    TWA TERMINAL CONSTRUCTION DETAILS

    Tunnel Plenum

    Claim & ticketlobby

    Caf

    ofce

    outgoingbaggage

    parking

    outgoingbaggage

    Caf

    outgoingbaggage

    Tunnel Plenum

    Metal Waterproong

    Vinyl Floor tile

    BaggageConveyor

    Acoustical Tile onmetal lathand plaster

    suspended cementplaster

    concrete slab

    concrete slabutility racewayutility raceway

    cement ll

    baggage scale

    plywood with laminatenish

    laminate plasticnish

    plywood nish

    vinyl tile over midgetceramic tile

    SECTION THROUGHTICKET COUNTER

    ELEVATION OF TICKETCOUNTER SECTION DETAIL

    SECTION

    SIDE ELEVATION

    FRONT ELEVATION

    Typical Cove Line

    entrance doors

    glass entrancevestibule

    cement cove base

    ceramic tile

    brace hung from brace

    built up roong

    recessed lightingxtures

    concrete slab

    cement plasteron metal lath

    furring chanels

    template channels

    carrier channels hungfrom metal brackets

    SOUTH WINGPLAN

    WALL SECTION B

    WALL SECTION A

    SECTION

  • 7/24/2019 jfk airport ,usa

    2/8

    TWA TERMINAL CONSTRUCTION DETAILS

    RECONSTRUCTION OFRUNWAY

    Instead of using asphalt , concrete wasbeing used .Asphalt, the material of choice at JFKairport, has a lifespan of ve to 10 years.Concrete's is nearly 40, but installing

    concrete costs about 10 percent moreover asphalt and takes out the runwayunder reconstruction out of commissionfor a signicantly longer time.Asphalt is typically overlayed in sections,which means part of the runway can beused for ights during construction, whileworking with concrete requires taking outthe entire runway for the length of theconstruction cycle, drastically impactingoverall airport operations, potentiallycausing those dreaded minutes andhours on the tarmac.

  • 7/24/2019 jfk airport ,usa

    3/8

    TWA TERMINAL SECTION

  • 7/24/2019 jfk airport ,usa

    4/8

    TWA TERMINAL CONSTRUCTION DETAILS

    23

    1

    5

    4

    1. ReinforcedConcrete Roof2. ReinforcedConcrete Column3. Concrete Pour Line4. Curtain Wall5. Raised walkways to

    terminalELEVATION

    EXPLODED AXON

    PLAN

  • 7/24/2019 jfk airport ,usa

    5/8

    Solar board - Flightinformation

    Midget Ceramic Tilenish

    Solar board - Flightinformation

    Mechanical Grill Vent.

    Plaster nish

    Marble Desktop

    MidgetCeramic tiles

    MidgetCeramic tiles

    Duct

    Metal Platetemplates

    Framing

    Channels

    TWA TERMINAL CONSTRUCTION DETAILS

    Solar boardPlaster nish

    Midget Ceramictile nish

    Midget Ceramic Tile nishMarble Desktop

    PARTIAL SECTION AND FINISH ELEVATION

    FINISH ELEVATION PROFILESOLAR BOARD FINISH PLAN

  • 7/24/2019 jfk airport ,usa

    6/8

    TRANSVERSE SECTION

    TWA TERMINAL CONSTRUCTION DETAILS

  • 7/24/2019 jfk airport ,usa

    7/8

    Baggagecheck

    Entrancestair

    Mezzanine Bridgeand Concrete Pillar

    Mezzanine Stair

    TWA TERMINAL CONSTRUCTION DETAILS

    Tunnel Plenum

    Claim & ticketlobby

    Caf

    ofce

    outgoingbaggage

    parking

    outgoingbaggage

  • 7/24/2019 jfk airport ,usa

    8/8

    TWA TERMINAL CONSTRUCTION DETAILS

    SOUPLA

    Typical Cove Line

    entrance doors

    glass entrancevestibule

    WALL SECTION B

    cement cove base

    ceramic tile

    brace hung from brace

    built up roongrecessed lightingxtures

    concrete slab

    cement plasteron metal lath

    furring chanels

    template channels

    carrier channels hungfrom metal brackets

    WALL SECTION A