Upload
rajan-kashyap
View
212
Download
0
Embed Size (px)
DESCRIPTION
g
Citation preview
A
PROJECT REPORT
ON
“ Human Resource Management/Payroll System ”
Submitted to
V.B.S PURVANCHAL UNIVERSITY
In partial fulfillment for the award of the degree of
Bachelor of Computer Application
Prepared By : Project Supervisor :
DIPIKA SINGH Mr.Durgesh SinghBCA 6th Semester (Assistant Professor)Roll No- 9460033
Enrollment No. PU/12/1924
2014 - 2015
Department of Computer ApplicationTechnical Education & Research Institute
Post- Graduate College, Ghazipur - 233001 (U.P.)
Certificate
This is to certify that Dipika Singh, pursuing BCA 6th Semester from Technical
Education & Research Institute, has prepared project entitled “Human Resource
management/Payroll System ” in partial fulfillment of the requirements of the degree of
Bachelor of Computer Application from V.B.S. Purvanchal University, Jaunpur, for the
session 2014-2015.
This report is based on the project work undertaken by Dipika Singh at Technical
Education & Research Institute under the supervision of Mr. Durgesh singh and fulfills the
requirement of regulation relating to the nature and standard of BCA course of V.B.S
Purvanchal Unversity ,Jaunpur,Uttar Pradesh.
I recommend that this project report may be sent for evaluation.
Durgesh Singh Ajit Pratap Singh
Assistant Professor Head,Deptt. Of Computer Application
DECLARATION
Dipika Singh, hereby declare that this project report entitled “ Human Resource
management/Payroll System” has been prepared by me under the supervision of Mr.
Durgesh Singh.
This project report is my bonafide work and has not been submitted in any form to
any University or Institute for the award of any degree or diploma prior to the mentioned
date. I bear the entire responsibility of submission of this project report.
Dipika Singh (BCA 6th Semester)
Department of Computer Application Technical education & Research Institute Post Graduate College , Ghazipur
PREFACE
The project “Human Resource management/Payroll System” is designed as the project
work of BCA 6th semester.
Problems have been solved by manually which required lot of time. Here is a system
designed to simplify the task and make it so easily to do.
The project starts with system analysis. This part focuses on the requirements analysis
& specification. It first describes the present working system. Then the problems are
identified.
After the complete analysis of present system and the problem related to old system
has been specified new system is proposed, which gives the user a better and efficient way of
managing transaction and updating his knowledge regarding the latest development.
Then we have covered topics of algorithms, mathematical foundation, and flowchart
to be easily understandable by any one.
ACKNOWLEDGEMENT
The development process of any software project owes to the hard work of a
lot of people besides the person whose name appears on the front. I take opportunity to
express me profound sense of gratitude & respect to all those helped me throughout the
duration of the project.
I express my sincere thanks to Director of TERI Mr. D. N. Singh for
providing such a environment of study in the campus.
The reliability of this project owes to the constant watchful eye of my project
guide Mr. Durgesh Singh who provides me the technical accuracy & support in the project
work. This project would never have been complete without his help & guidance.
The overwhelming response of any friends & they taken interest shown my
learned teachers, promoted more meaningful compact & comprehensive. It is a pleasure to let
you know that I have put my feeling into practice.
In addition, I want to thanks the people at Google Search Services provided
for their assistance in setting up the help, I would like to thank to the faculty, my friends &
classmates who have helped me in the completion of this project.
Place: Ghazipur Dipika Singh
BCA 6th Semester
U. Roll NO.: 9460033
INDEX OF CONTENTS
• Introduction 1-2
• Initial requirement 3
• System analysis 4-6 • Business need 7
• Objective 7
• Existing system description 8
• Proposed system 8
• Benefits 9
• Feasible study with report 10
• Software Requirement Specification 11-15 • Objective 16
• Scope 17
• Requirement 18
• Functional requirement 18
• Security requirement 19
• Output requirement 20
• Software requirement 21
• Hardware requirement 21
• Module description 22
• Software design 23-25• Software process model 26
• Designing approach 27
• High level design 28
Table schema 29• D F D
• E R diagram
• Low level design 40-41
• Coding 42-43• Programming Practice 44
• Top –Down and Bottom-Up 44
• Structured Programming 45
• Information hiding 46
• Programming Style 47-48
• Screen Shots of System 49-55
• Testing 56-59
• Testing Methodology 60-61
• Test cases 62-63
• Implementation 64-66
• Maintenance 67-69
• Bibliography & References 70-71