OBK Technology Ltd. 2008
USP H2
O Success
USP H2
O Success
Successful Project Delivery ofUSP PW & WFI Systems
OBK Technology Ltd. 2008
USP H2
O Success
“Define it, Design it, Deliver it”©
This is a review of all the key steps required for a successful USP water system deliveryThis review covers; Science & Technology, Pretreatment & Generation, Distribution System, Project Management & ValidationConcept design to a validated conclusion
OBK Technology Ltd. 2008
USP H2
O Success
Water Water ––
“Science & Technology”“Science & Technology”
OBK Technology Ltd. 2008
USP H2
O Success
Water is the worlds most ubiquitous solventWater is able to absorb and carry some of most of the known elementsWith today’s ability to measure down to parts per trillion – if you look for it - you can find it!
OBK Technology Ltd. 2008
USP H2
O Success
Basic criteria: “Purified water must meet the requirements for ionic and organic chemical purity and must be protected from microbial contamination. PW systems must be validated to reliably and consistently produce and distribute water of acceptable chemical and microbiological quality”.
OBK Technology Ltd. 2008
USP H2
O Success
USP XXIX allows WFI from distillation OR USP XXIX allows WFI from distillation OR an equivalent process (equivalent an equivalent process (equivalent processes not yet accepted by European processes not yet accepted by European Pharmacopoeia)Pharmacopoeia)WFI for global use products must come WFI for global use products must come from distillationfrom distillationSo to produce WFI So to produce WFI -- either vapor either vapor compression or Multicompression or Multi--Effect distillation Effect distillation
OBK Technology Ltd. 2008
USP H2
O Success
Water source is critical:Water source is critical:Potable sources include: surface, ground Potable sources include: surface, ground and groundwater under surface influenceand groundwater under surface influenceIt is critical to understand seasonal It is critical to understand seasonal variability since this can mean big variability since this can mean big difference in water sourcesdifference in water sources
OBK Technology Ltd. 2008
USP H2
O Success
With characteristics defined With characteristics defined -- pretreatment pretreatment equipment can be selectedequipment can be selectedPretreatment systems manage:Pretreatment systems manage:
Scaling (precipitation) of mineral salts & Scaling (precipitation) of mineral salts & silicasilicaFouling due to organic and inorganic Fouling due to organic and inorganic materialsmaterialsOxidation due to chlorine, chloraminesOxidation due to chlorine, chloramines
OBK Technology Ltd. 2008
USP H2
O Success
Most scaling is controlled by one of; Most scaling is controlled by one of; softening, lowering pH, anti scalants, or nano softening, lowering pH, anti scalants, or nano filtrationfiltration
Fouling is controlled with a multiFouling is controlled with a multi--media filter media filter and / or cartridge filtrationand / or cartridge filtration
pH to remove dissolved gas, particularly pH to remove dissolved gas, particularly carbon dioxidecarbon dioxide
OBK Technology Ltd. 2008
USP H2
O Success
For organic & inorganic reduction For organic & inorganic reduction -- ultraultra--filtration, ultraviolet light, organic filtration, ultraviolet light, organic scavenging and regular cleaning and scavenging and regular cleaning and sanitizationsanitizationFor oxidation control For oxidation control -- sodium bisodium bi--sulphite sulphite addition, activated carbon and ultraviolet addition, activated carbon and ultraviolet lightlight
OBK Technology Ltd. 2008
USP H2
O Success
With preWith pre--treatment defined treatment defined –– select the main select the main purification methodpurification method
Most usual is RO (Revere Osmosis) to Most usual is RO (Revere Osmosis) to remove salt and organic materialremove salt and organic materialDeionization (polishing) Deionization (polishing) -- either anion and either anion and cation resins or Electrocation resins or Electro--Deionization.Deionization.
