DraŌ Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION STUDY Cover image: courtesy of the City of Virginia Beach Appendix H Conceptual Cost EsƟmates for the Build AlternaƟves February 2015

L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Dra Environmental Impact Statement

VIRGINIA BEACH TRANSIT EXTENSION STUDY

Cover image: courtesy of the City of Virginia Beach

A p p e n d i x H Conceptual Cost Es mates for the 

Build Alterna ves 

February 2015

Page 2: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives i

Table of Contents

1.0 Introduction ........................................................................................................................ 1

2.0 Description of Project Build Alternatives .............................................................................. 1

2.1 Light Rail Transit Alternatives.................................................................................................... 1

2.1.1 Alternative 1A: Newtown Road Station to the Proposed Town Center Station (Town Center Alternative)............................................................................................................................ 1 2.1.2 Alternative 1B: Newtown Road Station to the Proposed Rosemont Station (Rosemont Alternative) ....................................................................................................................................... 2 2.1.3 Alternative 2: Newtown Road Station to the Proposed Oceanfront Station via NSRR ROW (NSRR Alternative) ................................................................................................................... 3 2.1.4 Alternative 3: Newtown Road Station to the Proposed Oceanfront Station via Laskin Road (Hilltop Alternative) ................................................................................................................. 4

2.2 Bus Rapid Transit Alternatives .................................................................................................. 6

2.2.1 Alternative 1A: Newtown Road Station to the Proposed Town Center Station (Town Center Alternative)............................................................................................................................ 6 2.2.2 Alternative 1B: Newtown Road Station to the Proposed Rosemont Station (Rosemont Alternative) ....................................................................................................................................... 7 2.2.3 Alternative 2: Newtown Road Station to the Proposed Oceanfront Station via NSRR ROW (NSRR Alternative) ................................................................................................................... 7 2.2.4 Alternative 3: Newtown Road Station to the Proposed Oceanfront Station via Laskin Road (Hilltop Alternative) ................................................................................................................. 7

3.0 Cost Estimating Methodology .............................................................................................. 9

3.1 Assumptions .............................................................................................................................. 9

3.1.1 Design Sources .................................................................................................................. 9 3.1.2 Cost Data Sources............................................................................................................ 10

3.2 Standard Cost Categories ........................................................................................................ 11

3.2.1 Summary of Elements in Standard Cost Categories ........................................................ 11 3.2.2 Design Contingency ......................................................................................................... 14 3.2.3 Escalation ........................................................................................................................ 16

4.0 Summary of Conceptual Cost Estimates ............................................................................. 18

4.1 Light Rail Transit Alternatives.................................................................................................. 18

4.2 Bus Rapid Transit Alternatives ................................................................................................ 19

5.0 Test of Reasonableness ..................................................................................................... 20

Appendices

H-1 FTA Standard Cost Category Worksheets

H-2 Cost Estimate Backup Details

Page 3: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 1

1.0 Introduction

The purpose of this report is to document the conceptual-level capital cost estimates for the bus rapid

transit (BRT) and light rail transit (LRT) build alternatives under consideration in the Virginia Beach

Transit Extension Study (VBTES). The cost estimates are based on conceptual engineering design plans

dated August 27, 2014, which can be found in Appendix G of the VBTES Draft Environmental Impact

Statement (DEIS).

The estimates in this report and supporting documents are based on the methodology outlined in the

Capital Cost Methodology Report dated April 2010 and the Association for the Advancement of Cost

Engineering International Recommended Practice No. 17R-97 (Cost Estimate Classification System)

Class 4, 0 to 15% Project Definition. The estimate has an accuracy range index of 4, which is equal to a

+40% to -20% range of accuracy.

Unit costs for these estimates have been estimated for the third quarter of 2013 and have been

escalated to the year of expenditure as described in Section 3, assuming the start of revenue service

in 2020 for all alternatives. The estimates reflect the total project cost including right-of-way

acquisition, site preparation, guideway, vehicles, maintenance facilities, soft costs, and contingencies.

2.0 Description of Project Build Alternatives

This section summarizes the four alternatives for the Virginia Beach Transit Extension Study that are

presented in this report. All of the build alternatives under consideration would provide fixed

guideway transit service to extend The Tide east between Newtown Road and the Virginia Beach

Oceanfront Resort Area.

2.1 Light Rail Transit Alternatives

There are four alignment alternatives under consideration for the VBTES: Newtown Road to Town

Center, Newtown Road to Rosemont, Newtown Road to the Oceanfront Station via the former Norfolk

Southern Railway right of way (NSRR ROW), and Newtown Road to the Oceanfront Station via Laskin

Road. A summary of physical characteristics of the alternatives is in Table 1. Conceptual engineering

drawings for each of the LRT alternatives are in Appendix G of the VBTES DEIS.

2.1.1 Alternative 1A: Newtown Road Station to the Proposed Town Center Station (Town Center Alternative)

Alternative 1A would follow the former NSRR ROW from The Tide’s Newtown Road Station to a

station at the Town Center of Virginia Beach (See Figure 1). The length of this alternative is

approximately 3.0 miles; its exact distance depends on the selected location for the end of line station

at Town Center.

Page 4: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 2

Beginning at the Newtown Road Station, this alternative would travel east along the former NSRR

ROW as a double track ballasted section. The alignment would cross Newtown Road and Princess

Anne Road at-grade.

Continuing east, the alignment would cross Greenwich Road at-grade and pass under the existing I-

264 bridge before rising to be grade separated over Witchduck Road. A station with a Park & Ride and

bus transfer area would be located east of Witchduck Road, along Southern Boulevard. The alignment

would cross Euclid Road and Kellam Road at-grade. In the Town Center area east of Kellam Road, the

alignment would depend on the location that is selected for the station. One of the following four

station location options will be selected:

At-grade, immediately west of Independence Boulevard with a pedestrian bridge over

Independence to a park and ride on the east side of the road; or,

On a new transit bridge over Independence Boulevard and Market Street with the boarding

platforms directly over Independence Boulevard; or,

On a new transit bridge over Independence Boulevard and Market Street with the boarding

platforms directly over Market Street; or,

At-grade, immediately west of Constitution Drive (a new transit bridge would be required

over Independence Boulevard and Market Street for this station site option).

Construction of Alternative 1A would not require a new vehicle storage and maintenance facility

(VSMF). The existing facility for The Tide in Norfolk would continue to be used for the entire line with

modifications to accommodate the additional vehicles and equipment for the Operations Control

Center.

Figure 1 | Alternative 1A Alignment

Source: HDR, Inc. August 2014

2.1.2 Alternative 1B: Newtown Road Station to the Proposed Rosemont Station (Rosemont Alternative)

Alternative 1B would follow the former NSRR ROW from The Tide’s Newtown Road Station to the

proposed Rosemont Station located east of Lynn Shores Drive (See Figure 2). The length of this

alternative is approximately 4.8 miles.

Page 5: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 3

From the Newtown Road Station to the Town Center area, Alternative 1B would be the same as

Alternative 1A. The Town Center Station would be at one of three locations: on a new transit bridge

over Independence Boulevard, on a new transit bridge over Market Street, or at-grade west of

Constitution Drive. The alignment would cross Constitution Drive at-grade and continue east.

East of Constitution Drive, the alignment would cross Thalia Creek on a new structure. The alignment

would then cross Fir Avenue, Thalia Road, and Budding Avenue at-grade. The alignment would

continue at-grade across South Kentucky Avenue and Lynn Shores Drive before entering the

Rosemont Station. The alignment would end approximately 400 feet east of the station for space for

vehicle storage.

Construction of Alternative 1B would not require a new VSMF. The existing facility for The Tide in

Norfolk would continue to be used, with modifications proposed to accommodate the additional

vehicles and equipment for the Operations Control Center.

Figure 2 | Alternative 1B Alignment

Source: HDR, Inc. August 2014

2.1.3 Alternative 2: Newtown Road Station to the Proposed Oceanfront Station via NSRR ROW (NSRR Alternative)

Alternative 2 would follow the former NSRR ROW from The Tide’s Newtown Road Station to the

Virginia Beach Oceanfront Resort Area (see Figure 3). The total length of this alternative is

approximately 12.2 miles.

From Newtown Road to the Rosemont Station, this alignment is the same as Alternative 1B. Extending

east from the Rosemont Station, the alignment would rise to be grade-separated over Rosemont Road

and cross South Plaza Trail at-grade. Past South Plaza Trail, the alignment would cross North

Lynnhaven Road at-grade before coming to a station with a Park & Ride lot along Southern Boulevard

between North Lynnhaven Road and Lynnhaven Parkway.

East of the Lynnhaven Station, the alignment would rise to be grade separated over Lynnhaven

Parkway. The alignment would then cross London Bridge Creek on a new bridge and go under I-264

using an existing overpass. After passing under I-264, the alignment would rise to be grade separated

over London Bridge Road. Continuing east from London Bridge Road, the alignment would continue

along the former NSRR ROW north of NAS Oceana. There would be a North Oceana station with a Park

Page 6: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 4

& Ride lot on City-owned property west of Air Station Drive. Continuing east from the new station, the

alignment would remain at-grade and cross Air Station Drive, South First Colonial Road, Oceana

Boulevard, Sykes Avenue and Distribution Drive before reaching the east end of the former NSRR

ROW at Birdneck Road.

At Birdneck Road, the alignment would turn north and then east at Virginia Beach Boulevard. The

double track section in this area would generally consist of retained ballast on concrete ties along

Birdneck Road and Virginia Beach Boulevard, then it changes to embedded track before turning onto

Washington Avenue. At Washington Avenue, the alignment turns north to pass through the parking

lot at the Virginia Beach Convention Center. The Convention Center Station would be located

immediately south of 19th Street. At 19th Street, the alignment turns east to the end-of-line

Oceanfront Station at 19th and Arctic Avenue. The tracks would be coordinated with the City’s

streetscape improvement project on 19th Street.

A new VSMF would be located on property owned by the City of Virginia Beach north of Potters Road,

adjacent to the North Oceana Station and Park & Ride.

Figure 3 | Alternative 2 Alignment

Source: HDR, Inc. August 2014

2.1.4 Alternative 3: Newtown Road Station to the Proposed Oceanfront Station via Laskin Road (Hilltop Alternative)

Alternative 3 would follow the former NSRR ROW from The Tide’s Newtown Road Station to London

Bridge Creek, then it would split from the right of way to go through the Hilltop area, using Laskin

Road and Birdneck Road to reach the Virginia Beach Oceanfront Resort Area (see Figure 4). The length

of this alternative is approximately 13.5 miles.

From Newtown Road to London Bridge Creek, this alignment is the same as Alternative 2. East of

London Bridge Creek, between the creek and I-264, the alignment would leave the NSRR ROW onto its

own alignment parallel to I-264. The alignment turns northeast on a bridge that would cross over

Virginia Beach Boulevard and Great Neck Road. The alignment would continue on a bridge north of

the Virginia Beach Boulevard/Laskin Road interchange, and then it would cross over the westbound

lanes of Laskin Road. The alignment would continue south of the westbound lanes on a structure over

Page 7: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 5

the I-264 onramp before touching down in the median of Laskin Road west of Phillip Avenue, where

the eastbound and westbound lanes of Laskin Road converge.

The alignment would continue at-grade in the median of Laskin Road in a retained ballast double track

section. A new walk-up station would be located between Republic Road and the Hilltop Plaza

Shopping Center entrance. The alignment would cross over the First Colonial Road intersection on a

bridge that begins east of Hilltop Plaza Shopping Center and touches down again in the median of

Laskin Road near Nevan Road. It would continue in the median of Laskin Road with another station

located near the Hilltop East Shopping Center entrance. A Park & Ride lot would be located at the

southeast corner of Laskin Road and Winwood Drive.

The alignment would continue east in the median of Laskin Road, crossing over Linkhorn Bay on a new

combined transit/roadway bridge, until it intersects with Birdneck Road. At Birdneck Road, the

alignment turns south into the median, and the track section changes from ballasted to embedded. A

new station would be located in the median of Birdneck Road south of Laskin Road, and a Park & Ride

lot would be located at the southeast corner of the Laskin Road and Birdneck Road intersection. The

alignment would continue in the median of Birdneck Road, passing under I-264, until it reaches 19th

Street.

At 19th Street, the alignment would move from Birdneck Road into the center lanes of 19th Street,

which would be exclusive for LRT use. East of Jefferson Avenue would be the Convention Center

station. Existing parking lots would be used to serve this station, and no additional parking would be

constructed. The alignment would continue in the center of 19th Street; east of Parks Avenue,

Alternative 3 would be the same as Alternative 2, in the center of 19th Street to the end of line

Oceanfront station west of Arctic Avenue.

The VSMF for Alternative 3 would be on the City’s Potters Road site, at the same location proposed

under Alternative 2. For LRT vehicles to reach this site, a non-revenue track would be constructed

along the former NSRR ROW between London Bridge Creek and the VSMF. The crossing of London

Bridge Road would take place at-grade, and non-revenue vehicles would proceed through the

intersection with a traffic signal without preemption.

Figure 4 | Alternative 3 Alignment

Source: HDR, Inc. August 2014

Page 8: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 6

Table 1 | Summary of LRT Alternative Characteristics

Alternative 1A Alternative 1B Alternative 2 Alternative 3

Stations

At grade 2 (3a) 3 (4 a) 7 (8 a) 9 (10 a)

Aerial 1 (0a) 1 (0 a) 1 (0 a) 2 (1 a)

Access to Stations

New Park & Ride Lot 2 3 5 7

Walk-up 0 0 1 2

Alignment

Length (miles) 3.0 (approx.) 4.8 12.2 13.5

Grade separations 2 (1b) 2 5 6

Water crossings 0 1 2 3

Facilities

VSMF Existing Tide

facility (with

modifications)

Existing Tide

facility (with

modifications)

Potters Road

(new)

Potters Road

(new)

Vehicles

Light Rail Vehicle 4 5 10 10

Feeder Bus 12 10 11 11

Source: HDR, Inc. August 2014

a Number in parentheses indicates number of stations with Town Center West (Alternative 1A only) or

Constitution (Alternatives 1A, 1B, 2, or 3) station options at Town Center. b Number in parentheses indicates number of grade separations with Town Center West station option.

2.2 Bus Rapid Transit Alternatives

The VBTES includes a BRT mode option corresponding to each of the LRT alternatives. This section

describes these alternatives. Characteristics of the BRT alternatives are summarized in Table 2.

2.2.1 Alternative 1A: Newtown Road Station to the Proposed Town Center Station (Town Center Alternative)

Alternative 1A for BRT would follow the same alignment along the former NSRR ROW as the LRT

Alternative 1A described in Section 2.1.1. A grade separation would occur at Witchduck Road. A grade

separation over Independence Boulevard and Market Street would be constructed for any of the

station locations that are over or east of Independence Boulevard. The station locations and Park &

Page 9: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 7

Ride lot sites identified for the LRT alternative would be the same for the BRT. Because HRT does not

have available space at their existing facilities to maintain the articulated buses that would be used for

the BRT system, a new VSMF would need to be constructed for this alternative. For conceptual design

purposes, the BRT VSMF is assumed to be at the Potters Road site owned by the City of Virginia Beach

under all alternatives.

2.2.2 Alternative 1B: Newtown Road Station to the Proposed Rosemont Station (Rosemont Alternative)

Alternative 1B for BRT would follow the same alignment along the former NSRR ROW as the LRT

Alternative 1B described in Section 2.1.2. Grade separations would occur at Witchduck Road and

Independence Boulevard. Station locations and Park & Ride lot sites identified for the LRT alternative

would be the same for the BRT. As with Alternative 1A, a new BRT VSMF would need to be

constructed for this alternative.

2.2.3 Alternative 2: Newtown Road Station to the Proposed Oceanfront Station via NSRR ROW (NSRR Alternative)

The BRT Alternative 2 would follow the former NSRR ROW described for the LRT Alternative 2, with

the same station locations and grade-separated intersections. At the east end of the former NSRR

ROW, the BRT vehicles would turn onto Birdneck Road and begin operating in mixed traffic on local

streets to reach the stations at the Virginia Beach Convention Center and Oceanfront Resort Area.

A new VSMF for BRT would be located in the same location identified for the LRT facility, on City of

Virginia Beach property north of Potters Road, adjacent to the North Oceana Station and Park & Ride.

2.2.4 Alternative 3: Newtown Road Station to the Proposed Oceanfront Station via Laskin Road (Hilltop Alternative)

The BRT Alternative 3 would construct a new exclusive busway following the former NSRR ROW from

Newtown Road to London Bridge Creek, similar to that described for LRT Alternative 3. Station

locations and grade-separated intersections would be in the same locations as the LRT alternative.

East of London Bridge Creek, the BRT guideway would turn north to connect to Parker Lane. At Parker

Lane, BRT vehicles would begin to operate in mixed traffic along Virginia Beach Boulevard and through

the interchange with Laskin Road and I-264, serving a station in the Great Neck area. BRT vehicles

would transition to an exclusive guideway on Laskin Road east of Phillip Avenue. The guideway would

continue in the median of Laskin Road east to Birdneck Road, with a grade-separated crossing over

First Colonial Road. Station locations and Park & Ride lots on Laskin Road would be in the same

locations as the LRT Alternative 3. At Birdneck Road, the exclusive BRT guideway ends. BRT vehicles

would operate in mixed traffic on Birdneck Road and 19th Street to serve stations in the Birdneck

area, Virginia Beach Convention Center, and Oceanfront Resort Area.

Page 10: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 8

A new VSMF for BRT would be located in the same location identified for the LRT facility, on the City

of Virginia Beach property north of Potters Road. Buses would access the VSMF using existing

roadways.

