InterMoor – Innovation in Action

InterMoor:USAMexicoBrazilNorwaySingapore & MalaysiaUKWest Africa

3

InterMoor is an Acteon Company – linking subsea services

InterMoor Services

MOORINGSMOORINGSRig Moves

Permanent MooringsEquipmentInspection,

Maintenance & RepairMarine Assurance

FOUNDATIONSFOUNDATIONSWell Conductors

Suction PilesDriven Piles

SEPLAsAnchorsMudmats

SUBSEASUBSEARiserless Well Intervention

Heave CompensationAbrasive Cutting

Decommissioning

5

Personnel

Diverse Capable Staff

• Safety Staff • Ocean Engineers• Civil / Structural Engineers • CAD Designers • Procurements Specialists • Contract Supervisors • Master Mariners • Anchor Handling Superintendents • Anchor Handling Crew Members• Equipment Technicians• Management & Support Staff

6

Operational Capability

- InterMoor is a leader in innovative mooring and installationtechnology.

- The company designs, supplies and deploys technically advancedmooring systems.

- InterMoor also provides rig moves and back of the boat installationservices worldwide and survey and positioning services.

- InterMoor is the only mooring service company worldwide thatoffers FULL service for both temporary and permanent moorings.The services include:

- mooring system design and installationengineering;

- expertise and experience with ALL oil field anchortypes (drag, SEA, SEPLA, VLA, torpedo);

- provisions of mooring systems and equipment forlease or sale;

- mooring installation teams including crews andsupervision;

- inspection, maintenance and repair of mooring.- and ring recovery

7

Operational Capability

- InterMoor provides subsea services with cost-effective solutions forunderwater projects using unconventional installation andintervention vessels (in-line subsea heave compensation fordeployment and recovery subsea hardware, manifold, conductor, treeinstallation and etc.)

InterMoor Firsts:- Current world record holder of conventional

drilling rig mooring installation, 2.570m WD – 2008- Current record for Shell in Brazil for conventional

drilling rig mooring installation, 2.015m WD – 2012- First permanent production facility polyester

mooring (outside of Brazil) – 2003- First full drilling rig polyester and suction

embedded plate anchor (SEPLA) mooring system –2001

- First test drilling rig polyester and SEPLA mooringinstallation – 1999

- First test drilling rig suction anchor installation –1996

- First drag VLA installation (outside of Brazil) - 1994

InterMoor Support Services

ENGINEERINGENGINEERINGDesign / Analysis

Mooring/HydrodynamicStructural/Installation

Foundation DesignField Development

& Planning

Cost & Feasibility

FABRICATIONFABRICATIONSEPLAs

Suction PilesDriven Piles/ Conductors

MudmatsSpecialty

Fabrication

SURVEY & POSITIONING

SURVEY & POSITIONING

Rig KitsVessel Kits

Heading ControlMetrology

USBL

SHORE BASESHORE BASEHeavy LiftStorageProject

MobilizationCargo Handling

Test Bed

InterMoor Overview

RESOURCES EXPERIENCE TECHNOLOGYRESOURCES EXPERIENCE TECHNOLOGYFacilities

Shore Base & Offshore Crews

Technical & Operations Personnel

Extensive Inventory

Equipment

Rig Moves

Temporary & Permanent Moorings

Foundation Design, Supply & Install

Subsea Install/Retrieve

Abrasive Cutting

Back-of-boat Services

Development of Deepwater Moorings

Development of Synthetic Moorings Applications

Suction Piles

Award-Winning SEPLA

Heave Compensation

Riserless Well Intervention

Novel Installations & Operations

10

Engineering & Design• Hydrodynamic Analysis (Vessel Motions & Coefficients)

• Mooring System Design & Analysis (Frequency & Time Domain)

• Dynamic Lowering Analysis (CASIM)(Compensated Anchor-handler Subsea Installation Method)

A complete package for installation of (trees, manifolds, anchors, hammers, etc.) that includes:

• Detailed engineering• Dynamic lowering analysis• Operational procedures• Tools and equipment• Offshore personnel

Mooring Design & Installation

11

Engineering & Design• 3D Finite Element Structural Analysis

• CAD & Drafting Services

• Suction Pile Design & Analysis

• SEPLA Anchor Design & Analysis

• Foundations Engineering

• Mooring Operations & Planning Studies

• Installation Engineering & Procedures

• Cost & Feasibility Studies

Nonlinear Buckling Analysis

SEPLA FEA

12

Services in BrazilBC-10 Conductors Installation(Phase 1 – Parque das Conchas)

Mooring analysis for drilling units rig moves, Positioning and Offshore Supervision

FPSO mooring lines recovery and hook up

Polvo FPSO Installation

Mooring analysis for drilling unit rig moves, Positioning and Offshore Supervision

Mooring analysis for drilling unit rig moves, Positioning and Offshore Supervision

Mooring hook up and Riser pull-in campaigns

Papa Terra Conductors design, construction and installation

Peregrino FPSO Installation(Client Rep)

FPSO OSX-1 Installation(Client Rep)

13

– Shell BC-10 (Phase 1):• 3 Year Program to Manage the Arctic 1 Drilling Program (Polyester

and Drag VLAs)• Turnkey Installation of Driven Drilling Conductors

– Provision of Conductors and All Installation Equipment– Provision of Purpose Built Barge– Provision of All Installation Management and Supervision

Project Highlights – Brazil

14

– Shell MODUs Installation (2 drilling units)• Mooring analysis (deepwater moorings – 1600 to 2000m):

