Table 2.1 - Number and Value of Projects Awarded by Status of Contractor as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.80 1,759 21,315.31 5,993 102,710.48 5 2,046.83 182 45,572.18
Jan. / Jan. 568 8,980.70 97 1,693.13 458 6,233.17 - - 13 1,054.40
Feb. / Feb. 583 8,495.68 108 2,127.83 466 6,017.61 - - 9 350.24
Mac./ Mar. 660 13,750.39 97 2,294.35 544 9,858.49 1 306.74 18 1,290.81
Apr. / Apr. 666 11,538.77 110 1,167.61 546 9,508.02 - - 10 863.14
Mei. / May. 684 15,569.67 138 1,672.24 524 7,757.47 1 1.09 21 6,138.87
Jun. / Jun. 634 9,917.28 128 1,631.10 491 7,678.40 - - 15 607.78
Jul. / Jul. 719 20,780.35 217 1,666.33 484 12,269.92 - - 18 6,844.10
Ogos. / Aug. 663 23,106.92 146 665.98 507 6,778.48 - - 10 15,662.46
Sep. / Sep. 661 12,798.13 168 1,624.03 472 5,936.31 1 214.68 20 5,023.11
Okt./ Oct. 670 18,974.01 145 1,968.57 507 10,292.32 1 1,505.52 17 5,207.60
Nov./ Nov. 708 9,612.80 184 1,505.00 513 7,558.71 1 18.80 10 530.29
Dis./ Dec 723 18,120.10 221 3,299.14 481 12,821.58 - - 21 1,999.38
2015 6,885 124,382.06 1,742 21,672.26 5,009 83,539.09 3 772.67 131 18,398.04
Jan. / Jan. 610 14,956.63 128 1,604.04 475 11,498.75 - - 7 1,853.84
Feb. / Feb. 477 8,879.08 107 1,018.53 355 6,163.14 - - 15 1,697.41
Mac./ Mar. 669 11,482.80 163 3,599.97 487 6,317.11 1 63.52 18 1,502.20
Apr. / Apr. 617 8,301.08 133 1,355.00 467 5,137.59 - - 17 1,808.49
Mei. / May. 551 8,485.46 119 1,105.41 423 6,530.41 1 22.27 8 827.37
Jun. / Jun. 629 11,780.55 168 1,417.04 450 8,007.91 - - 11 2,355.60
Jul. / Jul. 592 6,614.32 184 1,221.93 397 4,740.74 - - 11 651.65
Ogos. / Aug. 577 10,394.33 124 2,216.20 444 7,950.47 - - 9 227.66
Sep. / Sep. 601 11,866.04 170 1,521.69 421 9,132.47 - - 10 1,211.88
Okt./ Oct. 605 13,229.80 154 2,122.58 442 7,215.35 - - 9 3,891.87
Nov./ Nov. 484 8,235.67 147 1,281.15 328 5,318.56 1 686.88 8 949.08
Dis./ Dec 473 10,156.30 145 3,208.72 320 5,526.59 - - 8 1,420.99
2016 677 11,908.92 145 2,394.07 523 8,108.59 0 0.00 9 1,406.26
Jan. / Jan. 354 6,287.14 79 1,560.76 269 3,701.88 - - 6 1,024.50
Feb. / Feb. 235 4,588.41 54 790.29 178 3,416.36 - - 3 381.76
Mac./ Mar. 88 1,033.37 12 43.02 76 990.35 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Tahun
Year
Jadual 2.1 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor Pada Mac 2016.
Projek Swasta
Private Projects
Status kontraktor / Status of Contractor
Kontraktor Asing / Foreign Contractor
Projek Kerajaan
Government Projects
Kontraktor Tempatan / Local Contractor
Projek Swasta
Private Projects
Projek Kerajaan
Government ProjectsTotal Project
Value (RM m)
Total Number
of Projects
Jumlah
Bilangan
Projek
Jumlah Nilai
Projek (RM j)
Jadual 2.2 - Bilangan dan Nilai Projek Diaward Berdasarkan Kategori Projek Pada Mac 2016.
Table 2.2 - Number and Value of Projects Awarded By Project Category as of March 2016.
Total Number of
Projects
Total Project Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.76 2,390 46,821.21 2,874 81,606.71 693 8,071.12 1,982 35,145.72
Jan. / Jan.Jan. / Jan. 568 8,980.68 189 3,782.13 209 2,369.80 49 248.87 121 2,579.88
Feb. / Feb.Feb. / Feb. 583 8,495.68 199 3,843.86 195 2,384.38 54 282.73 135 1,984.71
Mac./ Mar.Mac./ Mar. 660 13,750.38 184 3,512.01 285 5,297.42 54 1,764.78 137 3,176.17
Apr. / Apr.Apr. / Apr. 666 11,538.77 210 3,115.77 240 5,124.15 41 891.78 175 2,407.07
Mei. / May.Mei. / May. 684 15,569.66 222 3,921.46 242 9,360.92 40 287.76 180 1,999.52
Jun. / Jun.Jun. / Jun. 634 9,917.29 197 2,929.23 243 4,791.17 46 409.74 148 1,787.15
Jul. / Jul.Jul. / Jul. 719 20,780.35 186 5,411.59 231 12,275.24 94 713.45 208 2,380.07
Ogos. / Aug.Ogos. / Aug. 663 23,106.93 211 3,777.45 233 18,182.21 59 542.24 160 605.03
Sep. / Sep.Sep. / Sep. 661 12,798.13 193 3,399.48 244 3,347.98 67 1,369.64 157 4,681.03
Okt./ Oct.Okt./ Oct. 670 18,974.00 208 6,030.99 244 8,004.68 56 988.09 162 3,950.24
Nov./ Nov.Nov./ Nov. 708 9,612.80 201 3,368.95 246 4,435.80 73 288.74 188 1,519.31
Dis./ DecDis./ Dec 723 18,120.09 190 3,728.29 262 6,032.96 60 283.30 211 8,075.54
2015 6,885 124,382.08 1,966 47,136.12 2,546 46,025.91 632 5,573.49 1,741 25,646.56
Jan. / Jan.Jan. / Jan. 610 14,956.63 197 4,896.93 223 8,168.78 53 360.91 137 1,530.01
Feb. / Feb.Feb. / Feb. 477 8,879.07 164 3,959.55 163 2,377.89 41 423.92 109 2,117.71
Mac./ Mar.Mac./ Mar. 669 11,482.80 200 5,790.26 225 1,677.55 61 379.75 183 3,635.24
Apr. / Apr.Apr. / Apr. 617 8,301.08 164 2,998.81 234 3,428.19 44 303.92 175 1,570.16
Mei. / May.Mei. / May. 551 8,485.45 143 3,697.52 237 3,679.28 35 141.66 136 966.99
Jun. / Jun.Jun. / Jun. 629 11,780.56 178 5,489.48 225 3,625.41 63 1,072.80 163 1,592.87
Jul. / Jul.Jul. / Jul. 592 6,614.33 173 2,569.81 232 2,125.78 52 664.43 135 1,254.31
Ogos. / Aug.Ogos. / Aug. 577 10,394.34 165 4,383.72 220 2,900.15 57 383.64 135 2,726.83
Sep. / Sep.Sep. / Sep. 601 11,866.05 173 3,104.20 215 5,492.96 62 706.66 151 2,562.23
Okt./ Oct.Okt./ Oct. 605 13,229.79 161 2,754.63 218 6,934.48 60 327.81 166 3,212.87
Nov./ Nov.Nov./ Nov. 484 8,235.67 128 3,227.20 174 2,605.70 51 323.92 131 2,078.85
Dis./ DecDis./ Dec 473 10,156.31 120 4,264.01 180 3,009.74 53 484.07 120 2,398.49
2016 677 11,908.94 178 4,357.87 247 3,590.42 81 1,342.78 171 2,617.87
Jan. / Jan.Jan. / Jan. 354 6,287.14 101 2,294.29 122 2,050.57 47 632.11 84 1,310.17
Feb. / Feb.Feb. / Feb. 235 4,588.42 52 1,778.94 92 1,236.59 26 692.62 65 880.27
Apr. / Apr.Mac./ Mar. 88 1,033.38 25 284.64 33 303.26 8 18.05 22 427.43
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Kategori Pembangunan Projek / Project Category
Kediaman / ResidentialBukan Kediaman
Non Residential
Infrastruktur
Infrastructure
Jumlah Bilangan
ProjekJumlah Nilai Projek (RM j)
Tahun
Year
Kemudahan Sosial
Social Amenities
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2014 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for 2014
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor /No. of Contractor 21 13 1 1 - - - - - 36
Bilangan Projek / No. of Projects 21 13 1 1 - - - - - 36
Nilai Projek (RM j) / Project Value (RM m) 17.72 32.67 5.04 15.54 - - - - - 70.97
Bilangan Kontraktor /No. of Contractor 53 26 4 6 - - - - - 89
Bilangan Projek / No. of Projects 57 30 4 6 - - - - - 97
Nilai Projek (RM j) / Project Value (RM m) 40.62 68.7 29 110.42 - - - - - 248.74
Bilangan Kontraktor /No. of Contractor 331 237 39 15 1 - - - - 623
Bilangan Projek / No. of Projects 426 289 45 20 1 - - - - 781
Nilai Projek (RM j) / Project Value (RM m) 322.3 591.89 311.93 406.67 59 - - - - 1,691.79
