Ilembe Chamber of Commerce Breakfast Session
Niveshen Govender
Chief Operations Officer, SAPVIA
06 March 2020
Introduction
2- Confidential -
The South African Photovoltaic Industry Association (“SAPVIA” or “the Association”) is a non-profit industry association that aims to promote,
develop and grow the Photovoltaic (“PV”) sector as part of the wider renewable energy industry in South Africa.
Aim: To facilitate the creation of a viable Solar PV Market, by becoming the trusted partner to Government and
promoting member products and services
Vision, mission and values
3- Confidential -
ValuesCohesionWe embrace diversity, our strength.
ConsistencyWe say what we mean, do what we
say. Always.
CollaborationInstead of walking fast on our own,
we walk together with our
stakeholders, so we can walk far
VisionSolar PV is the electricity generation
technology of choice in South Africa and
the rest of Sub-Saharan Africa, in support
of socio-economic development
MissionTo vigorously mobilise support for the
sustainable growth of solar PV in South
Africa and the rest of Sub-Saharan Africa
Membership
5- Confidential -
The association serves the collective interests of its 180+ members. SAPVIA’s members are active in various parts of the PV value-chain, including…
Project development
PV project ownership (as independent power producers)
Engineering-procurement-construction (EPC)
Operations and maintenance (O&M)
Manufacturing
Embedded (roof-top) PV installation
Training
Consulting and Research
Finance
- Confidential -
• SSEG (>1MW & self generation) Generation requires– A ministers deviation from the IRP
– A licence to generate
• The new IRP alleviates the requirement for ministerial deviation – up to 500MW/year
• >1MW projects requires full licencing – up to 500MW
• <1MW has exemption for licencing – if they fit into 1 of the exemption categories in the schedule 2 notice
– Required to register at NERSA • The rules for registration still need to be fully defined, a connection agreement with
the distributor is required for registration
19
Policy mattersDistributed Generation - ERA
- Confidential - 19
Policy mattersSANS 10142-1-2
• The Draft has been completed and submitted to SABS -October 2019
• Internal Processing • Public Comment (60days)• Finalisation and Gazette
- Confidential -
SSEG Installations
1 - 1.2GW installed
100 000 installations
4500 jobs created
533170t/CO2e emissions/yr
R9 - R11 cost per Wp
Industry Estimation
- Confidential -
Installations Gone Wrong
• Lack of Skills• Lack of Standards• Lack of Quality Installations
- Confidential -
PV GreenCard Training and Assessment
Skills Development
Accreditation
Standards
Documentation
The Solar Photovoltaic Service Technician, Curriculum Code 313109001, NQF Level 5, SAQA Qualification ID 99447
Solar PV Stand-alone System Mounter
84 Credits
Approx 7 months education cycle
Mounts pre-designed PV systems according to instructions from either a PV Installer or PV Designer
Solar PV Stand-alone Installer
218 Credits
Approx 2 years education cycle
Liaises with clients, obtains and analyses data, designs a PV system, installs, commissions and tests a PV system
Solar PV Farm Technician
•229 Credits
•Approx 2 years education cycle
•Service and maintenance technician at a Solar PV Farm
Solar PV Stand-Alone Service Technician
•245 Credits
•Approx 2 years education cycle
•Service and maintenance technician at a stand-alone installation, which would include domestic roof-top installations
Solar PV Assessment
Assessment to prove a) mounting and b) installing competency
Practical and theoretical elements
Recognition of prior learning (RPL Toolkit)
PV Installer Course
1 week short course with focus on design and compliance
Special additional focus on the DC-side of PV systems
Includes minimum requirements to install a PV system
- Confidential -
PV GreenCard Skills Development Overview
• 2 Assessment Centres– 250 Installers assessed – 86% pass rate
• 24 Training Institutions– JHB, KZN, PE, EL and CPT – Over 700 participants trained
• In Process– merSETA/QCTO submission for RPL
Toolkit
o STEP 1: Go to: https://www.pvgreencard.co.za/installers/training-and-assessment/
- Confidential - 15
Installer Assessment and/or Training Process
o STEP 2: Contact an approved assessment center for upcoming assessment dates
o STEP 3: Register and successfully complete the 2-day assessment o The 5-day training at approved training institutions is optional as the
assessment is based on the principle ‘recognition of prior learning’- Confidential - 16
Installer Assessment and/or Training Process
- Confidential -
PV GreenCard Registration
Skills Development
Accreditation
Standards
DocumentationRequirements
- DoL Registered Person- SAPVIA Assessed Person
o STEP 1: Register on www.pvgreencard.co.za for the PV GreenCard
o STEP 2: Register Assessed Installers and DoL registered persons
o STEP 3: Issue PV GreenCards
- Confidential - 18
Installation Company Registration Process
Requirements- DoL Registered Person
- SAPVIA Assessed Person
- Confidential -
PV GreenCard Applicable Standards
Skills Development
Accreditation
Standards
Documentation
- Confidential -
PV GreenCard Installation Guidelines
www.pvgreencard.co.za
SANS10142-1 modified to allow for synchronous embedded generation.
SNAS10142-1-2 to be drafted and published for public comment in 2018 - Covering both AC and DC
sizes of LV embedded generator
Interim measure until SANS 10142-1-2 is available
Will be updated as and when required
- Confidential -
PV GreenCard As Built Report/Checklist
Skills Development
Accreditation
Standards
Documentation
https://www.pvgreencard.co.za/app/installer/pvg-gc