International Hard Anodizing Association

Maximizing Process Control

THE ONE THING THAT REALLY MATTERS IS CONSISTENCY

Once Consistency is Achieved, Quality Can Be Reliably Managed

10/26/2016

2

What is Needed for Consistency?

• A System that can receive data from various areas of an

Anodizing Operation and turn that data into useful

information

• A System that can then be used to turn that information

into knowledge which, when provided consistently and

timely to appropriate personnel, transforms an Anodizing

Operation from one that is Reactive to one that is

Proactive

• A Scalable System that makes collection/storage of

rules/logic based actions seamless for maximum

knowledge utilization

• User Definable Features:

– Schedules, Procedures, Event Tracking

– System/User Security, Rules/Actions/Notifications

10/26/2016

3

Analysis/Data Collection Rules Conditions Logic Actions

Uniformity

Consistency

Awareness

Communications

Best Practices

Unlimited User

Conditions

5 out of last 5

Increasing in

Value

Test Result

Outside of

Control Limits

Test Result Outside

of Spec Limits

True Control

Unlimited User

Defined Actions

Extended Actions

Using VBA Script

Schedule Re-Test

Require Corrective

Action Sign-off

Require Add or

Remake

Sound an AlarmIssue Pop-up

Message, Alert, or

NotificationSend an Email

Security

Efficiency

10/26/2016

4

Relational Database Utilization

• Standardizes Operations

– Software can provide the confidence to know that

each operation, regardless of personnel, shift, or

location, will be performed the same

– Resulting actions/activities will be consistent

• Provides Traceability

– Who1performed a procedure?

– What1procedure was performed?

– When1was a procedure performed (timely)?

– Why1was a procedure modified (if yes, why)?

– How1did a procedure affect the process?

– Where1does additional attention need to be

focused?

Sample Screens from a Relational Database

10/26/2016

5

Scheduler

TrueChem - Your Company Name

Demo Process/Demo Tank Test Procedure

10/26/2016

6

ABC Concentration Test Result

Outside of Six Sigma Calculated Control Limits

SPC Graph Overview Screen

10/26/2016

7

Bath Component (ABC) Run Chart with Data Point Information

ABC Component Run Chart With Data Point Historical Notes

10/26/2016

8

ABC Component Run Chart With Bookmark (Procedure Change)

ABC Component Run Chart With Procedure Change Results

10/26/2016

9

Additional Bath Component Run Chart (XYZ)

Additional Bath Component Run Chart (pH)

10/26/2016

10

ABC-XYZ-pH Components Overlay Run Chart

Group Rights

10/26/2016

11

Assigning Users To Groups

Rules/Logic: Application of Knowledge

10/26/2016

12

Critical Variable Visualization Tool

PROCESS LEVEL DASHBOARD

Critical Variable Visualization Tool

TANK LEVEL DASHBOARD

10/26/2016

13

Critical Variable Visualization Tool

COMPONENT LEVEL DASHBOARD

Relational Database-Improvement Examples

0

50

100

150

200

250

300

1 11 21 31 41 51 61 71 81 91

Weeks

Spec Limits Exceeded Per Week

Plant A

Plant B

Plant C

Plant D

Plant E

0

50

100

150

200

250

300

1 11 21 31 41 51 61 71 81 91

Weeks

Scheduled Items Past Due

Plant A

Plant B

Plant C

Plant D

Plant E

10/26/2016

14

Viewlen Dank!

Thank You

Any Questions?