72
Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019 Research Assistant: Austin DeJong, EIT Principal Investigator: Travis Hosteng, PE Co-Principal Investigator: Behrouz Shafei, Ph.D., PE 1

Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

  • Upload
    others

  • View
    6

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Integral Abutment Connection Details for ABC – Phase II

ABC-UTC Research Seminar – April 26, 2019Research Assistant: Austin DeJong, EIT

Principal Investigator: Travis Hosteng, PECo-Principal Investigator: Behrouz Shafei, Ph.D., PE

1

Page 2: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Acknowledgements

• ABC-UTC• IowaDOT

– Match funding

2

Page 3: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Project Goal• Develop Integral Abutment Connection(s)

that meet the design and construction demands of an Accelerated Bridge Construction (ABC) project– Slide-in Construction Capable– Durable– Construction Friendly

3

Page 4: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Objective and Scope• Analyze strength and durability of three

integral abutment connection details for ABC applications

• Scope– Revise and retest the two connection details

designed for Phase I (ISU 2014-2016)– Design and test Ultra-High Performance

Concrete (UHPC)-Joint for Iowa DOT

4

Page 5: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Why Integral Abutment• Integral Abutments

– Semi-Integral– Expansion Joint

• Benefits of Integral Abutment– Eliminate Expansion Joint– Decrease Maintenance Costs– Increase Service Life– Less Expensive to Construct, Simple to Detail

5

Page 6: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory SpecimensDesign, Construction and Testing

6

Page 7: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Cast-In-Place (control) Specimen

Figure 1: Cast-In-Place Pile Cap

7

Page 8: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Cast-In-Place (control) Specimen

Figure 2: Cast-In-Place Integral Diaphragm

8

Page 9: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Cast-In-Place (control) Specimen

Figure 3: Cast-In-Place Connection prior to concrete casting

9

Page 10: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Cast-In-Place (control) Specimen

Figure 4: Cast-In-Place Integral Abutment Specimen completed (with reaction blocks)

10

Page 11: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Specimen Construction• Three specimens evaluated:

– Grouted Reinforcing Bar Coupler (GRBC)• 8 couplers revised from 17 couplers in Phase I

– Pile Coupler (PC)• 4 couplers revised from 2 couplers in Phase I

– UHPC-Joint• Designed in conjunction with IowaDOT

• Structural Response & Constructability

11

Page 12: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Grouted Reinforcing Bar Coupler (GRBC)

Figure 5: Plan View of GRBC Specimen (Note: Red dots represent locations of couplers)

12

Beam

Page 13: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 6: Section View through couplers (Note: Red marks represent Grouted Couplers)

13

Grouted Reinforcing Bar Coupler (GRBC)

Page 14: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 7: Completed GRBC Pile Cap

14

Grouted Reinforcing Bar Coupler (GRBC)

Page 15: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 8: GRBC Integral Diaphragm Reinforcing Cage (Note: Grout Sleeves on bottom)

15

Grouted Reinforcing Bar Coupler (GRBC)

Page 16: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 9: Completed GRBC Integral Diaphragm

16

Grouted Reinforcing Bar Coupler (GRBC)

Page 17: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 10: Completed GRBC Integral Diaphragm Surfaced Grout Ports

17

Grouted Reinforcing Bar Coupler (GRBC)

Page 18: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 11: GRBC Connection Dry-Fit

18

Grouted Reinforcing Bar Coupler (GRBC)

Page 19: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 12: GRBC Connection Installation (Note: ¾” Neoprene pad with silicone)

19

Grouted Reinforcing Bar Coupler (GRBC)

Page 20: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 13: Completed GRBC Connection Installation

20

Grouted Reinforcing Bar Coupler (GRBC)

Page 21: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 14: Completed GRBC Specimen

21

Grouted Reinforcing Bar Coupler (GRBC)

Page 22: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

GRBC – Construction Issues• Pile Cap

– No significant issues• Integral Diaphragm

– Reinforcement cage adjustments for grout sleeve ports

– One grout sleeve port did not fully surface• Connection

– No significant issues

22

Page 23: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Pile Coupler (PC)

Figure 15: Plan View of PC Specimen

23

Beam

Page 24: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 16: Section View through couplers

24

Pile Coupler (PC)

Page 25: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 17: PC Pile Cap Corrugated Metal Pipe (CMP) plug

25

Pile Coupler (PC)

Page 26: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 18: PC Pile Cap salvage reinforcing bars holding CMP’s at design location

26

Pile Coupler (PC)

Page 27: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 19: Completed PC Pile Cap

27

Pile Coupler (PC)

Page 28: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 20: PC Integral Diaphragm CMP plug

28

Pile Coupler (PC)

Page 29: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 21: PC Integral Diaphragm reinforcing cage

29

Pile Coupler (PC)

Page 30: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 22: PC Integral Diaphragm CMP with Ports and “locking” salvage reinforcing bars

30

Pile Coupler (PC)

Page 31: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 23: Completed PC Integral Diaphragm Surfaced CMP’s and Ports

31

Pile Coupler (PC)

Page 32: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 24: Completed PC Integral Diaphragm

32

Pile Coupler (PC)

Page 33: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 25: Steel Section Couplers with Shear Studs suspended within CMP’s

33

Pile Coupler (PC)

Page 34: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 26: PC Connection Installation – Installation of and Completed SCC

34

Pile Coupler (PC)

Page 35: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Figure 27: Completed PC Specimen

35

Pile Coupler (PC)

Page 36: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

PC – Construction Issues• Pile Cap

– CMP movement during concrete pour– One CMP Plug blowout

• Integral Diaphragm– One 1 in. vent port did not fully surface

• Connection– SCC aggregate settled to bottom of barrel

during casting– Steel Section Guide locations

36

Page 37: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 28: Plan View of UHPC-Joint Specimen (Note: Red dots represent locations of couplers)