Bilangan Kontraktor /No. of Contractor 131 542 21 14 - 1 - - - 709
Bilangan Projek / No. of Projects 168 757 24 15 - 1 - - - 965
Nilai Projek (RM j) / Project Value (RM m) 130.91 1,501.58 156.26 287.16 - 106.23 - - - 2,182.14
Bilangan Kontraktor /No. of Contractor 124 519 83 40 1 - - - - 767
Bilangan Projek / No. of Projects 172 760 97 46 1 - - - - 1,076
Nilai Projek (RM j) / Project Value (RM m) 124.87 2,211.91 670.92 754.58 85.23 - - - - 3,847.51
Bilangan Kontraktor /No. of Contractor 88 193 171 43 2 - - - - 497
Bilangan Projek / No. of Projects 150 322 258 48 2 - - - - 780
Nilai Projek (RM j) / Project Value (RM m) 110.01 856.2 1,893.52 823.39 164.74 - - - - 3,847.86
Bilangan Kontraktor /No. of Contractor 251 708 451 780 228 136 26 14 2 2,596
Bilangan Projek / No. of Projects 496 1320 593 1126 270 161 34 15 2 4,017
Nilai Projek (RM j) / Project Value (RM m) 366.24 3,432.72 4,388.39 25,527.52 18,636.57 27,709.29 12,878.78 11,004.01 8,193.25 112,136.77
Bilangan Kontraktor /No. of Contractor 3 27 18 29 14 19 7 7 14 138
Bilangan Projek / No. of Projects 6 49 25 42 14 22 8 7 14 187
Nilai Projek (RM j) / Project Value (RM m) 4.81 108.45 180.94 1,099.82 1,069.57 4,064.26 2,749.25 4,144.23 34,197.66 47,618.99
Bilangan Kontraktor /No. of Contractor 1,002 2,265 788 928 246 156 33 21 16 5,455
Bilangan Projek / No. of Projects 1,496 3,540 1,047 1,304 288 184 42 22 16 7,939
Nilai Projek (RM j) / Project Value (RM m) 1,117.48 8,804.12 7,636.00 29,025.10 20,015.11 31,879.78 15,628.03 15,148.24 42,390.91 171,644.77
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
G3
G4
G5
G1
G2
Note : Figures are subject to change due to late notification.
Jumlah
Total
G6
G7
Asing
Foreign
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2015 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for 2015
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractor 9 10 1 2 - - - - - 22
Bilangan Projek / No. of Projects 9 12 1 2 - - - - - 24
Nilai Projek (RM j) / Project Value (RM m) 6.11 21.19 9.6 28.02 - - - - - 64.92
Bilangan Kontraktor /No. of Contractor 50 18 3 1 - - - - - 72
Bilangan Projek / No. of Projects 55 19 3 1 - - - - - 78
Nilai Projek (RM j) / Project Value (RM m) 37.55 45.15 21.32 18.12 - - - - - 122.14
Bilangan Kontraktor /No. of Contractor 323 191 32 22 - - - - 1 569
Bilangan Projek / No. of Projects 434 231 32 22 - - - - 1 720
Nilai Projek (RM j) / Project Value (RM m) 331.06 474.18 219.65 407.07 - - - - 1,091.21 2,523.17
Bilangan Kontraktor /No. of Contractor 108 498 12 4 - - - - - 622
Bilangan Projek / No. of Projects 152 697 14 4 - - - - - 867
Nilai Projek (RM j) / Project Value (RM m) 121.1 1,372.65 96.46 65.8 - - - - - 1,656.01
Bilangan Kontraktor /No. of Contractor 114 477 69 36 4 - - - - 700
Bilangan Projek / No. of Projects 148 666 75 41 4 - - - - 934
Nilai Projek (RM j) / Project Value (RM m) 109.94 1,946.38 483.48 816.21 239.25 - - - - 3,595.26
Bilangan Kontraktor /No. of Contractor 74 161 164 38 1 - - 1 - 439
Bilangan Projek / No. of Projects 114 282 209 41 1 - - 1 - 648
Nilai Projek (RM j) / Project Value (RM m) 84.08 699.87 1,494.37 816.84 62.6 - - 580 - 3,737.76
Bilangan Kontraktor /No. of Contractor 218 621 360 680 166 140 23 9 5 2,222
Bilangan Projek / No. of Projects 484 1138 462 995 196 167 24 9 5 3,480
Nilai Projek (RM j) / Project Value (RM m) 363.11 2,883.55 3,311.07 23,287.32 13,667.29 27,791.05 8,715.95 5,932.45 7,560.29 93,512.08
Bilangan Kontraktor /No. of Contractor 8 17 12 22 15 14 4 5 5 102
Bilangan Projek / No. of Projects 11 32 16 29 17 14 5 5 5 134
Nilai Projek (RM j) / Project Value (RM m) 8.45 83.36 114.31 733.04 1,197.48 2,704.77 1,943.57 3,787.77 8,597.95 19,170.70
Bilangan Kontraktor /No. of Contractor 904 1,993 653 805 186 154 27 15 11 4,748
Bilangan Projek / No. of Projects 1,407 3,077 812 1,135 218 181 29 15 11 6,885
Nilai Projek (RM j) / Project Value (RM m) 1,061.40 7,526.33 5,750.26 26,172.42 15,166.62 30,495.82 10,659.52 10,300.22 17,249.45 124,382.04
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
G1
G2
Asing
Foreign
Jumlah
Total
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
G3
G4
G5
Total may not necessarily add up due to rounding.
G6
G7
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Mac 2016 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for March 2016.
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractor 1 - - - - - - - - 1
Bilangan Projek / No. of Projects 1 - - - - - - - - 1
Nilai Projek (RM j) / Project Value (RM m) 0.5 - - - - - - - - 0.50
Bilangan Kontraktor /No. of Contractor 1 3 - - - - - - - 4
Bilangan Projek / No. of Projects 1 3 - - - - - - - 4
Nilai Projek (RM j) / Project Value (RM m) 0.72 4.45 - - - - - - - 5.17
Bilangan Kontraktor /No. of Contractor 36 8 1 - - - - - - 45
Bilangan Projek / No. of Projects 37 8 1 - - - - - - 46
Nilai Projek (RM j) / Project Value (RM m) 29.53 18.01 5.59 - - - - - - 53.13
Bilangan Kontraktor /No. of Contractor 18 57 - 1 - - - - - 76
Bilangan Projek / No. of Projects 19 63 - 1 - - - - - 83
Nilai Projek (RM j) / Project Value (RM m) 15.55 130.68 - 21.25 - - - - - 167.48
Bilangan Kontraktor /No. of Contractor 18 59 12 5 - - - - - 94
Bilangan Projek / No. of Projects 19 62 13 6 - - - - - 100
Nilai Projek (RM j) / Project Value (RM m) 15.06 173.18 82.46 117.91 - - - - - 388.61
Bilangan Kontraktor /No. of Contractor 12 19 19 7 - - - - - 57
Bilangan Projek / No. of Projects 14 22 19 7 - - - - - 62
Nilai Projek (RM j) / Project Value (RM m) 10.89 54.78 140.72 95.9 - - - - - 302.29
Bilangan Kontraktor /No. of Contractor 32 107 44 104 22 14 3 2 - 328
Bilangan Projek / No. of Projects 42 128 49 110 23 15 3 2 - 372
Nilai Projek (RM j) / Project Value (RM m) 32.36 339.63 388.25 2,567.14 1,559.97 2,514.91 1,087.59 1,095.65 - 9,585.50
Bilangan Kontraktor /No. of Contractor 2 2 1 2 - - 1 1 - 9
Bilangan Projek / No. of Projects 2 2 1 2 - - 1 1 - 9
Nilai Projek (RM j) / Project Value (RM m) 1.26 5.42 8.18 61.54 - - 379.32 950.53 - 1,406.25
Bilangan Kontraktor /No. of Contractor 120 255 77 119 22 14 4 3 - 614
Bilangan Projek / No. of Projects 135 288 83 126 23 15 4 3 - 677
Nilai Projek (RM j) / Project Value (RM m) 105.87 726.15 625.20 2,863.74 1,559.97 2,514.91 1,466.91 2,046.18 - 11,908.93
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Asing
Foreign
Jumlah
Total
G2
G3
G7
G1
Note : Figures are subject to change due to late notification.
