REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS 153 Electrical Arrangements to the Service Buildings at Various Location in Chennai July - 2011 Supply and Erection Electrical Products and Wiring 152 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Jan - 2011 Supply and Erection of Electrical, Instrumentation and Control System 151 Electrification of DAE – UGC – CSR Building Jan - 2011 Design Manufacturing, Supply, Installation, Testing, and Commissioning of Electrical systems. 150 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Heat Tracing 149 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Fire Alarm Panel 148 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Electric Control System and DCS System

KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

Embed Size (px)

Citation preview

Page 1: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

153

Electrical Arrangements to the Service Buildings at Various Location in Chennai

July - 2011 Supply and Erection Electrical Products and Wiring

152

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Jan - 2011 Supply and Erection of Electrical, Instrumentation and Control System

151

Electrification of DAE – UGC – CSR Building

Jan - 2011 Design Manufacturing, Supply, Installation, Testing, and Commissioning of Electrical systems.

150

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Heat Tracing

149

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Fire Alarm Panel

148

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Electric Control System and DCS System

 

Page 2: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST   

SL NO CUSTOMER PROJECT DELIVERY REMARKS

147

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of E-House and Instrumentation

146

Electrical and Automation Panel

Nov - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels

145

Building Management Systems

Nov - 2010 Supply and Installation of BMS

144

Automation System for Air Conditioning Equipments

Nov - 2010 Design, Manufacture, Supply, Installation, Testing , Commissioning and Training of Automation System.

143

Electrical System for RECLAIMER

Nov - 2010

Design, Engineering, Supply, Erection and Commissioning of Electrical System.  

 

 

 

Page 3: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

142

Control System Upgradation for EAF – III Project

Nov - 2010 Design, Supply, Erection, Testing, Commissioning of PLC based Control System

141

Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Vedanta Aluminum Limited, Orissa )

Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

140

Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Bellary Thermal Power Station, Karnataka Power Corporation )

Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

139

Electrical and Control systems for Stacker & Reclaimer ( Bellary Thermal Power Station, Karnataka Power Corporation )

Oct 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

138

6th Oxidizer Line at Cristal Pigment Plant

Sep - 2010 Detail Design Engineering, PDMS Modeling of Mechanical and Piping.

137

 

 

  

Control System for Nitrogen Package

Sep - 2010 Design, Engineering and Commissioning of PLC and Power Distributed Panels

Page 4: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST   

SL NO CUSTOMER PROJECT DELIVERY REMARKS

136

Electrical Works at LOBS Project Site

Aug 2010 Supply, Installation, Testing & Commissioning of LT Switchgears ( Excluding Supply ), Cabling, Lighting etc at LOBS Project Site

135  

  

PLC Based Control System for Fuel Recovery System

Jul - 2010 Design, Engineering and Commissioning for PLC, MCC and VFD Systems

134

 

ROC Plant

Jun - 2010

Design and Detail Engineering of Electrical, Instrumentation and control system

133

Electrical and Automation Panel

Apr - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels.

132

OGIP IK WELLHEAD PLATFORM

Apr - 2010 Site survey, design and detail engineering for modification of Existing E-House with deck extension

131  

   

OGIP SD WELLHEAD PLATFORM

Mar - 2010 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

Page 5: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

130

GOHDS REVAMP PROJECT AT MRPL

Mar - 2010

Supply and Installation of Electrical & Instrumentation work

129

B193 – Detailed Engineering

Feb - 2010 Pre-Bid Engineering support

128

D1 Development Project

Feb - 2010 Pre-Bid Engineering support

127

Tank Level and Temperature Measurement System

Jan - 2010 Design, Engineering, Commissioning and Supply of Instrumentation and PLC Panel

126

B193 Process Platform

Jan - 2010 Pre-Bid Engineering support

125

PLC System

Jan - 2010

Supply, Installation, Commissioning and Testing of PLC system

124

 

Electrification of Modified Hall

Jan - 2010

Electrical Works

123

 

Drive Panels for Printing Machines - 47 Nos.

Dec - 2009

Manufacturing and Supply

 

Page 6: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST   

SL NO CUSTOMER PROJECT DELIVERY REMARKS

122

Compression Test Bed Facility at SIEMENS, Vadodara

Dec - 2009

SITC of Electrical and Instrumentation Package

121

HRDC Building

Dec - 2009

Electrical Works

120

, KKNPP

Starter Panel

Nov - 2009

Manufacture, and Supply of Stater Panel

119

,KKNPP

Copper Bus Bar

Nov- 2009

Supply,Fabrication & Installation of Copper Bus Bar

118

Electrical System for Wagon Tippler

Nov - 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical Systems.