37

Beam

Page 38: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 29: Section View through “Chimney” (Left) and other sections (Right)

38

Page 39: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 30: Elevation View (Left) Section View through “Chimney” (Right)

• Flowability Test conducted to investigate the ability of the UHPC material to flow through the designed cross section

39

Page 40: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 31: UHPC-Joint Flowability Test Completed

40

Page 41: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 32: UHPC-Joint Pile Cap Threaded Couplers

41

Page 42: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 33: Completed UHPC-Joint Pile Cap

42

Page 43: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 34: UHPC-Joint Integral Diaphragm Formwork

43

Page 44: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 35: UHPC-Joint Integral Diaphragm Reinforcing Cage (Note: Coupler Bars passing through bottom of formwork)

44

Page 45: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 36: Form Retarder applied to bottom of UHPC-Joint Integral Diaphragm

45

Page 46: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 37: Completed UHPC-Joint Integral Diaphragm with Exposed Aggregate Finish

46

Page 47: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 38: UHPC-Joint Connection Installation – (Left to Right) Adequate Clearance for Rear Coupler Bars. Adequate Clearance for Front Coupler Bars. Bottom of Integral Diaphragm with Steel Shoe bearing on Neoprene Pad

47

Page 48: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 39: UHPC-Joint Rear face of Specimen (Note: “Chimney’s”)

48

Page 49: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 40: UHPC-Joint Connection Installation – (Left) Chimney System for installing UHPC (Right) Completed UHPC-Joint

49

Page 50: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint

Figure 41: Completed UHPC-Joint Specimen

50

Page 51: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

UHPC-Joint – Construction Issues• Pile Cap

– Some bars did not have 8 in. protrusion• Integral Diaphragm

– Variation of protruding lengths for coupler bars– Coupler bars were not easily tied to

reinforcement cage• Connection

– UHPC layers during casting

51

Page 52: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Setup• Two independent static loads applied to the

fixed-base specimens– 100-kip Horizontal Load => front face joint

opening– 400-kip Vertical Load => rear face joint

opening• Instrumentation

– Displacement Transducers– Sacrificial Strain Gauges– Displacement Gauges

52

Page 53: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Setup

Figure 42: Laboratory Testing Setup

53

400 kip Vertical Load

100 kip Horizontal Load

Reaction Blocks

Post-tensioned Tie-Down Bars

Page 54: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - GRBC

Figure 43: GRBC Front Face Joint Crack from Horizontal Load

54

Beam

Page 55: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - GRBC

Figure 44: GRBC Front Coupler Bar Stress from Horizontal Load

55

Beam

Page 56: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - GRBC

Figure 45: GRBC Rear Face Joint Crack from Vertical Load

56

Beam

Page 57: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - GRBC

Figure 46: GRBC Rear Coupler Bar Stress from Vertical Load

57

Beam

Page 58: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - PC

Figure 47: PC Front Face Joint Crack from Horizontal Load

58

Beam

N

Page 59: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - PC

• Maximum Front Coupler Stress due to Horizontal Load was tabulated to be 3.34-ksi, which is essentially no stress in the coupler steel sections

59

Beam

N

Page 60: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - PC

Figure 48: PC Rear Face Joint Crack from Vertical Load

60

Beam

N

Page 61: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results - PC

Figure 49: PC Rear Coupler Section Stresses from Vertical Load

61

Beam

N

Page 62: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results – UHPC-Joint

Figure 50: UHPC-Joint Front Face Joint Crack from Horizontal Load

62

Beam

Page 63: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results – UHPC-Joint

Figure 51: UHPC-Joint Front Coupler Bar Stresses from Horizontal Load

63

Beam

Page 64: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results – UHPC-Joint

Figure 52: UHPC-Joint Rear Face Joint Crack from Vertical Load

64

Beam

Page 65: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results – UHPC-Joint

Figure 53: UHPC-Joint Rear Coupler Bar Stresses from Vertical Load

65

Beam

Page 66: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Laboratory Test Results

Table 1: Summary of Laboratory Test Results

Specimen Max. Front Face Joint Crack (in)

Max. Rear Face Joint Crack (in)

Max Coupler Stress (ksi)

Cast-In-Place 0.001 0.025 42GRBC – Phase I 0.001 0.035 43GRBC – Phase II 0.020 0.348 133.0

PC – Phase I 0.050 1.75 26PC – Phase II 0.007 0.306 22.1UHPC-Joint 0.018 0.032 48.1

66

Page 67: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Recommended Future Work

Figure 54: Proposed revision to UHPC-Joint Connection Detail

67

Page 68: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Recommended Future Work

Figure 55: Proposed spiral reinforcing cages for Pile Coupler

• Add confinement reinforcement surrounding the CMP’s• Spiral reinforcing cage in lieu of H-pile sections

68

Page 69: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Recommended Future Work• GRBC grout sleeve size variation

– Dayton Superior allows for variance of 2 bar sizes between reinforcing bar and grout sleeve (i.e. #8 bar with #10 sleeve)

• Cyclic loading of connection details• Field monitoring of real-world applications

of the connection details• Finite element simulations of connection

details for laboratory testing and field monitoring

69

Page 70: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Research Implementation

70

Page 71: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Implementation of Details• UHPC-Joint Connection Detail to be used

by IowaDOT – design phase currently• Grouted Couplers have been used on

numerous pier-pier cap connections

71

Page 72: Integral Abutment Connection Details for ABC – Phase II...Apr 26, 2019  · Integral Abutment Connection Details for ABC – Phase II ABC-UTC Research Seminar – April 26, 2019

Thank You

Questions and Discussions

72