BUCKEYE WATER OO;I2VTIo !D DRflt&G DIRICT QUIi:T ,R1zo T STORC1 FOUNDATION ARIZONA coa CTEON ARZONA ST. U. Yii5rri L. Ha)3c, ±ieer Jeir1x ria

Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

BUCKEYE WATER OO;I2VTIo !D DRflt&G DIRICT

QUIi:T

,R1zo T STORC1 FOUNDATION

ARIZONA coa CTEONARZONA ST. U. Yii5rri

L. Ha)3c, ±ieer

Jeir1x ria

Page 2: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

flt ri Ph 1r 1 -r-j--i-'-i-rn ; 1r-flp nrn1-j--y-t-1L, I i.Li .,, LJ\.)?he Buckeye .Vater onservatio-i arid Drainage District, v;i11

rec3ive nd pub1ic;1y open se1ed iropo1s at th ffice of

,

-'id inst1iing 1ectricr1 Jquip1ent for twenty-one puipingir nt in the I)jstrjct. Plants to range in size froro TD?

to 125 IT. The following eçuipnent to be usedTransforners sin;1e-Dh' se O-cyc1e

Definite ttne-de1y-re1ygnetic uto-Tr:isforner type Starter

Aeters self coritinedSwitches safety enclosed

otors Squirrel Jage typo 5-phse E-cyc1e 44O-v1tsindu.ctin iotors

iire, )1du1ts and other eteria1 necessary to iake a

corp1ete installetion.

As soon as convenient thereafter the 3o.rd of Directors of

the District may let the work either in oortion or es

whole, to the lowest responsible bidder, for the whole or

partions of such work.

ach Proose1 nust he accopnied by a deposit or certified

check equal to ten per cent (it) of the bid thereof.

The District reserves the right to reject any nd 1l

rroposals.3uckeye n.ter onseriration and Drainage District.

By . J. Kell, Prisident,

te District, t :3uckre, Arizo;i, Un t i 11 / ',',,.

t:e day of Doniher, 198, for stnp1.ring

Page 3: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

General Dpecificatonns fr Ilectrica1 Jquiprnent.

The stem in general will consist of three single phase

transformers, of the rper size connected together on the

sub-station platform for three phase operation; A three phase

squirrel cage type vertical oiotor mounted on a 7ertical shaft

pump in the pump-house arid a control switch-bo.. rd in the puip-

house on which are mounted the various pieces of cntrol appar-

atus. The size of the weather proof wire from the sub-station to

the pumD-house a distance which will average some 75 feet, the

size of the transformers, the size of the motor, the size of the

rubber covered wire for pumphouse wiring, the size of the conduit,

the size of main entrance fused switch nd the size of arrieter

required are ailgiven for each pump location in the forrq for

bids hrewith enclosed.

reme for switch-loarct on which to moant instruments and

control amaratus to he made of angle-iron with equal legs,

2 inches long, inch thick. to consist of two uprights and

three cross pieces. The uprights to extend from the floor to the

roof of the pump-house. Frame to be well bolted together am!

fastened to the floor and roof and we1lbrace to the wall of

the pump-house.

Transformers shall he Westinghouse or equal, single-p.hae

60-cycle type 3K 6900/11950 y volts with taps for 385- 6275-

5960 to 230-460 v secondary.

Definite time-delay-relays shall be General 1ectric type

CR 2823 MC-ll or equal.

Page 4: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

agnetic Auto-Transformer Type Starter shi1l be 11-500

Westinghouse or equal for 3-phase 50-cycle 440-volts induction

motors, for 60, 75, 100 and

Ammeters shall be Vestinghouse Type or equal self contained

ammeters, scale 0-75, 0-100, 0-150 and. 0-00.

Switches shall be Type WK 62 Westinghouse or equal, safety

enclosed switches 200-amp 3-pole 500 ac volts and 40O-arp 3-pole

500 c volts. These switches are to be equiped with Union Metal

or equal renewable fuses.

Use Tpye ?-(0roue Hinds Oo.) ondu1et with porcelain cover

on service outlet from pump-house.