G5
G6
G4
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.4 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2016.
Jumlah Bilangan
Projek
Jumlah Nilai Projek
(RM juta)
Total Number of
Projects
Total Project Value (RM
million)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.81 1,764 23,362.15 6,175 148,282.66
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,496 1,117.49 374.00 284.24 1,122 833.25
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,540 8,804.13 876.00 2,134.33 2,664 6,669.80
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,047 7,636.01 198.00 1,454.69 849 6,181.32
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,304 29,025.10 220.00 5,176.04 1,084 23,849.06
Melebihi 50 hingga 100 / Exceeding 50 to 100 288 20,015.12 53.00 3,509.01 235 16,506.11
Melebihi 100 hingga 300 / Exceeding 100 to 300 184 31,879.78 34.00 5,844.36 150 26,035.42
Melebihi 300 hingga 500 / Exceeding 300 to 500 42 15,628.03 7.00 2,599.23 35 13,028.80
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 22 15,148.24 1.00 854.73 21 14,293.51
Melebihi 1,000 / Exceeding 1,000 16 42,390.91 1.00 1,505.52 15 40,885.39
2015 6,885 124,382.05 1,745 22,444.92 5,140 101,937.13
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,407 1,061.41 428 324.37 979 737.04
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,077 7,526.33 855 2,075.90 2,222 5,450.43
Melebihi 5 hingga 10 / Exceeding 5 to 10 812 5,750.26 183 1,310.14 629 4,440.12
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,135 26,172.41 203 4,604.47 932 21,567.94
Melebihi 50 hingga 100 / Exceeding 50 to 100 218 15,166.62 39 2,902.10 179 12,264.52
Melebihi 100 hingga 300 / Exceeding 100 to 300 181 30,495.82 26 4,470.97 155 26,024.85
Melebihi 300 hingga 500 / Exceeding 300 to 500 29 10,659.52 4 1,515.57 25 9,143.95
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 15 10,300.22 6 3,991.40 9 6,308.82
Melebihi 1,000 / Exceeding 1,000 11 17,249.46 1 1,250.00 10 15,999.46
2016 677 11,908.94 145 2,394.08 532 9,514.86
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 135 105.87 28 22.93 107 82.94
Melebihi 1 hingga 5 / Exceeding 1 to 5 288 726.15 64 151.69 224 574.46
Melebihi 5 hingga 10 / Exceeding 5 to 10 83 625.20 15 110.95 68 514.25
Melebihi 10 hingga 50 / Exceeding 10 to 50 126 2,863.75 29 755.53 97 2,108.22
Melebihi 50 hingga 100 / Exceeding 50 to 100 23 1,559.97 5 324.5 18 1,235.47
Melebihi 100 hingga 300 / Exceeding 100 to 300 15 2,514.91 2 382.1 13 2,132.81
Melebihi 300 hingga 500 / Exceeding 300 to 500 4 1,466.91 2 646.38 2 820.53
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 3 2,046.18 - - 3 2,046.18
Melebihi 1,000 / Exceeding 1,000 - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Projek Kerajaan
Government Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Julat Nilai Projek (RM juta)
Project Value Range (RM million)
Table 2.4 - Number and Value of Projects Awarded By Status of Contractor and Project Value Range as of March 2016.
Projek Swasta
Private Project
Jadual 2.5 - Bilangan Projek Diaward Berdasarkan Julat Nilai dan Kategori Projek Pada Mac 2016 . Table 2.5 - Number of Projects Awarded By Project Value Range and Category as of March 2016.
Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1000Melebihi 1,000
Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000
Exceeding to
1,000
2014 7,939 1,496 3,540 1,047 1,304 288 184 42 22 16
Kediaman
Residential2,390 354 961 345 511 129 71 14 4 1
Bukan Kediaman
Non Residential2,874 522 1,287 414 452 87 70 21 10 11
Kemudahan Sosial
Social Amenities693 159 344 79 90 9 8 1 3
Infrastruktur
Infrastructure1,982 461 948 209 251 63 35 6 5 4
2015 6,885 1,407 3,077 812 1,135 218 181 29 15 11
Kediaman
Residential1,966 290 797 245 424 107 81 14 5 3
Bukan Kediaman
Non Residential2,546 510 1,154 328 420 64 50 11 3 6
Kemudahan Sosial
Social Amenities632 144 333 63 74 5 13 - - -
Infrastruktur
Infrastructure1,741 463 793 176 217 42 37 4 7 2
2016 677 135 288 83 126 23 15 4 3 0
Kediaman
Residential178 27 68 22 42 11 5 1 2 -
Bukan Kediaman
Non Residential247 54 118 28 36 6 3 1 1 -
Kemudahan Sosial
Social Amenities81 18 32 7 19 3 1 1 - -
Infrastruktur
Infrastructure171 36 70 26 29 3 6 1 - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jadual 2.6 - Nilai Projek Diaward Berdasarkan Julat Nilai dan Kategori Projek Pada Mac 2016. Table 2.6 - Value of Projects Awarded By Project Value Range and Category as of March 2016.
Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1000Melebihi 1,000
Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000
Exceeding to
1,000
2014 171,644.80 1,117.50 8,804.13 7,636.00 29,025.10 20,015.12 31,879.78 15,628.03 15,148.23 42,390.91
Kediaman
Residential46,821.21 267.98 2,516.92 2,551.62 11,505.20 9,084.17 11,804.54 5,173.75 2,900.03 1,017.00
Bukan Kediaman
Non Residential81,606.72 389.39 3,216.26 2,965.86 9,860.15 5,938.47 12,712.89 7,780.95 6,459.11 32,283.64
Kemudahan Sosial
Social Amenities8,071.13 121.60 849.31 574.30 1,883.56 599.07 1,557.79 488.00 1,997.50
Infrastruktur
Infrastructure35,145.74 338.53 2,221.64 1,544.22 5,776.19 4,393.41 5,804.56 2,185.33 3,791.59 9,090.27
2015 124,382.02 1,061.40 7,526.33 5,750.25 26,172.42 15,166.61 30,495.82 10,659.51 10,300.22 17,249.46
Kediaman
Residential47,136.12 222.56 2,089.24 1,733.69 10,243.51 7,464.73 13,503.31 5,157.87 3,418.66 3,302.55
Bukan Kediaman
Non Residential46,025.89 382.33 2,786.40 2,312.32 9,367.56 4,377.39 9,148.46 3,987.22 2,155.33 11,508.88
Kemudahan Sosial
Social Amenities5,573.47 111.07 811.18 476.43 1,656.55 357.24 2,161.00
Infrastruktur
Infrastructure25,646.54 345.44 1,839.51 1,227.81 4,904.80 2,967.25 5,683.05 1,514.42 4,726.23 2,438.03
2016 11,908.93 105.87 726.15 625.21 2,863.74 1,559.96 2,514.92 1,466.90 2,046.18 0.00
Kediaman
Residential4,357.87 20.67 176.20 170.60 973.81 723.74 755.99 441.21 1,095.65
Bukan Kediaman
Non Residential3,590.43 44.49 293.41 201.75 760.66 419.95 540.32 379.32 950.53
Kemudahan Sosial
Social Amenities1,342.77 13.41 81.48 56.27 482.40 211.39 165.14 332.68
Infrastruktur
Infrastructure2,617.86 27.30 175.06 196.59 646.87 204.88 1,053.47 313.69
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Jadual 2.7 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2016. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2016.
