JFK International Airport
Terminal One Redevelopment
May 31, 2019
1
New Terminal One MWBE Information Session
2
Agenda
• Welcome Remarks
• Overview of team and New Terminal One
• Project Schedule & Phasing
• Diversity & Inclusion Strategy
• Networking
3
Overview of Team
and
New Terminal One
4
The New Terminal One Team
Design Team
Financing Sponsors
4
Contractors
Airline Sponsors
Operator
Project Management Office
Confidential
Our World-Class Team
5
Two Design Delivery PhasesGMP: Owner + Design Team + Contractor
▪ Project Designation Financial Close / FONSI
DESIGN-BUILD : Owner + Contractor / Design Team
▪ Financial Close / FONSI Beneficial Occupancy
Design
Team
Developer
Contractor
DeveloperContractor
Design Team
Confidential
6
Design Team OverviewMajor Partners for Professional Design Services
▪ PGAL – Architecture / Team Management (Prime)
▪ Atkins North America – Civil Engineering
▪ Walter P Moore – Structural Engineering
▪ Syska Hennessy Group – MEPF Engineering
▪ Major Specialties – To be Selected
– Baggage Handling Systems
– Life Safety / Code / Fire Protection
– Telecommunications & Security Systems
– Hydrant Fueling Systems
– Conveyance Systems (Elevators / Escalators / Moving Walks)
– Other (Landscape, LEED, Lighting, Interiors)
Confidential
7
New Terminal One
New Terminal with Wide Body Gates
Demolition of Terminals 1, 2, and Green Garage Incorporation of AirTrain
New Ground Transportation Center
8
Aerial
View
Iconic terminal design with integrated AirTrain and improved airport connectivity 8
9Expansive frontage with multiple curbsides for easy-access passenger drop-off
Curbside
9
10
Commercial
Zone
Grand entrance into world-class commercial areas with captivating views of the airfield 10
11
Departure
Gates
24
12
Arrivals
Corridor
26
13
Project Schedule
& Phasing
14
Designation
Planning & Design
Development for GMP
Enabling Works
Phase A1/A2
Phase A3
Phase B
Date of Beneficial Occupancy
Shovel in the Ground
2018 2019 2020 2021 2022 2023 2024 2025
Dependent on Taxiway
A & B Realignment
Project Schedule
Confidential
15
Phasing Overview
A1
A2
B
C
A3
Confidential
B
16
Diversity &
Inclusion Strategy
19
Networking
Confidential
Delivering the Vision Plan for JFKCollaborative | Local | World-Class