin in 2021 with an anticipated three to four year construction period
Speed reliability While the express toll lanes have reduced travel times and increased speeds during peak periods in most sections of the corridor some sections have fallen short of the second legislative performance measure of maintaining speeds of 45 mph or faster 90 percent of the time during peak periods However the southbound dual lane section and the northbound single lane section are both surpassing the 90 percent goal WSDOT reports this measure in six month increments in order to be consistent with reporting to the Federal Highway Administration
Overall the express toll lanes are meeting the speed target 80 percent of the time during peak periods from January 2019 to June 2019 despite the fact that I-405 is carrying up to 23 percent more vehicles each weekday when compared to before tolling began This is a significant improvement compared to the old HOV lanes which only met the goal 62 percent of the time during the same time of year in 2015 before they were turned into express toll lanes
The southbound lanes move at 45 mph 71 percent of the time during peak periods due to a lack of capacity in the single lane section and increasing traffic volumes The northbound lanes met the speed goal 89 percent of the time due to heavy demand between Bellevue and Bothell Percent of peak time periods Express toll lanes Pre-Tolling HOV
JAN 2019 - JUNE 2019 JAN 2015- JUNE 2015 when the lanes move vehicles within each speed range
MPH0-29
45 +
30-44
8016
4
62 36
2
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
3
Washington State Department of Transportation
8016
4
6236
2
MPH0-29
45 +
30-44
6236
2
MPH0-29
45 +
30-44
8016
4
project is scheduled to begin in 2021 with an anticipated three to four year construction period
Speed reliability While the express toll lanes have reduced travel times and increased speeds during peak periods in most sections of the corridor some sections have fallen short of the second legislative performance measure of maintaining speeds of 45 mph or faster 90 percent of the time during peak periods However the southbound dual lane section and the northbound single lane section are both surpassing the 90 percent goal WSDOT reports this measure in six month increments in order to be consistent with reporting to the Federal Highway Administration
Overall the express toll lanes are meeting the speed target 80 percent of the time during peak periods from January 2019 to June 2019 despite the fact that I-405 is carrying up to 23 percent more vehicles each weekday when compared to before tolling began This is a significant improvement compared to the old HOV lanes which only met the goal 62 percent of the time during the same time of year in 2015 before they were turned into express toll lanes
The southbound lanes move at 45 mph 71 percent of the time during peak periods due to a lack of capacity in the single lane section and increasing traffic volumes The northbound lanes met the speed goal 89 percent of the time due to heavy demand between Bellevue and Bothell Percent of peak time periods Express toll lanes Pre-Tolling HOV
JAN 2019 - JUNE 2019 JAN 2015- JUNE 2015 when the lanes move vehicles within each speed range
MPH0-29
45 +
30-44
8016
4
62 36
2
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
4
Washington State Department of Transportation
-
Average Corridor Speeds From April to June 2019 the express toll lanes moved vehicles traveling the full length of the express toll lanes an average 16 mph faster than the general purpose lanes during the southbound morning peak period and 23 mph faster during the northbound afternoon peak period
Average corridor speeds peak period APRIL - JUNE 2019
ROUTE GENERAL PURPOSE EXPRESS TOLL LANES
Bellevue to Bothell (northbound) 25 mph 52 mph
Bothell to Lynnwood (northbound) 41 mph 55 mph
Lynnwood to Bothell (southbound) 23 mph 38 mph
Bothell to Bellevue (southbound) 41 mph 57 mph
Express toll lane speeds compared to general purpose lane speeds during spring 2019
GEN
ERAL PU
RPOSE LA
NES
EXPR
ESS
TOLL
LA
NES
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
405
405
5
520
522
527
NE 160th St
NE 6th St
15 MPH FASTER
16 MPH FASTER
14 MPH FASTER
27 MPH FASTER
General Purpose Lanes While most areas are seeing speed improvements the southbound section from Lynnwood to Bothell continues to fluctuate WSDOT is currently conducting preliminary engineering to widen I-405 between the State Route 522 and SR 527 interchanges
Average general purpose lanes speed peak period
ROUTE PRE TOLLING SPRING 2016 SPRING 2017 SPRING 2018 SPRING 2019
Bellevue to Bothell (northbound) 25 mph 30 mph 32 mph 27 mph 25 mph
Bothell to Lynnwood (northbound) 32 mph 27 mph 39 mph 41 mph 41 mph
Lynnwood to Bothell (southbound) 24 mph 27 mph 24 mph 25 mph 23 mph
Bothell to Bellevue (southbound) 35 mph 44 mph 41 mph 42 mph 41 mph
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
5
Washington State Department of Transportation
Transit Travel Times Since the express toll lanes opened in September 2015 transit ridership has increased by an average of five percent on I-405 During the spring 2019 quarter an average 7750 people used transit routes on the express toll lanes every day WSDOT works with regional transit agencies King County Metro and Community Transit (servicing Snohomish County) to monitor transit performance on the I-405 express toll lanes Both Community Transit and King County Metro operate Sound Transit routes on I-405
King County Metro travel times on I-405 between Bellevue and Lynnwood have improved by 1 to 11 minutes When comparing travel times to pre-tolling conditions daily average travel times for Community Transit showed an improvement for the majority of routes with the exception of Route 424 that travels along I-405 between SR 520 and SR 522 The travel time increase was slightly over a minute The remaining routes have travel time savings of up to 4 minutes
2 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
4
9 RIDERSHIP INCREASE
TIME SAVINGS
MINUTES
UP TO
11
Route 424 that travels along I-405 between SR 520 and SR 522 is the only route to show a travel timeincrease but reports travel times over a significantly shorter distance than the other routes
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
6
Washington State Department of Transportation
Revenue Toll revenue is appropriated by the Legislature and monitored by the Office of Financial Management Under existing law I-405 express toll lane revenue must be used to cover facility operations and maintenance costs and any additional revenue is to be invested back in to the corridor
Express toll lane revenue has increased over time due to increasing demand as the number of cars on the road increases However operations costs have remained relatively consistent over the past three years As a result the percentage of revenue going to I-405 improvements has increased each year
In winter 2019 express toll lane revenue decreased due to the snowy weather in February which resulted in less volume on I-405 However the express toll lanes generated more than enough revenue to cover expenses and finances have returned to the previous trend of increasing revenue with relatively stable expenditures
$
TOTAL REVENUE
$995 M
EXPENDITURES
$328 M
FOR IMPROVEMENTS
$668 M Revenue and expenditures remain consistent
Revenue Expenditures
$9 M
$8 M
$7 M
$6 M
$5 M
$4 M
