5
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817 bradleycorp.com Installation 215-1434 Rev. L; ECN 14-05-006 © 2014 Bradley Page 1 of 5 5/12/2014 S19-270HC (Eyewash) S19-270JC (Eye/Face Wash) Cabinet-Mounted Swing-Down Eyewash and Eye/Face Wash Table of Contents Pre-Installation Information 2 Installaton 2 S19-270HC Dimensions 3 S19-270JC Dimensions 3 S19-270HC Assembly of Components and Parts List 4 S19-270JC Assembly of Components and Parts List 5 S19-270HC S19-270JC OBSOLETE

Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

P.O. Box 309, Menomonee Falls, WI USA 53052-0309PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817bradleycorp.com

Installation

215-1434 Rev. L; ECN 14-05-006© 2014 BradleyPage 1 of 5 5/12/2014

S19-270HC (Eyewash)S19-270JC (Eye/Face Wash)Cabinet-Mounted Swing-Down Eyewash and Eye/Face Wash

Table of ContentsPre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . . 2Installaton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2S19-270HC Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . 3S19-270JC Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . 3S19-270HC Assembly of Components and Parts List . . . 4S19-270JC Assembly of Components and Parts List . . . 5

S19-270HC

S19-270JCOBSOLETE

Page 2: Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

2

S19-270HC, S19-270JC Installation

5/12/2014 Bradley • 215-1434 Rev. L; ECN 14-05-006

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.

The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1.

For questions regarding the operation/installation of this product, visit bradleycorp.com or call 800.BRADLEY (800.272.3539).

Product warranties may also be found under ”Products” at bradleycorp.com.

Installation

THIS

SIDE

UP

Packing List

••••

P.O. B

ox 3

09, M

enom

onee F

alls

, WI 5

3051

R

TEST THIS U

NIT E

ACH WEEK

Test

-oper

ate

valv

e(s)

eac

h wee

k an

d sig

n bel

ow.

Report

any

mal

funct

ions

imm

edia

tely.

Ventil

(e) w

öchen

tlich

im Te

stbet

rieb p

rüfe

n, bes

tätig

t

durch U

nters

chrif

t. Je

gliche

Störu

ng sofo

rt m

elden

.

Date

Datum

Date

Signed

Unters

chrif

t

Signe

Date

DateDat

e

Signed

Signed

Signed

DIESES G

ERÄT 1ST W

ÖCHENTLICH Z

U PRÜFEN.

ESSAI HEBDOM

ADAIRE

Test

le fo

nctio

nnemen

t des

valv

es c

haque

sem

aine

et

signe

en b

as. S

'il y

à quel

que ch

ose q

ui ne

va p

as fa

it

un rapport

imm

édia

tem

ent.

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

InstallationNOTICE! Avoid cleaners containing organic solvents, alcohols, and

hydrocarbons. Rinse with water after cleaning.

Supplies Required:• ½" NPT water supply to inlet on unit

• Bolts for cabinet mounting

• Pipe sealant

• Sign-mounting hardware

Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation.

Step 1: Rough-In1 . Rough in the wall opening .

2 . Rough in the ½" NPT water supply (refer to page 3) .

3 . Position the unit in the wall opening . Mount the unit to the wall with four bolts (supplied by installer) .

4 . With the cabinet door open, connect the water supply using the coupling nut and combination tailpiece (refer to page 4) .

5 . Mount the safety sign to the wall with appropriate hardware supplied by the installer .

14½" (368mm)

21" (533mm)

OBSOLETE

Page 3: Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

3

Installation S19-270HC, S19-270JC

Bradley • 215-1434 Rev. L; ECN 14-05-006 5/12/2014

S19-270HC Dimensions

16¹³⁄₃₂"(417mm)

22½"(572mm)

1⁷⁄₈"(48mm)

7½"(191mm)

"ON" position

10⁷⁄₈"(276mm)

1⁷⁄₁₆" (37mm)

15⁹⁄₁₆" (395mm)

to mounting

holes

22"–34"(559mm–864mm) to floor for ANSI

compliance

1" (25mm)

3⁷⁄₈"(98mm)

½" NPT supply

Ø ¼" mtg . hole (qty . 4)

4½"(114mm)

9¼"(235mm)

½" NPT supply

S19-270JC Dimensions

16¹³⁄₃₂"(417mm)

22½"(572mm)

1⁷⁄₈"(48mm)

9½"(241mm)

"ON" position

13"(330mm)

1⁷⁄₁₆" (37mm)

15⁹⁄₁₆" (395mm)

to mounting

holes

19¹⁵⁄₁₆"–31¹⁵⁄₁₆"(506mm–811mm) to floor for ANSI

compliance

1" (25mm)