All wiring inside pump-house is to be in conduit or metal

iflclosures throughout. No exposed or open wires are to he shown

at iny point. Meter and potential nnd current transformers are

to be inclosed in a steel cabinet with door hinged and with hasp.

Anieter. is to be mounted on side of the cabinet on outside with

short circuting switch inside but operated from outside.

Steel Oahinet to be large enough to contain four meter trans-

forniers, watthour meter, aLTneter terminals and short circuting

switch fo. amieter..

All wiring and materials used shall correspond to the rules

and regulations of the Hational Board of ire Underwriters.

otors. One motor to be 125 iT 440-volts Type W Westinghouse

or equal, varying speed vertical motor, 1160 high speed, 5O2

reduction in speed, with manual speed control complete, motor

ready to mount on pump furnisher by the District.

Page 5: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

All other rnotors are to the Squirrel Cage Type and. Westing-

houae Type CS or equal. These motors are to wired. so as to he

started. autoiiatically by means of the definite tine-delay-relay

degribed. above in conjunction with the auto-transformer starters

There is also to be provided for push button hand starting andstoig.

The general arrangement of the switch-board apparatus, service

switch, ieter cabinet, ammeter, definite time-delay-re1y, ag-

netic auto-transformer starter, push button control etc. on the

angle iron switch-board as d.escribed above shall be submitted.

to the Engineer of the District for his approval or rejection

before work on the same is started. The Thgineer reserves the

right to change this arrangement as he shall see fit.

It is the general intent of these specifications that a

complete electrical installation, fully adequate for satisfactory

operation of each pumping plant unit shall result and the Elec-

trical Contractor shall be required to furnish all material

and labor for a complete job even if such necessary material

and labor is not definately mentioned or described in the fore-

going specifications.

Page 6: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

PR1)POSAL JRISH AND I'STLL T SJIIS, OTORSAND OTHER LU'FiICAL UIiNT FO SUB STATCN ANDPULT_EOTJGIS.

P the Directors of Buckeye 'dater Conservation and Drainage

Diatrict, Buckeye Arizona.

In response to your call for proposals for the furnishing

and instllin-; transformers, motors nd other electrical

equipment in sub-stations nd pump-houses in your District,

The undersigned. declares that he has exinec the sites of the

work, and informed himself in regerd to the sr!'1e od all con-

ditions pertn,iing to the places where the work is to be done;

That he ha examined the form of Contract and. the Bond on file

in the of'ice of the 3oard, the Specifications and J)awings

therein referred. to ad hs read. the eneral equirements

referring t the work an has satisfied himself as t all ratters

relating to the worcs to 'be performed.

The bidclor proposes a'id agrees, if thts Frposal sh'll he

accepted, that he will furnish, all labor an 'iateria]. n. fully

complete the work, and ci) everything requireu by the Contract

to which this refers, for each unit complete, for tias foflov:ing

steted. prices;

Three 37-i KrA transforners a d one 125 varying speod vert-

ical motor with amial speed control complete, 3uckeye.

Dollars )

Page 7: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

I will leave e1rerytJ1ng in first class shape and. running orei.

1nc1osed olease find certified ahe3k for

nade payable to IT. . Kell, President of the Buckeye Water onser-

vation. and Drainage District, which shall become the property of

said District if I ai awarded the ontract and I fail to si2fl the

Contract arid furnish satisfactory B3nd, to the District in the suri

of 50 of the ;rice hid. within ten days from date of award.

MotorI

RubberCoveredWireSize

ConduitSizeInches

Switch WP WireTribloleBr.id.1iz

ThreTransformersSize

Ariii. Total priceEaoh UnitdopleteWith wiring,:ontrol and.Switchboard.

Apparatus.Installed.

WK 62

200 3 15 KVA 0-100

60 0 2 200 2 25 KVA. 0-100

75 0 2 200 2 25 KVA 0-150

100 000 2 400 0 JA Q-00

125 000,0 2 400 30 37- KVA 0-200

Page 8: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

ESTIMATED COST OFD?ILLING IND INSTALLING -- P!R UNIT

175 ft. 7e11 Drilling ; 3.50 612.50160 " " Casing @ 4.50 720.