$3 M
$2 M
$1 M
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
7
Washington State Department of Transportation
Average peak period peak direction toll rates OCTOBER 1 2015 - JUNE 30 2019
$479 $5
$4
$3
$2
$1
FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
(OCT-DEC) (OCT-DEC) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN) (JULY-SEPT) (OCT-DEC) (JAN-MAR) (APR-JUN)
$382 $355$370
$308$296$299 $329$334 $272$240
$175
$442 $460
$423
MONDAY - FRIDAY Southbound 5-9 am Northbound 3-7 pm
Toll Rates In March 2015 the Washington State Transportation Commission (WSTC) approved a minimum toll rate of 75 cents and a maximum of $10 Toll rates are adjusted by a congestion-based tolling algorithm designed to keep the express toll lanes flowing by adapting the toll rate to match the demand
In the most recent quarter
bull For peak period peak direction trips the average toll rate was $479 a 56 cent increase from last quarter
bull The spring 2019 quarter is returning to the trend of increasing peak period rates 30 2018
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
8
Washington State Department of Transportation
Maximum Toll WSDOT tracks the instances where the express toll lanes reached $10 In spring 2019 the proportion of drivers who paid the $10 maximum toll rate was
$4 - $bull 85 percent for all tolled trips bull 151 percent for peak period peak direction trips 155 percent of northbound peak period trips paid the $10 toll rate
147 percent of southbound peak period trips paid the $10 toll rate
The chart below represents the percentage of days that the maximum $10 toll rate was displayed during the peak period by quarter For consistency percentages for each quarter are calculated based on the current tolling hours before and after the hours of operation were changed in March 2016
8
SPRING 2019 PEAK PERIOD
PEAK DIRECTION 44
TOLL RATES
$075 - $4
- $10
24
32
$8
Percent of weekdays with $10 rate by quarter
Northbound Southbound 100
20
30
40
50
60
70
80
90
10
0 WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING
2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
9
Washington State Department of Transportation
Though tolls reached the maximum most weekdays this spring they did not remain at that price for long The following chart shows how many minutes on average the lanes were at the $10 maximum
Southbound commutes on Tuesdays saw the longest $10 maximum remaining at that price for an average of 125 minutes However Friday commutes heading south saw a $10 toll for only 30 minutes
The northbound peaks were more consistent with the lanes displaying the maximum between 65 and 110 minutes on average
Minutes at $10 during peak periods (longest trip) SPRING 2019
150
120
90
60
30
0
AVERAGE NB AVERAGE SB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
10
Washington State Department of Transportation
LEGISLATIVE MONITORING REQUIREMENT REPORT SECTION REFERENCE
a Whether the express toll lanes maintain speeds of 45 miles per hour at least 90 percent of the time during peak periods
Page 4 Includes percent of time the express toll lanes are moving traffic at 45 miles per hour or faster
b Whether the average traffic speed changed in the general purpose lanes
Page 3 - 5 Includes average speed and travel time trends for the general purpose lanes
c Whether transit ridership changed Page 6 Includes preliminary transit ridership and travel time findings
d Whether the actual use of the express toll lanes is consistent with the projected use
We have exceeded original forecasts and will no longer be reporting
e Whether the express toll lanes generated sufficient revenue to pay for all I-405 express toll lane operating costs
Page 7 Includes preliminary revenue and expenditure results
f Whether travel times and volumes have increased or decreased on adjacent local streets and state highways
This data is only reported on every 6 months For the most recent information please refer to the 42 month report
g Whether the actual gross revenues are consistent with projected gross revenues as identified in the fiscal note for EHB 1382 distributed by the Office of Financial Management on March 15 2011
We have far exceeded the original forecasts and will no longer be reporting on this unless we fall below forecasts
APPENDIX A LEGISLATIVE PERFORMANCE MEASURES
In its 2011 authorization of the I-405 express toll lanes (RCW 4756880) the Legislature directed WSDOT to monitor and report on seven performance metrics on a quarterly basis
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
11
Washington State Department of Transportation
Legislative Performance Measures The legislature added reporting requirements during the 2016 budget process detailed in ESHB 2524 209 (7) and in the 2019 budget process in ESHB 1160 209 (8) These subsequent reporting requirements address travel times and volumes for 10 specific travel segments along the I-405 express toll lanes corridor This appendix provides a high-level summary of the travel time data and links to electronic copies of the detailed travel time and volume data The Legislature requested average and at minimum 90th percentile travel times Consistent with WSDOT methodology and the requirements of the proviso this report includes 95th percentile travel times
ESHB 2524 209 (7) states
The department must provide quarterly reports to the transportation committees of the legislature on the Interstate 405 express toll lane project performance measures listed in RCW 4756880(4) These reports must include
(a) Information on the travel times and travel time reliability (at a minimum average and 90th percentile travel times) maintained during peak and nonpeak periods in the express toll lanes and general purpose lanes for both the entire corridor and commonly made trips in the corridor including but not limited to northbound from Bellevue to Rose Hill state route number 520 at NE 148th to Interstate 405 at state route number 522 Bellevue to Bothell (both NE 8th to state route number 522 and NE 8th to state route number 527) and a trip internal to the corridor (such as NE 85th to NE 160th) and similar southbound trips
(b) A month-to-month comparison of travel times and travel time reliability for the entire corridor and commonly made trips in the corridor as specified in (a) of this subsection since implementation of the express toll lanes and to the extent available a comparison to the travel times and travel time reliability prior to implementation of the express toll lanes
(c) Total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane (i) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane on this segment of Interstate 405 prior to implementation of the express toll lanes and (ii) compared to total express toll lane and total general purpose lane traffic volumes as well as per lane traffic volumes for each type of lane from month to month since implementation of the express toll lanes and
(d) Underlying congestion measurements that is speeds that are being used to generate the summary graphs provided to be made available in a digital file format
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
12
Washington State Department of Transportation
ESHB 1160 209 (8) states
(a) The department shall compile monthly data on the number of Washington state patrol enforcement hours on each facility and the percentage of time during peak hours that speeds are at or above forty-five miles per hour on each facility