Jumlah Bilangan
Projek
Total Number of
Projects
2014 7,939 1,346 277 146 324 462 587 551 603 44 1,604 277 400 511 807
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 1,496 270 49 31 84 102 104 111 108 11 333 59 56 53 125
Melebihi 1 hingga 5
Exceeding 1 to 5 3,540 556 139 70 153 195 308 228 341 21 635 145 164 224 361
Melebihi 5 hingga 10
Exceeding 5 to 10 1,047 177 33 29 47 70 76 94 68 6 189 25 53 83 97
Melebihi 10 hingga 50
Exceeding 10 to 50 1,304 225 48 9 32 84 82 86 65 5 317 38 84 109 120
Melebihi 50 hingga 100
Exceeding 50 to 100 288 60 3 1 2 7 11 16 8 1 72 5 28 27 47
Melebihi 100 hingga 300
Exceeding 100 to 300 184 32 4 4 6 1 5 15 8 - 40 5 13 12 39
Melebihi 300 hingga 500
Exceeding 300 to 500 42 13 1 - - - - 1 2 - 13 - - 2 10
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 22 4 - 1 - 1 1 - 3 - 3 - 1 1 7
Melebihi 1,000
Exceeding 1,000 16 9 - 1 - 2 - - - - 2 - 1 - 1
2015 6,885 1,098 291 138 273 427 467 501 436 41 1,458 269 369 497 620
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 1,407 225 56 29 67 124 81 126 109 11 304 56 57 93 69
Melebihi 1 hingga 5
Exceeding 1 to 5 3,077 498 132 64 129 180 236 213 212 22 583 138 177 202 291
Melebihi 5 hingga 10
Exceeding 5 to 10 812 102 42 20 34 54 48 53 57 5 170 29 59 63 76
Melebihi 10 hingga 50
Exceeding 10 to 50 1,135 172 52 18 35 48 76 80 50 3 295 37 56 102 111
Melebihi 50 hingga 100
Exceeding 50 to 100 218 41 6 6 3 14 12 15 - - 61 3 8 25 24
Melebihi 100 hingga 300
Exceeding 100 to 300 181 42 2 1 4 6 11 9 6 - 40 4 12 9 35
Melebihi 300 hingga 500
Exceeding 300 to 500 29 10 1 - 1 - 2 4 - - 3 - - - 8
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 15 4 - - - 1 - - 2 - 1 2 - 2 3
Melebihi 1,000
Exceeding 1,000 11 4 - - - - 1 1 - - 1 - - 1 3
Johor Kedah
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Julat Nilai Projek
(RM juta)
Project Value Range
(RM million)
Kelantan MelakaNegeri
SembilanPahang
Total may not necessarily add up due to rounding.
Pulau
Pinang
Note : Figures are subject to change due to late notification
PerlisPerak Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
Jadual 2.7 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2016. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2016.
Jumlah Bilangan
Projek
Total Number of
Projects
Johor Kedah
Julat Nilai Projek
(RM juta)
Project Value Range
(RM million)
Kelantan MelakaNegeri
SembilanPahang
Pulau
PinangPerlisPerak
Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
2016 677 137 35 6 19 27 31 64 57 5 121 27 37 38 73
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 135 31 5 2 5 9 4 19 12 1 23 8 4 3 9
Melebihi 1 hingga 5
Exceeding 1 to 5 288 54 17 2 9 9 10 24 33 1 46 15 19 17 32
Melebihi 5 hingga 10
Exceeding 5 to 10 83 21 6 - 1 4 5 8 6 2 11 1 7 3 8
Melebihi 10 hingga 50
Exceeding 10 to 50 126 26 6 2 3 3 12 11 5 1 28 2 4 12 11
Melebihi 50 hingga 100
Exceeding 50 to 100 23 2 - - 1 - - 2 1 - 10 - - 3 4
Melebihi 100 hingga 300
Exceeding 100 to 300 15 1 1 - - 2 - - - - 3 - 2 - 6
Melebihi 300 hingga 500
Exceeding 300 to 500 4 1 - - - - - - - - - 1 1 - 1
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 3 1 - - - - - - - - - - - - 2
Melebihi 1,000
Exceeding 1,000 - - - - - - - - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Jadual 2.8 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2016.
Table 2.8 - Value of Projects Awarded By Site Location and Project Value Range as of March 2016.
2014 171,644.77 51,649.77 2,964.59 4,589.44 2,560.45 7,045.23 5,581.78 6,881.84 7,067.28 320.81 36,642.93 2,655.55 10,870.30 8,542.29 24,272.51
Melebihi 0.5 hingga 1
Exceeding 0.5 to 11,117.49 199.51 37.09 22.30 62.09 73.01 77.81 84.93 82.61 8.41 248.21 43.63 40.05 39.90 97.94
Melebihi 1 hingga 5
Exceeding 1 to 58,804.12 1,380.09 342.03 162.10 377.45 481.86 783.68 562.55 843.63 42.54 1,584.54 370.21 425.03 591.22 857.19
Melebihi 5 hingga 10
Exceeding 5 to 107,636.01 1,264.77 235.22 214.30 346.24 540.70 560.48 704.40 472.48 39.90 1,379.69 173.82 390.44 612.33 701.24
Melebihi 10 hingga 50
Exceeding 10 to 5029,025.08 5,041.59 1,024.16 168.23 525.61 1,912.89 1,817.24 1,957.71 1,207.30 145.46 7,471.15 751.34 1,809.30 2,461.67 2,731.43
Melebihi 50 hingga 100
Exceeding 50 to 10020,015.10 4,154.20 201.95 80.78 164.10 475.51 781.61 1,103.24 500.50 84.50 5,016.37 366.69 1,909.36 1,803.32 3,372.97
Melebihi 100 hingga 300
Exceeding 100 to 30031,879.79 6,007.67 749.67 814.04 1,084.96 267.00 711.70 2,131.01 1,334.14 - 6,930.80 949.86 2,292.37 1,877.52 6,729.05
Melebihi 300 hingga 500
Exceeding 300 to 50015,628.03 4,432.53 374.47 - - - - 338.00 788.60 - 5,221.02 - - 654.95 3,818.46
Melebihi 500 hingga 1,000
Exceeding 500 to 1,00015,148.24 2,632.35 - 854.73 - 753.51 849.26 - 1,838.02 - 2,241.63 - 530.13 501.38 4,947.23
Melebihi 1,000
Exceeding 1,00042,390.91 26,537.06 - 2,272.96 - 2,540.75 - - - - 6,549.52 - 3,473.62 - 1,017.00
2015 124,382.03 29,362.34 3,042.25 1,541.64 2,500.91 4,524.54 6,798.03 7,574.60 4,632.52 140.26 23,366.33 3,529.05 4,583.65 9,519.38 23,266.53
Melebihi 0.5 hingga 1
Exceeding 0.5 to 11,061.42 169.30 42.23 21.35 49.53 93.18 63.29 94.36 81.44 8.54 226.84 45.01 42.31 73.12 50.92
Melebihi 1 hingga 5
Exceeding 1 to 57,526.33 1,197.07 317.41 144.24 296.42 481.49 589.39 524.15 521.82 46.63 1,402.67 337.06 430.88 529.98 707.12
Melebihi 5 hingga 10
Exceeding 5 to 105,750.25 705.71 298.38 152.53 237.57 366.21 335.02 399.53 407.02 34.60 1,204.47 208.38 411.76 450.67 538.40
Melebihi 10 hingga 50
Exceeding 10 to 5026,172.42 3,979.92 1,158.79 417.83 868.24 1,104.72 1,530.36 1,844.79 1,041.86 50.49 7,209.46 835.97 1,305.66 2,291.72 2,532.61
Melebihi 50 hingga 100
Exceeding 50 to 10015,166.62 2,766.11 388.20 505.74 182.87 996.57 821.62 1,078.56 - - 4,175.11 243.00 538.03 1,822.96 1,647.85
Melebihi 100 hingga 300
Exceeding 100 to 30030,495.81 7,900.77 501.60 299.95 539.21 979.09 1,464.39 1,239.15 1,108.27 - 6,481.38 572.75 1,855.01 1,428.00 6,126.24
Melebihi 300 hingga 500
Exceeding 300 to 50010,659.52 3,734.48 335.64 - 327.07 - 805.93 1,358.23 - - 1,009.24 - - - 3,088.93
Melebihi 500 hingga 1,000
Exceeding 500 to 1,00010,300.21 3,100.89 - - - 503.28 - - 1,472.11 - 594.66 1,286.88 - 1,217.75 2,124.64
Melebihi 1,000
Exceeding 1,00017,249.45 5,808.09 - - - - 1,188.03 1,035.83 - - 1,062.50 - - 1,705.18 6,449.82
Julat Nilai Projek (RM juta)
Project Value Range (RM m)
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau
Pinang
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Selangor
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah Kelantan TerengganuPerak PerlisNegeri
Sembilan
Jadual 2.8 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2016.