Starter & shoe 167.50Sand Pumping & Developing 250.

1750.0075 HP Electric Pump 2915.50Contractors 10% Contingencies

and Profit 291.50Total 3207.00

Starting Box 114.Safety Switch & Fuses 60.Time Relsy 74.Meter Box 10.Conduit & Fittings ) 50.%'ire & Construction )

3 Transformers (279.) 837.Keliman Switch 132.11000 Volt Knife SwitchLightning ArrestersInstallation LaborTotal Electrical Equipment

Contractors 10% Contingencies& Profit

Total

38.8561.4150900

1570.00

1427.26

142.74

Sub-station - Material 200.Labor 100.

Pump House - Material 150.Labor 100.Total 550.

Contractors 10% Contingencies& Profit 50.

600 00eir Box - Material 105.)eir Box - Labor 56.Gates & ripe - iateria1 90.

Labor 50..

Miscel. Labor & Dirt MovIng 80.381.

Contractors 10% contingencies& Profit 38.

Total 419.

7546.

Page 9: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

BUCKEYE iATR C0NSEVA.TI0N & DRiINAGE DI3TICT

for 20 el1s

ITEM APPRCXI}ATE UANTiTIT;S

3200 feet of double well casing of j'lO gaugehard red steel, 20 inches in dianeter, in24 inch lengths, an eual number of insideand outside joints, to be single riveted joints

Dollars ($ ) per lineal foot.

2. 20 three-ply starters for double well casing,15 feet long, 9 feet of three-ply and 6 feet oftwo-ply, with a standard steel well ring 20inc:1es in ciameter, 12 incnes long ona l inchthick.

Dollars ( ) each

3. Drilling 20 20 inch wells total drtlling 3500 feetand placing casing

Dollars ( ) per lineal foot.

4. 2200 feet perforatirw. well casing maximum16 holes per foot

Dollars ( ) per linear foot.

5. 500 hours service pf crew and use of ecuimentfor work not included in item 3 and 4

Dollars (1; ) per hour.

3. 30 miles moving rig and tools.Dollars ($ ) per mile.

T0TiL

Page 10: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

rLC1T c :::'iic :

ØJZOT4A flISTOR!

ARIZONA COLLECTIONA'RIZONA STA[L UiVLRS1TY

C PEOICTIOrL

Page 11: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

NOTICE TO WILL DRILLING CONT!RL.CTORS.

The Buckeye Water Cons erTation and. Drainage

District will receive and. publicly open sealed proposals

at the office of the District, at Buckeye, Arizona,

imtil .7" ' it. '77k (- ,f,'

day of December, 1928, for furnishing casing and drilling

ten to twenty wells in the District, the location of

which are shown on the plans and Specifications therefor,

which may be seen at the office of the Distriot, and

as soon as convenient thereafter the Board. of Directorsof the District may let the rk either in portion or

as a whole, to the lowest responsible bidder, for the

whole or portions of su.eh rkD

Each proposal must be accompanied by a deposit

or certified cheek eq2l to ten per cent (10%) of the

total thereof0

The District reserves the right to reject any

and. al]. proposals.

BUCKEYE WATER CONSERVAUON .1tD DRILA.G-E DISTRICT,

By It. E. President.

Page 12: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

SPECIFICATIONS FOR CASING AND WELL DRILLING.

PROPOSAL. Blank spaces in. the proposal and in.

the statement of the time of the beginning and the rate of

completing the rk should be properly filled. Bidders

are invited to be present at the opening of proposals.

The right is reserved to rejeot any or all proposals and

to waive technical defeets as the interest of the District

may reQuire. The proposals shall be submitted in. a

sealed envelope marked "Proposal for Furnishing Casing and

Drilling Wells" and addressed to Buckeye Water Conservation

and Drainage District, Buckeye, Arizona. As soon as con-

venient after the bids are opened the Board of Directors

of the District may let the work either in portion or as

a whole, to the lowest responsible bidder for the whole

or portions of such work. The Board reserves the right to

reject any and all bids.