Table 2 | Summary of BRT Alternative Characteristics

Alternative 1A Alternative 1B Alternative 2 Alternative 3

Stations

At grade 2 (3a) 3 7 9

Aerial 1 (0a) 1 1 1

Access to Stations

New Park & Ride Lot 2 3 6 7

Walk-up 0 0 1 2

Alignment

Length (miles) 3.0 (approx.) 4.8 12.2 13.5

Grade separations 2 (1b) 2 5 5

Water crossings 0 1 2 3

Facilities

VSMF Potters Road

(new)

Potters Road

(new)

Potters Road

(new)

Potters Road

(new)

Vehicles

BRT Vehicle 7 7 11 12

Feeder Bus 12 10 11 11

Source: HDR, Inc. August 2014

a Number in parentheses indicates number of stations with Town Center West (Alternative 1A only) station

option at Town Center. For BRT Alternatives 1B, 2, and 3, only the aerial station over Independence

Boulevard was considered. b

Number in parentheses indicates number of grade separations with Town Center West station option.

Page 11: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 9

3.0 Cost Estimating Methodology

This section describes the methodology for developing the VBTES conceptual cost estimates, including

key assumptions, sources of information, and other inputs.

3.1 Assumptions

3.1.1 Design Sources

For each of the LRT and BRT alternatives under consideration, conceptual engineering designs have

been developed. Typical sections for the project were created, and their limits were identified as

appropriate along the alignments under consideration in the VBTES.

These designs are at a 5% to 10% level, which is sufficient for the purpose of supporting the DEIS.

While the degree of design development varies by discipline, most project elements have not been

completely developed. Therefore, the conceptual estimates represent an order of magnitude cost. As

the design is refined during future phases of the project, the accuracy of cost estimates will improve.

Existing Conditions Data

Data representing existing conditions comes from the following sources:

ALTA survey collected for the purchase of the NSRR ROW,

Geographic Information System (GIS) level information obtained from the City of Virginia

Beach and utility operators,

information obtained from VDOT’s Laskin Road Phase II project,

topographic surveys taken specifically for the VBTES project in the Great Neck area and along

Birdneck Road and 19th Street west of Parks Avenue,

topographic survey taken of 19th Street east of Parks Avenue as part of the City’s proposed

streetscape project,

aerial photography from the City of Virginia Beach supplemented with aerials taken of the

areas covered in the surveys of the Great Neck area and along Birdneck Road and 19th Street.

Existing topography for developing vertical alignments is from a surface model that was created using

LIDAR data provided by the City of Virginia Beach.

Utility Information

Existing utility information is shown on the ALTA survey, other surveys, and in GIS files. This

information has not been field verified. Surveys of the Great Neck and Birdneck Road areas did not

include subsurface utilities. The locations of major public and private utility facilities were discussed in

general terms during stakeholder meetings that have occurred periodically throughout the course of

the VBTES, but specific design or disposition of these utilities have not been identified in the

conceptual design.

Page 12: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 10

Dominion Virginia Power has provided paper copies of their records showing locations of transmission

and distribution lines along the former NSRR ROW.

Real Estate

Real estate boundaries and estimated appraised values are based on information provided by the City

of Virginia Beach. Boundaries of the NSRR ROW and adjacent properties were located by the ALTA

survey and have been incorporated into the design. Right of way limits and property lines in the areas

of the supplemental survey have also been incorporated into the design.

3.1.2 Cost Data Sources

Cost information was compiled by HDR. Unit and lump sum costs for items identified in the

conceptual design were obtained from recent transit projects and historical data using Timberline

estimating software and supplemented by unit costs from construction of The Tide. They are based on

the complete in-place costs of construction, including labor, materials, equipment, supplies, overhead,

and profit. Unit costs were adjusted to the 2013 base year. During a series of workshops with HRT and

City of Virginia Beach staff in 2013, the unit and lump sum costs were adjusted to reflect actual

experience during construction of The Tide and recent construction bids.

Utility costs for City of Virginia Beach water and sanitary sewer facilities are based on the average cost

per linear foot of The Tide for construction contracts 30 and 40 (which incorporated most of the civil

and utility work for the project). The bid value was escalated to the base year, and then it was

doubled to account for discrepancies between the bid and actual costs that were experienced during

construction.

Real estate costs are based on City of Virginia Beach assessments for the year 2013. The assessed

values of parcels that were identified as complete acquisitions were increased to represent the

additional cost of relocations. Costs for partial acquisitions were proportional to the amount of the

property that would be taken for the project, assuming that the value of the parcel is homogenous;

for example, an acquisition of 10% of a parcel would cost 10% of its assessed value regardless of

which portion of the property is being taken. Fees and other legal costs to transfer properties owned

by the City of Virginia Beach for project-related use were based on a discounted percentage of the

assessed value for each parcel.

The cost of the former NSRR ROW was allocated proportionally according to the percentage of the

right of way that would be used for each alternative, since the Town Center, Rosemont, and Hilltop

alternatives would not operate along the entire length of the property that was purchased. Under the

FTA cost estimating methodology, costs related to the purchase of the former NSRR ROW and other

properties that would potentially be used as part of the local match to federal funding are included as

part of the project-related cost.

Page 13: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 11

Add-on items such as professional services costs and design contingencies are based on a percentage

of the base cost. Professional services costs are discussed in Section 3.2.1, design contingencies are in

Section 3.2.2. Escalation to year of expenditure is discussed in Section 3.2.3.

3.2 Standard Cost Categories

The Federal Transit Administration (FTA) established a standard format for reporting and estimating

capital projects under the New Starts program, which allows for easier comparison of costs between

projects. There are ten Standard Cost Categories (SCC), which are listed in Table 3. Most categories

have line items for project elements that costs can be assigned to. Each SCC and line item has been

defined by FTA to identify which elements belong in each category.

Table 3 | FTA Standard Cost Categories

SCC Category Number

Description

10 Guideway and Track Elements

20 Stations, Stops, Terminals, Intermodal

30 Support Facilities: Yards, Shops, Admin. Buildings

40 Sitework and Special Conditions

50 Systems

60 Right of Way, Land, Existing Improvements

70 Vehicles

80 Professional Services

90 Unallocated Contingency

100 Finance Charges

Source: Federal Transit Administration

For development of the VBTES cost estimates, construction-related elements in SCC categories 10

through 50 were identified from the conceptual design (where possible) and entered into

spreadsheets. Unit costs were assigned, and then those items were grouped by SCC category so that

the subtotals could be transferred to the appropriate section of the SCC worksheets. Costs for real

estate (SCC category 60) and vehicles (SCC category 70) were determined separately and entered into

the SCC worksheets.

3.2.1 Summary of Elements in Standard Cost Categories

The SCC worksheet provided by FTA contains definitions of each category and line item as well as

examples of elements that are to be included. Appendix H-2 of this report lists the items that were

identified from the conceptual design for each alternative, their unit costs, and additional detail

regarding what is included with each item and assumptions that were made.

Page 14: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 12

Category 10: Guideway and Track Elements

This category includes costs for rough grading, excavation, and site preparation of the transit

guideway (LRT tracks or BRT roadway). Separate line items are provided for exclusive guideway, semi-

exclusive, guideways in mixed traffic, aerial structures, built-up fill, and retained fill. Costs for LRT

tracks are assigned to Category 10, with items for ballasted, embedded, and direct fixation track.

Costs for the BRT roadway pavement are covered under Category 40. Special trackwork and track

treatments for noise and vibration attenuation are identified in this category.

Category 20: Stations, Stops, Terminals, Intermodal

Costs for stations are entered under this category. There are separate items for at-grade and aerial

stations, parking garages, and elevators.

Category 30: Support Facilities: Yards, Shops, Administration Buildings

This category covers costs for administration buildings, vehicle maintenance facilities (separated into

light maintenance and heavy maintenance functions), and maintenance of way buildings. All costs of

those buildings are included, such as site preparation, materials, building construction, building

components (HVAC, electrical, plumbing, life safety), and equipment for performing the building’s

functions. Yards and yard tracks are a separate item under this category.

Category 40: Sitework and Special Conditions

Project-wide clearing, demolition, and grading are a part of Category 40. Utility work and relocations,

civil elements such as roadways and sidewalks, miscellaneous site structures, and parking lots

(including park and ride facilities at stations) are covered under this category. All paving for the BRT

roadway is in this category, but site preparation for the guideway is in Category 10. Costs for

environmental mitigation and hazardous materials removal are considered in this category.

Category 50: Systems

The systems category includes train control systems, train signals and crossing protection (signals and

gates at grade crossings, for example), traction power systems, communication systems, fare

collection equipment, and central control facilities. Traffic signals outside of the guideway and for BRT

operations are covered under this category.

Category 60: Right of Way, Land, Existing Improvements

This category includes costs for real estate that will be used for the project, including acquisitions,

permanent easements, and temporary easements. It includes real estate that would be used as part

of a local match for Federal funding of the project. For the VBTES conceptual estimates, this includes

the costs of the former NSRR ROW and properties currently owned by the City of Virginia Beach that

have been identified as potential Park & Ride sites for the Witchduck and Town Center stations. Legal

Page 15: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 13

fees, professional services, and administrative costs for the real estate component of the project are a

part of this category.

For the VBTES, real estate costs were determined as described in Section 3.1.2. A separate item in

Category 60 is designated for relocation costs, but these have not been specifically identified in the

VBTES at this time.

Category 70: Vehicles

Costs for vehicles are identified in Category 70. Separate line items are provided for each type of

vehicle; for the VBTES, only light rail and buses are used, but there are items available for non-

revenue vehicles, spare parts, and other types of rail vehicles. Costs for professional services

associated with vehicle procurement are included.

Category 80: Professional Services

Professional services costs were automatically calculated in the SCC worksheets based on a

percentage of the construction subtotal. These percentages are listed in Table 4.

Table 4 | Professional Services Costs as a Percentage of Construction Cost

SCC Line Item

Number Description

Percentage of Total

Construction Cost

80.01 Project Development 2.50%

80.02 Engineering 12%

80.03 Project Management for Design and Construction 5%

80.04 Construction Administration and Management 8%

80.05 Professional Liability and other Non-Construction Insurance 2%

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2%

80.07 Surveys, Testing, Investigation, Inspection 2%

80.08 Start up 1.50%

Source: HDR, Inc.

Category 90: Unallocated Contingency

The unallocated contingency is added on to the subtotal of Categories 10 through 80. It represents

financial reserves for the project that are not associated with any particular scope item. For the VBTES

conceptual estimates, unallocated contingency was applied at 2% of the total for SCC categories 10

through 80.

Design contingencies allocated to individual scope items are discussed in Section 3.2.2.

Page 16: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 14

Category 100: Finance Charges

Finance charges associated with the project are entered in this category. They are to be based on the

project’s financial plan. A financial plan has not been created for this phase of the VBTES.

3.2.2 Design Contingency

In order to account for uncertainty in unit costs, future changes in quantities, and project elements

that have not been defined in the conceptual design, contingency factors were applied to the

estimate. For individual items in the SCC worksheet, a contingency factor was applied which was

variable due to differences in the level of development of the conceptual design and identification of

cost-related risks associated with each item. The item-specific contingency, known as allocated

contingency, was applied as a percentage of the base year cost. Table 5 shows the levels of allocated

contingency used for each item for the VBTES conceptual cost estimates. The contingency

percentages will be reduced in cost estimates that are based on advanced levels of design.

An additional level of contingency, known as unallocated contingency, was applied to the estimate at

2% of the total for SCC categories 10 through 80. This amount represents financial reserves for the

project that are not associated with any particular scope item.

Table 5 | Levels of Allocated Contingency by SCC Category

SCC Category

Description Allocated

Contingency Percentage

10 GUIDEWAY & TRACK ELEMENTS

10.01 Guideway: At-grade exclusive right-of-way 35%

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 35%

10.03 Guideway: At-grade in mixed traffic 35%

10.04 Guideway: Aerial structure 35%

10.05 Guideway: Built-up fill 35%

10.06 Guideway: Underground cut & cover 35%

10.07 Guideway: Underground tunnel 35%

10.08 Guideway: Retained cut or fill 35%

10.09 Track: Direct fixation 30%

10.10 Track: Embedded 30%

10.11 Track: Ballasted 30%

10.12 Track: Special (switches, turnouts) 30%

10.13 Track: Vibration and noise dampening 30%

20 STATIONS, STOPS, TERMINALS, INTERMODAL

20.01 At-grade station, stop, shelter, mall, terminal, platform 30%

Page 17: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 15

20.02 Aerial station, stop, shelter, mall, terminal, platform 30%

20.03 Underground station, stop, shelter, mall, terminal, platform 30%

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 30%

20.05 Joint development 30%

20.06 Automobile parking multi-story structure 35%

20.07 Elevators, escalators 35%

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 Administration Building: Office, sales, storage, revenue counting 30%

30.02 Light Maintenance Facility 30%

30.03 Heavy Maintenance Facility 30%

30.04 Storage or Maintenance of Way Building 30%

30.05 Yard and Yard Track 30%

40 SITEWORK & SPECIAL CONDITIONS

40.01 Demolition, Clearing, Earthwork 35%

40.02 Site Utilities, Utility Relocation 40%

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 40%

40.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 40%

40.05 Site structures including retaining walls, sound walls 35%

40.06 Pedestrian / bike access and accommodation, landscaping 35%

40.07 Automobile, bus, van accessways including roads, parking lots 35%

40.08 Temporary Facilities and other indirect costs during construction 35%

50 SYSTEMS

50.01 Train control and signals 35%

50.02 Traffic signals and crossing protection 35%

50.03 Traction power supply: substations 35%

50.04 Traction power distribution: catenary and third rail 35%

50.05 Communications 35%

50.06 Fare collection system and equipment 35%

50.07 Central Control 35%

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 Purchase or lease of real estate Lump Sum

60.02 Relocation of existing households and businesses Included in

60.01

70 VEHICLES

70.01 Light Rail 20%

70.02 Heavy Rail N/A

70.03 Commuter Rail N/A

Page 18: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 16

70.04 Bus 20%

70.05 Other N/A

70.06 Non-revenue vehicles N/A

70.07 Spare parts N/A

80 PROFESSIONAL SERVICES

80.01 Project Development 12%

80.02 Engineering 5%

80.03 Project Management for Design and Construction 8%

80.04 Construction Administration & Management 2%

80.05 Professional Liability and other Non-Construction Insurance 2%

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2%

80.07 Surveys, Testing, Investigation, Inspection 2%

80.08 Start up 3%

Source: HDR, Inc. 2013

3.2.3 Escalation

Unit costs that were used to develop the conceptual cost estimates were based on values from the

third quarter of 2013 (the base year). To account for inflation, costs plus allocated contingencies for

the base year were escalated to the projected year of expenditure (YOE). The YOE total represents the

cost of the project at the time that costs are expected to be incurred.

To determine the rate of escalation, three cost indices were consulted: the IHS Global Insight Highway

and Street Index, the Engineering News Record Construction Cost Index, and the IHS PPI Finished

Consumer Goods Index. For each year between 2013 (the base year) and 2020 (the opening year), the

highest of the three index values was taken for calculating the escalation rate used in the VBTES

conceptual cost estimates. Table 6 shows the index values between 2013 and 2020 along with the

rate for each year that was used in the estimates.

Page 19: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 17

Table 6 | Construction Cost Indices for VBTES

Year

IHS Global Insight

Highway and Street

Index

ENR Construction

Cost Index

IHS PPI Finished

Consumer Goods Index

VBTES Rate

VBTES Cost Index

2013 Base 1.0000

2014 1.4 4.7 0.1 4.7 1.0470

2015 2.5 3.4 0.8 3.4 1.0826

2016 2.9 2.2 1.8 2.9 1.1140

2017 2.5 2.4 1.0 2.5 1.1418

2018 2.2 2.4 1.1 2.4 1.1692

2019 2.0 2.7 1.6 2.7 1.2008

2020 2.0 2.6 2.0 2.6 1.2320

The assumed years of expenditure are listed in Table 7.

Table 7 | Assumed Year of Expenditure

SCC Category

Description Year of

Expenditure

10-50 Construction items: Guideway and track, Stations, Support Facilities, Sitework and Special Conditions, Systems

2018a

60 Real estate currently owned by the City of Virginia Beach 2013

60 Real estate not currently owned by the City of Virginia Beach 2017

70 Vehicles 2019

80 Professional Services: Project Development 2016

80 Professional Services: Engineering 2017

80 Professional Services: Construction-related activities (project management, administration, insurance, legal, surveys and inspections)

2018a

80 Start-up activities 2020

90 Unallocated contingency 2018a

Source: HDR, Inc. August 2014

a 2018 is the assumed midpoint of construction year.

Page 20: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 18

4.0 Summary of Conceptual Cost Estimates

4.1 Light Rail Transit Alternatives

Capital cost estimates were developed for the four LRT alternatives. Table 8 shows a summary of the

base year (2013) and year of expenditure costs for the LRT Alternatives and Town Center station

options. Additional details for each estimate can be found in the SCC worksheets in Appendix H-1 of

this report.

FTA’s SCC definitions state that costs of land for the project are included under Category 60 if that

value is to be used as part of the local match for federal funding. The methodology for developing the

conceptual costs for the VBTES has assumed that the costs of real estate that have already been

expended (for the former NSRR ROW and sites for the Witchduck and Town Center station park and

ride lots that are currently owned by the City of Virginia Beach) would be used as part of a local match

if federal funding were to be pursued; therefore, these costs are included in the Category 60 total.

The SCC worksheets do not provide separate line items to differentiate real estate that is currently

owned by the City of Virginia Beach from real estate that would be acquired in the future for this

project. The costs in Table 8 include the totals as shown on the SCC worksheets for each alternative,

the cost of expended real estate, and the cost of the remaining project elements through construction

and opening.