Table 2.8 - Value of Projects Awarded By Site Location and Project Value Range as of March 2016.
Julat Nilai Projek (RM juta)
Project Value Range (RM m)
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau
PinangSelangorKedah Kelantan TerengganuPerak Perlis
Negeri
Sembilan
2016 11,908.94 2,109.27 346.97 65.99 163.52 486.12 313.71 457.21 273.62 37.39 2,112.73 450.73 733.20 648.85 3,709.63
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1105.88 23.13 3.68 1.58 3.51 8.14 3.47 14.37 10.29 0.93 18.10 6.69 2.53 2.54 6.92
Melebihi 1 hingga 5
Exceeding 1 to 5726.15 135.29 52.32 3.13 26.50 22.66 28.58 64.82 81.64 2.02 105.44 44.05 51.75 36.97 70.98
Melebihi 5 hingga 10
Exceeding 5 to 10625.21 171.17 49.49 - 6.93 29.10 36.54 58.46 40.71 13.94 80.30 6.97 50.54 23.46 57.60
Melebihi 10 hingga 50
Exceeding 10 to 502,863.73 576.99 103.29 61.28 73.61 60.19 245.12 205.91 83.40 20.50 661.64 60.34 68.49 377.77 265.20
Melebihi 50 hingga 100
Exceeding 50 to 1001,559.97 145.82 - - 52.97 - - 113.65 57.58 - 696.11 - - 208.11 285.73
Melebihi 100 hingga 300
Exceeding 100 to 3002,514.92 164.30 138.19 - - 366.03 - - - - 551.14 - 246.20 - 1,049.06
Melebihi 300 hingga 500
Exceeding 300 to 5001,466.90 379.32 - - - - - - - - - 332.68 313.69 - 441.21
Melebihi 500 hingga 1,000
Exceeding 500 to 1,0002,046.18 513.25 - - - - - - - - - - - - 1,532.93
Melebihi 1,000
Exceeding 1,000- - - - - - - - - - - - - - -
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Jadual 2.9 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2016. Table 2.9 - Number and Value of Projects Awarded By Status of Contractors and Project Value Range as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.77 187 47,618.99 7,752 124,025.78
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,496 1,117.49 6 4.81 1490 1,112.68
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,540 8,804.12 49 108.45 3491 8,695.67
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,047 7,636.00 25 180.94 1022 7,455.06
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,304 29,025.09 42 1,099.82 1262 27,925.27
Melebihi 50 hingga 100 / Exceeding 50 to 100 288 20,015.11 14 1,069.57 274 18,945.54
Melebihi 100 hingga 300 / Exceeding 100 to 300 184 31,879.78 22 4,064.26 162 27,815.52
Melebihi 300 hingga 500 / Exceeding 300 to 500 42 15,628.03 8 2,749.25 34 12,878.78
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 22 15,148.24 7 4,144.23 15 11,004.01
Melebihi 1,000 / Exceeding 1,000 16 42,390.91 14 34,197.66 2 8,193.25
2015 6,885 124,382.04 134 19,170.70 6,751 105,211.34
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,407 1,061.41 11 8.45 1396 1,052.96
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,077 7,526.33 32 83.36 3045 7,442.97
Melebihi 5 hingga 10 / Exceeding 5 to 10 812 5,750.26 16 114.31 796 5,635.95
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,135 26,172.41 29 733.04 1106 25,439.37
Melebihi 50 hingga 100 / Exceeding 50 to 100 218 15,166.62 17 1,197.48 201 13,969.14
Melebihi 100 hingga 300 / Exceeding 100 to 300 181 30,495.82 14 2,704.77 167 27,791.05
Melebihi 300 hingga 500 / Exceeding 300 to 500 29 10,659.52 5 1,943.57 24 8,715.95
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 15 10,300.22 5 3,787.77 10 6,512.45
Melebihi 1,000 / Exceeding 1,000 11 17,249.45 5 8,597.95 6 8,651.50
2016 677 11,908.94 9 1,406.25 668 10,502.69
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 135 105.86 2 1.26 133 104.6
Melebihi 1 hingga 5 / Exceeding 1 to 5 288 726.17 2 5.42 286 720.75
Melebihi 5 hingga 10 / Exceeding 5 to 10 83 625.20 1 8.18 82 617.02
Melebihi 10 hingga 50 / Exceeding 10 to 50 126 2,863.74 2 61.54 124 2,802.20
Melebihi 50 hingga 100 / Exceeding 50 to 100 23 1,559.97 - - 23 1,559.97
Melebihi 100 hingga 300 / Exceeding 100 to 300 15 2,514.91 - - 15 2,514.91
Melebihi 300 hingga 500 / Exceeding 300 to 500 4 1,466.91 1 379.32 3 1,087.59
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 3 2,046.18 1 950.53 2 1,095.65
Melebihi 1,000 / Exceeding 1,000 - - - - - -
Kontraktor Asing / Foreign Contractors Kontraktor Tempatan / Local Contractors
Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Julat Nilai Projek (RM juta)
Project Value Range (RM million)
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek
(RM juta)
Total Project Value
(RM m)
2014 7,939 1,346 277 146 324 462 587 551 603 44 1,604 277 400 511 807
Kediaman
Residential 2,390 362 96 48 124 153 202 165 234 9 564 55 87 98 193
Bukan Kediaman
Non Residential 2,874 570 95 56 88 138 213 215 221 17 527 109 136 170 319
Kemudahan Sosial
Social Amenities 693 77 27 16 23 36 56 55 43 9 120 41 54 51 85
Infrastruktur
Infrastructure 1,982 337 59 26 89 135 116 116 105 9 393 72 123 192 210
2015 6,885 1,098 291 138 273 427 467 501 436 41 1,458 269 369 497 620
Kediaman
Residential 1,966 338 96 31 80 147 142 172 151 13 435 51 66 73 171
Bukan Kediaman
Non Residential 2,546 394 121 48 94 139 172 158 188 7 523 120 131 148 303
Kemudahan Sosial
Social Amenities 632 87 24 23 26 27 47 45 43 14 88 44 39 78 47
Infrastruktur
Infrastructure 1,741 279 50 36 73 114 106 126 54 7 412 54 133 198 99
2016 677 137 35 6 19 27 31 64 57 5 121 27 37 38 73
Kediaman
Residential 178 28 18 - 7 8 8 14 18 2 42 6 5 2 20
Bukan Kediaman
Non Residential 247 52 9 3 5 9 13 19 27 1 45 7 8 10 39
Kemudahan Sosial
Social Amenities 81 15 2 1 4 2 6 8 6 1 8 11 6 5 6
Infrastruktur
Infrastructure 171 42 6 2 3 8 4 23 6 1 26 3 18 21 8
Selangor
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Perlis SabahTerengganu
Jadual 2.10 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Kategori Projek Pada Mac 2016. Table 2.10 - Number of Projects Awarded By Site Location and Project Category as of March 2016.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah KelantanJohorKategori Projek Project
Category
Jumlah Bilangan
Projek
Total Number of
Projects
PahangMelakaNegeri
SembilanPerak
Pulau
Pinang
Wilayah
PersekutuanSarawak
Jadual 2.11 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Kategori Projek Pada Mac 2016.
Table 2.11 - Value of Projects Awarded By Site Location and Project Category as of March 2016.