THE cONTRACT. The Bidder to whom the award is

made will be reQuired to execute a written contract with

the Buckeye Water Conservation and Drainage District,

agreeing to fiu'nish the material and execute the work at

the prices bid and. in accordance with. the Specifications.

A copy of these Specifich.tions shall be embodied in and.

made a part of the contract.

-1-

Page 13: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

3. EIGINER. The word Engineer used in these

Specifications or in the Contract means the Chief..

igineer of the. Buckeye Water Conservation and Drainage

District. He will be represented by assistants and

Inspectors authorized to act for him. On all questions

ooneerialng the interpretation Specifications, the

classification of nterIals, the exeeun of the work,

and. the determination of oosts, the decision of the

Engineer shall be final.

4 CONTRACTOR. The word "Contraotor' used in

those Specifications or in the contract means the. person,

fira or corporation with. om the contract is made with

the Buckeye Water Conservation and Drainage District0

The Contractor shall at all tia be represented on the

works, in. person or by a foreman as duly designated agent.

Instructions and information given by the Engineer to the

Contractor's foreman or agent on the work shall be con-

sidered as having been given to the Contractor0

i. WORAR{I]? EQJLPMNT. All work shall be

performed in a first class manner by experienced men,

notwi t standing any olLt asi ozis from these specifications0

The eQuipment used by the Contractor must be such. as will

secure satisfactory wow, and. insure its completion

within the time. agreed upon0

Page 14: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

6. MATERIAL. All material furnished to be first

class in every respect. Casing to be double easing of

#10 gange Hard. Red. Steel, twenty inches in. dianeter.

To be in twenty-four inch joints an eq.ual number of inside

and outside joints to be fumished.. To have single

riveted joints. Starter to be three ply, of #10 gauge

Hard Red Steel, 15 feet long, 9 feet of three-ply and.

6 feet of two-ply, with a Standard. Well Ring twenty

inches in diameter, twelve inches long and one and one

quarter inches thlek0

QQIk!tLO OR DLLS. '1he cnt.rtor aVL

receive no compensation for delays or hindrances to the

work except when direct and unavoidable extra cost to

the Contractor is caused by failure of the. District to

provide necessary site for construction. When such

extra compensation is claimed, a written statement thereof

shall be presented by the Contractor within fifteen days

after the close of the month during which extra cost is

claimed to. have been incurred.. If delays are caused by

specific orders to stop work given by the gineer, or

by the performance of extra work, or by unforseen causes

beyond the control of the Contractor, then suoh delay

will entitle the Contractor to an equivalent extension

of time0

Page 15: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

8 EXTRA WORK OR Mà.TERIALS The Engineer may at any

time during the prress of the work, order work or ma-terials not covered by these specifications. Such work

ox materials will be classed as extra work and will be

ordered in writing. Extra work or material shall be charged

for at actual necessary cost, plus fif teen per cent (15%)for profit, superintendence, and general expense. Allbids for extra work or material shall be presented at theend of the calendar month in which such rk or materialis furnishedG

9 LOCAL C ONDI T IONS Bidders shall satisfy them-Vselves as to local conditions affecting the work0

ERRORS AIU OMISSIONS. The Contractor shallnot be allowed to take advantage of any error or omissionin the specifications. Suitable instructions will begiven when such error or omission is discovered.

CEACTER OF VO1UMJ!N. None but skilled foremanand workmen shall be employed on work requiring special

quaiifications, and when. required by the Engineer, theContractor shall discharge any person who is disorderly,dangerous, insubordinate, incompetent or otherwise obec-tionable Such di soharge shall not be the basis f or anyclaim for compisation or damages against the BuckeyeWater Conservation and Drainage District, or any of itsofficers or employee0

Page 16: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

12. DELkYS. Should. the Contractor abandon the

work, or cause it to be unreasoimbly delayed, or should.