At the Town Center of Virginia Beach, four station options are under consideration: west of

Independence Boulevard (applicable to Alternative 1A only), over Independence Boulevard, over

Market Street, and west of Constitution Drive. The Independence and Market Street options would be

aerial stations, while the platforms for Town Center West and Constitution Drive would be at-grade.

Because the station types and structure lengths are different among the options, separate cost

estimates for each station option were developed for LRT Alternatives 1A, 1B, and 2 to determine if

changing the station location had a significant effect on the cost. The range of base year costs for

Alternative 1A was $264.5 million for the Town Center West option to $307.2 million for the

Constitution Drive option. This large difference can be attributed to the structure over Independence

Boulevard that would be required to build a station at Constitution but not for the location west of

Independence. For Alternatives 1B and 2, it was found that the difference between the highest cost

(Market Street) and lowest cost (Constitution Drive) station option was approximately $3.5 million in

the base year; in these alternatives, a full length bridge over Independence Boulevard and Market

Street would be built regardless of where the Town Center Station is located. The conceptual cost

estimate for Alternative 3 was developed with only the Independence station option. The Market

Street station location option in Alternative 2 was approximately $4.3 million more than the

Independence option, and the Constitution option in Alternative 2 was approximately $3.8 million less

than Independence. These differences are assumed to be valid for Alternative 3 as well, since the

conceptual designs are the same for Alternatives 2 and 3 in this area.

The total costs for Alternative 3 include as part of the transit project the reconstruction of the Laskin

Road roadway within the limits of the current VDOT project (Republic Road to Birdneck Road) using

Page 21: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 19

the six-lane section identified in the conceptual design. A separate SCC worksheet has been prepared

to account for that roadway reconstruction.

Table 8 | Summary of LRT Alternative Conceptual Cost Estimate Totals

Base Year Dollars (x1000) YOE Dollars (x1000)

LRT Alternative Without

expended real estate

Expended real

estate cost

Total (SCC)

Without expended

real estate

Expended real

estate cost

Total (SCC)

Alternative 1A (Town Center West) $236,744 $27,715 $264,459 $276,325 $30,503 $306,828

Alternative 1A (Independence) $275,620 $27,715 $303,335 $321,676 $30,503 $352,179

Alternative 1A (Market) $274,814 $27,715 $302,529 $320,735 $30,503 $351,238

Alternative 1A (Constitution) $279,515 $27,715 $307,230 $326,219 $30,503 $356,722

Alternative 1B (Independence) $373,957 $34,508 $408,465 $436,192 $37,295 $473,487

Alternative 1B (Market) $377,600 $34,508 $412,108 $440,443 $37,295 $477,738

Alternative 1B (Constitution) $370,418 $34,508 $404,926 $432,065 $37,295 $469,360

Alternative 2 (Independence) $827,679 $58,146 $885,825 $966,348 $61,231 $1,027,579

Alternative 2 (Market) $831,323 $58,146 $889,469 $970,598 $61,231 $1,031,829

Alternative 2 (Constitution) $824,431 $58,146 $882,577 $962,558 $61,231 $1,023,789

Alternative 3* $1,076,905 $55,428 $1,132,333 $1,254,575 $59,270 $1,313,845

Source: HDR, Inc. August 2014

*Conceptual cost estimate for Alternative 3 is based on the Independence station option.

4.2 Bus Rapid Transit Alternatives

Cost estimates were developed for the three BRT alternatives in a similar manner as the LRT

alternatives, except that BRT Alternatives 1B, 2, and 3 only considered the Independence station

option at Town Center. BRT Alternative 1A considered the Independence station option and the

location west of Independence Boulevard. A summary of these estimates is in Table 9 with separate

columns for expended real estate similar to the method described for the LRT alternatives. The SCC

worksheets in Appendix H-1 provide additional information for the estimates in FTA’s Standard Cost

Categories format.

Page 22: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 20

Table 9 | Summary of BRT Alternative Conceptual Cost Estimates

Base Year Dollars (x1000) YOE Dollars (x1000)

BRT Alternative

Without expended

real estate

Expended real

estate cost

Total (SCC)

Without expended

real estate

Expended real

estate cost

Total (SCC)

Alternative 1A (Town Center West) $227,395 $27,714 $255,109 $263,906 $30,500 $294,406

Alternative 1A (Independence) $270,377 $27,714 $298,091 $314,046 $30,500 $344,546

Alternative 1B $329,398 $34,506 $363,904 $384,189 $37,293 $421,482

Alternative 2 $593,793 $56,471 $650,264 $692,578 $59,271 $751,849

Alternative 3 $721,362 $45,140 $766,502 $838,500 $48,111 $886,611

Source: HDR, Inc. August 2014

5.0 Test of Reasonableness

As a check of costs, HDR examined the per mile costs of other BRT and LRT systems. Table 10 shows

the total year of expenditure costs for comparable light rail projects now being funded or considered

for funding by the Federal Transit Administration (excluding projects that are primarily tunnel) in

Fiscal Year 2014. Year of expenditure costs for these projects range from $63 million to more than

$204 million per mile. The LRT alternatives under consideration in the VBTES would cost $84.5 million

per mile (Alternative 2), $99.6 million per mile (Alternative 1B), $97.3 million per mile (Alternative 3),

and $108.7 million per mile (Alternative 1A). These costs are within the range of the other recent LRT

projects.

Table 11 shows the per mile total development costs for some similar BRT systems in the United

States, Canada, and Australia as shown in the Transit Cooperative Research Project’s Bus Rapid Transit

Practitioner’s Guide (TCRP Report 118), as well as BRT projects being funded or under consideration

by the Federal Transit Administration in Fiscal Year 2014. There are a wide range of costs from $1.2

million per mile to $60.9 million per mile, not accounting for inflation. The BRT Alternatives

considered under the VBTES range from $61.6 million per mile (Alternative 2) to $105.7 million per

mile (Alternative 1A). In between are Alternative 1B, at $87.7 million per mile, and Alternative 3, at a

cost of $65.7 million per mile. If inflation is considered, the costs of the VBTES alternatives would be

at the high end of the range of comparable BRT projects.

Page 23: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Appendix H: Conceptual Cost Estimates for Build Alternatives 21

Table 10 | Capital Costs for LRT Projects Requesting Section 5309 Funding, FY2014

LRT Project Total Capital

Cost (YOE millions)

Length (Miles)

Cost (millions/mile)

Sacramento South Corridor Phase 2 $270 4.3 $63

St. Paul-Minneapolis, Central Corridor LRT $957 9.8 $98

Charlotte, Northeast Corridor Blue Line Ext. $1,160 9.8 $118

Portland, Portland-Milwaukie Light Rail $1,490 7.3 $204

Dallas, Northwest/Southeast LRT MOS $1,406 21.0 $67

Houston, North Corridor LRT $756 5.2 $145

Houston, Southeast Corridor LRT $823 6.5 $127

Houston, University Corridor $1,563 11.36 $138 Source: FTA FY2014 Annual Report on Funding Recommendation

Table 11 | Recent BRT Project Costs

BRT Type and System Year Opened Miles Cost

(millions/mile)

Grade-Separated Busways

Adelaide, Australia (guided bus) 1989 7.5 $ 9.1

Brisbane, Australia 2001 10.3 $ 32.0

Ottawa 1983 16.0 $ 18.6

Pittsburgh: South Busway 1977 4.3 $ 6.3

Pittsburgh: East Busway 1983 6.8 $ 19.1

Pittsburgh: East Busway Extension 2003 2.3 $ 29.9

Pittsburgh: West Busway 2000 7.5 $ 50.0

New Britain-Hartford Busway (CT) 2015 (est.) 9.4 $ 60.9 (YOE)

At-Grade Busways (Off-Street)

Hartford: New Britain (proposed) 2007 9.6 $ 15.1

South Miami-Dade 1996 8.2 $ 7.2

South Miami-Dade Extension 2007 11.5 $ 1.2

Michigan-Grand River BRT (Lansing) 2016 (est.) 8.5 $ 25.3 (YOE)

Grand Rapids: Silver Line BRT (MI) 2014 (est.) 9.6 $ 4.2 (YOE) Sources: TCRP Report 118; FTA FY2014 Annual Report on Funding Recommendations

Page 24: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Draft Conceptual Cost Estimates for Build Alternatives

APPENDIX H-1:

FTA Standard Cost Category Worksheets

Page 25: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/31/14

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT- Newtown to Town Center (West of Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 3.02 33,480 11,044 44,524 $14,743 33% 17% 52,06010.01 Guideway: At-grade exclusive right-of-way 3.02 6,695 2,343 9,038 $2,993 10,568

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 550 192 742 868

10.03 Guideway: At-grade in mixed traffic 0 0 0 0

10.04 Guideway: Aerial structure 10,091 3,532 13,623 15,929

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 2,672 935 3,607 4,217

10.09 Track: Direct fixation 0 0 0 0

10.10 Track: Embedded 0 0 0 0

10.11 Track: Ballasted 11,435 3,431 14,866 17,382

10.12 Track: Special (switches, turnouts) 2,038 611 2,649 3,097

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 1,928 578 2,507 $836 2% 1% 2,93120.01 At-grade station, stop, shelter, mall, terminal, platform 3 1,928 578 2,507 $836 2,931

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 0 0 0

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 0 0 0 0

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 3.02 1,587 476 2,063 $683 2% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 3.02 28,544 11,011 39,554 $13,097 29% 15% 46,24940.01 Demolition, Clearing, Earthwork 1,585 555 2,140 2,503

40.02 Site Utilities, Utility Relocation 15,857 6,343 22,200 25,957

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,328 931 3,259 3,81040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,222 889 3,110 3,63740.05 Site structures including retaining walls, sound walls 1,286 450 1,736 2,03040.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 4,794 1,678 6,471 7,56740.08 Temporary Facilities and other indirect costs during construction 472 165 637 745

50 SYSTEMS 3.02 34,111 11,939 46,049 $15,248 34% 17% 53,84350.01 Train control and signals 11,712 4,099 15,812 18,488

50.02 Traffic signals and crossing protection 1,962 687 2,649 3,098

50.03 Traction power supply: substations 9,495 3,323 12,818 14,987

50.04 Traction power distribution: catenary and third rail 6,173 2,160 8,333 9,743

50.05 Communications 3,575 1,251 4,826 5,643

50.06 Fare collection system and equipment 1,194 418 1,612 1,884

50.07 Central Control 0 0

3.02 99,650 35,048 134,698 $44,602 100% 51% 157,495

60 ROW, LAND, EXISTING IMPROVEMENTS 3.02 35,000 12,000 47,000 $15,563 18% 52,10660.01 Purchase or lease of real estate 35,000 12,000 47,000 52,10660.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 16 25,359 5,072 30,431 $1,902 12% 36,54270.01 Light Rail 4 17,474 3,495 20,968 $5,242 25,179

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 3.02 34,877 12,267 47,144 $15,611 35% 18% 54,62180.01 Project Development 2,491 876 3,367 3,902

80.02 Engineering 11,958 4,206 16,164 18,727

80.03 Project Management for Design and Construction 4,982 1,752 6,735 7,803

80.04 Construction Administration & Management 7,972 2,804 10,776 12,485

80.05 Professional Liability and other Non-Construction Insurance 1,993 701 2,694 3,121

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 1,993 701 2,694 3,121

80.07 Surveys, Testing, Investigation, Inspection 1,993 701 2,694 3,121

80.08 Start up 1,495 526 2,020 2,341

Subtotal (10 - 80) 3.02 194,886 64,387 259,274 $85,852 98% 300,76590 UNALLOCATED CONTINGENCY 5,185 2% 6,063Subtotal (10 - 90) 3.02 264,459 $87,569 100% 306,828100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 3.02 264,459 $87,569 100% 306,828Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.04%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.70%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $52,151YOE Total Project Cost per Mile Not Including Vehicles (X000) $89,499YOE Total Project Cost per Mile (X000) $101,599

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 26: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/31/14

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Town Center (Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 3.24 51,427 17,286 68,713 $21,208 42% 23% 80,34210.01 Guideway: At-grade exclusive right-of-way 3.24 6,490 2,271 8,761 $2,704 10,244

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 550 192 742 868

10.03 Guideway: At-grade in mixed traffic 0 0 0 0

10.04 Guideway: Aerial structure 27,021 9,458 36,479 42,653

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 3,088 1,081 4,169 4,875

10.09 Track: Direct fixation 0 0 0 0

10.10 Track: Embedded 0 0 0 0

10.11 Track: Ballasted 12,240 3,672 15,912 18,605

10.12 Track: Special (switches, turnouts) 2,038 611 2,649 3,097

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 3,685 1,181 4,866 $1,622 3% 2% 5,69020.01 At-grade station, stop, shelter, mall, terminal, platform 2 1,286 386 1,671 $836 1,954

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,050 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 3.24 1,587 476 2,063 $637 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 3.24 29,238 11,280 40,518 $12,506 25% 13% 47,37640.01 Demolition, Clearing, Earthwork 1,650 578 2,228 2,605

40.02 Site Utilities, Utility Relocation 16,213 6,485 22,698 26,540

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,490 996 3,486 4,07640.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,222 889 3,110 3,63740.05 Site structures including retaining walls, sound walls 1,380 483 1,863 2,17940.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 4,794 1,678 6,471 7,56740.08 Temporary Facilities and other indirect costs during construction 490 172 662 773

50 SYSTEMS 3.24 34,645 12,126 46,770 $14,435 29% 15% 54,68650.01 Train control and signals 11,761 4,116 15,877 18,564

50.02 Traffic signals and crossing protection 1,962 687 2,649 3,098

50.03 Traction power supply: substations 9,495 3,323 12,818 14,987

50.04 Traction power distribution: catenary and third rail 6,398 2,239 8,637 10,099

50.05 Communications 3,835 1,342 5,178 6,054

50.06 Fare collection system and equipment 1,194 418 1,612 1,884

50.07 Central Control 0 0

3.24 120,582 42,348 162,931 $50,287 100% 54% 190,506

60 ROW, LAND, EXISTING IMPROVEMENTS 3.24 35,000 12,000 47,000 $14,506 15% 52,10660.01 Purchase or lease of real estate 35,000 12,000 47,000 52,10660.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 16 25,359 5,072 30,431 $1,902 10% 36,54270.01 Light Rail 4 17,474 3,495 20,968 $5,242 25,179

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 3.24 42,204 14,822 57,026 $17,601 35% 19% 66,07080.01 Project Development 3,015 1,059 4,073 4,719

80.02 Engineering 14,470 5,082 19,552 22,652

80.03 Project Management for Design and Construction 6,029 2,117 8,147 9,439

80.04 Construction Administration & Management 9,647 3,388 13,034 15,102

80.05 Professional Liability and other Non-Construction Insurance 2,412 847 3,259 3,775

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2,412 847 3,259 3,775

80.07 Surveys, Testing, Investigation, Inspection 2,412 847 3,259 3,775

80.08 Start up 1,809 635 2,444 2,832

Subtotal (10 - 80) 3.24 223,145 74,242 297,388 $91,786 98% 345,22590 UNALLOCATED CONTINGENCY 5,948 2% 6,954Subtotal (10 - 90) 3.24 303,335 $93,622 100% 352,179100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 3.24 303,335 $93,622 100% 352,179Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.27%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.67%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.94%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $58,798YOE Total Project Cost per Mile Not Including Vehicles (X000) $97,419YOE Total Project Cost per Mile (X000) $108,697

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 27: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/31/14

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Town Center (Market St. Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 3.23 50,783 17,062 67,845 $21,005 42% 22% 79,32810.01 Guideway: At-grade exclusive right-of-way 3.23 6,490 2,271 8,761 $2,712 10,244

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 550 192 742 868

10.03 Guideway: At-grade in mixed traffic 0 0 0 0

10.04 Guideway: Aerial structure 26,416 9,246 35,662 41,697

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 3,088 1,081 4,168 4,874

10.09 Track: Direct fixation 0 0 0 0

10.10 Track: Embedded 0 0 0 0

10.11 Track: Ballasted 12,202 3,661 15,863 18,548

10.12 Track: Special (switches, turnouts) 2,038 611 2,649 3,097

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 3,685 1,181 4,866 $1,622 3% 2% 5,69020.01 At-grade station, stop, shelter, mall, terminal, platform 2 1,286 386 1,671 $836 1,954

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,050 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 3.23 1,587 476 2,063 $639 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 3.23 29,257 11,286 40,544 $12,552 25% 13% 47,40640.01 Demolition, Clearing, Earthwork 1,658 580 2,239 2,618

40.02 Site Utilities, Utility Relocation 16,213 6,485 22,698 26,540

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,490 996 3,486 4,07640.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,222 889 3,110 3,63740.05 Site structures including retaining walls, sound walls 1,376 482 1,857 2,17240.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 4,794 1,678 6,471 7,56740.08 Temporary Facilities and other indirect costs during construction 505 177 682 797

50 SYSTEMS 3.23 34,834 12,192 47,026 $14,559 29% 16% 54,98650.01 Train control and signals 11,758 4,115 15,874 18,561

50.02 Traffic signals and crossing protection 1,962 687 2,649 3,098

50.03 Traction power supply: substations 9,495 3,323 12,818 14,987

50.04 Traction power distribution: catenary and third rail 6,602 2,311 8,912 10,421

50.05 Communications 3,824 1,338 5,162 6,035

50.06 Fare collection system and equipment 1,194 418 1,612 1,884

50.07 Central Control 0 0

3.23 120,147 42,198 162,345 $50,262 100% 54% 189,821

60 ROW, LAND, EXISTING IMPROVEMENTS 3.23 35,000 12,000 47,000 $14,551 16% 52,10660.01 Purchase or lease of real estate 35,000 12,000 47,000 52,10660.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 16 25,359 5,072 30,431 $1,902 10% 36,54270.01 Light Rail 4 17,474 3,495 20,968 $5,242 25,179

