KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 20 05 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute of Energy, Vietnam

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

Embed Size (px)

DESCRIPTION

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam MAIN OBJECTIVES Krong Pa 2 hydropower plant is to supply partly electricity to Kbang district with annual average electricity production of 24.5 x 10 6 KWh The project is expected to contribute to impulse for local economic and social development

Citation preview

Page 1: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1

krong pa 2 hydropower PLANT

FEASIBILITY STUDY, VIETNAM 2005Tran Thanh Lien, Institute of Energy, Vietnam

Page 2: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 2

GENERAL

Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river.

The dam site is located in DakRong commune, KBang district, Gia Lai province, Vietnam

Page 3: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 3

MAIN OBJECTIVES

Krong Pa 2 hydropower plant is to supply partly electricity to Kbang district with annual average electricity production of 24.5 x 106 KWh

The project is expected to contribute to impulse for local economic and social development

Page 4: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 4

ECO-SOCIAL CONDITIONSIn this area, mainly ethnic minorities of Ba Na, E De, etc live with low density. Local life is poor, local inhabitants mainly earn their livings by husbandry and exploitation of forest products. Their life will be improved (by creating jobs, processing agricultural products, etc.) when the hydropower plant comes in. The area owns convenient access road to the site. Road No. 669 A passes through powerhouse area and is 200 m far from the powerhouse. Access road to the dams is sloped gently along the riverside and convenient for construction. The distance from powerhouse to the dams is 2.5 km

Page 5: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 5

LAYOUT OF HEADWORKS

Page 6: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 6

MAIN FEATURES OF PROJECTCatchment parameters

Catchment area: 99 km2

Annual average flow: 2.71 m3/sFlood discharge P = 0.2%: 1,008 m3/s

Flood discharge P = 1.0% 733 m3/sFlood discharge P = 5.0% 478 m3/s

Flood discharge P = 10% 378 m3/s

Page 7: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 7

MAIN FEATURES OF PROJECTReservoir parameters

Full Supply Level, FSL: 979.0 m

Minimum Operating Level, MOL: 977.5 m

Total storage capacity: 82.38 x 103 m3

Active storage capacity: 61.31 x 103 m3

Page 8: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 8

MAIN FEATURES OF PROJECTDam and Spillway parameters

DAM• Dam type: Concrete Gravity• Crest elevation: 985 m.a.s.l• Crest length: 85.83 m• Max height: 9.52 m

SPILLWAY• Sill elevation: 979 m.a.s.l• Spillway Design Discharge: 1,008 m3/s

• S

Page 9: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 9

MAIN FEATURES OF PROJECTWaterway parameters

INTAKE• Crest elevation: 985 m.a.s.l• Sill elevation: 975.48 m.a.s.l• Number of intake gates: (bxh) 1 unit (2x1.8) TUNNEL• Length: 2,420 m• Cross section dimension (bxh): 2 x 1.8PENSTOCK• Inner Diameter: 1 m• Length: 824 m

• I

Page 10: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 10

CROSS SECTION OF POWER STATION

Page 11: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 11

MAIN FEATURES OF PROJECTPower Station parameters

Install Capacity: 5.80 MWFirm Capacity: 0.88 MWNumber of units: 2 unitsType of Turbine: FrancisMax Water Head: 267.96 mDesign Water Head: 249.90 mTurbine Design Discharge: 2.80 m3/s

Page 12: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 12

DESIGN WORK PROGRESS

Under Vietnamese standard, TCXD VN: 285 - 2002, based on the design parameters as FSL of 979 m, dam height of 9.52, and install capacity of 5.4 MW, the Krong Pa 2 hydropower project should be project at level III.Based on the previous studies on topographic and geological conditions at project site, two alternatives 1&2 are compared to select the best dam site.Alternatives of FSL will be either 978 m or 980 m, with daily regulation or non- regulation. Consideration for alternatives of install capacity and number of units.

Page 13: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 13

Main Civil Work (1)

Items Unit Volume

1 Rock and earth excavation

Thousand m ^3

275.675

2 Rock and earth fill Thousand m ^3

6.334

3 Structure Stone Thousand m ^3

2.307

Page 14: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 14

Main Civil Work (2)

Items Unit Volume

4 Concrete Thousand m ^3

10.309

5 Reinforced concrete

Thousand m ^3

0.420

6 Cement injection boring

Thousand m ^3

0.457

Page 15: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 15

INTERCONNECTION Current situation of power system in K'Bang district

At present, K’Bang is supplied electricity with 22kV network from feeder to K’Bang substation of 22 km length, AC-70 line. K’Bang substation owns three feeders of 22kV supplying electricity to the communes, including Dak Rong which supplied with electricity from feeder of 474 with the length of 40 km, AC-70 and AC-50 line. Currently, P max of entire district reaches 2600kW .

Page 16: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 16

INTERCONNECTIONPower system development plan up to 2020 in

K'Bang district Transformer of 110/35/22kV- 16MVA is planned to install in K’Bang. The transformer both supplies the district with electricity and transmits electricity from 13 MW-Ka Nak, 5.8 MW Krong Pa 2 hydropower stations to national power grid. It will meet the district’s power demand with electricity through 22 kV and 35 kV power network.At Plan on Power Development of Gia Lai province period 2004-2010 perspectives up to 2015 prepared by Institute of Energy, Pmax is forecasted to reach 3610kW by 2005 and 5700kW by 2010 .

Page 17: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 17

INTERCONNECTIONInterconnection plan for Krong Pa 2 project

From Krong Pa 2 hydropower project, the line goes along the road No. 699, passing through the communes of Dak Rong, Son Lang, So Pai, Xa Dong and K’Bang village to 110kV K’Bang transformer

The expecting line is about 55km, it will pass through the smoother area. Almost line is closed to the road, thus convenient for installation and operation.

Page 18: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 18

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Physical environment. construction of KrongPa 2 hydropower project will give inconsiderable impact on physical environment. Reservoir bed does not cover any industrial minerals Ecological environment Krong Pa 2 hydropower project does not give any bad impact on ecological environment and gives insignificant ones on biological diversification. As the small reservoir, the impacts on surrounding are inconsiderableSocio-economical situation Annually, Krong Pa 2 hydropower project will supply national power grid with its electricity of 24.48 x 106 kWh /year, making significant contribution to socio-economic development.

Page 19: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 19

CONSTRUCTION SHEDULE

Krong Pa 2 hydropower project is planned to construct within 2.5 years, 6 months among them will be spent for preparation.

Page 20: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 20

TOTAL INVESTMENT CAPITAL

Total investment cost (not including IDC) 100.58 billion VNDof which:1. Construction:52.72 bil. VND2. Equipment: 31.10 bil. VND3. Other cost: 7.62 bil. VND4. Contingency: 9.14 bil. VND

Total investment capital: 107.55 billions VND

Page 21: KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 1 krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005 21

CONCLUSION

Based on calculations in the Fs it may be concluded that the proposed development of Krong Pa 2 Hydropower Project would be economically viable and friendly with environment.