be fail to furnish sufficient material, eq.uipinent or

laborera to complete the rk within the time agreed

upon, or should he wilfully violate any of the conditions

of th.e contract so as to delay the. completion of the work,

the Diatriot shall have the right to furnish, such force

and. eq,uipment as may be sufficient to complete the work

within the time agreed upon. If the work done by this

force coats more than 'the contract price for such work,

the excess cost will be charged against the Contractor0

If the cost is less than the contract price for such work,

the profit will be credited to the Contractor0

l3 DESCRIPTION OF WORK0

(A) The wells to be constructed. under

these spe1fioations will be located in the Buckeye

Water Conservation and. Da1r.ge Districts The material

ITL tht ecttou cor1tBt. 1eir of allutal deposit and.

caliohe, underlaid with heavy gravel and boulders0 It

is the intention to sink the wells well into the water

beari materials. The depth of the wells will depend

upon the character of material enoountered. and will be

determined as work proresse8. It is expected that they

may vary from 120 to 2O feet deep. The size of the

wells will be 20" in diameter. The minimum number of

wells that will be req.uired is ten, and. the right is

Page 17: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

reserved to increase this to twenty.(B) The Contractor shall furnish all

material and complete well drilling rx.chinery withcompetent men to operate the sam.e for sinking, casing,perforating, sand. pumping and putting wells in suitablecondition for the installing of pumps. All wells areto be drilled in. a. good. and worknianlike maimer with

casings sufficiently straight to permit the proper operationof pumps designed for them. Perforator knives shall bekept sharp and. in such condition that they will positivelyout the casing. The size of perforations will be desig-nated by the ineer; they y vary from three-eighthsby four (3/8 x 4) inches to three-fourths by four (3/4 x 4)inches.

(o) The contractor shall keep an accuratelog of each well, together with samples of the variousmaterials encountered and record all changes in ground.water elevation during drilling or perforation and furnishthe same to the Engineer.

14. Q.UMTTITIES AND UIT PRICES.

(A) The quantity of work cannot bedefinitely stated. except that not less than nor

more than wells will be drilled. The depth ofeach well will depend. upon the character of materialencountered. The unit price for drilling and casing shall

Page 18: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

in.olu.de work in all materials except rook or heavy

boulders, where the rate of progress for eight (8)

consecutive hours working is less than four (4) feet0

In suoh material drilling will be paid. for by the

hour at the unit price per foot under Item Nol 5 of

schedule.

In the event that the total amountd.ue the Contractor on any one well for drilling and

casing under Item No. 3, and for rook work under Item

No. 5 of the Sohedule, iail be less than the amount

which would be earned by drilling 125 feet at the unit

price bid on Item lb. 3 of the Schedule, the Contractor

shall be paid for sioh well the equivalent of 150 feet

at the price bid on Item 3 of said. Schedule. Other work

performed by the Contractor in connection with such well

under Item S and 6 of said Schedule shall be paid for as

horeinbefore provided, in addition to the minimum payment

to be made as above specified.Paym.t for perforating will be made

at the unit price bid on It No. 4 of schedule, for the

number of linear feet of easing actually perforated.0

The moving of well drilling equipment

from job to job in the field after completing the first

wall to be drilled by each rig employed will, be done by

the Contractor and. will be paid for by th.e mile under bid.

in Item 6. The moving from one well drilled to new location

Page 19: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

shall be at the direction of the g1neer. This moving

does not include the moving of tools or eq.uipmeut from

one well being drilled to another well being drilled.

The Contractor is expected to furnish each rig complete

with. all tools and. eQuipment, necessary for operating

independently of other rigs.

DEFECTIYE M&TERIAL OR IOHK. A1y d.efeotive

material or unfaithful or improperly executed work which

xnay be discovered befo.re the fil acceptance of the work

shall Do corrected iiiediately. The inspection of the work

shall not relieve the Contractor of any of his obligations

to perform sound. work, as herein prescribed; material or

work, of whatever kind, which during its progress and. be-

fore It is finally accepted, may become damaged from any

cause., sha].l be removed and replaced by good and. satisfac-

tory work.

TESTING. ill testing of wells will be done by

the District. Any work done by the Contractor in eonneo-

tion with such tests, such as installing test pump, or sand.

pump, will be paid for by the hour and. the price bid tinner

Item Io. of Schedule0

PROTECTION OF WOC U'Th CLflG TIP. The Contaetoshall be responsible for any material furnisId by him, and.

for the care of all work until its completion and. final

Page 20: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

acceptance. He shall remove from the site of the work

any temporary structures built by him, or rubbish tha.t

may have accumulated, axid, leave the site in a neat con-

dition.