2014 171,644.78 51,649.76 2,964.59 4,589.43 2,560.45 7,045.24 5,581.79 6,881.85 7,067.28 320.80 36,642.91 2,655.56 10,870.30 8,542.31 24,272.51
Kediaman
Residential46,821.21 9,139.89 1,401.65 235.00 821.84 1,671.10 1,207.06 3,066.00 1,933.53 74.91 12,541.88 348.47 2,139.12 1,115.02 11,125.74
Bukan Kediaman
Non Residential81,606.70 38,713.54 735.76 2,747.21 942.31 1,196.14 2,580.09 2,495.94 4,254.62 124.67 10,333.84 624.50 5,234.09 2,725.98 8,898.01
Kemudahan Sosial
Social Amenities8,071.12 890.26 111.38 314.71 84.36 251.22 291.93 321.88 155.31 26.58 2,803.05 125.32 1,131.44 640.51 923.17
Infrastruktur
Infrastructure35,145.75 2,906.07 715.80 1,292.51 711.94 3,926.78 1,502.71 998.03 723.82 94.64 10,964.14 1,557.27 2,365.65 4,060.80 3,325.59
2015 124,382.08 29,362.33 3,042.27 1,541.63 2,500.92 4,524.53 6,798.02 7,574.61 4,632.54 140.26 23,366.34 3,529.06 4,583.65 9,519.39 23,266.53
Kediaman
Residential47,136.12 11,067.89 870.95 201.47 702.43 2,085.89 1,167.12 4,255.45 1,283.52 71.85 12,694.59 231.04 1,253.94 894.47 10,355.51
Bukan Kediaman
Non Residential46,025.92 13,751.30 1,453.04 601.94 1,324.05 1,372.79 2,259.10 2,398.63 922.25 14.83 6,361.08 1,731.48 1,198.90 3,685.57 8,950.96
Kemudahan Sosial
Social Amenities5,573.49 1,542.72 79.34 117.95 98.32 266.20 214.65 232.89 457.17 32.49 891.57 459.96 187.62 623.77 368.84
Infrastruktur
Infrastructure25,646.55 3,000.42 638.94 620.27 376.12 799.65 3,157.15 687.64 1,969.60 21.09 3,419.10 1,106.58 1,943.19 4,315.58 3,591.22
2016 11,908.96 2,109.28 346.97 65.99 163.52 486.11 313.71 457.22 273.61 37.39 2,112.74 450.74 733.21 648.84 3,709.63
Kediaman
Residential4,357.87 879.88 236.77 - 99.96 205.46 69.94 113.36 125.88 2.95 957.56 15.35 40.00 11.85 1,598.91
Bukan Kediaman
Non Residential3,590.44 784.35 65.88 3.71 28.10 42.53 136.53 95.44 85.14 5.80 575.92 16.66 154.27 143.35 1,452.76
Kemudahan Sosial
Social Amenities1,342.77 68.61 3.74 36.73 32.37 9.11 81.80 127.17 22.09 20.50 51.37 409.92 15.57 134.73 329.06
Infrastruktur
Infrastructure2,617.88 376.44 40.58 25.55 3.09 229.01 25.44 121.25 40.50 8.14 527.89 8.81 523.37 358.91 328.90
PahangKedahKategori Projek
Project Category
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Wilayah
PersekutuanPerlis Sarawak
Pulau
PinangMelaka
Negeri
SembilanTerengganu SabahJohor SelangorKelantan Perak
Jadual 2.12 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2016. Table 2.12 - Number of Projects Awarded By Site Location and Sector as of March 2016.
2014 7,939 1,346 277 146 324 462 587 551 603 44 1,604 277 400 511 807
Projek Kerajaan
Government
Projects
1,764 177 66 47 35 61 145 107 113 21 213 115 147 196 321
Projek Swasta
Private Projects 6,175 1,169 211 99 289 401 442 444 490 23 1,391 162 253 315 486
2015 6,885 1,098 291 138 273 427 467 501 436 41 1,458 269 369 497 620
Projek Kerajaan
Government
Projects
1,745 162 77 64 40 68 114 86 116 22 261 125 167 253 190
Projek Swasta
Private Projects 5,140 936 214 74 233 359 353 415 320 19 1,197 144 202 244 430
2016 677 137 35 6 19 27 31 64 57 5 121 27 37 38 73
Projek Kerajaan
Government
Projects
145 10 4 1 3 5 8 18 15 3 8 15 20 18 17
Projek Swasta
Private Projects 532 127 31 5 16 22 23 46 42 2 113 12 17 20 56
PerlisMelakaNegeri
SembilanPahang Perak
Pulau
Pinang
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Johor Kedah KelantanSektor
Sector
Jum. Bilangan
Projek
Total Number of
Projects
Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
TerengganuWilayah
PersekutuanSarawakSelangor Sabah
Jadual 2.13 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2016. Table 2.13 - Value of Projects Awarded By Site Location and Sector as of March 2016.
2014 171,644.79 51,649.77 2,964.59 4,589.43 2,560.45 7,045.23 5,581.79 6,881.85 7,067.28 320.80 36,642.92 2,655.55 10,870.31 8,542.31 24,272.51
Projek Kerajaan
Government Projects23,362.14 1,135.24 845.24 1,646.11 735.08 530.98 1,387.02 1,045.80 956.81 172.56 4,616.19 992.61 3,148.20 2,900.03 3,250.27
Projek Swasta
Private Projects148,282.65 50,514.53 2,119.35 2,943.32 1,825.37 6,514.25 4,194.77 5,836.05 6,110.47 148.24 32,026.73 1,662.94 7,722.11 5,642.28 21,022.24
2015 124,382.04 29,362.33 3,042.27 1,541.63 2,500.92 4,524.53 6,798.02 7,574.60 4,632.53 140.26 23,366.34 3,529.05 4,583.65 9,519.38 23,266.53
Projek Kerajaan
Government Projects22,444.93 2,114.26 1,249.47 899.28 441.41 361.17 1,409.85 546.52 2,302.72 55.48 2,104.08 2,452.28 2,318.81 3,046.41 3,143.19
Projek Swasta
Private Projects101,937.11 27,248.07 1,792.80 642.35 2,059.51 4,163.36 5,388.17 7,028.08 2,329.81 84.78 21,262.26 1,076.77 2,264.84 6,472.97 20,123.34
2016 11,908.93 2,109.27 346.97 65.99 163.52 486.10 313.71 457.22 273.61 37.39 2,112.73 450.73 733.21 648.85 3,709.63
Projek Kerajaan
Government Projects2,394.08 55.00 17.29 36.73 5.67 221.48 80.13 162.99 80.01 27.23 100.98 422.25 421.66 408.66 354.00
Projek Swasta
Private Projects9,514.85 2,054.27 329.68 29.26 157.85 264.62 233.58 294.23 193.60 10.16 2,011.75 28.48 311.55 240.19 3,355.63
Sektor
Sector
Jumlah Nilai Projek
(RM juta)
Total Project Value
( RM million)
Perak
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
PahangWilayah
PersekutuanSabahSelangorPerlisPulau Pinang SarawakTerengganuKelantan Melaka
Negeri
SembilanJohor Kedah
Jadual 2.14 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Kategori Projek Pada Mac 2016. Table 2.14 - Number and Value of Projects Awarded By Status of Contractors and Project Category as of March 2016.
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
2014 7,939 171,644.78 1,759 21,315.31 5,993 102,710.47 5 2,046.82 182 45,572.18
Kediaman / Residential 2,390 46,821.21 159 2,124.09 2,208 42,264.47 - - 23 2,432.65
Bukan Kediaman / Non Residential 2,874 81,606.72 334 3,542.02 2,424 40,981.32 2 307.83 114 36,775.55
Kemudahan Sosial / Social Amenities 693 8,071.12 446 3,345.85 239 3,658.25 - - 8 1,067.02
Infrastruktur / Infrastructure 1,982 35,145.73 820 12,303.35 1,122 15,806.43 3 1,738.99 37 5,296.96
2015 6,885 124,382.03 1,742 21,672.25 5,009 83,539.08 3 772.67 131 18,398.03
Kediaman / Residential 1,966 47,136.12 141 1,855.93 1,795 37,058.36 - - 30 8,221.83
Bukan Kediaman / Non Residential 2,546 46,025.89 423 3,855.17 2,042 32,454.44 - - 81 9,716.28
Kemudahan Sosial / Social Amenities 632 5,573.48 426 2,755.31 206 2,818.17 - - - -
Infrastruktur / Infrastructure 1,741 25,646.54 752 13,205.84 966 11,208.11 3 772.67 20 459.92
2016 677 11,908.94 145 2,394.09 523 8,108.59 - - 9 1,406.26
Kediaman / Residential 178 4,357.87 11 22.93 166 4,292.54 - - 1 42.4
Bukan Kediaman / Non Residential 247 3,590.43 29 176.53 211 2,050.76 - - 7 1,363.14
Kemudahan Sosial / Social Amenities 81 1,342.77 50 1,071.64 31 271.13 - - - -
Infrastruktur / Infrastructure 171 2,617.87 55 1,122.99 115 1,494.16 - - 1 0.72
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Kerajaan
Government Project Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai Projek
(RM juta)
Total Project Value
(RM million)
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Projek Swasta
Private Project
Total may not necessarily add up due to rounding.
