INUNDATION TESTBED PI MEETING: LSU FVCOM Progress Chunyan Li (with ACKNOWLEDGEMENT to UMASS Team and Dr. Zheng) Louisiana State University 1

INUNDATION TESTBED PI MEETING: LSU FVCOM Progress

  • Upload
    stew

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

INUNDATION TESTBED PI MEETING: LSU FVCOM Progress. Chunyan Li (with ACKNOWLEDGEMENT to UMASS Team and Dr. Zheng ) Louisiana State University. Computer Resource Usage. LONI computers: Queen Bee - 668 Compute Nodes 50.7 TFlops Peak Performance - PowerPoint PPT Presentation

Citation preview

Page 1: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

INUNDATION TESTBED PI MEETING: LSU FVCOM Progress

Chunyan Li (with ACKNOWLEDGEMENT to UMASS Team and Dr. Zheng)

Louisiana State University

1

Page 2: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

2

Computer Resource UsageLONI computers:

Queen Bee - 668 Compute Nodes50.7 TFlops Peak PerformanceTwo 2.33 GHz Quad Core Xeon 64-bit Processors8 GB Ram10 Gb/sec Infniband network interface10/100/1000 Ethernet network interfaceRed Hat Enterprise Linux 4

Painter - 128 compute node cluster4.77 TFlops Peak Performance Two 2.33 GHz Quad Core Xeon 64-bit ProcessorsA Dell Linux cluster housed at Louisiana Tech University10 Gb/sec Infniband network interface10/100/1000 Ethernet network interfaceRed Hat Enterprise Linux 4

Louie …Poseidon …

Page 3: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

3

Total used 166003 SUsWith ~ 80% used for this project

270K SU More LONI allocations Requested

Page 4: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

4

Cases that have been run –1. 2D tide only:

dtE = 2 sec.2008.8.1 – 2008.10.1nodes=32:ppn=8 256 CPUsfinished in 12:47:33 (12.7925 hr.) walltime

61 days of simulation 12.7925 hr./61 day =12.5828 min./day2a. 2D tide only new run

2008.7.1 – 2008.11.1nodes=16:ppn=8 128 CPUsStart saving Aug. 1: 93 days of simulation ran from 2/27, 5:02:43 AM to 2/28, 14:49:39

a total of 1.4076 days 1.4076 days /92 days = 22.03 min/day

Page 5: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

5

Cases that have been run –2b. 2D tide only new run:

dtE = 2 sec.2008.7.1 – 2008.11.1nodes=16:ppn=8 128 CPUsfinished in 45:14:52 (45.2478 hr.) walltime

123 days of simulation 45.2478 hr./123 day =22.07 min./day

Scaling: doubling CPUs 22.07/12.5828=1.75

Page 6: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

6

Cases that have been run (continued) –4. 2D tide + hurricane surge:

dtE = 2 sec.2008.9.6 – 2008.9.16nodes=16:ppn=8 128 CPUs

5. 2D wave only2008.9.6 – 2008.9.16nodes=32:ppn=8 256 CPUs

Page 7: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

7

Cases that have been run (continued) –6. 3D tide only (new):

dtE = 1 sec.2008.7.1 – 2008.11.1nodes=48:ppn=8 384 CPUs~ Finished in 3 days 3 hr.

75 hr./day ~ 0.625 hr./day7. 3D tide + hurricane surge

nodes=16:ppn=8 128 CPUs2008.9.6 – 2008.9.16 (10 days) ~ Finished in 16 hr.

1.6 hr./day Scaling: 384/128=3, tripling CPUs 1.6/0.625=2.56

Page 8: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

8

Observations for Hurricane storm surges by Hurricanes Gustav and Ike

OUR OWN DATALi, C., E. Weeks, B. W. Blanchard, 2010, Storm surge induced flux through multiple tidal passes during Hurricanes Gustav and Ike, Estuarine, Coastal and Shelf Science, 87 (2010) 517–525.

Page 9: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

Rate of water flux in m3/s and the 40-hour low-pass filtered time series.

Rigolets

Chef Menteure

Industrial Canal

9

Observations for Hurricane storm surges by Hurricanes Gustav and Ike

Li, C., E. Weeks, B. W. Blanchard, 2010, Storm surge induced flux through multiple tidal passes during Hurricanes Gustav and Ike, Estuarine, Coastal and Shelf Science, 87 (2010) 517–525.