The Legislature directed WSDOT to examine travel times along specific segments of the I-405 express toll lanes corridor The following table lists these travel segments and their corresponding mileposts A map of the express toll lanes with milepost markers is included for reference at the end of this appendix
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
13
Washington State Department of Transportation
Legislative segments requested and corresponding mileposts
LEGISLATIVE REQUEST PROVIDED TR AVEL TIMES
MISSING GP DATA1
MISSING ETL DATA1 NOTES
1 Interstate 405 Northbound Bellevue to Rose Hill
(MP 1392) Bellevue to (MP 2022) Rose Hill
2 Interstate 405 Southbound Rose Hill to Bellevue
(MP 2022) Rose Hill to (MP 1392) Bellevue July 2015 May June
July 2015
3 State Route 520 Westbound at NE 148th to Interstate 405 Northbound at State Route 522
(SR 520 MP 911) SR 520 148th to (I-405 MP 2351) SR 522
Sept 2015 Aug Sept 2015
EB and WB sensor at 148th not located in same place
4 Interstate 405 Southbound at State Route 522 to State Route 520 Eastbound at NE 148th
(I-405 MP 2351) SR 522 to (SR 520 MP 935) SR 520 148th
EB and WB sensor at 148th not located in same place
5 Interstate 405 Northbound Bellevue to Bothell (State Route 522)
(MP 1392) Bellevue to (MP 2351) SR 522
Sept 2015 Aug Sept 2015
6 Interstate 405 Southbound Bothell (State Route 522) to Bellevue
(MP 2351) SR 522 to (MP 1392) Bellevue
May June Sept 2015
7 Interstate 405 Northbound Bellevue to Bothell (State Route 527)
(MP 1392) Bellevue to (MP 2616) SR 527
8 Interstate 405 Southbound Bothell (State Route 527) to Bellevue
(MP 2616) SR 527 to (MP 1392) Bellevue
May June 2015
9 Northbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 1799) NE 85th to (MP 2439) Beardslee Blvd
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
10 Southbound Trip Internal to the Corridor (such as NE 85th to NE 160th)
(MP 2439) Beardslee Blvd to (MP 1799) NE 85th
Sept Dec 2015
Sept Dec 2015
Insufficient data availability NE 160th
1 Loop data is not available in various locations due to construction activity This has resulted in incalculable travel times for certain months
Note Monthly average and 95th percentile travel times provided for both general purpose and express toll lanes for the morning Peak (5AM - 9AM) Midday Period (9 AM - 3PM) and PM Peak (3PM - 7PM)
Note The legislature requested average and 90th percentile travel times Direction was received from OFM to report the 95th percentile
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
14
Washington State Department of Transportation
Detailed General Purpose Lane Travel Time Data After 45 months of I-405 express toll lanes operation several sections of the general purpose lanes have experienced improved speed and reliability compared to before tolling
The largest improvements in travel times occur on northbound I-405 during the evening peak period between Bothell and Lynnwood Travel times in this section degraded until April 2017 when the peak-use shoulder lane opened which significantly improved travel times and reliability
Projects that have added capacity in the that section such as the toll-funded peak use shoulder lane have improved speeds in the general purpose and express toll lanes This additional general purpose capacity frees up room for vehicles allowing for faster speeds and shorter travel times However as vehicle volumes continue to increase the peak-use shoulder will only serve as an interim improvement General purpose lane speeds in the that section have been steadily decreasing from an average 46 mph in summer 2017 after the shoulder lane opened to 41 mph in spring 2019
Speeds in the southbound general purpose lanes from Lynnwood to Bothell continue to fluctuate during the morning peak period and have not seen consistent improvements When the express toll lanes first opened in fall 2015 drivers were averaging speeds of 28 mph But by late 2017 those speeds decreased to the 21-23 mph average the lanes experienced prior to tolling Since then the average speeds have continued to range between 21 and 27 mph
The southbound dual lane section between Bothell and Bellevue shows faster more reliable speeds during the morning peak period when compared to pretolling However general purpose travel times and reliability in the afternoon peak period have progressively declined in recent months due to a higher traffic demand in the area between Bellevue and NE 116th St
More detailed data can be found on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
15
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO NE 116TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
22 MIN
15 MIN
23 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
1
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
16
10
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 116TH TO BELLEVUE
AM PEAK PERIOD
Average 95th Percentile
20
9 MIN
11 MIN
13 MIN
11 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
2
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
17
50
TRAVEL TIMES WESTBOUND SR 520 AT 148TH AVE NE TO NORTHBOUND I-405 AT SR 522
PM PEAK PERIOD 95th Percentile Average
20
30
40
26 MIN
38 MIN
23 MIN
34 MIN
10
0 Fall
2014 Winter Spring Summer 2015 2015 2015
Fall 2015
Winter Spring Summer 2016 2016 2016
Fall 2016
Winter Spring Summer 2017 2017 2017
Fall 2017
Winter Spring Summer 2018 2018 2018
Fall 2018
Winter Spring 2019 2019
3
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
18
30
TRAVEL TIMES SOUTHBOUND I-405 AT SR 522 TO EASTBOUND SR 520 AT 148TH AVE NE
AM PEAK PERIOD 95th Percentile Average
20 20 MIN
25 MIN
17 MIN
20 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
4
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
19
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 522
PM PEAK PERIOD 95th Percentile Average
40
20
30
23 MIN
31 MIN
21 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Spring 2019
Winter 2019
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Fall 2017
Summer 2017
Spring 2017
Winter 2017
5
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
20
20
TRAVEL TIMES SOUTHBOUND I-405 FROM SR 522 TO BELLEVUE
AM PEAK PERIOD 95th Percentile Average
30
18 MIN
23 MIN
14 MIN
18 MIN
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
6
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
21
TRAVEL TIMES NORTHBOUND I-405 FROM BELLEVUE TO SR 527
PM PEAK PERIOD 95th Percentile Average
50
40
30
20
10
0
27 MIN
37 MIN
25 MIN
36 MIN
Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
7
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
22
SOUTHBOUND I-405 FROM SR 527 TO BELLEVUE 95th Percentile AM PEAK PERIOD Average
50
10
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
20
30
40
27 MIN
36 MIN
23 MIN
29 MIN
8
TRAVEL TIMES
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
23
TRAVEL TIMES NORTHBOUND I-405 FROM NE 85TH TO NE 195TH
PM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
19 MIN
11 MIN
17 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
9
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
24
TRAVEL TIMES SOUTHBOUND I-405 FROM NE 195TH TO NE 85TH
AM PEAK PERIOD 95th Percentile Average
30
10
20
15 MIN
21 MIN
11 MIN
15 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
10
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
25
ADDITIONAL EXAMPLE TRAVEL TIMES
NORTHBOUND I-405 FROM NE 160TH ST TO I-5
30
PM PEAK PERIOD
Average 95th Percentile