117

, DAE , KALPAKKAM

Power Control Center

Nov - 2009

Manufacture,Supply,Erection, Commissioning and Testing of Control panel

116  

Electrical and Control systems for Stacker & Reclaimer (Paradeep project of ESSAR STEEL)

Nov - 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

115

6WPP Well Head Platform

Oct - 2009 Pre-Bid Engineering support

 

Page 7: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST   

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

114

  

Orient Cement Plant

Oct - 2009

Manufacture and supply of MCC Panel

113

Orient Cement Plant

Oct - 2009

Manufacture and supply of Control desk

112

Automatic Cotton Feeding System

Oct - 2009

Design, Engineering and Supply of PLC System

111 INS KATTABOMMAN

Modification of compressor control system

Sep - 2009

Manufacture and supply of compressor control system

110 EXCEL TEXTRONICS

VFD Panel

Aug - 2009

Manufacture and Supply of VFD Panel.

109

Drive Panel

Aug - 2009

Manufacture and Supply of Drive Panel.

108

B-193 Well head

Aug - 2009

Pre-Bid Engineering support

107

Automation for 10 MW Bio Mass Power plant

Jun - 2009

Design , Engineering, Supply, Erection and Commissioning of DCS system

Page 8: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

106  

 

Fertilizer &Chemical Plant

May -2009

Design and Detail Engineering & supply of PLC control system

105

OGIP IB WELLHEAD PLATFORM

Apr - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

104

OGIP SR WELLHEAD PLATFORM

Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

103

OGIP NH WELLHEAD PLATFORM

Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

102

 

Electrical and Control systems for Paddle Feeder. (Santaldih Thermal Power plant)

Apr- 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

101   

 

 

Automation for Amine Sweetening Plant

Apr - 2009

Design , Engineering and Commissioning of PLC system

100

OGIP RS2 WELLHEAD PLATFORM

Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

Page 9: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

99

OGIP SE WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

98  

   

OGIP N4 WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

97

OGIP NJ WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

96

OGIP NV WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

95

OGIP SP WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

94  

  

OGIP NM WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

93

OGIP SB WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

Page 10: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

92

OGIP IF WELLHEAD PLATFORM

Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

91

Electrical Distribution system with DG sets

Mar- 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical distribution systems and DG sets.

90   

Unit - 400

Mar- 2009

Design and Detail Engineering of Electrical, Instrumentation and control system

89

   

OGIP RS11 WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

88

OGIP NO WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

87

   

OGIP NW WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

86

OGIP SS WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

 

 

Page 11: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

85

   

OGIP SJ WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

84

OGIP SN WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

83

OGIP IG WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

82

OGIP IA WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

81 JEYA VISHNU TEX PROCESSORS PVT LTD

PLC based water level control panel

Feb - 2009

Manufacture and Supply of PLC Control Panel.

80

 

Automation for Sinter Plant

Feb - 2009

Design , Engineering , Erection and Commissioning of PLC system

79

OGIP SY WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

 

 

 

Page 12: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

78

OGIP SM WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

77

OGIP N8 WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

76

OGIP N9 WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

75

 

Drive Panels for Printing Machines – 21 Nos.

Jan - 2009

Manufacturing and Supply

74

Drive Panels for process Pumps

Jan - 2009

Design ,Engineering , Installation, Erection and Commissioning

73

MHN Process Platform

Dec- 2008

Pre-Bid Engineering support

72   

6th Chlorinator

Dec - 2008

Design and Detail Engineering of Electrical, Instrumentation and control system

Page 13: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

71

Automatic cotton feeding system

May - 2008

Design, Engineering , Installation, Erection and Commissioning 

70

Digital Counting system for Castings

May-2008

Design, Engineering , Installation, Erection and Commissioning

69

 

Automation of Cup Cake Machine

Mar-2008

Design, Engineering , Installation, Erection and Commissioning

68 GLOBAL CONVEYOR

Automation of Material Handling System

Feb-2008

Design, Engineering , Installation, Erection and Commissioning

67

Automatic cotton feeding system

Feb-2008

Design, Engineering , Installation, Erection and Commissioning of PLC System

66

 

Design and Detail Engineering of ONGC - OGIP Power to ESP

Jan-2008/ Mar-09

Design and Detail Engineering for Offshore Grid interconnectivity Project comprising of Electrical Instrumentation, Structural modification Telecommunication, Catholic Production, JTube Design, SCADA System etc.,

65

Control Panel for Ready-mix Concrete preparation plant

Nov-2007

Design, Engineering , Installation, Erection and Commissioning of PLC System

64

 