5⁷⁄₈"(150mm)

½" NPT supply

Ø ¼" mtg . hole (qty . 4)

4½"(114mm)

9¼"(235mm)

½" NPT supply Alternate

supply location

Alternate supply

3¹⁄₈" (79mm)

Alternate supply

location

3¹⁄₈" (79mm)

Alternate supply location

OBSOLETE

Page 4: Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

4

S19-270HC, S19-270JC Installation

5/12/2014 Bradley • 215-1434 Rev. L; ECN 14-05-006

Assembly of Components and Parts List — S19-270HC

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.Report any malfunctions immediately.Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigtdurch Unterschrift. Jegliche Störung sofort melden.

DateDatumDate

SignedUnterschriftSigne

DateDate

Date SignedSignedSigned

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas faitun rapport immédiatement.

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)

http://www.bradleycorp.com

1.1

1.2

1.3

1.4

1.51.6

1.7 1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

910

8

2

3

4

7

6

5

Shown in the “ON” position

Item Part No. Qty. Description

1 S39-679A 1 Swing-Down Sub-Assembly

1 .1 S05-092 1 Eyewash Assembly

1 .2 107-371 2 Tethered Dust Cover

1 .3 113-1075 1 Pipe, 9½" (Plated)

1 .4 118-288 1 Valve Body (Plated)

1 .5 125-135 1 O-Ring

1 .6 125-120 1 O-Ring

1 .7 S39-598 1 Actuator Sub-Assembly, Valve

1 .8 192-016 1 Insert, Direction (Plated)

1 .9 160-413 1 Screw, Set

1 .10 110-115A 1 Nut, Hex (Plated)

1 .11 125-001DA 1 O-Ring

1 .12 131-082 1 Base

Item Part No. Qty. Description

1 .13 160-428 1 Screw, Set

1 .14 113-1058 1 Shank

1 .15 110-115 1 Nut, Hex

2 142-045A 1 Spacer

3 S39-160 1 Cabinet Assembly

4 169-364 1 90° Elbow

5 S27-110 1 Stop Valve

6 113-006DH 1 Nipple, Close

7 169-639 1 90° Street Elbow

8 169-348 1 Union

9 114-051 1 Safety Sign

10 204-421 1 Emergency Inspection Tag

OBSOLETE

Page 5: Installation · 4 S1-20C S1-20C Installation 5/12/201 Bradley 215-13 Rev. L ECN 1-05-00 Assembly of Components and Parts List — S19-270HC P.O. Box 309, Menomonee Falls, WI 53051

5

Installation S19-270HC, S19-270JC

Bradley • 215-1434 Rev. L; ECN 14-05-006 5/12/2014

Assembly of Components and Parts List — S19-270JC

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.Report any malfunctions immediately.Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigtdurch Unterschrift. Jegliche Störung sofort melden.

DateDatumDate

SignedUnterschriftSigne

DateDate

Date SignedSignedSigned

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas faitun rapport immédiatement.

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)

http://www.bradleycorp.com

1.4

1.51.6

1.7 1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

910

8

2

3

4

7

6

5

1.1

1.2

1.3

Shown in the “ON” position

Item Part No. Qty. Description

1 S39-680A 1 Swing-Down Sub-Assembly

1 .1 S05-162 1 Eye/Face Wash Yoke Sub-Assembly

1 .2 S53-063 2 Tethered Dust Cover

1 .3 113-1075 1 Pipe, 9½" (Plated)

1 .4 118-288 1 Valve Body (Plated)

1 .5 125-135 1 O-Ring

1 .6 125-120 1 O-Ring

1 .7 S39-598 1 Actuator Sub-Assembly, Valve

1 .8 192-016 1 Insert, Direction (Plated)

1 .9 160-413 1 Screw, Set

1 .10 110-115A 1 Nut, Hex (Plated)

1 .11 125-001DA 1 O-Ring

1 .12 131-082 1 Base

Item Part No. Qty. Description

1 .13 160-428 1 Screw, Set

1 .14 113-1058 1 Shank

1 .15 110-115 1 Nut, Hex

1 .16 S05-158 1 Eye/Face Wash Assembly

2 142-045A 1 Spacer

3 S39-160 1 Cabinet Assembly

4 169-364 1 90° Elbow

5 S27-110 1 Stop Valve

6 113-006DH 1 Nipple, Close

7 169-639 1 90° Street Elbow

8 169-348 1 Union

9 114-051 1 Safety Sign

10 204-421 1 Emergency Inspection Tag

1 .16

OBSOLETE