10
20
13 MIN
20 MIN
11 MIN
19 MIN
0 Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring
2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
26
ADDITIONAL EXAMPLE
50
TRAVEL TIMES SOUTHBOUND I-405 FROM I-5 TO NE 160TH ST
AM PEAK PERIOD Average 95th Percentile
20
30
40
18 MIN
38 MIN
17 MIN
31 MIN
10
0 Fall
2014 Fall
2015 Summer
2015 Spring 2015
Winter 2015
Fall 2017
Summer 2017
Spring 2017
Winter 2017
Fall 2016
Summer 2016
Spring 2016
Winter 2016
Fall 2018
Summer 2018
Spring 2018
Winter 2018
Spring 2019
Winter 2019
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
27
Washington State Department of Transportation
Detailed Volume Data bull The following pages contain a summary of the requested volume data Due to the large quantity and detail of volume data requested for each travel segment the rest of this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull The appendix volume data summarizes volume totals by peak hour peak period daily total direction lane and by month from October 2014 through June 2019 at four screen line locations along the corridor During the first 45 months of express toll lane operations all four locations saw average volume growth compared to the year prior to express toll lane operations The rate of growth was higher during the peak periods in the peak direction than the daily volume rate of growth The rate of growth was also higher at the locations between Bellevue and Bothell than between Bothell and Lynnwood The locations between Bellevue and Bothell clearly showed greater growth during the first year of operations than the second year However the locations between Bothell and Lynnwood displayed a mix of trends over the two years Most notably the southbound AM peak period primarily grew in the first year of operations while northbound PM peak period primarily grew in the second year of operations The evening peak period data collected after April 2017 includes the operation of the peak-use shoulder lane
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
28
Washington State Department of Transportation
Detailed Speed Data bull Due to the large amount and detail of the speed data requested for each travel segment this data will be provided on WSDOTrsquos website at wwwwsdotwagovTolling405libraryhtm
bull Data summary Monthly average 5th percentile and 95th percentile speeds (miles per hour) along I-405 in 5 minute increments from October 2014 to June 2019 Speeds are summarized in two segments the southern corridor (downtown Bellevue to SR 522) and the northern corridor (SR 522 to Swamp Creek) They are also summarized for the full length in the HOVexpress toll lanes and the general purpose lanes
REFERENCE MAP FOR LOCATING MILEPOSTS ALONG I-405
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
29
Washington State Department of Transportation
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 17663 23017 59002 82576
HOV 4301 4850 10402 10812
Total 21964 27867 69404 93388
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
Total Change (2015 2014) 2092 626 15131 401
Nov
2014
Mainline 17144 21508 68851 81400
HOV 3932 4565 12511 11345
Total 21076 26073 81362 92745
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
Total Change (2015 2014) 1771 1738 -1590 4515
Dec
2014
Mainline 16511 21553 68468 80554
HOV 3507 4504 12859 10968
Total 20018 26057 81327 91522
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
Total Change (2015 2014) 1793 885 379 55
Jan
2015
Mainline 17262 22217 68380 80996
HOV 3950 4609 11343 10426
Total 21212 26826 79723 91422
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
Total Change (2016 2015) 2537 1421 2945 249
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
30
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Feb
2015 Mainline 18152 23283 67434 80586
HOV 4158 4623 11436 9653
Total 22310 27906 78870 90239
2016 Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
Total Change (2016 2015) 3345 1881 8028 5546
Mar
2015 Mainline 18539 22839 72882 85870
HOV 4293 4836 12122 11115
Total 22832 27675 85004 96985
2016 Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
Total Change (2016 2015) 3644 2838 4423 1123
Apr
2015 Mainline 19022 22890 73793 85949
HOV 4197 4838 12769 11660
Total 23219 27728 86562 97609
2016 Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
Total Change (2016 2015) 3386 3736 4683 4219
May
2015 Mainline 18265 22625 72807 85565
HOV 4190 4794 13665 11840
Total 22455 27419 86472 97405
2016 Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
Total Change (2016 2015) 3707 5269 4492 9452
Jun
2015 Mainline 19028 23427 74338 88340
HOV 4462 4981 14387 12535
Total 23490 28408 88725 100875
2016 Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
Total Change (2016 2015) 3722 4822 5440 9416
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
31
Washington State Department of Transportation
-
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jul
2015 Mainline 18697 23398 74231 89503
HOV 4257 4897 14735 12653
Total 22954 28295 88966 102156
2016 Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
Total Change (2016 2015) 2434 4183 4436 6697
Aug
2015 Mainline 18633 22896 74145 88103
HOV 4298 4812 15132 12763
Total 22931 27708 89277 100866
2016 Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
Total Change (2016 2015) 3954 5652 5855 9338
Sep
2015 Mainline 17763 23025 71767 85595
HOV 3994 4566 11755 10132
Total 21757 27591 83522 95727
2016 Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
Total Change (2016 2015) 4167 5505 8399 11853
Oct
2015
Mainline 16434 19738 68482 79251
ETL 7622 8755 16053 14538
Total 24056 28493 84535 93789
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
Total Change (2016 2015) 2192 4564 6169 12225
Nov
2015
Mainline 15357 18946 63552 73567
ETL 7490 8865 16220 14663
Total 22847 27811 79772 88230
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
Total Change (2016 2015) 2026 3725 9264 15968
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
32
Washington State Department of Transportation
-
-
-
- -
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Dec
2015
Mainline 15235 18490 65204 75996
ETL 6576 8452 16502 15581
Total 21811 26942 81706 91577
2016 Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
Total Change (2016 2015) 3683 4903 7938 13107
Jan
2016
Mainline 15730 19042 65432 76350
ETL 8019 9205 17236 15321
Total 23749 28247 82668 91671
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
Total Change (2017 2016) 1663 4386 4972 11441
Feb
2016
Mainline 17038 19918 68765 79759
ETL 8617 9869 18133 16026
Total 25655 29787 86898 95785
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
Total Change (2017 2016) 446 2016 397 6560
Mar
2016
Mainline 17359 20000 69351 79866
ETL 9117 10513 20076 18242
Total 26476 30513 89427 98108
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
Total Change (2017 2016) 638 2828 3459 9667
Apr
2016
Mainline 17505 20568 69840 74820
ETL 9100 10896 21405 18570
Total 26605 31464 91245 93390
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
Total Change (2017 2016) 688 2521 2714 16746
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
33
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 16980 20698 69152 84522
ETL 9182 11990 21812 22335
Total 26162 32688 90964 106857
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
Total Change (2017 2016) 789 1415 3047 3969
Jun
2016
Mainline 17672 20693 69964 85705
ETL 9540 12537 24201 24586