OBK Technology Ltd. 2008
USP H2
O Success
Project ManagementProject Management
OBK Technology Ltd. 2008
USP H2
O Success
“Define it, Design it, Deliver it”©
♠ ♠ ♠ ♠
♥ ♥ ♥ ♥ ♥
♣ ♣ ♣ ♣ ♣ ♣ ♣ ♣ ♣
♠ ♠ ♠ ♠ ♠ ♠ ♠ ♠ ♥ ♥ ♥ ♥ ♥ ♣ ♣ ♣ ♣ ♣ ♣
OBK Technology Ltd. 2008
USP H2
O Success
“Define it, Design it, Deliver it”©
Start with a high level definition of the requirements – a draft URS The supply of USP - PW appears very complicated.The reality – follow the many steps of simple chemistry and logical process engineering from start to finish
OBK Technology Ltd. 2008
USP H2
O Success
Finalize the technical content of URS Develop a water consumption matrixDevelop clearly defined end water quality specifications from;What product(s) and/or cleaning processes will be served at the points of useDevelop the process requirementsDevelop the process requirements
OBK Technology Ltd. 2008
USP H2
O Success
Draft an outline scheduleDraft an outline scheduleThis provides a preliminary indication of This provides a preliminary indication of the expected end datethe expected end dateThis also provides a flag for those long This also provides a flag for those long lead time items that need to be ordered lead time items that need to be ordered earlyearly
This is also the time you can reconfirm the This is also the time you can reconfirm the budgetbudget
OBK Technology Ltd. 2008
USP H2
O Success
Define the detail of the water source(s)Define the detail of the water source(s)Temperatures, composition variabilityTemperatures, composition variabilityArrange for source sampling analysis if Arrange for source sampling analysis if required (recommended)required (recommended)Check to ensure that all seasons and all Check to ensure that all seasons and all likely sources are covered and documentedlikely sources are covered and documented
OBK Technology Ltd. 2008
USP H2
O Success
Reconfirm the consumption usage matrix Reconfirm the consumption usage matrix spread sheetspread sheetVerify all the process requirements Verify all the process requirements ––volumes, flows, temperature & pressurevolumes, flows, temperature & pressureCheck all the points of use and their capacity Check all the points of use and their capacity requirements & diversificationrequirements & diversificationReconfirm the required quality parameters Reconfirm the required quality parameters
OBK Technology Ltd. 2008
USP H2
O Success
Make system capacity decisions from the Make system capacity decisions from the usage matrixusage matrixWhat is the hourly, daily and weekly What is the hourly, daily and weekly consumption need?consumption need?Is usage batch or continuous?Is usage batch or continuous?This will drive the system capacity choice & This will drive the system capacity choice & prospective storage tank sizeprospective storage tank size
OBK Technology Ltd. 2008
USP H2
O Success
What does a typical system look like?What does a typical system look like?
OBK Technology Ltd. 2008
USP H2
O Success
Full USP system diagram hereFull USP system diagram here
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
WFIWFIRORO® ® is a patented RO system that meets is a patented RO system that meets or exceeds USP guidelines for WFI, but not or exceeds USP guidelines for WFI, but not currently accepted in Europecurrently accepted in Europe
WFIWFIRORO®® technology does not require a tank technology does not require a tank & is self sanitizing& is self sanitizing
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
45 GPM 2 x Pass WFI45 GPM 2 x Pass WFIRORO®®
Self Contained & Compact (20 x 6 x 6)Self Contained & Compact (20 x 6 x 6)Softeners not shownSofteners not shown5 years of Municipal water data5 years of Municipal water dataDrought conditions upon start upDrought conditions upon start up8 Months of operation 8 Months of operation –– zero micro zero micro count & zero cleaningcount & zero cleaning
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
Supplied by a 10 GPM systemSupplied by a 10 GPM system
30,000 gallon tank 30,000 gallon tank –– flat bottom flat bottom -- poor poor turn over turn over –– outdoor outdoor –– micro issuesmicro issues
Ozone system solutionOzone system solution
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
2 floors each @ 25 K Sq Ft2 floors each @ 25 K Sq Ft
International vaccines supplierInternational vaccines supplier
Equipment 18 months in outdoor Equipment 18 months in outdoor unsheltered storage prior to installation unsheltered storage prior to installation -- problemsproblems
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
2 Pass RO system with multi media 2 Pass RO system with multi media filtration and EDIfiltration and EDI
25 GPM capability25 GPM capability
Silica issues with rainy seasonSilica issues with rainy season
OBK Technology Ltd. 2008
USP H2
O Success
OBK Technology Ltd. 2008
USP H2
O Success
185 GPM RO system185 GPM RO systemOver 30 Points of UseOver 30 Points of UseSerious supply water issues Serious supply water issues ––Municipality not in control Municipality not in control –– Municipal Municipal softeners not functional at time of softeners not functional at time of commissioningcommissioningCity supply not to EPA standards at City supply not to EPA standards at timestimes
OBK Technology Ltd. 2008
USP H2
O Success
Account for inbound and outbound Account for inbound and outbound water use for cost credits from supply water use for cost credits from supply sourcesource
OBK Technology Ltd. 2008
USP H2
O Success
Project management continues;Project management continues;
Document all the usage criteriaDocument all the usage criteria
Review all criteria with the end usersReview all criteria with the end users
OBK Technology Ltd. 2008
USP H2
O Success
Update and expand the preliminary URS into Update and expand the preliminary URS into the completed URSthe completed URS
Sign off the user acceptanceSign off the user acceptance
Reconfirm the budget and the scheduleReconfirm the budget and the schedule
“Black box” P & ID“Black box” P & ID
OBK Technology Ltd. 2008
USP H2
O Success
10 Minute Networking Break10 Minute Networking Break
OBK Technology Ltd. 2008
USP H2
O Success
System DesignSystem Design
OBK Technology Ltd. 2008
USP H2
O Success
“Define it, Design it, Deliver it”©
Evolve the initial detail design for;Evolve the initial detail design for;Generation equipmentGeneration equipmentStorage requirements (buffer & quality Storage requirements (buffer & quality balance)balance)Distribution needsDistribution needsPoints of use Points of use
OBK Technology Ltd. 2008
USP H2
O Success
Continue to evolve the initial detail design;Continue to evolve the initial detail design;
Confirm piping run(s)Confirm piping run(s)(no dead legs and no air traps & 1 Mps (no dead legs and no air traps & 1 Mps return flow)return flow)
Plan for expansion needsPlan for expansion needsHot or chemical sanitization?Hot or chemical sanitization?