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 3.23 42,051 14,769 56,821 $17,592 35% 19% 65,83280.01 Project Development 3,004 1,055 4,059 4,702

80.02 Engineering 14,418 5,064 19,481 22,571

80.03 Project Management for Design and Construction 6,007 2,110 8,117 9,405

80.04 Construction Administration & Management 9,612 3,376 12,988 15,047

80.05 Professional Liability and other Non-Construction Insurance 2,403 844 3,247 3,762

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2,403 844 3,247 3,762

80.07 Surveys, Testing, Investigation, Inspection 2,403 844 3,247 3,762

80.08 Start up 1,802 633 2,435 2,821

Subtotal (10 - 80) 3.23 222,558 74,039 296,597 $91,826 98% 344,30290 UNALLOCATED CONTINGENCY 5,932 2% 6,936Subtotal (10 - 90) 3.23 302,529 $93,662 100% 351,238100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 3.23 302,529 $93,662 100% 351,238Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.27%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.67%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.93%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $58,768YOE Total Project Cost per Mile Not Including Vehicles (X000) $97,429YOE Total Project Cost per Mile (X000) $108,742

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 28: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/31/14

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Town Center (Constitution Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 3.47 53,155 17,848 71,003 $20,462 43% 23% 83,02010.01 Guideway: At-grade exclusive right-of-way 3.47 7,227 2,530 9,757 $2,812 11,408

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 626 219 846 989

10.03 Guideway: At-grade in mixed traffic 0 0 0 0

10.04 Guideway: Aerial structure 26,708 9,348 36,055 42,157

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 3,468 1,214 4,681 5,473

10.09 Track: Direct fixation 0 0 0 0

10.10 Track: Embedded 0 0 0 0

10.11 Track: Ballasted 13,089 3,927 17,015 19,895

10.12 Track: Special (switches, turnouts) 2,038 611 2,649 3,097

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 1,928 578 2,507 $1,003 2% 1% 2,93120.01 At-grade station, stop, shelter, mall, terminal, platform 3 1,928 578 2,507 $1,003 2,931

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 0 0 0

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 0 0 0 0

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 3.47 1,587 476 2,063 $595 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 3.47 29,837 11,505 41,342 $11,914 25% 13% 48,33940.01 Demolition, Clearing, Earthwork 1,770 619 2,389 2,794

40.02 Site Utilities, Utility Relocation 16,434 6,574 23,007 26,901

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,598 1,039 3,637 4,25240.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,222 889 3,110 3,63740.05 Site structures including retaining walls, sound walls 1,478 517 1,996 2,33340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 4,794 1,678 6,471 7,56740.08 Temporary Facilities and other indirect costs during construction 542 190 732 856

50 SYSTEMS 3.47 36,181 12,663 48,844 $14,076 29% 16% 57,11050.01 Train control and signals 12,061 4,221 16,283 19,039

50.02 Traffic signals and crossing protection 2,243 785 3,028 3,540

50.03 Traction power supply: substations 9,495 3,323 12,818 14,987

50.04 Traction power distribution: catenary and third rail 7,080 2,478 9,559 11,176

50.05 Communications 4,108 1,438 5,545 6,484

50.06 Fare collection system and equipment 1,194 418 1,612 1,884

50.07 Central Control 0 0

3.47 122,688 43,071 165,759 $47,769 100% 54% 193,813

60 ROW, LAND, EXISTING IMPROVEMENTS 3.47 35,000 12,000 47,000 $13,545 15% 52,10660.01 Purchase or lease of real estate 35,000 12,000 47,000 52,10660.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 16 25,359 5,072 30,431 $1,902 10% 36,54270.01 Light Rail 4 17,474 3,495 20,968 $5,242 25,179

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 3.47 42,941 15,075 58,016 $16,719 35% 19% 67,21780.01 Project Development 3,067 1,077 4,144 4,801

80.02 Engineering 14,723 5,169 19,891 23,046

80.03 Project Management for Design and Construction 6,134 2,154 8,288 9,602

80.04 Construction Administration & Management 9,815 3,446 13,261 15,364

80.05 Professional Liability and other Non-Construction Insurance 2,454 861 3,315 3,841

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2,454 861 3,315 3,841

80.07 Surveys, Testing, Investigation, Inspection 2,454 861 3,315 3,841

80.08 Start up 1,840 646 2,486 2,881

Subtotal (10 - 80) 3.47 225,988 75,218 301,206 $86,803 98% 349,67990 UNALLOCATED CONTINGENCY 6,024 2% 7,044Subtotal (10 - 90) 3.47 307,230 $88,539 100% 356,722100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 3.47 307,230 $88,539 100% 356,722Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.28%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.67%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.95%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $55,854YOE Total Project Cost per Mile Not Including Vehicles (X000) $92,271YOE Total Project Cost per Mile (X000) $102,802

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 29: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Rosemont (Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 4.76 68,509 22,815 91,324 $19,186 40% 22% 106,78010.01 Guideway: At-grade exclusive right-of-way 4.76 10,181 3,563 13,744 $2,887 16,070

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 738 258 997 1,165

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 30,079 10,528 40,607 47,480

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 4,242 1,485 5,726 6,695

10.09 Track: Direct fixation 154 46 201 235

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 17,822 5,347 23,169 27,090

10.12 Track: Special (switches, turnouts) 2,717 815 3,532 4,129

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 4 4,327 1,374 5,701 $1,425 3% 1% 6,66620.01 At-grade station, stop, shelter, mall, terminal, platform 3 1,928 578 2,507 $836 2,931

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,049 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 4.76 1,587 476 2,063 $433 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 4.76 46,114 17,828 63,941 $13,433 28% 16% 74,76340.01 Demolition, Clearing, Earthwork 2,543 890 3,433 4,014

40.02 Site Utilities, Utility Relocation 25,614 10,245 35,859 41,928

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 3,702 1,481 5,183 6,06040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4,443 1,777 6,220 7,27340.05 Site structures including retaining walls, sound walls 1,751 613 2,363 2,76340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 6,297 2,204 8,501 9,94040.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 4.76 46,868 16,404 63,272 $13,292 28% 15% 73,98050.01 Train control and signals 14,353 5,024 19,377 22,656

50.02 Traffic signals and crossing protection 3,354 1,174 4,528 5,295

50.03 Traction power supply: substations 11,868 4,154 16,022 18,734

50.04 Traction power distribution: catenary and third rail 11,309 3,958 15,268 17,852

50.05 Communications 4,491 1,572 6,062 7,089

50.06 Fare collection system and equipment 1,492 522 2,014 2,355

50.07 Central Control 0 0

4.76 167,406 58,897 226,302 $47,542 100% 55% 264,603

60 ROW, LAND, EXISTING IMPROVEMENTS 4.76 46,851 14,000 60,851 $12,784 15% 66,80960.01 Purchase or lease of real estate 46,851 14,000 60,851 66,80960.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 15 28,414 5,683 34,096 $2,273 8% 40,94370.01 Light Rail 5 21,842 4,368 26,211 $5,242 31,474

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 10 6,571 1,314 7,886 $789 9,469

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 4.76 58,592 20,614 79,206 $16,640 35% 19% 91,76780.01 Project Development 4,185 1,472 5,658 6,555

80.02 Engineering 20,089 7,068 27,156 31,463

80.03 Project Management for Design and Construction 8,370 2,945 11,315 13,110

80.04 Construction Administration & Management 13,392 4,712 18,104 20,975

80.05 Professional Liability and other Non-Construction Insurance 3,348 1,178 4,526 5,244

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 3,348 1,178 4,526 5,244

80.07 Surveys, Testing, Investigation, Inspection 3,348 1,178 4,526 5,244

80.08 Start up 2,511 883 3,395 3,933

Subtotal (10 - 80) 4.76 301,262 99,193 400,456 $84,129 98% 464,12390 UNALLOCATED CONTINGENCY 8,009 2% 9,365Subtotal (10 - 90) 4.76 408,465 $85,812 100% 473,487100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 4.76 408,465 $85,812 100% 473,487Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.93%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.58%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $55,589YOE Total Project Cost per Mile Not Including Vehicles (X000) $90,871YOE Total Project Cost per Mile (X000) $99,472

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 30: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Rosemont (Market Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 4.76 70,470 23,500 93,970 $19,742 41% 23% 109,87410.01 Guideway: At-grade exclusive right-of-way 4.76 10,152 3,553 13,706 $2,879 16,025

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 738 258 997 1,165

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 32,053 11,218 43,271 50,595

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 4,242 1,485 5,726 6,695

10.09 Track: Direct fixation 227 68 295 345

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 17,765 5,330 23,095 27,004

10.12 Track: Special (switches, turnouts) 2,717 815 3,532 4,129

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 4 4,327 1,374 5,701 $1,425 2% 1% 6,66620.01 At-grade station, stop, shelter, mall, terminal, platform 3 1,928 578 2,507 $836 2,931

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,049 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 4.76 1,587 476 2,063 $433 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 4.76 46,114 17,828 63,941 $13,433 28% 16% 74,76340.01 Demolition, Clearing, Earthwork 2,543 890 3,433 4,014

40.02 Site Utilities, Utility Relocation 25,614 10,245 35,859 41,928

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 3,702 1,481 5,183 6,06040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4,443 1,777 6,220 7,27340.05 Site structures including retaining walls, sound walls 1,751 613 2,363 2,76340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 6,297 2,204 8,501 9,94040.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 4.76 46,868 16,404 63,272 $13,292 28% 15% 73,98050.01 Train control and signals 14,353 5,024 19,377 22,656

50.02 Traffic signals and crossing protection 3,354 1,174 4,528 5,295

50.03 Traction power supply: substations 11,868 4,154 16,022 18,734

50.04 Traction power distribution: catenary and third rail 11,309 3,958 15,268 17,852

50.05 Communications 4,491 1,572 6,062 7,089

50.06 Fare collection system and equipment 1,492 522 2,014 2,355

50.07 Central Control 0 0

4.76 169,366 59,582 228,948 $48,098 100% 56% 267,697

60 ROW, LAND, EXISTING IMPROVEMENTS 4.76 46,851 14,000 60,851 $12,784 15% 66,80960.01 Purchase or lease of real estate 46,851 14,000 60,851 66,80960.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 15 28,414 5,683 34,096 $2,273 8% 40,94370.01 Light Rail 5 21,842 4,368 26,211 $5,242 31,474

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 10 6,571 1,314 7,886 $789 9,469

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 4.76 59,278 20,854 80,132 $16,834 35% 19% 92,84080.01 Project Development 4,234 1,490 5,724 6,631

80.02 Engineering 20,324 7,150 27,474 31,831

80.03 Project Management for Design and Construction 8,468 2,979 11,447 13,263

80.04 Construction Administration & Management 13,549 4,767 18,316 21,221

80.05 Professional Liability and other Non-Construction Insurance 3,387 1,192 4,579 5,305

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 3,387 1,192 4,579 5,305

80.07 Surveys, Testing, Investigation, Inspection 3,387 1,192 4,579 5,305

80.08 Start up 2,540 894 3,434 3,979

Subtotal (10 - 80) 4.76 303,909 100,118 404,028 $84,880 98% 468,29090 UNALLOCATED CONTINGENCY 8,081 2% 9,448Subtotal (10 - 90) 4.76 412,108 $86,577 100% 477,738100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 4.76 412,108 $86,577 100% 477,738Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.94%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.60%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $56,239YOE Total Project Cost per Mile Not Including Vehicles (X000) $91,764YOE Total Project Cost per Mile (X000) $100,365

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 31: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Rosemont (Constitution Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 4.76 68,509 22,815 91,324 $19,186 41% 23% 106,78010.01 Guideway: At-grade exclusive right-of-way 4.76 10,181 3,563 13,744 $2,887 16,070

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 738 258 997 1,165

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 30,079 10,528 40,607 47,480

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 4,242 1,485 5,726 6,695

10.09 Track: Direct fixation 154 46 201 235

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 17,822 5,347 23,169 27,090

10.12 Track: Special (switches, turnouts) 2,717 815 3,532 4,129

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 4 2,409 723 3,132 $783 1% 1% 3,66220.01 At-grade station, stop, shelter, mall, terminal, platform 4 2,409 723 3,132 $783 3,662

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 0

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 0 0 0

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 4.76 1,587 476 2,063 $433 1% 1% 2,41330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 0 0 0 0

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 0 0 0 0

40 SITEWORK & SPECIAL CONDITIONS 4.76 46,114 17,828 63,941 $13,433 29% 16% 74,76340.01 Demolition, Clearing, Earthwork 2,543 890 3,433 4,014

40.02 Site Utilities, Utility Relocation 25,614 10,245 35,859 41,928

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 3,702 1,481 5,183 6,06040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4,443 1,777 6,220 7,27340.05 Site structures including retaining walls, sound walls 1,751 613 2,363 2,76340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 6,297 2,204 8,501 9,94040.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 4.76 46,868 16,404 63,272 $13,292 28% 16% 73,98050.01 Train control and signals 14,353 5,024 19,377 22,656

50.02 Traffic signals and crossing protection 3,354 1,174 4,528 5,295

50.03 Traction power supply: substations 11,868 4,154 16,022 18,734

50.04 Traction power distribution: catenary and third rail 11,309 3,958 15,268 17,852

50.05 Communications 4,491 1,572 6,062 7,089

50.06 Fare collection system and equipment 1,492 522 2,014 2,355

50.07 Central Control 0 0

4.76 165,487 58,245 223,732 $47,003 100% 55% 261,598

60 ROW, LAND, EXISTING IMPROVEMENTS 4.76 46,851 14,000 60,851 $12,784 15% 66,80960.01 Purchase or lease of real estate 46,851 14,000 60,851 66,80960.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 15 28,414 5,683 34,096 $2,273 8% 40,94370.01 Light Rail 5 21,842 4,368 26,211 $5,242 31,474

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 10 6,571 1,314 7,886 $789 9,469

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 4.76 57,920 20,386 78,306 $16,451 35% 19% 90,72580.01 Project Development 4,137 1,456 5,593 6,480

80.02 Engineering 19,858 6,989 26,848 31,106

80.03 Project Management for Design and Construction 8,274 2,912 11,187 12,961

80.04 Construction Administration & Management 13,239 4,660 17,899 20,737

80.05 Professional Liability and other Non-Construction Insurance 3,310 1,165 4,475 5,184

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 3,310 1,165 4,475 5,184

80.07 Surveys, Testing, Investigation, Inspection 3,310 1,165 4,475 5,184

80.08 Start up 2,482 874 3,356 3,888

Subtotal (10 - 80) 4.76 298,673 98,314 396,986 $83,400 98% 460,07690 UNALLOCATED CONTINGENCY 7,940 2% 9,284Subtotal (10 - 90) 4.76 404,926 $85,069 100% 469,360100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 4.76 404,926 $85,069 100% 469,360Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.92%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.58%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $54,958YOE Total Project Cost per Mile Not Including Vehicles (X000) $90,003YOE Total Project Cost per Mile (X000) $98,605

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 32: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Oceanfront (Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.18 159,768 53,179 212,947 $17,483 39% 24% 248,98810.01 Guideway: At-grade exclusive right-of-way 12.18 26,059 9,121 35,180 $2,888 41,134

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 1,495 523 2,018 2,360

10.03 Guideway: At-grade in mixed traffic 995 348 1,344 1,571

10.04 Guideway: Aerial structure 65,801 23,030 88,832 103,866

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 10,609 3,713 14,322 16,746

10.09 Track: Direct fixation 419 126 544 636

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 43,478 13,044 56,522 66,088

10.12 Track: Special (switches, turnouts) 8,336 2,501 10,836 12,670

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 8 6,775 2,108 8,883 $1,110 2% 1% 10,38620.01 At-grade station, stop, shelter, mall, terminal, platform 7 4,376 1,313 5,688 $813 6,651

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,049 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.18 37,659 11,298 48,957 $4,019 9% 6% 57,24330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 23,256 6,977 30,232 35,349

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 12,816 3,845 16,661 19,481

40 SITEWORK & SPECIAL CONDITIONS 12.18 72,920 27,958 100,878 $8,282 19% 11% 117,95240.01 Demolition, Clearing, Earthwork 6,496 2,274 8,770 10,254

40.02 Site Utilities, Utility Relocation 33,908 13,563 47,471 55,506

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,404 2,962 10,365 12,12040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 4,704 1,646 6,350 7,42540.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 11,239 3,934 15,173 17,74140.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 12.18 125,489 43,921 169,411 $13,909 31% 19% 198,08350.01 Train control and signals 37,049 12,967 50,016 58,481

50.02 Traffic signals and crossing protection 5,868 2,054 7,921 9,262

50.03 Traction power supply: substations 36,523 12,783 49,306 57,651

50.04 Traction power distribution: catenary and third rail 27,151 9,503 36,653 42,857

50.05 Communications 15,839 5,544 21,382 25,001

50.06 Fare collection system and equipment 3,060 1,071 4,132 4,831

50.07 Central Control 0 0

12.18 402,612 138,464 541,076 $44,423 100% 61% 632,651

60 ROW, LAND, EXISTING IMPROVEMENTS 12.18 68,000 14,000 82,000 $6,732 9% 87,95760.01 Purchase or lease of real estate 68,000 14,000 82,000 87,95760.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 21 50,913 5,091 56,004 $2,667 6% 67,25170.01 Light Rail 10 43,684 4,368 48,053 $4,805 57,702

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 723 7,951 $723 9,548

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.18 140,914 48,462 189,376 $15,548 35% 21% 219,41180.01 Project Development 10,065 3,462 13,527 15,672