Jadual 2.15 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kontrak dan Kategori Projek Pada Mac 2016. Table 2.15 - Number and Value of Projects Awarded By Type of Contracts and Project Category as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.79 7,623 131,756.71 148 8,448.42 112 6,619.09 6 225.87 50 24,594.70
Kediaman
Residential2,390 46,821.20 2,336 46,261.33 36 471.66 11 47.31 1 4.59 6 36.31
Bukan Kediaman
Non Residential2,874 81,606.73 2,767 53,717.09 50 1,534.99 25 3,991.65 4 208.90 28 22,154.10
Kemudahan Sosial
Social Amenities693 8,071.13 667 7,794.66 20 270.83 5 4.92 - - 1 0.72
Infrastruktur
Infrastructure1,982 35,145.73 1,853 23,983.63 42 6,170.94 71 2,575.21 1 12.38 15 2,403.57
2015 6,885 124,382.02 6,653 112,000.00 139 4,440.54 58 1,219.35 3 86.83 32 6,635.30
Kediaman
Residential1,966 47,136.12 1,927 45,847.30 33 1038.72 6 250.1 - - - -
Bukan Kediaman
Non Residential2,546 46,025.89 2,457 38,093.61 47 1,277.23 22 467.42 1 75 19 6,112.63
Kemudahan Sosial
Social Amenities632 5,573.47 624 5,547.78 4 12.15 3 12.74 - - 1 0.8
Infrastruktur
Infrastructure1,741 25,646.54 1,645 22,511.31 55 2,112.44 27 489.09 2 11.83 12 521.87
2016 677 11,908.94 661 11,782.95 14 117.49 2 8.50 - - - -
Kediaman
Residential178 4,357.87 177 4,347.37 1 10.5 - - - - - -
Bukan Kediaman
Non Residential247 3,590.43 240 3,493.03 6 93.9 1 3.50 - - - -
Kemudahan Sosial
Social Amenities81 1,342.77 77 1,336.15 4 6.62 - - - - - -
Infrastruktur
Infrastructure171 2,617.87 167 2,606.40 3 6.47 1 5 - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Konvensional
Conventional
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai
Projek (RM j)
Total Project
Value (RM m)
Jenis Kontrak / Type of Contract
Reka & Bina
Design & Build
Bina, Kendali & Pindah
Built, Operate & Transfer
(BOT)
Turnkey
Engineering, Procurement,
Construction and
Commissioning (EPCC)
Jadual 2.16 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Pengkhususan Kerja Pada Mac 2016. Table 2.16 - Number and Value of Projects Awarded By Status of Contractor and Work Specialisation as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.78 1,759 21,315.31 5,993 102,710.47 5 2,046.82 182 45,572.18
Bangunan / Building 4,963 94,348.02 717 8,073.11 4,147 75,927.62 1 306.74 98 10,040.55
Kejuruteraan Awam / Civil Engineering 2,337 43,441.70 938 12,196.33 1,361 21,034.52 3 1,738.99 35 8,471.86
Elektrik / Electrical 329 7,002.28 61 890.34 243 1,671.57 1 1.09 24 4,439.28
Mekanikal / Mechanical 310 26,852.78 43 155.53 242 4,076.76 - - 25 22,620.49
2015 6,885 124,382.05 1,742 21,672.26 5,009 83,539.08 3 772.67 131 18,398.04
Bangunan / Building 3,917 81,817.21 719 7,734.41 3,137 60,122.29 1 22.27 60 13,938.24
Kejuruteraan Awam / Civil Engineering 2,319 28,271.63 911 11,429.50 1,366 14,591.60 2 750.40 40 1,500.13
Elektrik / Electrical 314 4,096.16 60 595.99 240 3,302.66 - - 14 197.51
Mekanikal / Mechanical 335 10,197.05 52 1912.36 266 5,522.53 - - 17 2,762.16
2016 677 11,908.94 145 2,394.08 523 8,108.59 - - 9 1,406.27
Bangunan / Building 357 8,092.18 56 1,028.95 296 6,056.69 - - 5 1,006.54
Kejuruteraan Awam / Civil Engineering 257 3,140.73 74 1,298.47 180 1,821.85 - - 3 20.41
Elektrik / Electrical 36 120.04 11 61.31 25 58.73 - - - -
Mekanikal / Mechanical 27 555.99 4 5.35 22 171.32 - - 1 379.32
Pengkhususan Kerja
Work Specialisation
Jumlah
Bilangan
Projek
Total
Number of
Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Jadual 2.17 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Pengkhususan Kerja Pada Mac 2016. Table 2.17 - Number and Value of Projects Awarded By Type of Work and Work Specialisation as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.78 6,177 159,533.58 601 5,125.25 125 1,532.33 362 2,626.79 377 1,461.58 297 1,365.25
Bangunan / Building 4,963 94,348.02 4,276 90,135.04 185 951.86 94 1,137.08 51 266.07 112 732.12 245 1,125.85
Kejuruteraan Awam /
Civil Engineering 2,337 43,441.70 1,502 37,198.27 336 3,634.58 14 129.94 217 1,631.25 230 646.36 38 201.30
Elektrik / Electrical 329 7,002.28 219 5,965.47 46 366.92 10 248.19 32 386.12 18 30.73 4 4.85
Mekanikal / Mechanical 310 26,852.78 180 26,234.80 34 171.89 7 17.12 62 343.35 17 52.37 10 33.25
2015 6,885 124,382.06 5,230 111,528.86 513 5,702.15 155 1,035.74 329 2,205.46 368 2,335.81 290 1,574.04
Bangunan / Building 3,917 81,817.22 3,308 78,657.07 151 807.83 100 541.35 49 175.40 85 389.55 224 1,246.02
Kejuruteraan Awam /
Civil Engineering 2,319 28,271.64 1,477 20,058.09 307 4,546.05 32 217.72 189 1,577.56 255 1,590.18 59 282.04
Elektrik / Electrical 314 4,096.15 228 3,432.38 28 243.85 14 258.05 31 106.43 10 12.84 3 42.60
Mekanikal / Mechanical 335 10,197.05 217 9,381.32 27 104.42 9 18.62 60 346.07 18 343.24 4 3.38
2016 677 11,908.96 529 10,545.51 41 666.70 8 52.61 16 89.24 52 457.68 31 97.22
Bangunan / Building 357 8,092.19 303 7,868.52 6 20.45 8 52.61 1 5.78 14 64.56 25 80.27
Kejuruteraan Awam /
Civil Engineering 257 3,140.74 176 2,064.18 29 590.10 - - 14 82.51 33 387.86 5 16.09
Elektrik / Electrical 36 120.04 27 62.59 5 53.21 - - 1 0.95 3 3.29 - -
Mekanikal / Mechanical 27 555.99 23 550.22 1 2.94 - - - - 2 1.97 1 0.86
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Pengkhususan Kerja
Work Specialisation
Jumlah
Bilangan
Projek
Total Number
of Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Penyelenggaraan
Maintenance
Projek Baru
New Project
Naik Taraf
Upgrade
Baik Pulih
Repair
Ubah Suai
Renovation
Jenis Kerja / Type of Work
Pembesaran
Expansion
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Jadual 2.18 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Jenis Kontrak Pada Mac 2016. Table 2.18 - Number and Value of Projects Awarded By Status of Contractor and Type of Contracts as of March 2016.
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
2014 7,939 171,644.77 1,759 21,315.31 5,993 102,710.47 5 2,046.82 182 45,572.17
Konvensional / Conventional 7,623 131,756.70 1,655 19,009.19 5,810 90,943.27 4.00 1,740.08 154 20,064.16
Reka & Bina / Design & Build 148 8,448.41 41 1,545.53 98 6,346.88 9 556.00
Turnkey 112 6,619.09 52 636.95 50 565.77 1.00 306.74 9 5,109.63
Built, Operate & Transfer (BOT) 6 225.87 3 21.47 3 204.40 - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) 50 24,594.70 8 102.17 32 4,650.15 - - 10 19,842.38
2015 6,885 124,382.03 1,742 21,672.25 5,009 83,539.08 3 772.67 131 18,398.03
Konvensional / Conventional 6,653 112,000.00 1678 19,626.28 4,856 75,993.14 2 750.40 117 15,630.18
Reka & Bina / Design & Build 139 4,440.56 43 1,700.18 91 2,359.73 1 22.27 4 358.38
Turnkey 58 1,219.35 15 246.16 40 808.16 - - 3 165.03
Built, Operate & Transfer (BOT) 3 86.83 2 11.83 1 75 - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) 32 6,635.29 4 87.8 21 4,303.05 - - 7 2,244.44
2016 677 11,908.93 145 2,394.08 523 8,108.59 0 0.00 9 1,406.26
Konvensional / Conventional 661 11,782.94 142 2,386.56 510 7,990.12 - - 9 1,406.26
Reka & Bina / Design & Build 14 117.49 3 7.52 11 109.97 - - - -
Turnkey 2 8.50 - - 2 8.5 - - - -
Built, Operate & Transfer (BOT) - - - - - - - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) - - - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kontrak
Type of Contract
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai
Projek (RM j)
Total Project
Value (RM m)
Kontraktor Tempatan / Local Contractor Kontraktor Asing / Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Jadual 2.19 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Jenis Kontrak Pada Mac 2016. Table 2.19 - Number and Value of Projects Awarded By Type of Work and Type of Contracts as of March 2016.