Ozone generation system requirementsOzone generation system requirements
OBK Technology Ltd. 2008
USP H2
O Success
Create the final P & IDCreate the final P & ID
Create the schematic flow diagram & Create the schematic flow diagram & preliminary layoutpreliminary layout
OBK Technology Ltd. 2008
USP H2
O Success
Prepare a FRS (Functional Requirement Prepare a FRS (Functional Requirement Specification)Specification)
This is a detailed description of the This is a detailed description of the functionality of the total systemfunctionality of the total system
Along with the URS Along with the URS –– it provides important it provides important overview documentation for the later overview documentation for the later validation stagevalidation stage
OBK Technology Ltd. 2008
USP H2
O Success
PrePre--qualify vendors and suppliersqualify vendors and suppliers
Prepare all detail arrangement drawingsPrepare all detail arrangement drawings
Draft and finalize tender packages for all key Draft and finalize tender packages for all key supply itemssupply itemsPrePre--order long lead time itemsorder long lead time items
OBK Technology Ltd. 2008
USP H2
O Success
Specification package includes;Specification package includes;
URS, FRS, Water Analysis, URS, FRS, Water Analysis, Design Detail (surface finishes, Design Detail (surface finishes, materials specs for product contact)materials specs for product contact)Instrumentation & ControlsInstrumentation & ControlsLayout, orientation, sizes & access needsLayout, orientation, sizes & access needs
OBK Technology Ltd. 2008
USP H2
O Success
Evaluate all submitted tender packages for Evaluate all submitted tender packages for content and scope coveragecontent and scope coverage
OBK Technology Ltd. 2008
USP H2
O Success
Review systems design in the context of Review systems design in the context of tender packages and vendor / supplier input tender packages and vendor / supplier input detaildetail
OBK Technology Ltd. 2008
USP H2
O Success
“Define it, Design it, Deliver it”©
Reconfirm the budget and time line
Confirm vendor and suppliersConfirm vendor and suppliers
Issue purchase orders (long leads Issue purchase orders (long leads –– pre pre ordered)ordered)
OBK Technology Ltd. 2008
USP H2
O Success
Prepare detail work packages for;Prepare detail work packages for;MechanicalMechanicalPipingPipingElectricalElectricalCivil / structural if requiredCivil / structural if required
OBK Technology Ltd. 2008
USP H2
O Success
Verification & ValidationVerification & Validation
OBK Technology Ltd. 2008
USP H2
O Success
Develop FAT and SAT protocolsDevelop FAT and SAT protocols
Develop the commissioning protocol and Develop the commissioning protocol and check sheetscheck sheets
Execute the FAT on all key equipmentExecute the FAT on all key equipment
OBK Technology Ltd. 2008
USP H2
O Success
Develop validation documentation;Develop validation documentation;IQ IQ (installation)(installation)OQ OQ (operation)(operation)PQ PQ (performance)(performance)SOP’s (required for training)SOP’s (required for training)
The above are all based on the URS, The above are all based on the URS, FRS and operations manuals from the FRS and operations manuals from the suppliers and vendorssuppliers and vendors
OBK Technology Ltd. 2008
USP H2
O Success
Install all equipmentInstall all equipment
Connect all pipingConnect all piping
Connect all control requirementsConnect all control requirements
OBK Technology Ltd. 2008
USP H2
O Success
Execute the SAT from the developed SAT Execute the SAT from the developed SAT protocolprotocol
OBK Technology Ltd. 2008
USP H2
O Success
Commission the system based on the Commission the system based on the commissioning protocol developedcommissioning protocol developed
OBK Technology Ltd. 2008
USP H2
O Success
Update all “as built” drawings for the system Update all “as built” drawings for the system turnturn--over packageover package
OBK Technology Ltd. 2008
USP H2
O Success
Execute the validation protocols based on Execute the validation protocols based on the approved documentationthe approved documentation
Note: IQ can overlap with final installation Note: IQ can overlap with final installation and the start of commissioningand the start of commissioningOQ can overlap with the execution & OQ can overlap with the execution & completion of commissioningcompletion of commissioning
OBK Technology Ltd. 2008
USP H2
O Success
PQ requires the SOP’s approved and PQ requires the SOP’s approved and operator training to be completeoperator training to be completePQ execution is user driven, requires PQ execution is user driven, requires constant monitoring (usually first month) and constant monitoring (usually first month) and full documentationfull documentationSystem requires ongoing monitoring, System requires ongoing monitoring, recording & maintenancerecording & maintenance
OBK Technology Ltd. 2008
USP H2
O Success
System ready for turnover to usersSystem ready for turnover to users
Questions PleaseQuestions Please