Page 1: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies
Page 2: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

2

31

32

33

Overview of China Southern Power Grid

Actions for Power Supply Reliability Enhancement of CSG

Further Solutions for Power Supply Reliability Enhancement of CSG

Page 3: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies
Page 4: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

4

China Southern Power Grid Co. Ltd(CSG) was established on 29th December, 2002.

The business of CSG covers five provinces, i.e. Guangdong, Guangxi, Yunnan, Guizhou and

Hainan. Also it is interconnected with Three Gorge hydropower station, Hong Kong, Macao and

other areas related. It supply electricity to 230 million people over 1.02 million square kilometers.

CSG has been one of the global top 500 enterprises for 9 years successively. It ranked the 115th

in 2014.

Vietnam

BurmaBurma

Macao

Hong Kong

ThreeGorge

LaosLaos

Page 5: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

5

•• The voltage of 110kV and the above number of substations : The voltage of 110kV and the above number of substations : 38423842•• The voltage of 110kV and the above transmission line :The voltage of 110kV and the above transmission line :182673km182673km

±800kV DC 2787km, 2%±800kV DC 2787km, 2%

±500kV DC 5498km, 3%±500kV DC 5498km, 3%

500kV 33849km, 19%

500kV 33849km, 19%

220kV 59216km, 32%220kV 59216km, 32%

110kV 81331km, 45%

110kV 81331km, 45%

±800kV 4, 0.1%±800kV 4, 0.1%500kV (including

±500kV ) 118, 3.07%500kV (including

±500kV ) 118, 3.07%

220kV 707 18.04%220kV 707 18.04%

110kV 3013 78.42%110kV 3013 78.42%

•• TTotal installed capacity : otal installed capacity : 225.39GW225.39GW

Thermal:52.8%Thermal:52.8% Nuclear:2.8%Nuclear:2.8%Wind:0.7%Wind:0.7%

Others:0.1%Others:0.1%

Hydro:42.1%Hydro:42.1%

Pump & Storage:1.5%Pump & Storage:1.5%

By the end of 2013By the end of 2013 Peak Load of CSG and Each Province by the end of Aug, 2014, (GW)

2014/7/23

2014/1/13

2014/5/30

2014/1/12

2014/1/9

2014/7/10

Fig. Transmission line Fig. Substations

Number of Customers

Page 6: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

6

YunnanGuizhou

Guangdong

Hainan

Long DistanceLong Distance

Ultra High VoltageUltra High Voltage

Bulk CapacityBulk Capacity

Hybrid Operation of AC/DCHybrid Operation of AC/DC

Guangxi

Incoming side total:35.3GW

18.8GW

8.9GW

ThreeGorge

Data: Until Aug., 2014Data: Until Aug., 2014

3GW

Page 7: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

7

110kV and above Generation and Transformation

Equipment

35kV and below Primary

Equipment

Secondary and Communication

Equipment

Others

110kV and above Transformation

Equipment

CSG Assets

Asset:222.2Billion

Asset:152.8 Billion

Asset:41.9Billion

Asset:124.2 Billion

Asset:158.9 Billion

Assets of distribution network accounts for 32% of CSG.(CSG Total original value of assets : 700 Billion RMB)

Page 8: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

8

Overview of CSG Distribution Network Overview of CSG Distribution Network (Total equipment quantity+ electricity quantity by the end of 2013)

Number of feeder

Length of line/km

Number of transformer

Total capacity of transformer

/MW

Electricity/billion kWh

Load/MW

Guangdong 23665 219622 455562 175829 473 84073

Guangxi 5589 103353 164326 34127 100.2 16535

Yunnan 8253 157858 243326 40414 109.3 17524

Guizhou 6058 139453 195338 32113 100.9 17318

Hainan 1687 27277 43098 10367 19.7 3164

Guangzhou 5127 30737 77856 47517 67.3 13117

Shenzhen 5979 25653 74725 41887 71.3 13867

CSG CSG TotalTotal 5635856358 703953703953 12542311254231 382253382253 809.2809.2 165598165598

Page 9: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies
Page 10: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

10

(1)Evolution of CSG Power Supply Reliability

Note AIHC-1: Customer Average Interruption Duration Index

Hou

rs/(

Cus

tom

er*y

ear)

The ice disaster reduced the reliability at 2008.