Total 27212 33230 94165 110291
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
Total Change (2017 2016) 338 1547 3682 4233
Jul
2016
Mainline 16812 20397 69454 84960
ETL 8576 12081 23948 23893
Total 25388 32478 93402 108853
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
Total Change (2017 2016) 307 1278 3230 3749
Aug
2016
Mainline 17510 20683 70068 85514
ETL 9375 12677 25064 24690
Total 26885 33360 95132 110204
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
Total Change (2017 2016) 417 1631 3466 4125
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
34
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 16589 20618 67817 83428
ETL 9335 12478 24104 24152
Total 25924 33096 91921 107580
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
Total Change (2017 2016) 244 1548 2771 3400
Oct
2016
Mainline 16540 20598 66729 82580
ETL 9708 12459 23975 23434
Total 26248 33057 90704 106014
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
Total Change (2017 2016) 921 1706 3499 4601
Nov
2016
Mainline 15916 19888 65746 81248
ETL 8957 11648 23290 22950
Total 24873 31536 89036 104198
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
Total Change (2017 2016) 475 1211 1168 2123
Dec
2016
Mainline 16210 19588 65620 81107
ETL 9284 12257 24024 23577
Total 25494 31845 89644 104684
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
Total Change (2017 2016) -1708 -117 175 -23
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
35
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 16374 20661 65794 81035
ETL 9038 11972 21846 22077
Total 25412 32633 87640 103112
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
Total Change (2018 2017) -138 84 806 1052
Feb
2017
Mainline 16117 19944 64383 79389
ETL 9092 11859 22912 22956
Total 25209 31803 87295 102345
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
Total Change (2018 2017) 948 1999 3655 5043
Mar
2017
Mainline 16984 20726 67585 83419
ETL 10130 12615 25301 24356
Total 27114 33341 92886 107775
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
Total Change (2018 2017) 107 1826 2211 3702
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
36
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 17362 21026 70000 87110
ETL 10188 13751 27847 27414
Total 27550 34777 97847 114524
2018
Mainline 17499 20700 70632 87839
HOV 10134 13742 28181 28771
Total 27633 34442 98813 116610
Total Change (2018 2017) 83 -335 966 2086
Jul
2017
Mainline 16488 20895 69575 85995
ETL 9207 12861 27057 26607
Total 25695 33756 96632 112602
2018
Mainline 16764 19855 69446 85145
HOV 9205 13098 27447 27945
Total 25969 32953 96893 113090
Total Change (2018 2017) 274 803 261 488
Aug
2017
Mainline 17470 21509 70940 87151
ETL 9832 13482 27658 27178
Total 27302 34991 98598 114329
2018
Mainline 17513 20636 71166 86646
HOV 9687 13280 27960 28181
Total 27200 33916 99126 114827
Total Change (2018 2017) -102 -1075 528 498
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
37
Washington State Department of Transportation
-
- -
- - -
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2017
Mainline 16523 21319 68411 84558
ETL 9645 13325 26281 26422
Total 26168 34644 94692 110980
2018
Mainline 16465 20700 68182 84635
HOV 9775 13423 26339 27091
Total 26240 34123 94521 111726
Total Change (2018 2017) 72 521 -171 746
Oct
2017
Mainline 16891 21096 67776 83869
ETL 10278 13667 26427 26746
Total 27169 34763 94203 110615
2018
Mainline 16758 20807 67619 84490
HOV 10244 13589 26211 26998
Total 27002 34396 93830 111488
Total Change (2018 2017) -167 367 373 873
Nov
2017
Mainline 15200 20194 64316 80727
ETL 9198 12553 25888 25594
Total 24398 32747 90204 106321
2018
Mainline 15519 19775 65606 81835
HOV 9215 12467 25526 25882
Total 24734 32242 91132 107717
Total Change (2018 2017) 336 -505 928 1396
Dec
2017
Mainline 15295 19857 65179 79785
ETL 8491 11871 24640 24876
Total 23786 31728 89819 104661
2018
Mainline 14938 19655 64548 79975
HOV 8062 11367 24577 24561
Total 23000 31022 89125 104536
Total Change (2018 2017) -786 -706 694 -125
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
38
Washington State Department of Transportation
-
-
- - - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 15795 20036 64180 79661
ETL 9479 12681 24266 24503
Total 25274 32717 88446 104164
2019
Mainline 16020 20508 65366 81495
HOV 9317 12768 23931 24998
Total 25337 33276 89297 106493
Total Change (2019 2018) 63 559 851 2329
Feb
2018
Mainline 16472 20745 66663 82469
ETL 9685 13057 24287 24919
Total 26157 33802 90950 107388
2019
Mainline 14544 17521 57117 70419
HOV 7584 9922 20634 20996
Total 22128 27443 77751 91415
Total Change (2019 2018) 4029 6359 13199 -15973
Mar
2018
Mainline 16960 21253 68954 84854
ETL 10261 13914 26143 26623
Total 27221 35167 95097 111477
2019
Mainline 16786 20799 67617 84575
HOV 10281 13633 26151 26856
Total 27067 34432 93768 111431
Total Change (2019 2018) -154 -735 -1329 46
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
39
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT NE 100th (Dual Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 17446 20861 69378 84990
ETL 9940 13626 25477 26357
Total 27386 34487 94855 111347
2019
Mainline 17225 20927 68493 84812
HOV 10177 13485 26032 26885
Total 27402 34412 94525 111697
Total Change (2019 2018) 16 -75 -330 350
May
2018
Mainline 16934 20640 69253 85770
ETL 9907 13591 26593 27037
Total 26841 34231 95846 112807
2019
Mainline 16742 20257 67954 84750
HOV 9950 13294 26822 27368
Total 26692 33551 94776 112118
Total Change (2019 2018) -149 680 -1070 689
Jun
2018
Mainline 17499 20700 70632 87839
ETL 10134 13742 28181 28771
Total 27633 34442 98813 116610
2019
Mainline 17408 20077 69780 86144
HOV 10210 13809 28205 28539
Total 27618 33886 97985 114683
Total Change (2019 2018) -15 556 828 -1927
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
40
Washington State Department of Transportation
-
- -
- -
- -
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Oct
2014
Mainline 10841 14319 51987 53767
HOV 3126 4450 8644 8976
Total 13967 18769 60631 62743
2015 Mainline 11773 13483 53876 55295
ETL 3269 4773 7741 7231
Total 15042 18256 61617 62526
Total Change (2015 2014) 1075 513 986 -217
Nov
2014
Mainline 10665 13653 50239 52349
HOV 2681 4127 8976 8789
Total 13346 17780 59215 61138
2015
Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
Total Change (2015 2014) 927 -203 940 492
Dec
2014 Mainline 10586 13544 50562 52184
HOV 2331 4041 9005 8120
Total 12917 17585 59567 60304
2015
Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
Total Change (2015 2014) 638 569 615 16
Jan
2015 Mainline 11308 14025 51460 52184
HOV 2522 3985 7565 8120
Total 13830 18010 59025 60304
2016 Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
Total Change (2016 2015) 710 407 494 599
Feb
2015 Mainline 11864 14539 53269 53944
HOV 2665 4290 8046 8467
Total 14529 18829 61315 62411
2016 Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
Total Change (2016 2015) 987 341 956 265
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
41
Washington State Department of Transportation
-
-
-
-
-
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Mar
2015 Mainline 11937 14681 49388 50728
HOV 2819 4269 7975 7963
Total 14756 18950 57363 58691
2016 Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
Total Change (2016 2015) 1220 112 5920 5246
Apr
2015
Mainline 12277 14506 54498 54996
HOV 2725 4411 8892 9704
Total 15002 18917 63390 64700
