Development Parameters Key
Primary frontage
Secondary frontage
No building area or frontage
Rural character along A3059
Major gateway landmark seen outside site
������������� ���������������
Development plot zonesA
+93.2
+95.5
+89.7
+93.9
+92.2+95.3
+104.1
+106.3
+106.6
+102.28
+103.2
+96.9
+98.1+95.5
+94.4
+97.4 +99.6
+94.2
+91.5
Development Plots Key
All uses
��� ����� � ����� ������������
��� ����� � �����
All uses - plots subject to height restrictions to ���������������� �� ������ �����Cornwall Air Ambulance Trust (CAAT) HQ
No hotel zone where all development to be lit by low intensity obstacle lighting
Predicted platform level +/- 1m
No development zone - downwash protection covering a minimum of 30 metres from the western edge of the CAAT helipad
+98.1
I
K
J
A
B
CD
E
F
G
H
+103.0
+103.6
+105.0
+105.9
0 10 20 30 40 50 60 70 80 90 m 1:1250
30 20 10 0 20202 4040 606 808 m 1:500 / 1:200
APPENDIX 01 - Parameter Plans - ILLUasda
v5 2013
p/wind N
1:3000 @ A3
Parameter Plan - DEVELOPMENT PARAMETERS FOR PLOTS
Aerohub Business Park @ Newquay Cornwall AirportAerohub Business Park @ Newquay Cornwall Airport
A3059
SAR
Landscape Parameters Key
Bat foraging corridor (15m minimum)
Retained existing hedgerows
Planted green edge
Landscape corridor
Scrub Woodland Valley
Landscape gateway
Public square
Woodland edge corridor / wet grassland
Street trees
Landscape gateway feature
+ 93.96
+ 98.63
+ 105.1
+ 106.3
+ 98.5+ 93.8
+ 83.9
Access Key
Primary Avenue
Secondary Street
Plot Access (position may vary)
New Road Junctions
Spot height level on access
Route of SUDS
Narrowing of primary street and additional planting of landscape corridor edge
+ 93.8
0 10 20 30 40 50 60 70 80 90 m 1:1250
30 20 10 0 2020 40400 60 80 m 1:500 / 1:200
APPENDIX 01 - Parameter Plans - ILLUasda
v5 2013
p/wind N
1:3000 @ A3
Parameter Plan - DEVELOPMENT PARAMETERS FOR LANDSCAPE AND INFRASTRUCTURE
p/wind N
1:3000 @ A3
Key Note�������������������������landscape corridors and woodland edge � ���� ������������������������� �� ���roosting opportunities for bats and the installation of bird nest boxes.
Aerohub Business Park @ Newquay Cornwall Airport
1:3000 @ A3
Strategic Landscape Requirement Key
Zone Green
Zone Orange
Zone Turquoise
Zone Pink
Zone Blue
Zone Yellow
Potential plot division
Zone Red
0 10 20 30 40 50 60 70 80 90 m 1:1250
30 20 10 0 202022 404040 60 80 m 1:500 / 1:200
APPENDIX 01 - Parameter Plans - ILLUasda
v5 2013
p/wind N
1:3000 @ A3
Parameter Plan - STRATEGIC LANDSCAPE, DRAINAGE AND HABITAT MANAGEMENT DELIVERY PLAN
p/wind N
Important References
� Design Code 01 - Primary Avenue� Design Code 02 - Secondary Street� Design Code 04 - Site Edges� Design Code 06 - Natural Environment
Key NoteAny building of a section of highway within a coloured zone (whether running in its full length or not) will trigger as an absolute minimum the ��� �����������������������������!����management requirements for the entirety of that zone. The detail of which is indicated on the �� ������ ��� ������������"����# ��$�%���&������������ ����� ���������� the Local Development Order.
Aerohub Business Park @ Newquay Cornwall Airport