Page 10: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

10

WAVCIS DATA

Page 11: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3Grand Isle

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model: no tidal potential

Page 12: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4Shell Beach

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 13: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3Cypremort Point

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 14: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8Calcasieu Pass

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 15: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6Bay Waveland YachtClub

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 16: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4Gulfport Harbor

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 17: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.6

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4Freshwater Canal Locks

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 18: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8Sabine Pass North

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 19: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6Galveston Pleasure Pier

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 20: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.6

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4USCG Freeport data

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 21: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5Dock E Port Pascagoula

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 22: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4Dauphin Island

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 23: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4Panama City

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 24: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5Apalachicola

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 25: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6Clearwater Beach

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 26: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

0 5 10 15 20 25 30 35-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6Naples

Wat

er L

evel

(m)

Time (days) from July 25, 2008

PredictedModeled

Results from Initial Run of the 2D Model

Page 27: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

data1 = t8724698;data2 = t8726724;data3 = t8727333;data4 = t8727520;data5 = t8729210;data6 = t8729678;data7 = t8735180;data8 = t8737048;data9 = t8737373;data10= t8741041;data11= t8741196;data12= t8741533;data13= t8742221;data14= t8743281;data15= t8744117;data16= t8745557;data17= t8747437;data18= t8747766;data19= t8760551;data20= t8760922;data21= t8760943;data22= t8761305;data23= t8761720;data24= t8761724;data25= t8761927;data26= t8762075;data27= t8762372;data28= t8764025;data29= t8764044;data30= t8764227;

data31= t8764311;data32=t8765251;data33=t8766072;data34=t8767816;data35=t8767961;data36=t8768094;data37=t8770475;data38=t8770520;data39=t8770559;data40=t8770570;data41=t8770613;data42=t8770743;data43= t8770777;data44= t8770933;data45= t8770971;data46=t8771013;data47= t8771450;data48= t8771510;data49= t8772447;data50= t8773037;data51= t8773701;data52=t8774513;data53=t8774770;data54=t8775188;data55=t8775237;data56=t8775283;data57=t8775296;data58=t8775792;data59=t8775870;

Node numbers in the order of the numbers

Page 28: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

%=========================================================% DATE: FEB. 11, 2011% NOTE: THE JULIAN DATE WAS DEFINED% BY THE "MODIFIED JULIAN DAY" STARTING FROM% 1858, 11, 17, 0:00%% It can be verified by datenum(2008, 8,1)-t0-time(1) = 0% See below for definition of t0.%==========================================================

t0 = datenum(1858,11,17);dt = t0+time(1) - datenum(2008, 1,1);

time1 = time - time(1);times = (0:length(zetas1)-1)*1/24 - dt; % delta t = 1 hour

Note: station 25 is New Canal station, which did not seem to have predicted data on NOAA’s web site.

Page 29: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)data1 = t8724698

modelpredicted

Results from New Run of the 2D Model: w/ Tidal Potential

Page 30: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data2 = t8726724

modelpredicted

Results from New Run of the 2D Model

Page 31: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data3 = t8727333

modelpredicted

Results from New Run of the 2D Model

Page 32: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data4 = t8727520

modelpredicted

Results from New Run of the 2D Model

Page 33: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data5 = t8729210

modelpredicted

Results from New Run of the 2D Model

Page 34: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data6 = t8729678

modelpredicted

Results from New Run of the 2D Model

Page 35: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data7 = t8735180

modelpredicted

Results from New Run of the 2D Model

Page 36: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data8 = t8737048

modelpredicted

Results from New Run of the 2D Model

Page 37: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data9 = t8737373

modelpredicted

Results from New Run of the 2D Model

Page 38: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data10= t8741041

modelpredicted

Results from New Run of the 2D Model

Page 39: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data11= t8741196

modelpredicted

Results from New Run of the 2D Model

Page 40: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data12= t8741533

modelpredicted

Results from New Run of the 2D Model

Page 41: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data13= t8742221

modelpredicted

Results from New Run of the 2D Model

Page 42: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data14= t8743281

modelpredicted

Results from New Run of the 2D Model

Page 43: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data15= t8744117

modelpredicted

Results from New Run of the 2D Model

Page 44: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data16= t8745557

modelpredicted

Results from New Run of the 2D Model

Page 45: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data17= t8747437

modelpredicted

Results from New Run of the 2D Model

Page 46: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data18= t8747766

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 47: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data19= t8760551

modelpredicted

Results from New Run of the 2D Model

Page 48: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data20= t8760922

modelpredicted

Results from New Run of the 2D Model

Page 49: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data21= t8760943

modelpredicted

Results from New Run of the 2D Model

Page 50: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data22= t8761305

modelpredicted

Results from New Run of the 2D Model

Page 51: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data23=t8761720

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 52: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data24= t8761724

modelpredicted

Results from New Run of the 2D Model

Page 53: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data25= t8761927

modelpredicted

Results from New Run of the 2D Model

Page 54: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data26= t8762075

modelpredicted

Results from New Run of the 2D Model

Page 55: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data27= t8762372

modelpredicted

Results from New Run of the 2D Model

Page 56: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data28= t8764025

modelpredicted

Results from New Run of the 2D Model

Page 57: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data29=t8764044

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 58: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data30=t8764227