2016 Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
Total Change (2016 2015) 1237 213 2087 1355
May
2015 Mainline 11929 14182 54062 55279
HOV 2802 4502 9746 9573
Total 14731 18684 63808 64852
2016 Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
Total Change (2016 2015) 1079 127 1465 652
Jun
2015 Mainline 12225 14166 55328 56319
HOV 3095 4887 10683 10793
Total 15320 19053 66011 67112
2016 Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
Total Change (2016 2015) 952 185 1377 530
Jul
2015 Mainline 12440 14016 56522 56423
HOV 2797 4781 10698 11386
Total 15237 18797 67220 67809
2016 Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
Total Change (2016 2015) 223 -244 409 -1149
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
42
Washington State Department of Transportation
-
- -
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Aug
2015 Mainline 12445 14210 56452 56206
HOV 2925 4685 10755 11346
Total 15370 18895 67207 67552
2016 Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
Total Change (2016 2015) 820 -54 272 435
Sep
2015 Mainline 11603 13984 53381 54701
HOV 2820 4286 8897 8964
Total 14423 18270 62278 63665
2016 Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
Total Change (2016 2015) 704 495 2204 1441
Oct
2015 Mainline 11773 13483 53876 55295
ETL 6269 4773 7741 7231
Total 18042 18256 61617 62526
2016 Mainline 11186 13643 51919 53482
ETL 4020 5127 11039 10534
Total 15206 18770 62958 64016
Total Change (2016 2015) -2836 514 1341 1490
Nov
2015 Mainline 11047 13103 52034 53390
ETL 3226 4474 8121 7256
Total 14273 17577 60155 60646
2016 Mainline 10724 13296 51492 52930
ETL 3540 4807 10866 10279
Total 14264 18103 62358 63209
Total Change (2016 2015) -9 526 2203 2563
Dec
2015 Mainline 10845 12846 52300 53035
ETL 2710 4170 7882 7285
Total 13555 17016 60182 60320
2016 Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18347 62295 63407
Total Change (2016 2015) 1129 1331 2113 3087
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
43
Washington State Department of Transportation
-
-
- -
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2016
Mainline 11234 13241 51804 52504
ETL 3306 4362 7715 7201
Total 14540 17603 59519 59705
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
Total Change (2017 2016) 509 699 1782 2019
Feb
2016
Mainline 12085 13846 54020 54992
ETL 3431 4642 8251 7684
Total 15516 18488 62271 62676
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
Total Change (2017 2016) -587 551 -1209 -986
Mar
2016
Mainline 12240 14076 54019 55254
ETL 3736 4986 9264 8683
Total 15976 19062 63283 63937
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
Total Change (2017 2016) 498 607 1631 134
Apr
2016
Mainline 12433 13952 54906 56333
ETL 3806 5178 10571 9722
Total 16239 19130 65477 66055
2017
Mainline 11912 15641 54023 56908
ETL 3897 4989 11367 11579
Total 15809 20630 65390 68487
Total Change (2017 2016) 430 1500 87 2432
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
44
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2016
Mainline 11990 13670 54741 55531
ETL 3820 5141 10532 9973
Total 15810 18811 65273 65504
2017
Mainline 11675 15684 53901 55572
ETL 3930 4655 11585 10657
Total 15605 20339 65486 66229
Total Change (2017 2016) -205 1528 213 725
Jun
2016
Mainline 12260 13865 55920 56902
ETL 4012 5373 11468 10740
Total 16272 19238 67388 67642
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
Total Change (2017 2016) -393 1128 605 1701
Jul
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
Total Change (2017 2016) 302 2037 -502 1629
Aug
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
Total Change (2017 2016) -245 1866 1470 2166
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
45
Washington State Department of Transportation
-
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sep
2016
Mainline 11177 13640 52915 54656
ETL 3950 5125 11567 10450
Total 15127 18765 64482 65106
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
Total Change (2017 2016) 139 1991 1572 2287
Oct
2016
Mainline 11761 13432 54902 55848
ETL 3699 5121 11909 10812
Total 15460 18553 66811 66660
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
Total Change (2017 2016) 181 2530 -1502 398
Nov
2016
Mainline 12155 13573 55115 55947
ETL 4035 5268 12364 11170
Total 16190 18841 67479 67117
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 18347 62941 64801
Total Change (2017 2016) 2228 1067 4538 -2316
Dec
2016
Mainline 10915 13433 51169 53155
ETL 3769 4914 11126 10252
Total 14684 18765 62295 63407
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
Total Change (2017 2016) 898 974 372 690
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
46
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2017
Mainline 11440 13473 51395 51891
ETL 3609 4829 9906 9833
Total 15049 18302 61301 61724
2018
Mainline 10941 15037 50679 53152
HOV 3608 4673 10719 10001
Total 14549 19710 61398 63153
Total Change (2018 2017) -500 1408 97 1429
Feb
2017
Mainline 11248 13197 50733 51471
ETL 3681 4740 10329 10219
Total 14929 17937 61062 61690
2018
Mainline 11381 15816 52677 55302
HOV 3706 4737 10787 10062
Total 15087 20553 63464 65364
Total Change (2018 2017) 158 2616 2402 3674
Mar
2017
Mainline 11535 13292 53175 52949
ETL 3943 5163 11739 11122
Total 15478 18455 64914 64071
2018
Mainline 11681 16111 54271 56829
HOV 3965 4961 11655 10542
Total 15646 21072 65926 67371
Total Change (2018 2017) 168 2617 1012 3300
Apr
2017
Mainline 17173 21366 68899 85444
ETL 10120 12619 25060 24692
Total 27293 33985 93959 110136
2018
Mainline 17446 20861 69378 84990
HOV 9940 13626 25477 26357
Total 27386 34487 94855 111347
Total Change (2018 2017) 93 502 896 1211
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
47
Washington State Department of Transportation
-
-
-
- -
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
May
2017
Mainline 16932 21161 68485 85044
ETL 10019 12942 25526 25782
Total 26951 34103 94011 110826
2018
Mainline 16934 20640 69253 85770
HOV 9907 13591 26593 27037
Total 26841 34231 95846 112807
Total Change (2018 2017) -110 128 1835 1981
Jun
2017
Mainline 11805 15373 55261 57850
ETL 4074 4993 12732 11493
Total 15879 20366 67993 69343
2018
Mainline 12190 16129 56384 59154
HOV 4052 5068 13037 11805
Total 16242 21197 69421 70959
Total Change (2018 2017) 363 831 1428 1616
Jul
2017
Mainline 11792 15723 54399 57083
ETL 3970 4867 11910 11206
Total 15762 20590 66309 68289
2018
Mainline 11790 15347 55358 57172
HOV 3862 4793 12925 11917
Total 15652 20140 68283 69089
Total Change (2018 2017) -110 450 1974 800
Aug
2017
Mainline 11953 15768 55688 57721
ETL 3992 4939 13261 11562
Total 15945 20707 68949 69283
2018
Mainline 12274 15956 56710 58462
HOV 3952 4877 13258 11975
Total 16226 20833 69968 70437
Total Change (2018 2017) 281 126 1019 1019
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
48
Washington State Department of Transportation
-
-
-
-
-
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Sept
2017
Mainline 11326 15904 53689 56433
ETL 3940 4852 12365 10960
Total 15266 20756 66054 67393
2018
Mainline 11743 15709 54800 56638
HOV 3964 4887 12003 11180
Total 15707 20596 66803 67818
Total Change (2018 2017) 441 -160 749 425
Oct
2017
Mainline 11466 16043 53147 56213
ETL 4175 5040 12162 10845
Total 15641 21083 65309 67058
2018
Mainline 11946 12369 54109 52397
HOV 4235 8893 11867 15497
Total 16181 21262 65976 67894
Total Change (2018 2017) 540 179 667 836
Nov
2017
Mainline 10374 15203 51099 54157
ETL 3588 4705 11842 10644