18. PROGRESS ESTIILATES MD PAfltENTS. At the end

of each calendar month, the Engineer will make an esti-

mate of all work done i to that date, classified accordingto Item8 uaned in the Schedule. To this will be added

the amowits earne.d for extra work to the date of the esti-

mated. From the total thus obtained, a deduction of fifteen

per cent. (15%) wll be de, and fro.m the remaier there

will be deducted the .m of all previous payments together

'with any other sums due from the Contractor. The balance

will be due and, payable on the 15th of the month following

that for whieh the estimate is nde. The fifteen per cent

(15%) retained will be due ax payable ien the entire

work included in the contract is conleted. and accepted,

and provided all claims for labor and teria1 or supplies

incurred by the Contractor on the work have been. paid0

Approved:

Page 21: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

PROPOSAL TO FURNI WL C.ASU JD DRILL WRr,TkS.

To the Board of Directors,Buckeye Water Conservation and. Drain.age District,Buckeye, Arizona.

We, the undersigned., hereby declare that no person.or persons, firm or corporation, other than the undersign-ed,are interested in this. Proposal, a.s principals, and. thatthis proposal is made without collusion with any person,firm or corporation, and. we have carefully and. to our fullsatisfaction, examined the attached Specifications, and. thatwe have mad.e a full examination of the location of theprapose.d work, and we hereby agree to furnish all necessarymaterial and labor, d.ril1ir rigs, perforators, tools,machinery, teams and. eQuipment, fally understanding that

the quantities shown herein are approximate only, and. thatwe will furnish all material. and. rally complete all neoessai7work in. aceord.axice with the attached. Specifications, arid

the requirements under them of the nginee.r, within thetime limit specified in this proposal for the followingunit prices, to-wit:

Page 22: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

IT& APiROXIMTE QUAIITITIES TOTAL

2500 feet of double well casing of #10 gaugehard. red steel, 20 inches in diameter, in24 inoh lengths, an eq.ual rnmber of insideand. outside joints, to be single riveted joints

Dollars ( ) per lineal foot.

2. 18 three-ply atatois or d.oub1 well Qasing,it reet 1rrn, ' reet or three-ply ana b ree' oftwo-ply, with a staMard steel well ring 20inches in diameter, 12 inohea long and l inchthick.

Dollars ($ ) each

Drilling 18 20 inch wells total drilling 2770 feetand placing casing

Dollars ( ) per lineal foot.

2000 feet perforating well casing maximum16 holes per foot

Dollars ( ) per linear foot0

300 hours service of crew and. use of equipmerLtfor work not included in item 3 and 4

Dollars ( ) per hour0

6 20 miles moving rig and tools0Dollars ( ) per mile0

Page 23: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

The undersigned. further agrees to execute the

Contract and to furnish the req.uired. Bond. and. to begin

work with an ad.eqaate force and ecjuiprnent within five

(5) days from the date of executibn. of Contract, and. to

fully complete all necessary work under the sane within

not more than. calendar

days from the date of said execution of Contract, and also

furnish a sufficient and satisfactory bond. in the sum of

not less than fifty per cent (50%) of the contract price

of the work as indicated by the approximate quantities

shown herein.Aeoompauyin this Proposal is a certified check

made payable to the Board. of Directors, Buckeye Water

Conservation and Drainage District, in the sum of

Do liars

), whioh said check Is to be forfeited as

liQuidated. damages if, in case this proposal is accepted,

and. the undersigned. shall fall to execute the Contract

under the conditions of this Proposal; otherwise said

cb.eok is to be retu.rned to the un&ersigned upon the d.e-

livery. of a satisfactory bond.

Page 24: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

CONTRAC

This Contract, made this day of

1928, between the Buckeye Water Conservation axid. Drainage

District, by its Board of Directors, hereinafter called the

District, and.