Automatic cotton feeding system

Aug-2007

Design, Engineering , Installation, Erection and Commissioning of PLC System

Page 14: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

63

Automatic cotton feeding system

July-2007

Design ,Engineering , Installation, Erection and Commissioning of PLC System

62

G.KUPPUSWAMYNAIDU MEMORIALHOSPITAL 

Automation control panel for chillers p/c and plant room equipments

July-2007

Design ,Engineering , Installation, Erection and Commissioning of PLC System

61

 

2.5MW Captive Power Plant

July-2007

Design , Engineering , Erection and Commissioning of DCS 

60

 

10MW Bio-Mass Power Plant

July-2007

Design , Engineering , Erection and Commissioning of DCS

59

 

3 MW Captive Power Plant

May-2007

Design , Engineering , Erection and Commissioning of DCS

58   

 

 

SAXI – TEG regeneration package

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)

57   

  

PURE GROUP -Modec TEG Package 

June-2007

13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator

56

FRADE FPSO – TEG regeneration package 

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System

 

 

Page 15: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

55

SBM / CHEVRON -FRADE FPSO Desander and Sand Jetting water feed pump package 

June-2007

Design & Enginnering of sand removal system

54   

 

PETROBRAS-GENERIC FPSO GAS

Aug-2007

Detailed engineering of Flare and Drain Module,Water Injection Module and Gas dehydration/Fuel gas module.

53

SRKP Field Development – TSIOC/Modec

Aug-2007

FPSO Topsides Basic design and Engineering - production and treatment of 25,000 BOPD

52  

 

 

SHELL BC-10 FPSO-TEG Package

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System(45 MMscfd,11USgpm (99.78% wt TEG conc.)

51

RAS GAS OFFSHORE EXPANSION PROJECT PH-2

Apr-2007

Design engineering of condensate and water strainers (Basket strainers) 

50

ARMADA PEKASHA FPSO

Feb-2007

Existing system review and design 

49

PETROBRAS- FPSO OPPORTUNITY OIL

Jan-2007

Gas comp capacity of 3,500k m3/day and De-sulphated water inj capacity of 22k m3/day.

 

 

Page 16: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

48

SBM Saxi Bataque TEG Package

Dec-2006

Design and Engage of Gas Dehydration and TEG Regen Sys (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)

47

SBM/Chevron- FRADE FPSO – Gas Dehydration and TEG Regeneration package

Dec-2006

Design and Engineering of Gas Dehydration and TEG Regen Sys (116.6 MMscfd, 18 USgpm (99.5% wt TEG conc.)

46

PETROBRAS- FPSO OPPORTUNITY OIL

Sep-2006

FPSO Topsides design Engg & (Bidsupport)prodandtreatment of 16k m3/day, Gas comp capacity of 3,500k m3/day & De-sulphated water inj capacity of 22km3/day

45

KIZOMBA- C FPSO MONDO

Sep-2006

Design and Engineering of Gas Dehydration and TEG Regeneration System

44

Premier Oil MERU Project

July-2006

Design, Review and Optimization of Marine Energy Resource Unit (MERU)

43

 

POLVO-FPSO – COTP 500BPD

May-2006

Design, Review and Optimization of Crude Oil Topping Plant (COTP)

42 Global Techno Systems Engineering

EPCC for MOGA and Transit Line

Mar-2006

Produced water treatment system

41

MODEC INTERNATIONAL LLC / PETROBRAS PRA-1 FSO Project- Fuel Gas Skid Package

Feb -2006

13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator

 

 

Page 17: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

40

SHELL(SSB)- F13 Glycol Dehydration package 

Mar-2006

720 MMSCFD gas flow/ 132 USgpm (98.8% wt Glycol concentration)

39

Ujung Pangkah Development Project Gas Dehydration and TEG Regeneration Package

July-2006

148.8 MMSCFD gas flow/ 30USgpm (98.98% wt Glycol concentration)

38 TESMA/Singapore

PETROCHINA-TBA/TBC- Field Development

April-2006

FPSO Topside Process and Utilities

37 JORD International

PTTEP Arthit Field Development Central Facilities

Nov-2005

HP Production Separator Sand Jet Design case

36

COOEC

HZ21-1 Development Project

Aug-2005

Commissioning services

35

Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil 

July-2005

Separators Design Assistance

34

SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia

Dec-2005

FEED for gas Processing Facility

33

FPSO Kikeh-Murphy Sabah Oil.Ltd. - Chemical Injection Package

Nov-2005

Chemical Injection System

 

 

Page 18: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST   

SL NO CUSTOMER PROJECT DELIVERY REMARKS

32

FPSO Kikeh-Murphy Sabah Oil.Ltd.- Nitrogen Generator Package and Nitrogen Intensifier

Nov-2005

Membrane Technology, N2 purity 95%, 100 Nm3/hr

31

FPSO Kikeh-Murphy Sabah Oil.Ltd.- Gas Dehydration And TEG Regeneration Package

Nov-2005

141 MMscfd / 19 USgpm( 99.8% Wt Glycol Concentration)

30 CACT OG, China.

Feasibility Study for Marginal Field Development

Dec-2005

Feasibility Study

29

Panyu 4-2/5-1 Well head Platform Modifications.