Total 13962 19908 62941 64801
2017
Mainline 10986 11737 52784 51052
HOV 3709 8304 11584 15046
Total 14695 20041 64368 66098
Total Change (2018 2017) 733 133 1427 1297
Dec
2017
Mainline 10465 14811 51323 53550
ETL 3321 4510 11344 10547
Total 13786 19321 62667 64097
2018
Mainline 10652 11615 51984 49911
HOV 3264 7672 11393 14305
Total 13916 19287 63377 64216
Total Change (2018 2017) 130 -34 710 119
PM Mainline data includes Peak Use Shoulder Lane counts starting Apr 2017
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
49
Washington State Department of Transportation
-
-
- - -
- -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Jan
2018
Mainline 10941 15037 50679 53152
ETL 3608 4673 10719 10001
Total 14549 19710 61398 63153
2019
Mainline 11451 15740 52457 54940
HOV 3783 4702 10996 10216
Total 15234 20442 63453 65156
Total Change (2019 2018) 685 732 2055 2003
Feb
2018
Mainline 11381 15816 52677 55302
ETL 3706 4737 10787 10062
Total 15087 20553 63464 65364
2019
Mainline 10273 13615 45944 47969
HOV 3193 3902 9494 9191
Total 13466 17517 55438 57160
Total Change (2019 2018) 1621 -3036 8026 -8204
Mar
2018
Mainline 11681 16111 54271 56829
ETL 3965 4961 11655 10542
Total 15646 21072 65926 67371
2019
Mainline 11875 16029 54207 56703
HOV 4186 4968 11688 10998
Total 16061 20997 65895 67701
Total Change (2019 2018) 415 -75 31 330
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
50
Washington State Department of Transportation
-
-
- - -
- - -
AVERAGE WEEKDAY SCREENLINE VOLUMES YEAR TO YEAR COMPARISON - PRE-TOLLING TO PRESENT SR 527 (Single Lane Section)
AM Peak (SB 5-9a)
PM Peak (NB 3-7p)
Daily Total (SB)
Daily Total (NB)
Apr
2018
Mainline 12354 16106 55305 57509
ETL 3944 4962 11526 10699
Total 16298 21068 66831 68208
2019
Mainline 12035 16132 55119 57431
HOV 4190 4974 11859 11115
Total 16225 21106 66978 68546
Total Change (2019 2018) -73 38 147 338
May
2018
Mainline 11846 15801 55122 57571
ETL 4055 5073 12273 11221
Total 15901 20874 67395 68792
2019
Mainline 11574 15927 54671 57023
HOV 4091 4957 12118 11392
Total 15665 20884 66789 68415
Total Change (2019 2018) -236 10 606 377
Jun
2018
Mainline 12190 16129 56384 59154
ETL 4052 5068 13037 11805
Total 16242 21197 69421 70959
2019
Mainline 11794 15998 55542 58321
HOV 4124 5182 12860 12071
Total 15918 21180 68402 70392
Total Change (2019 2018) 324 -17 -1019 567
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
51
Washington State Department of Transportation
Kirkland
Bothell
Lynnwood
Bellevue
Woodinville
NE 195th St
NE 160th St
NE 116th St
NE 124th St
NE 128th St
NE 85th St
NE 70th Pl
NE 8th St
NE 4th St
NE 6th St
TOLL BRIDGE
5
405
405
520
522
527
525
EXIT I-5 in Lynnwood SR 525
EXIT SR 527
EXIT SR 527
EXIT NE 195th St SR 522 NE 160th St NE 124th St
EXIT SR 520 NE 8th St NE 4th St
EXIT NE 160th St SR 522 NE 195th St
EXIT NE 85th St NE 70th St
EXIT NE 70th St NE 85th St
EXIT NE 116th St NE 124th St
DIRECT ACCESS NE 128th St
DIRECT ACCESS NE 6th St
No I-405 tolling south of NE 6th St
Enter
Exit
Direct Access
1 Express Toll Lane
2 Express Toll Lanes
LEGEND
NB 10 292
SB 1 286
NB 8 259
NB 7 221
NB 9 280
SB 2 271
SB 3 255
SB 4 221
SB 6 208
SB 5 212
OFF RAMP NB 6 208
NB 4 197
NB 3 167
NB 5 205
ON RAMP
NB 2 138
NB 1 138
ON RAMP
ON RAMP
SB 8 177
SB 9 156
SB 10 138
SB 7 205 OFF RAMP
SB 11 138 OFF RAMP
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
52
Washington State Department of Transportation
APPENDIX B ADDITIONAL TRAFFIC PERFORMANCE DATAUsing sensors in the roadway WSDOT collected traffic counts on the stretch of I-405 between Bellevue and Lynnwood Volumes were reported at eight sample locations four in the northbound direction and four in the southbound direction In the dual-lane section sensors collect traffic data at NE 53rd St and NE 100th St In the single-lane section the sensors are located at the I-405 interchanges with SR 522 and SR 527
To monitor daily vehicle volumes on the portion of the I-405 corridor with dual express toll lanes WSDOT collected data at NE 100th (markers A and C) and NE 53rd St (markers B and D)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
Bellevue NE 6th St
520
E EB D
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
522
527
XPR
ESS
TOLL
LA
NES
XPR
ESS
TOLL
LA
NES
A C
MAP NOT TO SCALE
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
53
Washington State Department of Transportation
Average weekday dual-lane section volumes at sample locations ndash Oct 1 2014-March 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
A NE 100th St Average PeakPeriod Volume
5000 10000 15000
25000 20000
30000
B
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
NE 53rd St Average PeakPeriod Volume
5000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
10000 15000
25000 20000
30000
3 - 7 pm General purpose lanes HOVExpress toll lanes
C NE 100th St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
D
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
NE 53rd St Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019
Northbound Evening Peak
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
54
Washington State Department of Transportation
5
405
SOUTHBOUND NORTHBOUND
Lynnwood
Kirkland
Bellevue
Bothell
NE 195th St
NE 128th St
NE 124th St
NE 85th St
NE 70th St
Indent as subset to photo toll
Indent as subset to photo toll
NE 6th St
520
522
527
EXPR
ESS
TOLL
LA
NES
EXPR
ESS
TOLL
LA
NES
E
F
G
H
MAP NOT TO SCALE
To monitor daily vehicle volumes on the portion of the I-405 corridor with single express toll lanes WSDOT collected data at the SR 527 interchange (markers E and G) and SR 522 (markers F and H)
Quarterly average daily volumes for general purpose and express toll lanes at these locations can be viewed on the following page
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
55
Washington State Department of Transportation
Average weekday single-lane section volumes at sample locations ndash Oct 1 2014-Jun 31 2019
Southbound Morning Peak 5 - 9 am General purpose lanes HOVExpress toll lanes
E SR 527 Average PeakPeriod Volume 30000
25000
20000
5000 10000 15000
F
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
SR 522
25000 20000
30000
Average PeakPeriod Volume
5000 10000 15000
Pre-Tolling
Fall 2015
Winter 2016
Spring2016
Summer 2016
Fall 2016
Winter 2017
Spring2017
Summer 2017
Fall 2017
Winter 2018
Spring2018
Summer 2018
Fall 2018
Winter 2019
Spring2019
25000 30000
SR 527 Average PeakPeriod Volume
Northbound Evening Peak 3 - 7 pm General purpose lanes HOVExpress toll lanes
G
5000 10000 15000 20000
H
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
SR 522 Average PeakPeriod Volume 30000 25000 20000 15000 10000
5000
Pre- Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Tolling 2015 2016 2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2019
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
Washington State Department of Transportation
56
APPENDIX C EXPRESS TOLL LANE GUIDE Operational Parameters The following parameters define how the express toll lanes operate and are critical to understanding the data and analysis discussed in this report
bull The I-405 express toll lane corridor is made up of single- and dual-lane sections The 79 mile portion of the system with two lanes in each direction between Bellevue and Bothell is referred to as the dual-lane section The 715 mile portion of the system with one express toll lane in each direction between Bothell and I-5 in Lynnwood is referred to as the single-lane section