-1-

of , or their su.ccessors, executors,

administrators and assigns, hereinafter called the Contractor;

WIESS.T: That the Contractor agrees with the

District, for the consideration herein mentioned, and at their

own proper cost and expense, to do all work and furnish all

the materials, equipment and. labor necessary to carry out

this agreement in. the manner and. to the full extent as set

forth in the attached. specifications, provisions and proposal,

and under security as set forth in the attached contract bond,

which are hereby adopted and made a part of this agreement.

as completely as if incorporated. herein, and to the satis-

faction of the Engineer, who shall have at all times full

opportunity to inspect the materials to be furnished, and the

work to be done under this agreement0

It is agreed that the work. to be done and the mater-

ials to be furnished 'under this contract is that described

as Items one (1) to six (.6) inclusive, in Proposal to

Furnish Well Casing and. Drill Wells", bound. herein as shown

by the attached. specifications, provisions and proposal, and.

the accompanying plans, located in the Buckeye Water Conser-

Page 25: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

vation and Drainage District.

In. consideration o:f the foregoin premises, th.e

District agrees to pay the Contractor for all the it.s of

work performed and materials Thrnishd. at the unit prices

and under the conditions set forth in the attached proposal.

IN WITIE8S WELERFOF, The party of the first part has

hereunto subscribed, by the President and. Secretary of the

Board of Directors, and the party of the second part has

affixed their name.

THE BUCKEYE W&TER CONSERVATION D DRAIN&G-E DISTRICT,

ByPresident, Board. or Directors.

BySeoretary, Board or Directors.

Page 26: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

(horeinatter called the "PrinciDal") and

(Hereinafter cafled the SretyT?), are held. and, firmly bound

unto The Buckeye Water Conservation and Drainage District,

(hereinafter called tbe"Distriet) in the fulL and, just sum

of Dollars,

COUTRLCT BOND

KNOW L MEN BY WSE PRESif 3: That we,

law:ful money of the United States of America,

to be paid. to the said, 9)jatrjct, its successor and assigns,

to which payment well and. truly to be made we bind. ourselves,

ou heirs, executors, administrators, successors and assigns

jointly and. aeverally and. firmly by these presents:

WHSREP.S, the above bounden 'PrincipaiTt has entered.

into a contract wi the said "Diatriet" by and through ite

Board of Directors, beari date herewith, to perform

the construction of certain wells and stru.otures, to-wit:

upon certain terns and conditions in said. contract more

particularly mentioned; and.

WHEBE3, it was one of the conditions of the award.

of the. District" pursuant to whia said contract was entered

into that these presents shall be executed.;

-1-

Page 27: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

NOW, THRFOR., The cond.i tion of this. obligation.

is such that if the above bomid. 'Principal' shall in allresDeots comply with the terms and conditions of s.s.id.

contract and. his obligations thereunder, including theSpeeification&', TTProvis1ons, Proposa1, and such alter-

ation.s as may be made in specifications as herein provided.for, arid shall indemnify and save harmless the said. TtDistrictagainst or from all costs, expenses, damages, injury or lossto which the said "District may be subjected by reason ofany wrongdoing, misconduct, want of care or skill, negligenceor default, including patent infringement, on the part ofsaid 1Principal his agents or employees in. the execution orperformance of said. contract, including errors in plansThrnlskied. by the Prinoipal," and. shall promptly pay alljust claims for damages for injury to property and for laborand material incurred by such "Principals' in or about theconstruction contracted. for, then this obligation to be void;otherwise, to be and remain in full force and virtue in. law.

ny person performir labor for, or furnishingmaterial, merchandise or equipment to the TTPrincipal,lt in

or about his performance of said. contract, shall have aright of action against the TTPrinoipai" and "Surety' onthis bond for damages, In event the TTPrincIpalfl fails topay the contract price therefor.

Page 28: Jeir1x ria - University of Arizonauair.library.arizona.edu/system/files/usain/...agnetic Auto-Transformer Type Starter shi1l be 11-500 Westinghouse or equal for 3-phase 50-cycle 440-volts

WITNESS. the signature o the "Principal" and the

signature of the "Surety by

and. Its corporate seal duly attached by

hereunto affixed thiB

in th.e year 19__