Sep-2005

Pre-Commissioning and Commissioning Procedure & IOM

28

OKUME TLP – Modec International

May-2005

Methanol Injection System

27

OKUME TLP – Modec International

May-2005

Methanol Injection System

26

OKUME TLP – Modec International

May-2005

Chemical Injection System

25

OKUME TLP – Modec International

May-2005

Chemical Injection System

 

Page 19: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

24

 

SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia

May-2005

Sea Water Treatment And Deaeration- Conceptual Design

23

Rong Doi Field Development/Vietnam For Korean National Oil Corporation

June-2005

201 MMscfd / 18 USgpm( 99.0% Wt Glycol Concentration)

22

Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil

May-2005

121 MMscfd / 7.5 USgpm( 99.5% Wt Glycol Concentration)

21

PC Myanmar (Hong Kong) Ltd

FEED

Mar-2005

Pipeline Heaters

20

Back Processing Facility Block 51

Nov-2004

On Shore Processing Facility, Tank Form, Utilities Etc.

19

D1 WWIP

Sep-2004

Fine Filters Package

18

Sumatec Corporation Sdn.Bhd

Rehmat Gas Processing Facilities/Bid Support

June-2003

2 x 62 MMscfd / 10 gpm

17

/NanHaiwest

FPSO (Hai Yang She You 111) Debottlenecking Project

June-2004

FPSO Capacity Upgrade Studies

 

Page 20: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

16

PCSB –Fuel Gas Package- Bid Support

May-2004

Fuel Gas Package

15

BR-E CO2 Topsides Talisman Malaysia Limited

Dec-2004

Condensate Stabilization And Flash Gas Recovery

14

Basis and Detailed Engineering of BAOBAB FPSO Gas Processing Module

May-2004

Gas Dehydration, Gas Hydrocarbon Dew point Control, Gas Metering

13

Basis and Detailed Engineering of BAOBAB FPSO Separation Packages – 4 Skids

May-2004

RVP, BS&W, OIL IN WATER

12

Gas Dehydration And TEG Regeneration Facility -Venezuela

July-2003

2 x 17 MMscfd / 3.4 gpm

11 CPOC/Thailand

CO2 Removal Facility/Bid Support

June-2003

468 MMscfd, CO2 Mole frac.0.4335

10

Training for IBA / EXXON Mobil - Gas Dehydration And TEG Regeneration System/Bid Support

April/May 2003

Training – Operators and Engineers

9 Prai Power Sdn.Bhd.

TENAGA NAZAR - Trouble Shooting/ (350MW Combine cycle gas turbine project Prani, Pulau Pinang .Malaysia)

Feb-2003

Trouble shooting of Diesel Handling System

 

 

Page 21: KEAS ReferenceList Jan  · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th

REFERENCE LIST  SL NO CUSTOMER PROJECT DELIVERY REMARKS

8

Salman Oil & Gas Field, Gas Dehydration And TEG Regeneration System 

July-2003

2 x 300 MMscfd / 55 GPM

7

KINARUT Development - ERB West Tie - in    

May-2003

150 MMscfd / 6 GPM

6

MISC - FPSO Project- Gas Dehydration System

May-2003

60 MMscfd / 14 GPM

5

BOABAB Field Development-FPSO Topsides / CNR International (Côte d' Ivoire) S.A.R.L.- Bid Support

Nov-2003

90,000 BPD with 78% Water Cut/ 64 MMscfd/ 9 GPM

4

Espadarte FPSO Brazil - Trouble Shooting of Gas Dehydration Facility

Dec-2003

100 MMscfd

3 General Electric/

Turbine Encloser Structural General Arrangement

Dec-2003

Engineering Support

2

OKUME & OVENG Field's - FPSO Topsides Triton Eqaterial Quinea Inc./Bid Support 

Oct-2003

230,000 BPD with 60% Water cut. Gas Flow Rate 70 MMscfd

1 Santa Fe Energy Resources Of China,Ltd. / China Offshore Oil Nanhai West Corporation

Process Design Engineering of PANYU FPSO Topsides

May-2002

220,000 BPD with 0-90% Water Cut, Highly Waxy, High Dew point