P.O. Box 309, Menomonee Falls, WI USA 53052-0309PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817bradleycorp.com
Installation
215-1434 Rev. L; ECN 14-05-006© 2014 BradleyPage 1 of 5 5/12/2014
S19-270HC (Eyewash)S19-270JC (Eye/Face Wash)Cabinet-Mounted Swing-Down Eyewash and Eye/Face Wash
Table of ContentsPre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . . 2Installaton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2S19-270HC Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . 3S19-270JC Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . 3S19-270HC Assembly of Components and Parts List . . . 4S19-270JC Assembly of Components and Parts List . . . 5
S19-270HC
S19-270JCOBSOLETE
2
S19-270HC, S19-270JC Installation
5/12/2014 Bradley • 215-1434 Rev. L; ECN 14-05-006
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation/installation of this product, visit bradleycorp.com or call 800.BRADLEY (800.272.3539).
Product warranties may also be found under ”Products” at bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
••••
P.O. B
ox 3
09, M
enom
onee F
alls
, WI 5
3051
R
TEST THIS U
NIT E
ACH WEEK
Test
-oper
ate
valv
e(s)
eac
h wee
k an
d sig
n bel
ow.
Report
any
mal
funct
ions
imm
edia
tely.
Ventil
(e) w
öchen
tlich
im Te
stbet
rieb p
rüfe
n, bes
tätig
t
durch U
nters
chrif
t. Je
gliche
Störu
ng sofo
rt m
elden
.
Date
Datum
Date
Signed
Unters
chrif
t
Signe
Date
DateDat
e
Signed
Signed
Signed
DIESES G
ERÄT 1ST W
ÖCHENTLICH Z
U PRÜFEN.
ESSAI HEBDOM
ADAIRE
Test
le fo
nctio
nnemen
t des
valv
es c
haque
sem
aine
et
signe
en b
as. S
'il y
à quel
que ch
ose q
ui ne
va p
as fa
it
un rapport
imm
édia
tem
ent.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
InstallationNOTICE! Avoid cleaners containing organic solvents, alcohols, and
hydrocarbons. Rinse with water after cleaning.
Supplies Required:• ½" NPT water supply to inlet on unit
• Bolts for cabinet mounting
• Pipe sealant
• Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation.
Step 1: Rough-In1 . Rough in the wall opening .
2 . Rough in the ½" NPT water supply (refer to page 3) .
3 . Position the unit in the wall opening . Mount the unit to the wall with four bolts (supplied by installer) .
4 . With the cabinet door open, connect the water supply using the coupling nut and combination tailpiece (refer to page 4) .
5 . Mount the safety sign to the wall with appropriate hardware supplied by the installer .
14½" (368mm)
21" (533mm)
OBSOLETE
3
Installation S19-270HC, S19-270JC
Bradley • 215-1434 Rev. L; ECN 14-05-006 5/12/2014
S19-270HC Dimensions
16¹³⁄₃₂"(417mm)
22½"(572mm)
1⁷⁄₈"(48mm)
7½"(191mm)
"ON" position
10⁷⁄₈"(276mm)
1⁷⁄₁₆" (37mm)
15⁹⁄₁₆" (395mm)
to mounting
holes
22"–34"(559mm–864mm) to floor for ANSI
compliance
1" (25mm)
3⁷⁄₈"(98mm)
½" NPT supply
Ø ¼" mtg . hole (qty . 4)
4½"(114mm)
9¼"(235mm)
½" NPT supply
S19-270JC Dimensions
16¹³⁄₃₂"(417mm)
22½"(572mm)
1⁷⁄₈"(48mm)
9½"(241mm)
"ON" position
13"(330mm)
1⁷⁄₁₆" (37mm)
15⁹⁄₁₆" (395mm)
to mounting
holes
19¹⁵⁄₁₆"–31¹⁵⁄₁₆"(506mm–811mm) to floor for ANSI
compliance
1" (25mm)
5⁷⁄₈"(150mm)
½" NPT supply
Ø ¼" mtg . hole (qty . 4)
4½"(114mm)
9¼"(235mm)
½" NPT supply Alternate
supply location
Alternate supply
3¹⁄₈" (79mm)
Alternate supply
location
3¹⁄₈" (79mm)
Alternate supply location
OBSOLETE
4
S19-270HC, S19-270JC Installation
5/12/2014 Bradley • 215-1434 Rev. L; ECN 14-05-006
Assembly of Components and Parts List — S19-270HC
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigtdurch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas faitun rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
1.1
1.2
1.3
1.4
1.51.6
1.7 1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
910
8
2
3
4
7
6
5
Shown in the “ON” position
Item Part No. Qty. Description
1 S39-679A 1 Swing-Down Sub-Assembly
1 .1 S05-092 1 Eyewash Assembly
1 .2 107-371 2 Tethered Dust Cover
1 .3 113-1075 1 Pipe, 9½" (Plated)
1 .4 118-288 1 Valve Body (Plated)
1 .5 125-135 1 O-Ring
1 .6 125-120 1 O-Ring
1 .7 S39-598 1 Actuator Sub-Assembly, Valve
1 .8 192-016 1 Insert, Direction (Plated)
1 .9 160-413 1 Screw, Set
1 .10 110-115A 1 Nut, Hex (Plated)
1 .11 125-001DA 1 O-Ring
1 .12 131-082 1 Base
Item Part No. Qty. Description
1 .13 160-428 1 Screw, Set
1 .14 113-1058 1 Shank
1 .15 110-115 1 Nut, Hex
2 142-045A 1 Spacer
3 S39-160 1 Cabinet Assembly
4 169-364 1 90° Elbow
5 S27-110 1 Stop Valve
6 113-006DH 1 Nipple, Close
7 169-639 1 90° Street Elbow
8 169-348 1 Union
9 114-051 1 Safety Sign
10 204-421 1 Emergency Inspection Tag
OBSOLETE
5
Installation S19-270HC, S19-270JC
Bradley • 215-1434 Rev. L; ECN 14-05-006 5/12/2014
Assembly of Components and Parts List — S19-270JC
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigtdurch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas faitun rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
1.4
1.51.6
1.7 1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
910
8
2
3
4
7
6
5
1.1
1.2
1.3
Shown in the “ON” position
Item Part No. Qty. Description
1 S39-680A 1 Swing-Down Sub-Assembly
1 .1 S05-162 1 Eye/Face Wash Yoke Sub-Assembly
1 .2 S53-063 2 Tethered Dust Cover
1 .3 113-1075 1 Pipe, 9½" (Plated)
1 .4 118-288 1 Valve Body (Plated)
1 .5 125-135 1 O-Ring
1 .6 125-120 1 O-Ring
1 .7 S39-598 1 Actuator Sub-Assembly, Valve
1 .8 192-016 1 Insert, Direction (Plated)
1 .9 160-413 1 Screw, Set
1 .10 110-115A 1 Nut, Hex (Plated)
1 .11 125-001DA 1 O-Ring
1 .12 131-082 1 Base
Item Part No. Qty. Description
1 .13 160-428 1 Screw, Set
1 .14 113-1058 1 Shank
1 .15 110-115 1 Nut, Hex
1 .16 S05-158 1 Eye/Face Wash Assembly
2 142-045A 1 Spacer
3 S39-160 1 Cabinet Assembly
4 169-364 1 90° Elbow
5 S27-110 1 Stop Valve
6 113-006DH 1 Nipple, Close
7 169-639 1 90° Street Elbow
8 169-348 1 Union
9 114-051 1 Safety Sign
10 204-421 1 Emergency Inspection Tag
1 .16
OBSOLETE