AGENDA KICK OFF
MATERIALPREPARATION
1. PROLOG OLEH BPK ANANDHA
HINDARTO – 5 MENIT
2. PROLOG OLEH BPK AGUNG INDIARTO – 5MENIT
3. PROLOG OLEH BPK BERLIANDI
KUSUMAHADI – 5 MENIT
4. SERAH TERIMA PEKERJAAN – 5 MENIT
5. RAMAH TAMAH – 10 MENIT
8/17/2019 Kick Off 120615
2/6
MATERIAL
PREPARATION DEPT.(DEPT. PERSIAPAN BAHAN)
1. RANTAI PASOK KOMPONEN SAAT INI
2. RANTAI PASOK KOMPONEN SETELAH
KICK OFF
3. HUBUNGAN DENGAN DEPT. LAIN
8/17/2019 Kick Off 120615
3/6
1. RANTAI PASOK KOMPONEN SAAT INI
RAWMATERIA
L
SUBCON
T
FORMIN
G :•
BENDING• ROLLING•
MACHININ
G
SUB ASS
ASS
FULL ASS
INSTALLATI
ON
PAINTING
CUTTING CUTTINGDRILLIN
G
MFG
LOGISTIC
PROSESKOMPONEN
8/17/2019 Kick Off 120615
4/6
2. RANTAI PASOK KOMPONEN SETELAH
KICK OFF
RAW
MATERIA
L
SUBCON
T
FORMING :
•
BENDING• ROLLING•
MACHININ
G
SUB ASS ASS
FULL ASS
INSTALLATI
ON
PAINTING
CUTTING
CUTTING
DRILLIN
G
MFGLOGISTIC
MATERIAL PREPARATION
PROSES
KOMPONEN
8/17/2019 Kick Off 120615
5/6
3. HUBUNGAN DENGAN DEPT. LAIN
8/17/2019 Kick Off 120615
6/6
SEKIAN DAN TERIMA