Page 11: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

11

(2) Comparison Among Main Cities in China

Hou

rs/(

Cus

tom

er*y

ear)

Note AIHC-1: Customer Average Interruption Duration Index

Fig. 2013 AIHC Comparison Between Level-A Power Supply Companies of CSG and Other Main Cities

Source: Conclusion from National Energy Administration of China

Page 12: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

12

(3)Comparison Between Main Cities within CSG and Other Cities in Advanced Countries

Conclusion:

CSG is committed to power supply reliability enhancement !

(4)CSG Made Benchmarking with Other Companies in

Advanced CountriesSAIDI(System Average Interruption Duration Index)

(ho

urs/

cust

omer

*yea

r) Close to international

advanced level

International advanced

average Level

Paris London Milan Guangzhou

Shenzhen

Haikou

Kunming 2013 China

Average

Have gap

Page 13: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

13

(5) Main Idea

Page 14: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

14

(6) What We Have Done.Classification of Load and AreasOptimization of network structure

Standard Design Distribution AutomationNew Equipments and Systems

Integrated Overhaul ManagementLive-Wire OperationDifferentiated O&M

Demand Side ManagementElectricity Utilization Service

Information Integration of Distribution and MarketingEmergency Management

Optim

ize Entire Process

Page 15: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

15

Grades  Ultra grade First grade Second grade Third grade

Standard International  city Capital of  provinces and other major city

Other city, where the state government located County

Note:1. International  city:Guangzhou, Shenzhen.2. Major city: Foshan, Dongguan, Zhuhai, Nanning, Guilin,  Liuzhou, Kunming, Qujing, Honghe, Guiyang, Zunyi,     Haikou, 

Sanya.3 .Other city can develop to international  city or major city.

Grades  Class A Class B Class C Class D Class E Class F

Ultra grade Central area or≥30MW/km2

General urban area or 20‐30MW/km2

Suburbs and towns and 10‐20MW/km2 Suburbs and towns 

and  5‐10MW/km2Town or

1‐5MW/km2 County

First grade ≥ 30MW/km2 Central area or20‐30MW/km2

General urban area  or 10‐20MW/km2

Suburbs and towns and  5‐10MW/km2

Town or1‐5MW/km2 County

Second grade ‐‐‐ 20‐30MW/km2 Central area or10‐20MW/km2

General urban area or 5‐10MW/km2

Suburbs and towns or 1‐5MW/km2 County

Third grade ‐‐‐ ‐‐‐ 10‐20MW/km2 County town or5‐10MW/km2

Town or1‐5MW/km2 County

•Dividing Regions into Four Grades

•Dividing Areas into Six Classes

Different grades and classes, different reliability planning

Page 16: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

16

• Optimization of network structure

• Distribution network meshed design

Fig. Structure optimization by typical wire-connection in Guangzhou

Fig. Meshed grid in Luohu district of Shenzhen

The network structure is simplified

Load transfer scheme is flexible

Operation is reliable

Possible load transfer ratio increased

Schedule power outage time: 2min

Recovery time of non-fault zone: 60min

Current structure Optimized structure

Page 17: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

17

Detailed design

Construction drawings design

preliminary design

feasibility study

Increasingdetail and depth design

G1

G2

G3

G4

(1) Standard Design Frame G4

Establish unified construction standards

Copy homogeneous construction projects

Construction period is shortened

Project quality is guaranteed

Interruption Duration is reduced and reliability is improved

Page 18: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

18

(2) Project Management•WHS operation standardsW: Witness PointH: Hold PointS: Standby Point

Improve project quality

Page 19: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

19

(3) Material procurementa. Materials category optimization

b. Quality control of the entire processCase: key point control strategy of GIS manufacturing in Guangzhou utility

Key point control strategy

1. At least 200 times operation test on breakers, isolation switches and ground switches in factory2. Replace the defective parts of the GIS after the voltage withstand test3. At least 3 times lightning impulse test if the rated voltage is great than 252kV