modelpredicted

Page 59: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data31=t8764311

modelpredicted

Results from New Run of the 2D Model

Page 60: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data32=t8765251

modelpredicted

Results from New Run of the 2D Model

Page 61: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data33=t8766072

modelpredicted

Results from New Run of the 2D Model

Page 62: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data34=t8767816

modelpredicted

Results from New Run of the 2D Model

Page 63: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data35=t8767961

modelpredicted

Results from New Run of the 2D Model

Page 64: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data36=t8768094

modelpredicted

Results from New Run of the 2D Model

Page 65: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data37=t8770475

modelpredicted

Results from New Run of the 2D Model

Page 66: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data38=t8770520

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 67: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data39=t8770559

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 68: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data40= t8770570

modelpredicted

Results from New Run of the 2D Model

Page 69: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data41= t8770613

modelpredicted

Results from New Run of the 2D Model

Page 70: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data42= t8770743

modelpredicted

Results from New Run of the 2D Model

Page 71: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data43=t8770777

modelpredicted

Results from New Run of the 2D Model

Page 72: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data44= t8770933

modelpredicted

Results from New Run of the 2D Model

Page 73: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data45= t8770971

modelpredicted

Results from New Run of the 2D Model

Page 74: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data46= t8771013

modelpredicted

Results from New Run of the 2D Model

Page 75: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data47= t8771450

modelpredicted

Results from New Run of the 2D Model

Page 76: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data48= t8771510

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 77: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data49=t8772447

modelpredicted

Results from New Run of the 2D Model

Page 78: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data50=t8773037

modelpredicted

Results from New Run of the 2D Model

Page 79: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data51=t8773701

modelpredicted

Results from New Run of the 2D Model

Page 80: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data52=t8774513

modelpredicted

Results from New Run of the 2D ModelResults from New Run of the 2D Model

Page 81: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data53=t8774770

modelpredicted

Results from New Run of the 2D Model

Page 82: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data54=t8775188

modelpredicted

Results from New Run of the 2D Model

Page 83: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data55=t8775237

modelpredicted

Results from New Run of the 2D Model

Page 84: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data56=t8775283

modelpredicted

Results from New Run of the 2D Model

Page 85: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data57=t8775296

modelpredicted

Results from New Run of the 2D Model

Page 86: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data58=t8775792

modelpredicted

Results from New Run of the 2D Model

Page 87: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

30 35 40 45-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

Days from 2008.8.1

Z (m

)

data59=t8775870

modelpredicted

Results from New Run of the 2D Model

Page 88: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

88

3-D Results (FVCOM) 2-D Results (FVCOM)

8724698 zmamp zpamp zmphs zpphs dphs zmamp zpamp zmphs zpphs dphs

O1 0.1181 0.1261 57.4217 4.3942 53.0275 0.1256 0.1261 37.5831 4.3942 33.1889

K1 0.0848 0.1077 2.5141 3.9161 -1.402 0.1018 0.1077 12.4268 3.9161 8.5107

N2 0.0219 0.0228 89.8083 16.1022 73.7061 0.0226 0.0228 89.7996 16.1022 73.6974

M2 0.1218 0.133 64.2292 89.2734 -25.0442 0.1256 0.133 64.192 89.2734 -25.0814

S2 0.0493 0.0528 89.9738 89.4887 0.4851 0.051 0.0528 89.9785 89.4887 0.4899

K2 0.0187 0.0118 0.857 71.4762 -70.6192 0.0196 0.0118 0.6832 71.4762 -70.793

Q1 0.0265 0.0263 88.214 13.9924 74.2216 0.0275 0.0263 83.6412 13.9924 69.6488

P1 0.0028 0.0297 85.4583 0.412 85.0463 0.0034 0.0297 60.0943 0.412 59.6823

M4 0.0006 0.0044 89.1759 88.8083 0.3676 0.0005 0.0044 87.051 88.8083 -1.7573

M6 0.001 0 89.9979 85.7334 4.2645 0.0013 0 89.1471 85.7334 3.4138

Harmonic Analysis Results

Page 89: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

89

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.50

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

Modeled Amplitude (m)

Pre

dict

ed A

mpl

itude

(m)

3D Results

Page 90: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

90

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.50

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

Modeled Amplitude (m)

Pre

dict

ed A

mpl

itude

(m)

2D Comparison

Page 91: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

91

Reasons of discrepancy:

1.Bathymetry 2.Topography3.Dry – wet points

Page 92: INUNDATION TESTBED PI  MEETING:   LSU  FVCOM Progress

92

Solution?

1. update bathymetry2. upgrade topography3. delete dry points for

comparison