80.02 Engineering 48,313 16,616 64,929 75,227

80.03 Project Management for Design and Construction 20,131 6,923 27,054 31,344

80.04 Construction Administration & Management 32,209 11,077 43,286 50,151

80.05 Professional Liability and other Non-Construction Insurance 8,052 2,769 10,822 12,538

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 8,052 2,769 10,822 12,538

80.07 Surveys, Testing, Investigation, Inspection 8,052 2,769 10,822 12,538

80.08 Start up 6,039 2,077 8,116 9,403

Subtotal (10 - 80) 12.18 662,439 206,017 868,456 $71,302 98% 1,007,27090 UNALLOCATED CONTINGENCY 17,369 2% 20,309Subtotal (10 - 90) 12.18 885,825 $72,728 100% 1,027,579100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.18 885,825 $72,728 100% 1,027,579Allocated Contingency as % of Base Yr Dollars w/o Contingency 31.10%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.62%

Total Contingency as % of Base Yr Dollars w/o Contingency 33.72%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $51,942YOE Total Project Cost per Mile Not Including Vehicles (X000) $78,845YOE Total Project Cost per Mile (X000) $84,366

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 33: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Oceanfront (Market Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.18 161,729 53,864 215,593 $17,701 40% 24% 252,08110.01 Guideway: At-grade exclusive right-of-way 12.18 26,031 9,111 35,141 $2,885 41,089

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 1,495 523 2,018 2,360

10.03 Guideway: At-grade in mixed traffic 995 348 1,344 1,571

10.04 Guideway: Aerial structure 67,775 23,721 91,496 106,981

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 10,609 3,713 14,322 16,746

10.09 Track: Direct fixation 491 147 639 747

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 43,422 13,026 56,448 66,002

10.12 Track: Special (switches, turnouts) 8,336 2,501 10,836 12,670

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 8 6,775 2,108 8,883 $1,110 2% 1% 10,38620.01 At-grade station, stop, shelter, mall, terminal, platform 7 4,376 1,313 5,688 $813 6,651

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 881 264 1,145 $1,145 1,339

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,518 531 2,049 2,396

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.18 37,659 11,298 48,957 $4,019 9% 6% 57,24330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 23,256 6,977 30,232 35,349

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 12,816 3,845 16,661 19,481

40 SITEWORK & SPECIAL CONDITIONS 12.18 72,920 27,958 100,878 $8,282 19% 11% 117,95240.01 Demolition, Clearing, Earthwork 6,496 2,274 8,770 10,254

40.02 Site Utilities, Utility Relocation 33,908 13,563 47,471 55,506

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,404 2,962 10,365 12,12040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 4,704 1,646 6,350 7,42540.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 11,239 3,934 15,173 17,74140.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 12.18 125,489 43,921 169,411 $13,909 31% 19% 198,08350.01 Train control and signals 37,049 12,967 50,016 58,481

50.02 Traffic signals and crossing protection 5,868 2,054 7,921 9,262

50.03 Traction power supply: substations 36,523 12,783 49,306 57,651

50.04 Traction power distribution: catenary and third rail 27,151 9,503 36,653 42,857

50.05 Communications 15,839 5,544 21,382 25,001

50.06 Fare collection system and equipment 3,060 1,071 4,132 4,831

50.07 Central Control 0 0

12.18 404,572 139,149 543,721 $44,641 100% 61% 635,745

60 ROW, LAND, EXISTING IMPROVEMENTS 12.18 68,000 14,000 82,000 $6,732 9% 87,95760.01 Purchase or lease of real estate 68,000 14,000 82,000 87,95760.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 21 50,913 5,091 56,004 $2,667 6% 67,25170.01 Light Rail 10 43,684 4,368 48,053 $4,805 57,702

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 723 7,951 $723 9,548

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.18 141,600 48,702 190,303 $15,624 35% 21% 220,48480.01 Project Development 10,114 3,479 13,593 15,749

80.02 Engineering 48,549 16,698 65,247 75,594

80.03 Project Management for Design and Construction 20,229 6,957 27,186 31,498

80.04 Construction Administration & Management 32,366 11,132 43,498 50,396

80.05 Professional Liability and other Non-Construction Insurance 8,091 2,783 10,874 12,599

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 8,091 2,783 10,874 12,599

80.07 Surveys, Testing, Investigation, Inspection 8,091 2,783 10,874 12,599

80.08 Start up 6,069 2,087 8,156 9,449

Subtotal (10 - 80) 12.18 665,085 206,943 872,028 $71,595 98% 1,011,43790 UNALLOCATED CONTINGENCY 17,441 2% 20,392Subtotal (10 - 90) 12.18 889,469 $73,027 100% 1,031,829100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.18 889,469 $73,027 100% 1,031,829Allocated Contingency as % of Base Yr Dollars w/o Contingency 31.12%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.62%

Total Contingency as % of Base Yr Dollars w/o Contingency 33.74%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $52,196YOE Total Project Cost per Mile Not Including Vehicles (X000) $79,194YOE Total Project Cost per Mile (X000) $84,715

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 34: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/13/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Newtown to Oceanfront (Constitution Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.18 159,768 53,179 212,947 $17,483 40% 24% 248,98810.01 Guideway: At-grade exclusive right-of-way 12.18 26,059 9,121 35,180 $2,888 41,134

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 1,495 523 2,018 2,360

10.03 Guideway: At-grade in mixed traffic 995 348 1,344 1,571

10.04 Guideway: Aerial structure 65,801 23,030 88,832 103,866

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 10,609 3,713 14,322 16,746

10.09 Track: Direct fixation 419 126 544 636

10.10 Track: Embedded 2,576 773 3,349 3,915

10.11 Track: Ballasted 43,478 13,044 56,522 66,088

10.12 Track: Special (switches, turnouts) 8,336 2,501 10,836 12,670

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 8 5,018 1,506 6,524 $815 1% 1% 7,62820.01 At-grade station, stop, shelter, mall, terminal, platform 8 5,018 1,506 6,524 $815 7,628

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 0

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 0 0 0

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.18 37,659 11,298 48,957 $4,019 9% 6% 57,24330.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 23,256 6,977 30,232 35,349

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 12,816 3,845 16,661 19,481

40 SITEWORK & SPECIAL CONDITIONS 12.18 72,920 27,958 100,878 $8,282 19% 11% 117,95240.01 Demolition, Clearing, Earthwork 6,496 2,274 8,770 10,254

40.02 Site Utilities, Utility Relocation 33,908 13,563 47,471 55,506

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,404 2,962 10,365 12,12040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 4,704 1,646 6,350 7,42540.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 11,239 3,934 15,173 17,74140.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 12.18 125,489 43,921 169,411 $13,909 31% 19% 198,08350.01 Train control and signals 37,049 12,967 50,016 58,481

50.02 Traffic signals and crossing protection 5,868 2,054 7,921 9,262

50.03 Traction power supply: substations 36,523 12,783 49,306 57,651

50.04 Traction power distribution: catenary and third rail 27,151 9,503 36,653 42,857

50.05 Communications 15,839 5,544 21,382 25,001

50.06 Fare collection system and equipment 3,060 1,071 4,132 4,831

50.07 Central Control 0 0

12.18 400,855 137,861 538,716 $44,230 100% 61% 629,893

60 ROW, LAND, EXISTING IMPROVEMENTS 12.18 68,000 14,000 82,000 $6,732 9% 87,95760.01 Purchase or lease of real estate 68,000 14,000 82,000 87,95760.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 21 50,913 5,091 56,004 $2,667 6% 67,25170.01 Light Rail 10 43,684 4,368 48,053 $4,805 57,702

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 723 7,951 $723 9,548

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.18 140,299 48,251 188,551 $15,480 35% 21% 218,45480.01 Project Development 10,021 3,447 13,468 15,604

80.02 Engineering 48,103 16,543 64,646 74,899

80.03 Project Management for Design and Construction 20,043 6,893 26,936 31,208

80.04 Construction Administration & Management 32,068 11,029 43,097 49,932

80.05 Professional Liability and other Non-Construction Insurance 8,017 2,757 10,774 12,483

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 8,017 2,757 10,774 12,483

80.07 Surveys, Testing, Investigation, Inspection 8,017 2,757 10,774 12,483

80.08 Start up 6,013 2,068 8,081 9,362

Subtotal (10 - 80) 12.18 660,068 205,204 865,271 $71,040 98% 1,003,55590 UNALLOCATED CONTINGENCY 17,305 2% 20,234Subtotal (10 - 90) 12.18 882,577 $72,461 100% 1,023,789100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.18 882,577 $72,461 100% 1,023,789Allocated Contingency as % of Base Yr Dollars w/o Contingency 31.09%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.62%

Total Contingency as % of Base Yr Dollars w/o Contingency 33.71%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $51,715YOE Total Project Cost per Mile Not Including Vehicles (X000) $78,534YOE Total Project Cost per Mile (X000) $84,055

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 35: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 10/21/13

Virginia Beach Transit Extension Project, Virginia Beach, VA LRT - Laskin Road Alternative 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.87 200,745 67,514 268,259 $20,844 42% 25% 313,66110.01 Guideway: At-grade exclusive right-of-way 12.87 28,434 9,952 38,385 $2,983 44,882

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 1,602 561 2,163 2,529

10.03 Guideway: At-grade in mixed traffic 3,445 1,206 4,651 5,438

10.04 Guideway: Aerial structure 101,543 35,540 137,083 160,284

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 10,789 3,776 14,566 17,031

10.09 Track: Direct fixation 419 126 544 636

10.10 Track: Embedded 6,075 1,822 7,897 9,234

10.11 Track: Ballasted 41,430 12,429 53,859 62,974

10.12 Track: Special (switches, turnouts) 7,008 2,102 9,110 10,652

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 10 10,702 3,363 14,065 $1,406 2% 1% 16,44520.01 At-grade station, stop, shelter, mall, terminal, platform 9 5,463 1,639 7,103 $789 8,305

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 2,202 661 2,863 $2,863 3,348

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 3,036 1,063 4,099 4,793

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.87 42,904 12,871 55,776 $4,334 9% 5% 65,21630.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 23,256 6,977 30,232 35,349

30.04 Storage or Maintenance of Way Building 1,587 476 2,063 2,413

30.05 Yard and Yard Track 18,062 5,418 23,480 27,454

40 SITEWORK & SPECIAL CONDITIONS 12.87 86,276 32,763 119,039 $9,249 19% 11% 139,18640.01 Demolition, Clearing, Earthwork 10,700 3,745 14,444 16,889

40.02 Site Utilities, Utility Relocation 36,521 14,608 51,130 59,783

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,404 2,962 10,365 12,12040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 3,635 1,272 4,907 5,73740.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 18,847 6,597 25,444 29,75040.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 12.87 137,425 48,099 185,523 $14,415 29% 17% 216,92250.01 Train control and signals 31,705 11,097 42,802 50,046

50.02 Traffic signals and crossing protection 20,695 7,243 27,939 32,667

50.03 Traction power supply: substations 36,523 12,783 49,306 57,651

50.04 Traction power distribution: catenary and third rail 28,229 9,880 38,109 44,559

50.05 Communications 16,765 5,868 22,633 26,463

50.06 Fare collection system and equipment 3,508 1,228 4,736 5,537

50.07 Central Control 0 0

12.87 478,052 164,610 642,662 $49,935 100% 60% 751,431

60 ROW, LAND, EXISTING IMPROVEMENTS 12.87 100,400 34,000 134,400 $10,443 12% 147,79060.01 Purchase or lease of real estate 100,400 34,000 134,400 147,79060.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 21 50,913 5,091 56,004 $2,667 5% 67,25170.01 Light Rail 10 43,684 4,368 48,053 $4,805 57,702

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 723 7,951 $723 9,548

70.05 Other 0 0

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.87 167,318 57,613 224,932 $17,477 35% 21% 260,60580.01 Project Development 11,951 4,115 16,067 18,615

80.02 Engineering 57,366 19,753 77,119 89,350

80.03 Project Management for Design and Construction 23,903 8,230 32,133 37,229

80.04 Construction Administration & Management 38,244 13,169 51,413 59,567

80.05 Professional Liability and other Non-Construction Insurance 9,561 3,292 12,853 14,892

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 9,561 3,292 12,853 14,892

80.07 Surveys, Testing, Investigation, Inspection 9,561 3,292 12,853 14,892

80.08 Start up 7,171 2,469 9,640 11,169

Subtotal (10 - 80) 12.87 796,683 261,314 1,057,997 $82,206 98% 1,227,07690 UNALLOCATED CONTINGENCY 21,160 2% 24,741Subtotal (10 - 90) 12.87 1,079,157 $83,851 100% 1,251,817100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.87 1,079,157 $83,851 100% 1,251,817Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.80%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.46%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $58,386YOE Total Project Cost per Mile Not Including Vehicles (X000) $92,041YOE Total Project Cost per Mile (X000) $97,266

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 36: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 10/21/13

Virginia Beach Transit Extension Project, Virginia Beach, VA Roadway By Others - Laskin Road Alternative 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 0.00 0 0 0 0% 0% 010.01 Guideway: At-grade exclusive right-of-way 0 0 #DIV/0!

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 #DIV/0!

10.03 Guideway: At-grade in mixed traffic 0 0 #DIV/0!

10.04 Guideway: Aerial structure 0 0 #DIV/0!

10.05 Guideway: Built-up fill 0 0 #DIV/0!

10.06 Guideway: Underground cut & cover 0 0 #DIV/0!

10.07 Guideway: Underground tunnel 0 0 #DIV/0!

10.08 Guideway: Retained cut or fill 0 0 #DIV/0!

10.09 Track: Direct fixation 0 0 #DIV/0!

10.10 Track: Embedded 0 0 #DIV/0!

10.11 Track: Ballasted 0 0 #DIV/0!

10.12 Track: Special (switches, turnouts) 0 0 #DIV/0!

10.13 Track: Vibration and noise dampening 0 0 #DIV/0!

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 0 0 0 0 0% 0% 020.01 At-grade station, stop, shelter, mall, terminal, platform 0 0 #DIV/0!

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 #DIV/0!

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0 #DIV/0!

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0 #DIV/0!

20.05 Joint development 0 0 #DIV/0!

20.06 Automobile parking multi-story structure 0 0 #DIV/0!

20.07 Elevators, escalators 0 0 #DIV/0!

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 0.00 0 0 0 0% 0% 030.01 Administration Building: Office, sales, storage, revenue counting 0 0 #DIV/0!

30.02 Light Maintenance Facility 0 0 #DIV/0!

30.03 Heavy Maintenance Facility 0 0 #DIV/0!

30.04 Storage or Maintenance of Way Building 0 0 #DIV/0!

30.05 Yard and Yard Track 0 0 #DIV/0!

40 SITEWORK & SPECIAL CONDITIONS 0.00 25,592 9,241 34,833 90% 66% 40,72940.01 Demolition, Clearing, Earthwork 5,844 2,046 7,890 9,225

40.02 Site Utilities, Utility Relocation 5,678 2,271 7,949 9,294

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 0 0 040.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 0 0 040.05 Site structures including retaining walls, sound walls 4,719 1,652 6,371 7,44940.06 Pedestrian / bike access and accommodation, landscaping 0 0 040.07 Automobile, bus, van accessways including roads, parking lots 7,587 2,656 10,243 11,97640.08 Temporary Facilities and other indirect costs during construction 1,764 617 2,381 2,784

50 SYSTEMS 0.00 2,803 981 3,785 10% 7% 4,42550.01 Train control and signals 2,803 981 3,785 4,425

50.02 Traffic signals and crossing protection 0 0 0

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 0 0 0

50.06 Fare collection system and equipment 0 0 0

50.07 Central Control 0 0 0

0.00 28,395 10,222 38,618 100% 73% 45,154

60 ROW, LAND, EXISTING IMPROVEMENTS 0.00 0 0 0 0% 060.01 Purchase or lease of real estate 0 #DIV/0!60.02 Relocation of existing households and businesses 0 #DIV/0!

70 VEHICLES (number) 0 0 0 0 0% 070.01 Light Rail 0 #DIV/0!

70.02 Heavy Rail 0 #DIV/0!

70.03 Commuter Rail 0 #DIV/0!

70.04 Bus 0 #DIV/0!

70.05 Other 0 #DIV/0!

70.06 Non-revenue vehicles 0 #DIV/0!

70.07 Spare parts 0 #DIV/0!

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 0.00 9,938 3,578 13,516 35% 25% 15,66080.01 Project Development 710 256 965 1,119

80.02 Engineering 3,407 1,227 4,634 5,369

80.03 Project Management for Design and Construction 1,420 511 1,931 2,237

80.04 Construction Administration & Management 2,272 818 3,089 3,579

80.05 Professional Liability and other Non-Construction Insurance 568 204 772 895

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 568 204 772 895

80.07 Surveys, Testing, Investigation, Inspection 568 204 772 895

80.08 Start up 426 153 579 671

Subtotal (10 - 80) 0.00 38,334 13,800 52,134 98% 60,81490 UNALLOCATED CONTINGENCY 1,043 2% 1,219Subtotal (10 - 90) 0.00 53,177 100% 62,033100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 0.00 53,177 100% 62,033Allocated Contingency as % of Base Yr Dollars w/o Contingency 36.00%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.72%

Total Contingency as % of Base Yr Dollars w/o Contingency 38.72%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) #DIV/0!YOE Total Project Cost per Mile Not Including Vehicles (X000) #DIV/0!YOE Total Project Cost per Mile (X000) #DIV/0!