Discovered problems

1. 64 items equipment manufacturing problems in first half year of 20132. 12 items of serious problems3. The significant defect may cause 13 accidents

Benefit Analysis

1. Saving cost of 23 million RMB.2. Saving the possible loss of electricity 312MWh

No.Materials category Number of types

Originalquantity

Optimized quantity

The Optimized ratio(%)

1 Lines: ≥110kV 6 152 65 42.8%

2 Lines & Cables: 10‐35kV 4 385 45 11.7%

3 LV lines 4 977 96 9.8%4 10kV switches 6 378 95 25.1%

5 10kV‐35kV transformers 7 242 111 45.9%

6 total 27 2134 412 19.3%

Materials category optimization results 10kV‐35kV XLPE cables types

No. types SIze

1 YJV22 3X70

2 YJV22 3X120

3 YJV22 3X240

4 YJV22 3X300

5 YJV22 3X400

Page 20: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

20

(4) Technology Roadmap of Distribution Automation

Primary TargetEnhance Power Supply

Reliability

Construction Thoughts ConcisePracticalEconomy

Implementation Approach 1.Fast fault isolation2.Reduce fault influenced areas3.Auto-restore the non-fault areas4.Remote control and reduce on-site operation time

Achievements1.Extended to 39 Cities.2.Covered 8555 distribution lines.3.Used 64000 distribution automation terminals

Page 21: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

21

(4) Effects of Distribution AutomationCase 1:Reduce average time for fault location.Case 1:Reduce average time for fault location.

Hou

rs p

er f

ault

Case 2: Reduce average time for load transfer on 10kV feeders.Case 2: Reduce average time for load transfer on 10kV feeders.

1 hour

0.2 hourBefore DA Reform

After DA Reform

Maoming City0.5 hour

0.1 hourBefore DA Reform

After DA Reform

Guiyang CityTwo Typical Cases

Page 22: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

22

(5) Research and Applications of New Equipments and Systems

To improve reliability and reduce interruption time

Distribution Automation

Page 23: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

23

(1) Integrated Management of Overhaul with Service Interruption2011-2013 Customer Average Planned Interruption Duration

Analysis (Unit:Hours)

Power Rationing

Main Grid Renewal

Main Grid Equipment Repair

Distribution Renewal

Load Transfer

Main Reasons for Planned Interruption

DistributionEquipment Repair

Planed Interruption

Duration

Interruption DurationBy Fault

Page 24: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

24

(2) Live-Wire Operation

Targets

3 categories37 operation items

1. Reduce Interruption Frequency and Duration2. Increase Power Supply Quantity

Case: By-Pass Operation

Table. Contribution of live-wire operation on AIHC of 15 key Cities in CSG 2013 Achievements1.36730 times2.increased 48% than 20133.avoid power outage of 2.8725 million household4.AIHC is reduced by 2.54 hours

Page 25: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

25

Level-Ⅲ Level-Ⅲ Level-II

Level-Ⅲ Level-II Level-I

Level-II Level-I Level-I

Urgent and

material weakness

HealthNormal State

AttentionState

Abnormal State

Serious State

Critical Equipment

Important Equipment

OrdinaryEquipment

Impo

rtan

ce

(3) Differentiated Operation and Maintenance

Equipment connection

Importance rank

evaluation

State evaluation of

equipment

Differentiated strategies for

O&M

O&M scheme of equipment

Work Plan of crews

Importance Health

On-site execution

Fig. Procedures for risk management and control of distribution equipments

CaseCaseConventional cycle of inspection:At least once per month for urban area

Cycle of Level-III equipment :Once every 3-6 months

Cycle of Level-II equipment :Once per month

Cycle of Level-I equipment :Once every 1-2 weeks

Page 26: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

26

(1) Demand Side Management & Orderly Electricity Utilization

Marketization Mechanism

Subsidy policy

Pricepolicy

Forced Controlin

Emergencies

Schedule the plan of electricity consumption of

industry loads

Industrial consumer

Guarantee the electricity utilization of residential

customers

Balance the load demand at the customer side

Targets

Page 27: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

27

(2) Our Activities on ConsumerPromote green actionCustomer service for energy-savingEnsure electricity utilization safety

Introduce energy-saving technologies and products to consumers

Spreading the idea of energy-saving and environment-protecting to the public.

