12
SAP AG 1999 SAP AG 2001 Integration ofIS-U /C C S w ith the S A P standard system -business features ofthe system The IS-U /C C S D ata M odel B usiness Scenario Introduction

Introducere IUT 220

Embed Size (px)

DESCRIPTION

IUT 220

Citation preview

Page 1: Introducere IUT 220

SAP AG 1999 SAP AG 2001

Integration of IS-U/CCS with the SAP standard system - business features of the system

The IS-U/CCS Data Model

Business Scenario

Introduction

Page 2: Introducere IUT 220

SAP AG 1999

At the conclusion of this unit, you will be able to:

SAP AG 2001

Describe how IS-U/CCS is integrated with the standard SAP system

Describe how IS-U/CCS maps the value chain of your company

Identify the functions you can execute using the IS-U Device Management component

Introduction: Topic Objectives

Page 3: Introducere IUT 220

SAP AG 1999

Marketing and Sales

InstallationServices

Service Billing

ConsumptionEntry Billing

ConsumptionBilling

CustomerService &

Settlement

Generation/ Procurement

Transmission Distribution

IS-U/CCSIS-U/CCS

Billing

Customer Contact/Information/Service

Contract Accounts

Receivable& Payable

Meter & Device Management

Work Management

CRMCRM

Customer Relationship Management

All customer-related business processesfrom the areas of energy supply, services, and salesAll customer-related business processesfrom the areas of energy supply, services, and sales

PM/CS

SD

FI

Functional Scope of the IS-U/CCS System

Page 4: Introducere IUT 220

SAP AG 1999

Separation of Device Management and Billing

Billing-based usage(e.g. by suppliers)

Only the device data required for billing(such as rate data, device allocations, register relationships) has to be maintained

Device information record

Device management-based usage (by meter operators, distribution and transmission companies, for example)

Billing objects (such as the rate) do not have to be maintained

Page 5: Introducere IUT 220

SAP AG 2003

Service Connection GasService Connection ElectricityServiceConn. WaterSupply Grid

Connection object

Premise = Apartment 1

Apartment 4

Apartment 3

Apartment 2

BusinessPartner

Street

Device Loc. 2:Basement

Device Loc. 1:Hallway

Installation 1:Water Meter

Installation 2:Gas Meter

Installation 3:Current Meter

Contract 1:Water

Contract 2:Gas

Contract 3:Electricity

ContractAccount

The IS-U House

Page 6: Introducere IUT 220

SAP AG 2003

Cross-application data

Contract Accounts A/R & A/P

SD (Sales & Distribution)

MM/PM/CS

IS-U/CCS

IS-U res.

Reconciliationkey

FI-CAdocument

SD/cust.SD/cust.

Businesspartner Regional

structure

PostalPolitical

Enterprise

G/Ldocument (FI)

Print document

Contractaccount

Customercontact

SD contract

Contract

Billingdocument

Invoicerequest

RegisterMR

resultMR

order

PM/Equipment

Device

Warehouse Purchaserequisition

Installation

Device category MM/

Material

Portion

MR unit

Premise

Scheduling

Dates

Connectionobject/FL

Rates/prices/conditions

Servicenotification

Customerinquiry

Service order Maintenanceorder

Service conn.Equipment

Devicelocation/FL

IS-U res.

Technical installationEquipment

FactsPoint ofdelivery

Service

IS-U Data Model

Page 7: Introducere IUT 220

SAP AG 1999

Features of similar devices

Technical description

Certification periods

Procurement/stock in MM, and so

on

Device-specific data

Serial number (PM/MM)

Data for installation/removal

Certification year/

lot membership

Device group InspectionCertification

Procurement,

Installation, Removal,Replacement

Complaints

Functions ofFunctions ofDevice ManagementDevice Management

Meter reading

Inventory management

Device category

Device

Device Management - Master Data

Page 8: Introducere IUT 220

SAP AG 1999

IS-U Device ManagementIS-U Device Management Logistics Logistics

DeviceDevice

Device categoryDevice category

EquipmentEquipment

MaterialMaterial

Inventory management

PurchasingPurchase order, goods receipt

Technical data

Installation

Meter reading

Inspection

Groups: register, input/output, command, and winding

Device installation, removal and replacement, utility installation structure,

device and register allocations

Sampling procedure, certification, and periodic replacement

Organization, order, result

Plant maintenance

Warehouse management

Classification system

Quality management

IS-U Device Management: Integration with Logistics

Page 9: Introducere IUT 220

SAP AG 2003

A new low-energy housing development has been added to the supply area of IDES Utilities Inc. Most of the buildings are to be heated using off-peak storage heaters. The company decides to introduce a new double-rate meter category, which is also to replace all installed double-rate meters as part of the periodic replacement policy.

To model the procurement and implementation of the new devices, the project team is using the functions of IS-U Device Management:

A new low-energy housing development has been added to the supply area of IDES Utilities Inc. Most of the buildings are to be heated using off-peak storage heaters. The company decides to introduce a new double-rate meter category, which is also to replace all installed double-rate meters as part of the periodic replacement policy.

To model the procurement and implementation of the new devices, the project team is using the functions of IS-U Device Management:

Allocation of a device category in the system

Allocation of the devices to warehouses

Device procurement (goods receipt)

Organization of device movements

Business Scenario I

Page 10: Introducere IUT 220

SAP AG 1999

Device installation/removal/replacement

Definition of the installation structure

Meter reading

Organization

Entry

Monitoring

Device inspection

Sampling procedures

Periodic replacement

Certification

Business Scenario (2)

Page 11: Introducere IUT 220

SAP AG 2003

Certifi-cation

Central warehouseCentral warehouse

Certification/Repair Warehouse

Certification/Repair Warehouse

Installation structure

GridGrid

Retire-ment

Retire-ment

yes

no

Meterreading Meter

reading

Meter reading

Meter reading

RemovalReplace-ment

Installation

Device management

Technicaldata

Grouping

Additional topics• Device inspection• Sampling procedure• MR organization

D e v i c e H

i s t o r y

D e v i c e H

i s t o r y

Device category• Basic device category• Device combination• Device classification• Certification requirement• Price class

Device procurement

Purchasing(PM)

Delivery(MM, PM)

Purchasing(PM)

Delivery(MM, PM)

Device Management Business Scenario

Device data• Register group• Input/output group• Command group• Inspection point group• Winding group

Page 12: Introducere IUT 220

SAP AG 2003

IS-U/CCS is integrated with the standard SAP system, and enables you to use standard components such as Materials Management, Plant Maintenance, and Sales and Distribution.

IS-U/CCS Device Management includes device technology, device installation, meter reading as well as the inspection and certification of devices.

The business scenario includes all IMG activities needed for mapping the technology, procurement, movement, installation and certification of devices.

The business scenario forms the basis for the practical exercises that course participants will work through later on in the course. The entire business process is shown, with examples ranging from the definition of device types and goods receipt through to installation and certification.

SAP AG

Introduction: Unit Summary