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 37: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/23/14

Virginia Beach Transit Extension Project, Virginia Beach, VA BRT- Newtown to Town Center (West of Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 2.96 27,601 9,660 37,261 $12,588 27% 15% 43,56710.01 Guideway: At-grade exclusive right-of-way 2.96 11,851 4,148 15,999 $5,405 18,707

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 0

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 12,109 4,238 16,347 19,114

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 3,641 1,274 4,915 5,747

10.09 Track: Direct fixation 0 0 0

10.10 Track: Embedded 0 0 0

10.11 Track: Ballasted 0 0 0

10.12 Track: Special (switches, turnouts) 0 0 0

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 3,237 971 4,208 $1,403 3% 2% 4,92020.01 At-grade station, stop, shelter, mall, terminal, platform 3 3,237 971 4,208 $1,403 4,920

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 0 0 0 0

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 0 0 0 0

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 2.96 23,053 6,916 29,969 $10,125 22% 12% 35,04130.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 18,380 5,514 23,893 27,937

30.04 Storage or Maintenance of Way Building 3,197 959 4,157 4,860

30.05 Yard and Yard Track 1,476 443 1,919 2,243

40 SITEWORK & SPECIAL CONDITIONS 2.96 31,331 11,969 43,299 $14,628 32% 17% 50,62840.01 Demolition, Clearing, Earthwork 1,291 452 1,743 2,038

40.02 Site Utilities, Utility Relocation 15,822 6,329 22,151 25,900

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,003 801 2,804 3,27840.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,240 896 3,136 3,66740.05 Site structures including retaining walls, sound walls 1,269 444 1,713 2,00340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 8,226 2,879 11,105 12,98540.08 Temporary Facilities and other indirect costs during construction 480 168 648 758

50 SYSTEMS 2.96 15,731 5,506 21,237 $7,175 16% 8% 24,83150.01 Train control and signals 500 175 675 789

50.02 Traffic signals and crossing protection 10,163 3,557 13,720 16,042

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 3,840 1,344 5,184 6,061

50.06 Fare collection system and equipment 1,228 430 1,658 1,938

50.07 Central Control 0 0

2.96 100,952 35,022 135,973 $45,937 100% 53% 158,986

60 ROW, LAND, EXISTING IMPROVEMENTS 2.96 35,000 12,000 47,000 $15,878 18% 50,96560.01 Purchase or lease of real estate 35,000 12,000 47,000 50,96560.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 19 16,286 3,257 19,543 $1,029 8% 23,46770.01 Light Rail 0 0

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 7 8,400 1,680 10,080 $1,440 12,104

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 2.96 35,333 12,258 47,591 $16,078 35% 19% 55,13880.01 Project Development 2,524 876 3,399 3,938

80.02 Engineering 12,114 4,203 16,317 18,905

80.03 Project Management for Design and Construction 5,048 1,751 6,799 7,877

80.04 Construction Administration & Management 8,076 2,802 10,878 12,603

80.05 Professional Liability and other Non-Construction Insurance 2,019 700 2,719 3,151

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2,019 700 2,719 3,151

80.07 Surveys, Testing, Investigation, Inspection 2,019 700 2,719 3,151

80.08 Start up 1,514 525 2,040 2,363

Subtotal (10 - 80) 2.96 187,570 62,537 250,107 $84,496 98% 288,55790 UNALLOCATED CONTINGENCY 5,002 2% 5,849Subtotal (10 - 90) 2.96 255,109 $86,185 100% 294,406100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 2.96 255,109 $86,185 100% 294,406Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.34%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.67%

Total Contingency as % of Base Yr Dollars w/o Contingency 36.01%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $53,712YOE Total Project Cost per Mile Not Including Vehicles (X000) $91,533YOE Total Project Cost per Mile (X000) $99,461

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 38: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 7/23/14

Virginia Beach Transit Extension Project, Virginia Beach, VA BRT- Newtown to Town Center (East of Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 3.34 48,257 16,890 65,147 $19,505 39% 22% 76,17410.01 Guideway: At-grade exclusive right-of-way 3.34 11,952 4,183 16,136 $4,831 18,867

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 0

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 31,405 10,992 42,397 49,573

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 4,900 1,715 6,615 7,734

10.09 Track: Direct fixation 0 0 0

10.10 Track: Embedded 0 0 0

10.11 Track: Ballasted 0 0 0

10.12 Track: Special (switches, turnouts) 0 0 0

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 3 5,893 1,844 7,737 $2,579 5% 3% 9,04620.01 At-grade station, stop, shelter, mall, terminal, platform 3 2,589 777 3,366 $1,122 3,936

20.02 Aerial station, stop, shelter, mall, terminal, platform 0 1,775 532 2,307 2,697

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,529 535 2,064 2,413

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 3.34 23,053 6,916 29,969 $8,973 18% 10% 35,04130.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 18,380 5,514 23,893 27,937

30.04 Storage or Maintenance of Way Building 3,197 959 4,157 4,860

30.05 Yard and Yard Track 1,476 443 1,919 2,243

40 SITEWORK & SPECIAL CONDITIONS 3.34 30,633 11,849 42,482 $12,719 25% 14% 49,67240.01 Demolition, Clearing, Earthwork 1,467 514 1,981 2,316

40.02 Site Utilities, Utility Relocation 17,738 7,095 24,833 29,035

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 2,276 910 3,186 3,72640.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 2,542 1,017 3,559 4,16140.05 Site structures including retaining walls, sound walls 1,440 504 1,944 2,27340.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 4,626 1,619 6,245 7,30240.08 Temporary Facilities and other indirect costs during construction 544 190 734 859

50 SYSTEMS 3.34 16,187 5,666 21,853 $6,543 13% 7% 25,55150.01 Train control and signals 500 175 675 789

50.02 Traffic signals and crossing protection 10,163 3,557 13,720 16,042

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 4,296 1,504 5,800 6,782

50.06 Fare collection system and equipment 1,228 430 1,658 1,938

50.07 Central Control 0 0

3.34 124,023 43,165 167,188 $50,056 100% 56% 195,484

60 ROW, LAND, EXISTING IMPROVEMENTS 3.34 35,000 12,000 47,000 $14,072 16% 50,96560.01 Purchase or lease of real estate 35,000 12,000 47,000 50,96560.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 19 16,286 3,257 19,543 $1,029 7% 23,46770.01 Light Rail 0 0

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 12 7,886 1,577 9,463 $789 11,363

70.05 Other 7 8,400 1,680 10,080 $1,440 12,104

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 3.34 43,408 15,108 58,516 $17,520 35% 20% 67,79680.01 Project Development 3,101 1,079 4,180 4,843

80.02 Engineering 14,883 5,180 20,063 23,244

80.03 Project Management for Design and Construction 6,201 2,158 8,359 9,685

80.04 Construction Administration & Management 9,922 3,453 13,375 15,496

80.05 Professional Liability and other Non-Construction Insurance 2,480 863 3,344 3,874

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 2,480 863 3,344 3,874

80.07 Surveys, Testing, Investigation, Inspection 2,480 863 3,344 3,874

80.08 Start up 1,860 647 2,508 2,906

Subtotal (10 - 80) 3.34 218,717 73,530 292,246 $87,499 98% 337,71290 UNALLOCATED CONTINGENCY 5,845 2% 6,834Subtotal (10 - 90) 3.34 298,091 $89,249 100% 344,546100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 3.34 298,091 $89,249 100% 344,546Allocated Contingency as % of Base Yr Dollars w/o Contingency 33.62%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.67%

Total Contingency as % of Base Yr Dollars w/o Contingency 36.29%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $58,528YOE Total Project Cost per Mile Not Including Vehicles (X000) $96,131YOE Total Project Cost per Mile (X000) $103,158

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 39: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/20/13

Virginia Beach Transit Extension Project, Virginia Beach, VA BRT - Newtown to Rosemont (Independence Option) 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 4.73 60,258 21,090 81,348 $17,198 37% 22% 95,11610.01 Guideway: At-grade exclusive right-of-way 4.73 18,822 6,588 25,409 $5,372 29,710

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 0

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 35,026 12,259 47,284 55,287

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 6,411 2,244 8,655 10,120

10.09 Track: Direct fixation 0 0 0

10.10 Track: Embedded 0 0 0

10.11 Track: Ballasted 0 0 0

10.12 Track: Special (switches, turnouts) 0 0 0

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 4 6,864 2,136 8,999 $2,250 4% 2% 10,52220.01 At-grade station, stop, shelter, mall, terminal, platform 3 3,560 1,068 4,628 $1,543 5,412

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 1,775 532 2,307 $2,307 2,697

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,529 535 2,064 2,413

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 4.73 23,053 6,916 29,969 $6,336 14% 8% 35,04130.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 18,380 5,514 23,893 27,937

30.04 Storage or Maintenance of Way Building 3,197 959 4,157 4,860

30.05 Yard and Yard Track 1,476 443 1,919 2,243

40 SITEWORK & SPECIAL CONDITIONS 4.73 44,954 17,399 62,353 $13,183 29% 17% 72,90640.01 Demolition, Clearing, Earthwork 2,260 791 3,051 3,567

40.02 Site Utilities, Utility Relocation 26,262 10,505 36,767 42,989

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 3,331 1,333 4,664 5,45340.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 3,709 1,484 5,193 6,07240.05 Site structures including retaining walls, sound walls 2,222 778 2,999 3,50740.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 6,376 2,232 8,608 10,06540.08 Temporary Facilities and other indirect costs during construction 794 278 1,072 1,253

50 SYSTEMS 4.73 26,248 9,187 35,434 $7,491 16% 10% 41,43250.01 Train control and signals 500 175 675 789

50.02 Traffic signals and crossing protection 17,481 6,118 23,600 27,594

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 6,386 2,235 8,622 10,081

50.06 Fare collection system and equipment 1,880 658 2,538 2,968

50.07 Central Control 0 0

4.73 161,376 56,727 218,104 $46,111 100% 60% 255,017

60 ROW, LAND, EXISTING IMPROVEMENTS 4.73 35,562 8,800 44,362 $9,379 12% 48,10760.01 Purchase or lease of real estate 35,562 8,800 44,362 48,10760.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 17 14,971 2,994 17,966 $1,057 5% 21,57470.01 Light Rail 0 0 0

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 10 6,571 1,314 7,886 $789 9,469

70.05 Other 7 8,400 1,680 10,080 $1,440 12,104

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 4.73 56,482 19,855 76,336 $16,139 35% 21% 88,44380.01 Project Development 4,034 1,418 5,453 6,317

80.02 Engineering 19,365 6,807 26,172 30,323

80.03 Project Management for Design and Construction 8,069 2,836 10,905 12,635

80.04 Construction Administration & Management 12,910 4,538 17,448 20,216

80.05 Professional Liability and other Non-Construction Insurance 3,228 1,135 4,362 5,054

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 3,228 1,135 4,362 5,054

80.07 Surveys, Testing, Investigation, Inspection 3,228 1,135 4,362 5,054

80.08 Start up 2,421 851 3,272 3,790

Subtotal (10 - 80) 4.73 268,392 88,376 356,768 $75,427 98% 413,14090 UNALLOCATED CONTINGENCY 7,135 2% 8,343Subtotal (10 - 90) 4.73 363,903 $76,935 100% 421,483100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 4.73 363,903 $76,935 100% 421,483Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.93%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.66%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.59%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $53,915YOE Total Project Cost per Mile Not Including Vehicles (X000) $84,548YOE Total Project Cost per Mile (X000) $89,109

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 40: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 9/20/13

Virginia Beach Transit Extension Project, Virginia Beach, VA BRT - Newtown to Oceanfront 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.18 131,402 45,991 177,392 $14,564 45% 27% 207,41510.01 Guideway: At-grade exclusive right-of-way 12.18 42,104 14,736 56,840 $4,667 66,460

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 0

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 76,275 26,696 102,971 120,399

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 13,023 4,558 17,581 20,557

10.09 Track: Direct fixation 0 0 0

10.10 Track: Embedded 0 0 0

10.11 Track: Ballasted 0 0 0

10.12 Track: Special (switches, turnouts) 0 0 0

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 8 12,042 3,689 15,731 $1,966 4% 2% 18,39420.01 At-grade station, stop, shelter, mall, terminal, platform 7 8,739 2,622 11,361 $1,623 13,283

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 1,775 532 2,307 $2,307 2,697

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,529 535 2,064 2,413

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.18 23,053 6,916 29,969 $2,460 8% 5% 35,04130.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 18,380 5,514 23,893 27,937

30.04 Storage or Maintenance of Way Building 3,197 959 4,157 4,860

30.05 Yard and Yard Track 1,476 443 1,919 2,243

40 SITEWORK & SPECIAL CONDITIONS 12.18 73,051 28,011 101,063 $8,297 25% 16% 118,16740.01 Demolition, Clearing, Earthwork 6,542 2,290 8,831 10,326

40.02 Site Utilities, Utility Relocation 34,007 13,603 47,610 55,668

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,455 2,982 10,436 12,20340.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 4,736 1,658 6,393 7,47540.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 11,131 3,896 15,026 17,56940.08 Temporary Facilities and other indirect costs during construction 1,776 622 2,398 2,804

50 SYSTEMS 12.18 54,535 19,087 73,622 $6,044 19% 11% 86,08250.01 Train control and signals 500 175 675 789

50.02 Traffic signals and crossing protection 35,061 12,271 47,332 55,342

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 15,892 5,562 21,454 25,085

50.06 Fare collection system and equipment 3,082 1,079 4,161 4,865

50.07 Central Control 0 0

12.18 294,083 103,694 397,777 $32,658 100% 61% 465,100

60 ROW, LAND, EXISTING IMPROVEMENTS 12.18 64,000 12,000 76,000 $6,240 12% 81,10660.01 Purchase or lease of real estate 64,000 12,000 76,000 81,10660.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 22 20,429 4,086 24,514 $1,114 4% 29,43770.01 Light Rail 0 0 0

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 1,446 8,674 $789 10,416

70.05 Other 11 13,200 2,640 15,840 $1,440 19,021

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.18 102,929 36,293 139,222 $11,430 35% 21% 161,30280.01 Project Development 7,352 2,592 9,944 11,522

80.02 Engineering 35,290 12,443 47,733 55,304

80.03 Project Management for Design and Construction 14,704 5,185 19,889 23,043

80.04 Construction Administration & Management 23,527 8,296 31,822 36,869

80.05 Professional Liability and other Non-Construction Insurance 5,882 2,074 7,956 9,217

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 5,882 2,074 7,956 9,217

80.07 Surveys, Testing, Investigation, Inspection 5,882 2,074 7,956 9,217

80.08 Start up 4,411 1,555 5,967 6,913

Subtotal (10 - 80) 12.18 481,440 156,073 637,513 $52,341 98% 736,94590 UNALLOCATED CONTINGENCY 12,750 2% 14,908Subtotal (10 - 90) 12.18 650,263 $53,388 100% 751,853100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.18 650,263 $53,388 100% 751,853Allocated Contingency as % of Base Yr Dollars w/o Contingency 32.42%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.65%

Total Contingency as % of Base Yr Dollars w/o Contingency 35.07%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $38,186YOE Total Project Cost per Mile Not Including Vehicles (X000) $59,312YOE Total Project Cost per Mile (X000) $61,729

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 41: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

M A I N W O R K S H E E T - B U I L D A L T E R N A T I V E (Rev.15, August, 2013)

Hampton Roads Transit 10/21/13

Virginia Beach Transit Extension Project, Virginia Beach, VA BRT - Laskin Alternative 2013

Project Development 2020

Quantity Base YearDollars w/o

Contingency(X000)

Base Year Dollars

Allocated Contingency

(X000)

Base YearDollarsTOTAL(X000)

Base YearDollars Unit

Cost(X000)

Base Year Dollars

Percentageof

ConstructionCost

Base YearDollars

Percentageof

TotalProject Cost

YOE Dollars Total

(X000)

10 GUIDEWAY & TRACK ELEMENTS (route miles) 12.87 112,648 39,427 152,075 $11,816 37% 21% 177,81310.01 Guideway: At-grade exclusive right-of-way 12.87 36,163 12,657 48,821 $3,793 57,083

10.02 Guideway: At-grade semi-exclusive (allows cross-traffic) 0 0 0

10.03 Guideway: At-grade in mixed traffic 0 0 0

10.04 Guideway: Aerial structure 66,077 23,127 89,204 104,301

10.05 Guideway: Built-up fill 0 0 0

10.06 Guideway: Underground cut & cover 0 0 0

10.07 Guideway: Underground tunnel 0 0 0

10.08 Guideway: Retained cut or fill 10,408 3,643 14,051 16,429

10.09 Track: Direct fixation 0 0 0

10.10 Track: Embedded 0 0 0

10.11 Track: Ballasted 0 0 0

10.12 Track: Special (switches, turnouts) 0 0 0

10.13 Track: Vibration and noise dampening 0 0

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 11 15,926 4,854 20,781 $1,889 5% 3% 24,29820.01 At-grade station, stop, shelter, mall, terminal, platform 10 12,623 3,787 16,410 $1,641 19,187

20.02 Aerial station, stop, shelter, mall, terminal, platform 1 1,775 532 2,307 $2,307 2,697

20.03 Underground station, stop, shelter, mall, terminal, platform 0 0

20.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. 0 0

20.05 Joint development 0 0

20.06 Automobile parking multi-story structure 0 0 0

20.07 Elevators, escalators 1,529 535 2,064 2,413

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS 12.87 23,053 6,916 29,969 $2,329 7% 4% 35,04130.01 Administration Building: Office, sales, storage, revenue counting 0 0

30.02 Light Maintenance Facility 0 0

30.03 Heavy Maintenance Facility 18,380 5,514 23,893 27,937

30.04 Storage or Maintenance of Way Building 3,197 959 4,157 4,860

30.05 Yard and Yard Track 1,476 443 1,919 2,243

40 SITEWORK & SPECIAL CONDITIONS 12.87 109,461 42,281 151,742 $11,790 36% 21% 177,42440.01 Demolition, Clearing, Earthwork 9,608 3,363 12,970 15,165