Encourage society participation. Normalization of Customers' Electricity

Utilization. Intensify the Electricity Utilization Safety

of Key Customers

Page 28: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

28

(1) Mechanism of Fast Service Restoration

Fault Monitoring

Fault Alarm

Fault Handling

RepairMonitoring

Evaluation

System operation

department

Call Center

Repair Crew

System operation departmentCall Center

Production Equipment Management Department

Sales & Marketing Department

Page 29: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

29

(2) Information Integration of Distribution Network and Electricity Marketing

Break Through the Information Barrier of Four Key Links

Targets: 1. Supply Information for Fast Urgent Repair2. Lean Management of CSG Power Supply

Fig. Information Management of power supply reliability based on Information Integration of Distribution Network and Electricity Marketing

Fig. Visualization of Outage Area Based on GIS System

Page 30: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

30

(2) Information Integration of Distribution Network and Electricity Marketing

Distribution and Utilization OS2 Master Station

Main GridOS2

Fault indicatorAuto-switchData collection terminal

MarketingSystem

System Operator

MeteringAutomation

95598 Urgent Repair Crew

GIS

Request for repair info.

Repair progress info.Out-of-service customer info.Out-of-service area info.

Customer Record info.

Main Grid Model info.Main Grid switch info.Main Grid alert info.

Geographic map info. One line diagram info.

Repair command info.

Operation monitoring info. Fault location info. Fault isolation info.

Real-time remote signaling info.Real-time remote metering info.

Load control terminal info.Distribution transformer monitoring info.

Fault location info.

Repair progress info.

Outage info.Remote Control info.

Page 31: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

31

(3) Emergency Management

Major Natural Disasters

Key Customers

Critical Focus AreasTargets: Ensure Power Supply under Emergency

Complete emergency plan

Make emergency-handling exercises

Interconnect emergency platform

Key Approaches

序号 预案名称

1 总体应急预案

2 防风防汛应急预案

3 地震应急预案

4 大面停电应急预案

…… ………………………………

Page 32: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

32

(3) Emergency Management

Case 1: Respond to Ice Disaster① Ice monitoring system ② Ice melting and removing device

Case 2: Respond to Typhoon

① Material reserve and dispatch ② Emergency command center ③ Urgent repair and fast restoration

Page 33: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies
Page 34: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

34

Fig. Contributions of various approaches on reliability

First Phase Second Phase Third Phase

Management has key effects

Management has key effects

LowLow

ReliabilityReliability

MediumMedium

ReliabilityReliability

HighHigh

ReliabilityReliability

Advanced Technology, Network Structure,

and Reliable Equipment has key effects

Conclusion: To further improve reliability, we need advanced technology, network structure, and reliable equipment.

Page 35: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

35

Fig. Future distribution systemsCustomer’s Growing

Demand for Power Supply Reliability

Three Challenge

Energy Conservation and Emission Reduction

Distributed Generation and New Energy

Integration

Future Distribution System

More Reliable

More Green

More Flexible

Page 36: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

36

Optimize Entire Process of Distribution Planning

Optimize Entire Process of Distribution Operation

Page 37: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

37

Distribution Data Center

Collect

Customer D

emand

and User B

ehavior

Customer

Respond to

Customer D

emand

Equipment

Collect Equipment

Information and Status

Operation &

Maintenance

Data Analysis

Targets:Built the interaction bridge between CSG

and Customers

Page 38: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

38

Combined cooling and power supply microgrid

GuangdongFoshan

1) Dong-Ao island microgrid2) Guishan island microgrid

Guangdong Zhuhai

Microgrid GroupDemonstration

Guangxi Nanning

Science ParkMicrogrid

Yunnan Kunming

Page 39: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

39

•Optimization and management of the asset lifecycle.

Key Future Work

Targets:

1.Enhance equipment reliability

2. Improve asset utilization efficiency

Page 40: KS3 2014-9-16 Introduction to Power Supply Reliability ... · Assets of distribution network accounts for 32% of CSG. ... evaluation State evaluation of equipment Differentiated strategies

40

The End.Thanks!