– Pre-Sets:» VLA anchor» wire rope / polyester rope

– Conventional moorings:» drag anchor» chain / wire rope

• Operational procedures for the installation• Positioning services• Offshore Supervision

– Perenco MODU Installation (1 drilling unit)• Mooring analysis (deepwater moorings – 700 to 1200m):

– Conventional moorings:» drag anchor» chain / wire rope

• Operational procedures for the installation• Positioning services• Offshore Supervision

Project Highlights – Brazil

15

– Sonangol MODU Installation (1 drilling unit)• Mooring analysis (shallow waters, 140m up to deepwater moorings,

850m):– Conventional moorings:

» drag anchor» chain / wire rope

• Operational procedures for the installation• Positioning services• Offshore Supervision

– Anadarko MODU Installation (1 drilling unit)• Mooring analysis (deepwater mooring – 1500m):

– Pre-Set:» VLA anchor» wire rope / polyester rope

• Operational procedures for the installation• Positioning services• Offshore Supervision

Project Highlights – Brazil

16

– OGX MODUs Installation (6 drilling units)• Mooring analysis (shallow waters, 100–150m up to 300m moorings):

– Conventional moorings:» drag anchor» all chain or chain / wire rope

• Operational procedures for the installation• Positioning services• Offshore Supervision

Project Highlights – Brazil

17

Innovation• Long history of involvement with Mooring R&D and has led the industry in

innovative thinking that has resulted in many technological advancementsfor the oil and gas industry.

• Pioneer in the use of Deepwater Pre-Set Moorings to increase efficiencyand water depth capabilities of floating vessels with the development ofsuction anchors, the patented SEPLA (Suction Embedded PLate Anchor),and polyester rope and taut-leg moorings.

• Currently involved in multiple joint industry projects, industry committeesand forums – contribution to the development and improvement of theoffshore industry's practices and technologies.

18

Innovation – SEPLA Anchor• Combines advantages of suction embedment and proven plate anchor

technology• Uses suction embedment follower with plate anchor slotted into base to

install plate anchor• Follower is then removed by reversing pump action, leaving plate at

depth• Plate is then rotated to orientation close to perpendicular to direction of

load• Geotechnically efficient shape

19

Innovation – SEPLA AnchorCOMPARISON:

MODU Example:Suction Anchor SEPLA

2,90m diameter x 21,30m 2,45m x 6,10mWeight 68 tons Weight 24 tons (solid fluke)

Permanent Mooring Example (Red Hawk Spar) Suction Anchor SEPLA

5,50m diameter x 23,80m 4,60m x 9,15mWeight 180 tons Weight 37 tons (hollow fluke)

20

Mooring Design• MODU MOORING DESIGN AND RISK ASSESSMENT:

– MODUs have gotten bigger and staying at one site for longer periods of time.– There are more permanent deepwater production systems with higher

production rates.– There is much more subsea infrastructure.– Governments, regulatory agencies, companies and the general public have put

more emphasis on protecting the environment and offshore assets.– Hurricane and typhoon design criteria and regulatory requirements have become

more stringent.

InterMoor's extensive understanding of mooring components,installation methods, and analytical simulations means we can evaluatethe probability of failure, consequence of damage and the associated riskto deliver robust, reliable, and cost effective mooring systems.

21

Forecast– Shell Moorings & Conductors – BC-10 Phase 2

– Permanent Mooring Design and Installations

– Moorings & Positioning MODU Spot Market: OGX, Statoil, Maersk Oil, Karoon, Vanco, ONGC, etc.

– LLX – Porto do Açu: Shore Base support area for Oil & Gas Industry with heavy lift, inspection, logistic, spooling services and etc. – Start operations in 2013

22

Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)

• Maritime history shows that permanent mooring fails in a widerange of WD and environmental conditions

• Records show that failures are caused by a variety of mechanisms(wear, fatigue, abrasion, corrosion, damages from installationoperations, inspection operations, and dropped objects, flawedmaterials, excessive tension, etc.);

• Statistics at North Sea show that the probability of failure peroperating year is relatively high;

• Statistics also shows that most part of units cannot monitor linetension or offsets, do not have line failure alarms or adjust linelengths or have spare parts available;

• Mooring integrity is gaining interest: it is not acceptable for apermanent production unit to be with a damaged mooring system;

23

Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)

• Interest in MIM becomes more prevalent;• MIM programs tailored to encompass:

– regular inspection and evaluation of mooring system in-placecondition

– Identification and execution of routine maintenance operationsto reduce potential of failures

– Analytical prediction of a mooring line’s probability of failurebased on mooring system condition, line measurements,previous real world operating and survival conditions and

– Mooring repair plan (MRP) to identify market installationvessels, mooring suppliers, installation suppliers, developoperations procedures to repair line components before orafter failure occurs with little or no production loss down time

– Procurement, fabrication, storage and maintenance of sparemooring components and installation aids;

• The majority of existing Units assets are installed and operatingWITHOUT mooring system monitoring and load measurement. Theintegrity is based only on inspection and maintenance;

24

Forecast– Mooring Maintenance: Mooring Integrity Management (MIM)

• MIM for New Units should not only include a inspection,maintenance and MRP. There is the opportunity to augment thesystem in a real time line measurement equipment to realize acomprehensive MIM program.

• InterMoor has developed the Inter-M-Pulse direct in line tensionmonitoring system. The system send the real time measurement tocontrol room, detailing line inclination, orientation and curvature ofmooring line;

• For new Units, a comprehensive MIMcould be developed before the failureoccurs, offering the opportunity tomonitoring systems for more accurateand predictive probability of failureestimates (using real time mooringline measurement and monitoringsystem).