40.02 Site Utilities, Utility Relocation 64,530 25,812 90,342 105,633

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 7,455 2,982 10,436 12,20340.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 7,405 2,962 10,367 12,12240.05 Site structures including retaining walls, sound walls 3,130 1,095 4,225 4,94040.06 Pedestrian / bike access and accommodation, landscaping 0 040.07 Automobile, bus, van accessways including roads, parking lots 15,557 5,445 21,002 24,55740.08 Temporary Facilities and other indirect costs during construction 1,776 622 2,398 2,804

50 SYSTEMS 12.87 45,361 15,876 61,237 $4,758 15% 9% 71,60150.01 Train control and signals 500 175 675 789

50.02 Traffic signals and crossing protection 24,917 8,721 33,638 39,331

50.03 Traction power supply: substations 0 0 0

50.04 Traction power distribution: catenary and third rail 0 0 0

50.05 Communications 16,711 5,849 22,560 26,378

50.06 Fare collection system and equipment 3,233 1,131 4,364 5,102

50.07 Central Control 0 0

12.87 306,449 109,354 415,803 $32,308 100% 58% 486,176

60 ROW, LAND, EXISTING IMPROVEMENTS 12.87 85,500 26,550 112,050 $8,706 16% 122,27060.01 Purchase or lease of real estate 85,500 26,550 112,050 122,27060.02 Relocation of existing households and businesses 0 0

70 VEHICLES (number) 23 21,629 4,326 25,954 $1,128 4% 31,16670.01 Light Rail 0 0 0

70.02 Heavy Rail 0 0

70.03 Commuter Rail 0 0

70.04 Bus 11 7,229 1,446 8,674 $789 10,416

70.05 Other 12 14,400 2,880 17,280 $1,440 20,750

70.06 Non-revenue vehicles 0 0

70.07 Spare parts 0 0

80 PROFESSIONAL SERVICES (applies to Cats. 10-50) 12.87 107,257 38,274 145,531 $11,308 35% 20% 168,61280.01 Project Development 7,661 2,734 10,395 12,044

80.02 Engineering 36,774 13,122 49,896 57,810

80.03 Project Management for Design and Construction 15,322 5,468 20,790 24,087

80.04 Construction Administration & Management 24,516 8,748 33,264 38,540

80.05 Professional Liability and other Non-Construction Insurance 6,129 2,187 8,316 9,635

80.06 Legal; Permits; Review Fees by other agencies, cities, etc. 6,129 2,187 8,316 9,635

80.07 Surveys, Testing, Investigation, Inspection 6,129 2,187 8,316 9,635

80.08 Start up 4,597 1,640 6,237 7,226

Subtotal (10 - 80) 12.87 520,834 178,504 699,338 $54,339 98% 808,22490 UNALLOCATED CONTINGENCY 13,987 2% 16,354Subtotal (10 - 90) 12.87 713,325 $55,425 100% 824,578100 FINANCE CHARGES 0 0% 0

Total Project Cost (10 - 100) 12.87 713,325 $55,425 100% 824,578Allocated Contingency as % of Base Yr Dollars w/o Contingency 34.27%

Unallocated Contingency as % of Base Yr Dollars w/o Contingency 2.69%

Total Contingency as % of Base Yr Dollars w/o Contingency 36.96%

Unallocated Contingency as % of Subtotal (10 - 80) 2.00%

YOE Construction Cost per Mile (X000) $37,776YOE Total Project Cost per Mile Not Including Vehicles (X000) $61,648YOE Total Project Cost per Mile (X000) $64,070

Construction Subtotal (10 - 50)

Today's Date

Yr of Base Year $

Yr of Revenue Ops

Page 42: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Virginia Beach Transit Extension Study February 2015

Draft Conceptual Cost Estimates for Build Alternatives

APPENDIX H-2: Cost Estimate Backup Details

Page 43: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative 1A    

Page 44: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles) Stationing off Eastbound unless noted10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

485+43.28 to 491+81.19 638 LF $162.710103,794.34$              Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

493+27.22 to 503+10.96 984 LF $162.71 160,064.34$             

505+76.33 to 507+47.88 172 LF $162.71 27,912.90$                

508+19.52 to 567+62.81 5,943 LF $162.71 967,032.72$             

568+34.81 to 578+27.00 992 LF $162.71 161,439.23$             

587+00.00 to 592+45.52 546 LF $162.71 88,761.56$                

592+85.52 to 607+70.19 1,485 LF $162.71 241,570.66$             

608+40.19 to 635+49.94 2,710 LF $162.71 440,903.42$             

636+13.94 to 637+00.00 86 LF $162.71 14,002.82$                

SUBTOTAL  13,555 LF 2,205,481.98$          

B.  Ballast Curb and underdrain 12,134 LF $311.49 3,779,631.79$          

C. Subballast Access Road 533+51.45 to 562+28.75 LT 2,877 LF $59.94 172,476.87$             

608+57.75 to 635+73.98 RT 2,716 LF $59.94 162,821.69$             

SUBTOTAL  5,594 LF 335,298.56$             

TOTAL  13,555 LF 6,320,412.34$          

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

491+81.19 to 493+27.22 146 TF $754.100 110,121.22$             Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

503+10.96 to 505+76.33 265 TF $754.10 200,115.52$             

507+47.88 to 508+19.52 72 TF $754.10 54,023.72$                

567+62.81 to 568+34.81 72 TF $754.10 54,295.20$                

592+45.52 to 592+85.52 40 TF $754.10 30,164.00$                

607+70.19 to 608+40.19 70 TF $754.10 52,787.00$                

635+49.94 to 636+13.94 64 TF $754.10 48,262.40$                

TOTAL  729 TF 549,769.06$             10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

TF $365.30 ‐$                             Include costs for rough grading, excavation and track slab

TOTAL  0 TF ‐$                            

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE) 873 LF $11,559.07 10,091,070.73$         Ballast Deck Bridge, 24822 sq ft, 8 Piers

TOTAL  873 LF 10,091,070.73$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

578+27 TO 587+00 LRT

Over Witchduck Rd

10.08 GUIDWAY: RETAINED CUT OR FILL

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 9 base

Page 45: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

Unsuitable Excavation 18,760 CY $34.75 651,910.00$             Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 18,760 CY $57.64 1,081,345.16$           Does not Include MOF

Embankment 5,850 CY $65.57 383,584.50$             

B. Retaining Walls 569+00.00 to 572+13.65 WB 1,882 SF $35.84 67,451.06$                 Furnish and Install;

575+60.04 to 578+28.10 WB 1,977 SF $35.84 70,855.15$                 Retaining walls for bridge approaches

575+59.87 to 578+27.02 EB 1,977 SF $35.84 70,855.15$                

587+01.92 to 589+87.86 WB 2,162 SF $35.84 77,485.92$                

587+00.00 to 589+86.85 EB 2,162 SF $35.84 77,485.92$                

TOTAL  1 LS 2,480,972.87$          

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

TOTAL  0 TF ‐$                            

to TF $317.54 ‐$                             Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

to TF $317.51 ‐$                             Includes 115lb CWR, concrete ties, OTM

TOTAL  0 TF ‐$                            

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 485+43.28 to 491+81.19 EB 638 TF $322.893 205,976.67$              Furnish and Install;

491+73.78 to 491+81.97 WB 8 TF $322.89 2,644.49$                   Includes 115lb CWR, concrete ties, OTM, 10" ballast

493+27.22 to 503+10.96 EB 984 TF $322.89 317,642.76$             

493+28.00 to 502+74.81 WB 947 TF $322.89 305,718.32$             

505+76.33 to 507+47.88 EB 172 TF $322.89 55,392.29$                

505+38.85 to 507+48.72 WB 210 TF $322.89 67,765.55$                

508+19.52 to 567+62.81 EB 5,943 TF $322.89 1,919,046.74$          

508+20.36 to 567+25.03 WB 5,905 TF $322.89 1,906,576.61$          

568+34.81 to 578+27.00 EB 992 TF $322.89 320,371.21$             

567+97.07 to 578+27.01 WB 1,030 TF $322.89 332,560.42$             

587+00.00 to 592+45.52 EB 546 TF $322.89 176,144.59$             

587+01.92 to 592+46.53 WB 545 TF $322.89 175,850.76$             

592+85.52 to 607+70.19 EB 1,485 TF $322.89 479,389.55$             

592+86.53 to 607+71.15 WB 1,485 TF $322.89 479,373.41$             

608+40.19 to 635+49.94 EB 2,710 TF $322.89 874,959.31$             

608+41.15 to 635+50.78 WB 2,710 TF $322.89 874,920.56$             

636+13.94 to 637+00.00 EB 86 TF $322.89 27,788.17$                

636+14.78 to 637+00.79 WB 86 TF $322.89 27,772.03$                

SUBTOTAL  26,479 TF 8,549,893.43$          

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Furnish and Install  Retaining Wall Undercut and Fill in this bid item;

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

A. Earthwork

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 9 base

Page 46: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.083 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.08 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

SUBTOTAL  1,746 TF 600,768.92$             

491+81.19 to 493+27.22 EB 146 TF $1,243.02 181,518.50$              Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

491+81.97 to 493+28.00 WB 146 TF $1,243.02 181,518.50$              Use different type of grade crossing, increase cost

503+10.96 to 505+76.33 EB 265 TF $1,243.02 329,860.75$             

502+74.81 to 505+38.85 WB 264 TF $1,243.02 328,207.53$             

507+47.88 to 508+19.52 EB 72 TF $1,243.02 89,050.10$                

507+48.72 to 508+20.36 WB 72 TF $1,243.02 89,050.10$                

567+62.81 to 568+34.81 EB 72 TF $1,243.02 89,497.58$                

567+25.03 to 567+97.07 WB 72 TF $1,243.02 89,547.30$                

592+45.52 to 592+85.52 EB 40 TF $1,243.02 49,720.88$                

592+46.53 to 592+86.53 WB 40 TF $1,243.02 49,720.88$                

607+70.19 to 608+40.19 EB 70 TF $1,243.02 87,011.54$                

607+71.15 to 608+41.15 WB 70 TF $1,243.02 87,011.54$                

635+49.94 to 636+13.94 EB 64 TF $1,243.02 79,553.41$                

635+50.78 to 636+14.78 WB 64 TF $1,243.02 79,553.41$                

SUBTOTAL  1,457 TF 1,810,822.02$          

TOTAL  26,479 TF 10,961,484.37$        

10.12 TRACK: SPECIAL (NO. 8 TURNOUT) EA $171,341.48 ‐$                             Furnish and Install;

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                             See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast 486+01 1 EA $679,171.47 679,171.47$              Furnish and Install;

595+30 1 EA $679,171.47 679,171.47$              Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

SUBTOTAL  2 EA 1,358,342.94$          

C. Universal Crossover in Embedded 

TrackEA $642,674.29

‐$                            

Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                            

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                             Furnish and Install;

SUBTOTAL  0 EA ‐$                            

TOTAL  LS 1,358,342.94$          

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 9 base

Page 47: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

490+00.00 1 EA $321,380.80 321,380.80$             

Furnish and Install station platform;

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system. Newtown Road Station includes 

only one side platform for new EB track.

590+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Witchduck Station)

B.  Operator relief facility EA $321,380.80 ‐$                            

TOTAL  3 LF 964,142.40$             

EA $880,995.47 ‐$                            

TOTAL  0 EA ‐$                            

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

0+00.00 0 STATION $1,518,219.00 $0.00

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair 

towers on piles; elevators and towers shall have glass exterior

TOTAL  0 EA ‐$                            

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL 1 LS $1,587,379.00 1,587,379.00$          

30.05 YARD AND TRACK

Furnish and Install station platform (Town Center Station, Independence 

Option);

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

20.07 ELEVATORS, ESCALATORS

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 9 base

Page 48: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

A. Track ‐ Ballast TF $427.97 ‐$                            

B. Track ‐ In Building TF $365.43 ‐$                            

C. No. 8 Turnouts EA $157,533.80 ‐$                            

Interlock Signalization and Control EA $397,001.96 ‐$                            

Asphalt Paving SY $70.34 ‐$                            

TOTAL  LS ‐$                            

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 45,110 SF $5.14231,910.51$              Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track Removal 15,157 TF $14.49 219,651.19$              Does not include salvage value

Bridge Removal LF $793.67 ‐$                            

B. Clearing Clearing 13 ACRES $8,383.61 108,986.93$              area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 26,655 LF $34.73 925,781.46$              Double silt fence quantity in detailed estimate

TOTAL  LS 1,486,330.09$           Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 3,690 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open 

Cut3,390 LF

A3. Relocate Distribution Line ‐ UG 

Trenchless272 LF

SUBTOTAL  1 LS $11,960,000.00 $11,960,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 13,330 LF $123.40 1,644,961.99$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor 13,330 LF $1.24 16,529.20$                

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 13,330 LF $16.51 220,078.30$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In StreetLF $146.15 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street 0 LF $25.22 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 0 LF $39.26 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  498+00 1 EA $254,278.83 254,278.83$              Assume 5'x4' box and 65' length; piles every 10'

A. Demolition

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 9 base

Page 49: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

525+00 1 EA $254,278.83 254,278.83$             

579+00 1 EA $254,278.83 254,278.83$             

593+00 1 EA $254,278.83 254,278.83$             

623+00 1 EA $254,278.83 254,278.83$             

632+00 1 EA $254,278.83 254,278.83$             

SUBTOTAL  6 EA $254,278.83 $1,525,673.00

I. Transmission Guy Wire Mods @ Sta 

875+50LS $158,737.93 ‐$                            

TOTAL  LS 15,367,242.49$        

TOTAL  7,440 CY $298.22 2,218,756.80$          

TOTAL  3 AC $740,520.00 2,221,560.00$          

40.05 SITE STRUCTURES INCLUDING  ROW Fence 30,413 LF $40.33 1,226,548.22$           both side of ROW

Bollard and Chain Along 19th Street LF $119.05 ‐$                            

TOTAL  1 LS 1,226,548.22$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

475 Ton $92.13 43,800.41$                

892 Ton $92.13 82,186.70$                

124Ton $92.13 11,405.25$                

527+50 TO 533+65 570Ton $94.35 53,828.71$                

583+50 TO 587+70 1070 Ton $94.35 101,003.70$             

606+50 TO 608+50 149 Ton $94.35 14,016.53$                

583+50 TO 587+70 381 Ton $49.910 19,017.21$                

527+50 TO 533+65 190 Ton $49.91 9,491.18$                  

583+50 TO 587+70 357 Ton $49.91 17,809.15$                

606+50 TO 608+50 50 Ton $49.91 2,471.42$                  

D. Curb and Gutter (HS‐202) 500+00 TO 510+50 1048 LF $43.78 45,881.44$                

527+50 TO 533+65 1254 LF $43.78 54,900.12$                

583+50 TO 587+70 1230 LF $43.78 53,849.40$                

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A 583+50 TO 587+70

527+50 TO 533+65

606+50 TO 608+50

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

B. Asphalt Concrete Base Course, 6", 

Type BM‐25

C. Aggregate Base Material, Type 1, No. 

21A

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 9 base

Page 50: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

606+50 TO 608+50 725 LF $43.78 31,740.50$                

granite curb LF $23.56 ‐$                            

D. Park and Rides

585+00.00 Witchduck Rd 1.00 EA $1,797,388.08 1,797,388.08$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materialsE. Milling Asphalt SY $47.02 ‐$                            

TOTAL  LS 2,338,789.80$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $450,000.00 450,000.00$              Includes Maintenance of Traffic and Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 8 EA $500,000.00 4,000,000.00$          

Grade Crossing Signals 14 EA $250,000.00 3,500,000.00$          

Wayside Signals 6.38 MI $100,000.00 638,000.00$              Both Norfolk (3.5 MI) and VB (2.88 mi)

Track Circuits 6.38 MI $120,000.00 765,600.00$              Both Norfolk (3.5 MI) and VB (2.88 mi); Increase curcuits by 20%

Signal House 6 EA $253,980.68 1,523,884.08$           One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles 9 EA $55,555.56 500,000.04$              upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 10,927,484.12$        

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

492+50.00 Newtown Rd 1 EA $9,688.61 9,688.61$                   REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

504+00.00 Princess Anne Rd 1 EA $9,688.61 9,688.61$                  

508+00.00 Freight Ln 1 EA $9,688.61 9,688.61$                  

568+00.00 Greenwich Rd 1 EA $9,688.61 9,688.61$                  

592+50.00 Mac St 1 EA $9,688.61 9,688.61$                  

608+00.00 Euclid Rd 1 EA $9,688.61 9,688.61$                  

636+00.00 Kellam Rd 1 EA $9,688.61 9,688.61$                  

SUBTOTAL  7 67,820.27$                

492+50.00

Newtown Rd 1

EA $270,648.16

270,648.16$              Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

504+00.00 Princess Anne Rd 1 EA $270,648.16 270,648.16$             

508+00.00 Freight Ln 1 EA $270,648.16 270,648.16$             

568+00.00 Greenwich Rd 1 EA $270,648.16 270,648.16$             

592+50.00 Mac St 1 EA $270,648.16 270,648.16$             

608+00.00 Euclid Rd 1 EA $270,648.16 270,648.16$             

636+00.00 Kellam Rd 1 EA $270,648.16 270,648.16$             

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 9 base

Page 51: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

SUBTOTAL  7 1,894,537.12$          

TOTAL  1,962,357.39$          

Mainline 3 EA $2,373,678.79 7,121,036.37$           Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

TOTAL  3EA

7,121,036.37$           Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 23 EA $13,969.62 321,301.26$              Furnish and Install 40‐BI 028 (8 per mile)

Transit Systems Conduits 1 LS $600,000.00 600,000.00$              30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Drilled Shaft Foundations 173 EA $9,939.77 1,719,580.21$           Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Remove Existing Foundation (OCS Pole 

Foundation) 486+00 1 EA$3,911.67 3,911.67$                  

At Newtown Road station

OCS System35,900

LF$38.47

1,381,073.00$           OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

Tapered Tubular Feeder Pole 201 EA $3,027.75 608,577.75$              Changed OCS poles to approximately 80 foot spacing

Catenary Cantilever   363 EA $3,220.03 1,168,871.25$           Changed OCS poles to approximately 80 foot spacingProtection Barrier at Bridges 574+00 1 EA $91,064.29 91,064.29$                

TOTAL    LS 5,894,379.43$          

Fiber in Duct Bank 2.88 MI $533,762.18 1,537,235.09$           4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                             Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 2.88 mi $650,000.001,872,000.00$           To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL  1 LS 3,409,235.09$          

TVM 4 EA $149,213.65 596,855.00$             

Two collection machines at each station; 2 TVM per enclosure ($12,000 

each); Include CAT 5 cable from TVM's to nearest FO (for the machine and 

connections, each TVM is about $150,000, including the cable

TOTAL  LS 596,855.00$             

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                            

Parcel acquisition will be required, but area and costs are not determined at 

this time.