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
2014 7,939 171,644.78 6,177 159,533.57 601 5,125.25 125 1,532.33 362 2,626.79 377 1,461.59 297 1,365.25
Konvensional / Conventional 7,623 131,756.70 5,917 120,394.37 577 4,771.62 115 1,290.03 356 2,608.69 371 1,407.55 287 1,284.44
Reka & Bina / Design & Build 148 8,448.41 122 8,166.50 7 137.94 4 20.13 2 6.34 4 37.60 9 79.90
Turnkey 112 6,619.10 98 6,278.16 9 122.57 3 211.43 - - 1 6.03 1 0.91
Built, Operate & Transfer (BOT) 6 225.87 3 205.40 1 12.38 2 8.09 - - - - - -
Engineering, Procurement,
Construction and Commissioning
(EPCC)
50 24,594.70 37 24,489.14 7 80.74 1 2.65 4 11.76 1 10.41 - -
2015 6,885 124,382.03 5,230 111,528.86 513 5,702 155 1,035.74 329 2,205.45 368 2,335.80 290 1,574.04
Konvensional / Conventional 6,653 112,000.01 5,053 100,739.82 488 4,357.31 145 846.40 319 2,181.44 361 2,314.51 287 1,560.53
Reka & Bina / Design & Build 139 4,440.54 103 3,004.43 16 1273.42 6 116.51 9 23.36 3 13.87 2 8.95
Turnkey 58 1,219.35 45 1,109.86 3 24.03 4 72.83 1 0.65 4 7.42 1 4.56
Built, Operate & Transfer (BOT) 3 86.83 3 86.83 - - - - - - - - - -
Engineering, Procurement,
Construction and Commissioning
(EPCC)
32 6,635.30 26 6,587.92 6 47.38 - - - - - - - -
2016 677 11,908.94 529 10,545.51 41 666.69 8 52.61 16 89.23 52 457.68 31 97.22
Konvensional / Conventional 661 11,782.95 518 10,425.97 40 665.82 8 52.61 15 88.28 52 457.68 28 92.59
Reka & Bina / Design & Build 14 117.49 9 111.04 1 0.87 - - 1.00 0.95 - - 3 4.63
Turnkey 2 8.50 2 8.50 - - - - - - - - - -
Built, Operate & Transfer (BOT) - - - - - - - - - - - - - -
Engineering, Procurement,
Construction and Commissioning
(EPCC)
- - - - - - - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja / Type of Work
Penyelenggaraan
Maintenance
Projek Baru
New Project
Naik Taraf
Upgrade
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
Pembesaran
ExpansionJenis Kontrak
Type of Contracts
Jumlah
Bilangan
Projek
Total
Number of
Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Baik Pulih
Repair
Ubah Suai
Renovation
Total may not necessarily add up due to rounding.
Jadual 2.20 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Kategori Projek Pada Mac 2016. Table 2.20 - Number and Value of Projects Awarded By Type of Work and Projek Category as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.78 6,177 159,533.58 601 5,125.24 125 1,532.34 362 2,626.79 377 1,461.59 297 1,365.24
Kediaman
Residential 2,390 46,821.21 2,264 46,384.87 28 82.47 9 47.13 35 107.38 33 159.15 21 40.21
Bukan Kediaman
Non Residential 2,874 81,606.71 2,265 77,686.03 151 804.61 82 958.42 101 714.70 60 381.79 215 1,061.16
Kemudahan Sosial
Social Amenities 693 8,071.13 429 6,882.44 99 340.67 18 131.43 37 184.55 64 304.04 46 228.00
Infrastruktur
Infrastructure 1,982 35,145.73 1,219 28,580.24 323 3,897.49 16 395.36 189 1,620.16 220 616.61 15 35.87
2015 6,885 124,382.04 5,230 111,528.86 513 5,702.15 155 1,035.74 329 2,205.45 368 2,335.80 290 1,574.04
Kediaman
Residential 1,966 47,136.12 1,854 46,723.86 17 49.55 8 17.9 41 113.67 27 153.26 19 77.88
Bukan Kediaman
Non Residential 2,546 46,025.90 1,914 42,878.69 150 727.81 97 496.91 90 442.83 65 305.3 230 1,174.36
Kemudahan Sosial
Social Amenities 632 5,573.48 421 4,636.32 86 311.54 22 104 26 119.62 49 135.07 28 266.93
Infrastruktur
Infrastructure 1,741 25,646.54 1,041 17,289.99 260 4,613.25 28 416.93 172 1,529.33 227 1742.17 13 54.87
2016 677 11,908.94 529 10,545.51 41 666.69 8 52.61 16 89.23 52 457.68 31 97.22
Kediaman
Residential 178 4,357.87 168 4,324.48 1 0.84 1 0.6 - - 5 28.23 3 3.72
Bukan Kediaman
Non Residential 247 3,590.43 194 3,409.57 13 21.85 4 38.89 6 34.57 12 24.26 18 61.29
Kemudahan Sosial
Social Amenities 81 1,342.77 53 1,211.24 8 60.01 3 13.12 1 0.61 8 27.58 8 30.21
Infrastruktur
Infrastructure 171 2,617.87 114 1,600.22 19 583.99 - - 9 54.05 27 377.61 2 2
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kategori Projek
Project Category
Jumlah
Bilangan
Projek
Total Number
of Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Baik Pulih
Repair
Penyelenggaraan
Maintenance
Jenis Kerja / Type of Work
Projek Baru
New Project
Naik Taraf
Upgrade
Ubah Suai
Renovation
Pembesaran
Expansion
Jadual 2.21 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Jenis Kerja Pada Mac 2016. Table 2.21 - Number and Value of Projects Awarded By Status of Contractor and Type of Work as of March 2016.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2014 7,939 171,644.82 1,759 21,315.33 5,993 102,710.49 5 2,046.82 182 45,572.18
Projek Baru / New Project 6,177 159,533.58 879 14,566.90 5,153 98,299.13 3 2,026.93 142 44,640.62
Naik Taraf / Upgrade 601 5,125.25 347 3,548.58 239 1,415.61 1 18.80 14 142.26
Pembesaran / Expansion 125 1,532.34 16 109.75 104 960.57 - - 5 462.02
Penyelenggaraan / Maintenance 362 2,626.80 248 1,834.84 111 559.71 - - 3 232.25
Baik Pulih / Repair 377 1,461.59 216 820.86 156 631.52 1 1.09 4 8.12
Ubah Suai / Renovation 297 1,365.26 53 434.40 230 843.95 - - 14 86.91
2015 6,885 124,382.04 1,742 21,672.25 5,009 83,539.08 3 772.67 131 18,398.04
Projek Baru / New Project 5,230 111,528.86 851 13,658.13 4,265 79,805.90 1 22.27 113 18,042.56
Naik Taraf / Upgrade 513 5,702.15 339 4,852.87 171 781.74 - - 3 67.54
Pembesaran / Expansion 155 1,035.74 16 81.82 137 889.31 1 63.52 1 1.09
Penyelenggaraan / Maintenance 329 2,205.45 214 1,561.42 114 639.04 - - 1 4.99
Baik Pulih / Repair 368 2,335.80 232 1223.1 131 349.9 1 686.88 4 75.92
Ubah Suai / Renovation 290 1,574.04 90 294.91 191 1073.19 - - 9 205.94
2016 677 11,908.95 145 2,394.09 523 8,108.60 - - 9 1,406.26
Projek Baru / New Project 529 10,545.50 84 1,402.70 437 7,737.08 - - 8 1,405.72
Naik Taraf / Upgrade 41 666.69 18 604.63 23 62.06 - - - -
Pembesaran / Expansion 8 52.62 3 5.56 5 47.06 - - - -
Penyelenggaraan / Maintenance 16 89.24 5 10.7 10 78 - - 1 0.54
Baik Pulih / Repair 52 457.68 29 360.68 23 97 - - - -
Ubah Suai / Renovation 31 97.22 6 9.82 25 87.4 - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja
Type of Work
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.