bull The I-405 express toll lanes operate as a tolled facility on weekdays between 5 am and 7 pm except on major holidays During all other days and times the lanes are open to all traffic
bull Carpools with enough occupants may use the express toll lanes for free with a Flex Pass set to HOV mode The carpool occupancy requirement set by the Transportation Commission allows vehicles with three or more occupants to travel toll-free during peak periods on weekdays and vehicles with two or more occupants to travel toll-free on weekdays from 9 am to 3 pm
bull Peak time peak directions are southbound morning peak period (5 am-9 am) and northbound afternoon peak period (3 pm-7 pm)
bull Trip categories The following categories define toll trips Toll-exempt Buses vanpools on-duty emergency vehicles on-duty incident response and maintenance vehicles authorized in-service tow trucks carpools traveling toll-free with a Flex Pass set to HOV mode and motorcycles with a motorcycle pass
Good To Go pass Non-carpools that pay a toll using any Good To Go pass installed in their vehicle this method is the most inexpensive way to pay a toll
Photo toll Vehicles who pay the toll through a photo of the vehicle license plate There are two types of photo tolling
Pay By Plate License plates registered to a Good To Go account drivers are charged an additional 25 cent fee per trip
Pay By Mail Drivers without a Good To Go account receive toll bills through the mail for an additional $2 per trip
How Express Toll Lanes Work The I-405 express toll lanes were designed to provide faster more predictable trips for transit vanpools carpools and toll-paying vehicles While some factors such as collisions can inhibit the efficiency of the lanes managing the flow of traffic in and out of the lanes allows the lanes to maintain faster speeds than general purpose lanes during periods of congestion
WSDOT uses different strategies in the express toll lanes to promote steady speeds and more efficient person throughput including lane design vehicle limitations and tolling
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
57
Washington State Department of Transportation
Design Vehicles and transit can only enter and exit the express toll lanes by using specific access points Limiting merging points and managing traffic flow through dynamic tolling allows the express toll lanes to maintain more consistent speeds Drivers do not have to adjust the speeds of their vehicles as often in the express toll lanes to compensate for merging with other vehicles Some access points have a dashed white line for vehicles to merge in or out Temporary weave lanes allow vehicles to merge in and out of the express toll lanes with less disruption allowing the express toll lanes to operate more efficiently Additionally there are two direct access ramps that transit high occupancy vehicles (HOV) and toll-paying drivers can use from NE 6th Street in Bellevue and NE 128th Street in Kirkland to enter the express toll lanes directly
Vehicle Limitations WSDOT manages the types of vehicles that can and cannot use the express toll lanes during operational hours Between 7 pm and 5 am and on weekends and holidays the lanes are open to all vehicles
Express toll lanes are always free to transit vanpools and carpools that meet occupancy requirements During peak hours vehicles must have at least three occupants and a Flex Pass in order to use the lanes free of charge The lanes incentivize transit and carpooling by providing faster more predictable trips without a toll
Large commercial vehicles such as trucks over 10000 pounds gross vehicle weight are never allowed in the express toll lanes This is consistent with HOV lane restrictions throughout Washington which are designed to promote more efficient person throughput
One of the primary goals of the express toll lanes is to improve transit reliability and travel times The previous HOV lanes often experienced gridlock which interfered with transit efficiency Limiting the number of vehicles that can use the lanes ensures more reliability for transit riders Motorcycles can always use the lanes free of cost as long as they have a Good To Go motorcycle pass
Dynamic Tolling The efficiency of the express toll lanes relies heavily on the dynamic tolling algorithm which determines toll rates for the lanes The algorithm adjusts toll rates every 5 minutes based on congestion to influence the flow of vehicles into the lanes ensuring that traffic continues to move smoothly Toll rates range from 75 cents to $10
As traffic increases the toll increases As traffic subsides the toll goes down This process is called ldquodynamic pricingrdquo Dynamic pricing works to ensure that the lanes donrsquot get overloaded with vehicles and become as congested as the general purpose lanes The tolling system monitors congestion throughout the corridor which is why toll rates can vary for different destinations or ldquotoll zonesrdquo
Typically drivers chose to use the express toll lanes most during peak periods when traffic is heavy As more vehicles enter the toll rate goes up This is why when congestion is at its worst toll rates increase to the maximum rate
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
58
Washington State Department of Transportation
Transit and qualifying carpools can use the lanes for free This has the combined benefit of incentivizing carpooling or use of public transportation to avoid paying a toll When people opt to use these forms of transportation they reduce the number of cars on the road which in turn helps reduce congestion
Dynamic pricing is used successfully at other toll facilities around the country including San Diego Los Angeles Miami Denver Northern Virginia the Bay Area and Dallas
How the Signs Work The rates displayed on the roadway signs are for vehicles with transponders installed traveling to any point up to and including the listed destination Once a vehicle passes a listed destination the rate for that trip will be based on the rate for the next destination displayed on the sign when you entered Learn more about how express toll lanes work wwwyoutubecomwatchv=lhwRTz7zxrYampfeature= youtube
EXPRESS TOLL LANES
NE 124th St
Jct
Jct 5 INTERSTATE
522
$200 $250 $275
HOV 3+ FREE WFLEX PASS
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711
18-06-0239
59
Washington State Department of Transportation
FOR MORE INFORMATION Visit GoodToGo405org or contact us at GoodToGoTollingwsdotwagov
Title VI Notice to Public It is the Washington State Department of Transportationrsquos (WSDOT) policy to assure that no person shall on the grounds of race color national origin or sex as provided by Title VI of the Civil Rights Act of 1964 be excluded from participation in be denied the benefits of or be otherwise discriminated against under any of its federally funded programs and activities Any person who believes hisher Title VI protection has been violated may file a complaint with WSDOTrsquos Office of Equal Opportunity (OEO) For additional information regarding Title VI complaint procedures andor information regarding our non-discrimination obligations please contact OEOrsquos Title VI Coordinator at (360) 705-7090
Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the WSDOT DiversityADA Affairs team at wsdotadawsdotwagov or by calling toll free 855-362-4ADA(4232) Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711