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 9 base

Page 52: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

B. Norfolk Southern ROW AcquisitionLS

$25,500,000.00

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  1 LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  5 EA $4,368,421.05 21,842,105.00$        Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL 10 EA $657,142.86 6,571,429.00$          Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 9 of 9 base

Page 53: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles) Stationing off Eastbound unless noted637+00.00 644+33.47 733 LF $162.710 119,342.90$              

SUBTOTAL  733 LF 119,342.90$             

B.  Ballast Curb and underdrain 640+00.00 to 640+73.68 EB 74 LF $311.49 22,950.66$                

640+00.89 to 640+74.58 WB 74 LF $311.49 22,953.77$                

642+33.68 to 644+38.47 EB 205 LF $311.49 63,790.24$                

642+34.58 to 644+39.36 WB 205 LF $311.49 63,787.13$                

across end of track 644+38.47 29 LF $311.49 9,033.24$                  

SUBTOTAL  586 LF 182,515.04$             

C. Subballast Access Road LF $59.94 ‐$                            

SUBTOTAL  0 LF ‐$                            

TOTAL  733 LF 301,857.94$             

TF $754.100 ‐$                            

TOTAL  0 TF ‐$                            TF $365.30 ‐$                             Include costs for rough grading, excavation and track slab

TOTAL  0 TF ‐$                            

TOTAL  0 LF ‐$                            

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL Not used

Unsuitable Excavation 2,065 CY $34.75 71,744.23$                Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 2,065 CY $57.64 119,004.58$               Does not Include MOF

Embankment CY $65.57 ‐$                            

B. Retaining Walls SF $35.84 ‐$                             Furnish and Install;

TOTAL  LS 190,748.82$             

Furnish and Install Track on Guideway constructed in 10.04;

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

10.09 TRACK: DIRECT FIXATION (DIRECT 

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 7 west

Page 54: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

TOTAL  0 TF ‐$                            

TF $317.54 ‐$                            

TOTAL  0 TF ‐$                             Includes 115lb CWR, concrete ties, OTM

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 637+00.00 to 644+33.47 EB 733 TF $322.893 236,832.33$               Furnish and Install;

637+00.79 to 644+34.36 WB 734 TF $322.89 236,864.62$               Includes 115lb CWR, concrete ties, OTM, 10" ballast

SUBTOTAL  1,467 TF 473,696.95$             

0 0 TF $344.083 ‐$                            

SUBTOTAL  0 TF ‐$                            

TF $1,243.02 ‐$                             Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

Use different type of grade crossing, increase cost

SUBTOTAL  0 TF ‐$                            

TOTAL  1,467 TF 473,696.95$             

10.12 TRACK: SPECIAL (NO. 8 TURNOUT) EA $171,341.48 ‐$                             Furnish and Install;

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                             Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast 638+00.00 1 EA $679,171.47 679,171.47$               Furnish and Install;

SUBTOTAL  1 EA 679,171.47$             

C. Universal Crossover in Embedded Track EA $642,674.29 ‐$                             Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                            

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                             Furnish and Install;

Includes 115lb rail, concrete ties, switch, OTM, 10" ballast

SUBTOTAL  0 EA ‐$                            

TOTAL  LS 679,171.47$             

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

FIXATION TRACK CONSTRUCTION)

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 7 west

Page 55: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM 641+50.00 2 EA $321,380.80 642,761.60$              

Furnish and Install station platform; Town Center Station (Market Option); 

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system.

B.  Operator relief facility 1 EA $321,380.80 321,380.80$               includes 5 ft by 5 ft bath room building at end of line station

TOTAL  2 LF 964,142.40$             

EA $880,995.47 ‐$                            

TOTAL  0 EA ‐$                            

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

0+00.00 0 STATION $1,518,219.00 $0.00

TOTAL  0 EA ‐$                            

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $23,255,645.00 ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                            

30.05 YARD AND TRACKA. Track ‐ Ballast TF $427.97 ‐$                            

B. Track ‐ In Building TF $365.43 ‐$                            

C. No. 8 Turnouts EA $157,533.80 ‐$                            

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

Furnish and Install station platform (Town Center Station, Independence 

Option);

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

20.07 ELEVATORS, ESCALATORS Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair towers 

on piles; elevators and towers shall have glass exterior

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 7 west

Page 56: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

Interlock Signalization and Control EA $397,001.96 ‐$                            

Asphalt Paving SY $70.34 ‐$                            

TOTAL  LS ‐$                            

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal SF $5.14‐$                             Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track 

Removal1,080 TF $14.49 15,651.36$                

Does not include salvage value

Bridge 

RemovalLF $793.67

‐$                             675+22 to 676+45 Over Waterway = 1320 sf; 876+76 to 878+37 Over 

Waterway = 1735 sf, Total 282 LF/ 3055 SF

B. Clearing Clearing 1 ACRES $8,383.61 8,383.61$                   area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 2,160 LF $34.73 75,021.12$                 Double silt fence quantity in detailed estimate

TOTAL  LS 99,056.09$                 Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 1,080 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open Cut1,080 LF

A3. Relocate Distribution Line ‐ UG TrenchlessLF

SUBTOTAL  1 LS $230,000.00 $230,000.00

B. New, relocate, and adjust storm drain lines 

and structures, NS CorridorLF $123.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor 1,080 LF $1.24 1,339.20$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer Utility 

Lines and Structures: NS Corridor263 LF $16.51 4,342.13$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain lines 

and structures; In StreetLF $146.15 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines and 

structures; In Street LF $25.22 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer Utility 

Lines and Structures; In StreetLF $39.26 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  643+00 1 EA $254,278.83 254,278.83$               Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 875+50LS $158,737.93 ‐$                            

TOTAL  LS 489,960.16$             

A. Demolition

40.03 HAZ. MAT'L., CONTAM'D SOIL 

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 7 west

Page 57: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

TOTAL  365 CY $298.22 108,850.30$             

TOTAL  0 AC $740,520.00 ‐$                            

40.05 SITE STRUCTURES INCLUDING  ROW Fence 1,480 LF $40.33 59,688.40$                 both side of ROW

Bollard and Chain Along 19th Street LF $119.05 ‐$                            

TOTAL  LS 59,688.40$                

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 5", Type  Ton $92.13 ‐$                            

B. Asphalt Concrete Base Course, 6", Type BM‐

25Ton $94.35 ‐$                            

C. Aggregate Base Material, Type 1, No. 21ATon $49.910 ‐$                            

D. Curb and Gutter (HS‐202) LF $43.78 ‐$                            

granite curb LF $23.56 ‐$                            

D. Park and Rides

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                    

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

E. Milling Asphalt SY $47.02 ‐$                             Includes milling of 19th Street Adjacent to track

F. Transit Center

642+00.00 Independence Blvd 1.00 EA $3,600,000.00 3,600,000.00$          

Transit Center shall have approximately 14,700 square feet of bus paving; 5600 

square feet of auto paving; 15,300 square feet of sidewalk; and a pedestrian 

bridge 210 feet long x 15 feet wide; stairs and two elevators on each end of 

pedestrian bridge; includes stormwater detention/retention. Operator facility 

included in category 20.01; purchase and clearing of parcel included in ROW 

costs

TOTAL  LS 2,454,803.86$          

REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 7 west

Page 58: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $22,000.00 22,000.00$                 Includes Maintenance of Traffic and Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 1 EA $500,000.00 500,000.00$              

Grade Crossing Signals EA $250,000.00 ‐$                            

Wayside Signals 0.14 MI $100,000.00 14,000.00$                

Track Circuits 0.14 MI $120,000.00 16,800.00$                

Signal House 1 EA $253,980.68 253,980.68$               One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles EA $55,555.56 ‐$                             upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 784,780.68$             

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

EA $9,688.61 ‐$                             REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

SUBTOTAL  0 ‐$                            

EA $270,648.16 ‐$                            

SUBTOTAL  0 ‐$                            

TOTAL  ‐$                            

Mainline 1 EA $2,373,678.79 2,373,678.79$           Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

TOTAL  1EA

2,373,678.79$           Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 1 EA $13,969.62 13,969.62$                 Furnish and Install 40‐BI 028 (8 per mile)

Transit Systems Conduits 1 LS $29,200.00 29,200.00$                 30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Drilled Shaft Foundations 8 EA $9,939.77 79,518.16$                 Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Remove Existing Foundation (OCS Pole 

Foundation) EA$3,911.67 ‐$                            

At Newtown Road station

OCS System1,750

LF$38.47

67,322.50$                 OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

Tapered Tubular Feeder Pole 10 EA $3,027.75 30,277.50$                 Changed OCS poles to approximately 80 foot spacing

Catenary Cantilever   18 EA $3,220.03 57,960.56$                 Changed OCS poles to approximately 80 foot spacingProtection Barrier at Bridges EA $91,064.29 ‐$                            

TOTAL    LS 278,248.34$             

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

50.05 COMMUNICATIONS

Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 7 west

Page 59: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

West Station Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

Fiber in Duct Bank 0.14 MI $533,762.18 74,726.71$                 4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                             Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 0.14 mi $650,000.0091,000.00$                 To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL  1 LS 165,726.71$             

TVM 4 EA $149,213.65 596,855.00$             

TOTAL  LS 596,855.00$             

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

A. Property Acquisition AC ‐$                            

B. Norfolk Southern ROW AcquisitionLS

$25,500,000.00

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                            Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL EA $657,142.86 ‐$                            Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area and costs are not determined at 

this time.

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT Two collection machines at each station; 2 TVM per enclosure ($12,000 each); 

Include CAT 5 cable from TVM's to nearest FO (for the machine and 

connections, each TVM is about $150,000, including the cable

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 7 west

Page 60: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles) Stationing off Eastbound unless noted10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

0 LF $162.710‐$                              Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

637+00.00 to 640+69.96 370 LF $162.71 60,196.19$                

SUBTOTAL  370 LF 60,196.19$                

B.  Ballast Curb and underdrain 637+00.79 to 638+75.45 WB 175 LF $311.49 54,405.02$                

637+00.00 to 638+76.00 EB 176 LF $311.49 54,822.42$                

SUBTOTAL  351 LF 109,227.43$              

C. Subballast Access Road LF $59.94 ‐$                             

SUBTOTAL  0 LF ‐$                             

TOTAL  370 LF 169,423.63$              

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

TF $754.100 ‐$                             Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

TOTAL  0 TF ‐$                             10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

TF $365.30 ‐$                              Include costs for rough grading, excavation and track slab

TOTAL  0 TF ‐$                             

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)LRT Over Independence Blvd 640+70 649+86 916 LF $11,212.20 10,270,375.20$         Ballast Deck Bridge, 37951 sq ft, 9 Piers

TOTAL  916 LF 10,270,375.20$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation 1,255 CY $34.75 43,621.49$                Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 1,255 CY $57.64 72,356.45$                 Does not Include MOF

Embankment 3,600 CY $65.57 236,052.00$              

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 independence

Page 61: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

B. Retaining Walls SF $35.84 ‐$                              Furnish and Install;

638+75.45 to 640+71.65 WB 1,949 SF $35.84 69,856.06$                 Retaining walls for bridge approaches

638+76.00 to 640+69.96 EB 1,949 SF $35.84 69,856.06$                

649+87.98 to 650+63.98 WB 1,615 SF $35.84 57,884.83$                

649+86.00 to 650+62.00 EB 1,615 SF $35.84 57,884.83$                

TOTAL  1 LS 607,511.72$              

Furnish and Install Track on Guideway constructed in 10.04;

TOTAL  0 TF ‐$                             

TF $317.54 ‐$                              Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

Includes 115lb CWR, concrete ties, OTM

TOTAL  0 TF ‐$                             

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track TF $322.893 ‐$                              Furnish and Install;

637+00.00 to 640+69.96 EB 369.96 TF $322.89 119,457.49$               Includes 115lb CWR, concrete ties, OTM, 10" ballast

637+00.79 to 640+71.65 WB 370.86 TF $322.89 119,748.10$              

SUBTOTAL  741 TF 239,205.59$              

LRT Over Independence Blvd640+69.96 649+80.91 EB 910.95 TF $344.083 313,442.41$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

LRT Over Independence Blvd 640+71.65 649+82.89 WB 911.24 TF $344.083 313,542.19$              

SUBTOTAL  1,822 TF 626,984.60$              

TF $1,243.02 ‐$                              Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

Use different type of grade crossing, increase cost

SUBTOTAL  0 TF ‐$                             

TOTAL  741 TF 866,190.19$              

EA $171,341.48 ‐$                              Furnish and Install;

EA $171,341.48 ‐$                              Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                              See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                             

B. Universal Crossover in Ballast 643+00 1 EA $679,171.47 679,171.47$               Furnish and Install;

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 independence

Page 62: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

SUBTOTAL  1 EA 679,171.47$              

C. Universal Crossover in Embedded TrackEA $642,674.29

‐$                             

Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                             

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                              Furnish and Install;

SUBTOTAL  0 EA ‐$                             

TOTAL  LS 679,171.47$              

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM EA $321,380.80 ‐$                             

Furnish and Install station platform;

Includes cost for one 12' wide concrete platforms, each with canopy, furnishings, 

utility services, security system.

B.  Operator relief facility 1 EA $321,380.80 321,380.80$               includes 5 ft by 5 ft bathroom building at end of line station

TOTAL  0 LF 321,380.80$              

646+00.00 1 EA $880,995.47 880,995.47$              

TOTAL  1 EA 880,995.47$              

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

646+00.00 1 STATION $1,518,219.00 1,518,219.00$           

TOTAL  1 EA 1,518,219.00$          

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station stop 

locations; include two separate elevator towers on piles, and stair towers on 

piles; elevators and towers shall have glass exterior

20.07 ELEVATORS, ESCALATORS

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

Furnish and Install station platform (Town Center Station, Independence 

Option);

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 independence

Page 63: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $23,255,645.00 ‐$                             

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                             

30.05 YARD AND TRACKA. Track ‐ Ballast TF $427.97 ‐$                             

B. Track ‐ In Building TF $365.43 ‐$                             

C. No. 8 Turnouts EA $157,533.80 ‐$                             

Interlock Signalization and Control EA $397,001.96 ‐$                             

Asphalt Paving SY $70.34 ‐$                             

TOTAL  LS ‐$                             

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal SF $5.14‐$                              Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track Removal 1,300 TF $14.49 18,839.60$                 Does not include salvage value

Bridge Removal LF $793.67 ‐$                             

B. Clearing Clearing 1 ACRES $8,383.61 8,383.61$                    area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 2,600 LF $34.73 90,303.20$                 Double silt fence quantity in detailed estimate

TOTAL  LS 117,526.41$               Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 1,300 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open 

Cut1,300 LF

A3. Relocate Distribution Line ‐ UG 

TrenchlessLF

SUBTOTAL  1 LS $410,000.00 $410,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor LF $123.40 ‐$                             Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

A. Demolition

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 independence

Page 64: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

C. Relocate and adjust water utility lines 

and structures; NS Corridor 1,300 LF $1.24 1,612.00$                   

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 548 LF $16.51 9,047.48$                   

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In StreetLF $146.15 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street LF $25.22 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street LF $39.26 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  643+00 1 EA $254,278.83 254,278.83$               Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $158,737.93 ‐$                             

TOTAL  LS 674,938.31$              

TOTAL  650 CY $298.22 193,843.00$              

TOTAL  0 AC $740,520.00 ‐$                             

40.05 SITE STRUCTURES INCLUDING  ROW Fence 2,640 LF $40.33 106,471.20$               both side of ROW

Bollard and Chain Along 19th Street LF $119.05 ‐$                             

TOTAL  1 LS 106,471.20$              

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 5",  Ton $92.13 ‐$                             

B. Asphalt Concrete Base Course, 6", Type 

BM‐25Ton $94.35 ‐$                             

C. Aggregate Base Material, Type 1, No. 

21ATon $49.910 ‐$                             

D. Curb and Gutter (HS‐202) LF $43.78 ‐$                             

granite curb LF $23.56 ‐$                             

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 independence

Page 65: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

D. Park and Rides

650+00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$           

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 110,000 

SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 60.01.   

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

E. Milling Asphalt SY $47.02 ‐$                              Includes milling of 19th Street Adjacent to track

TOTAL  LS 2,454,803.86$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $40,000.00 40,000.00$                 Includes Maintenance of Traffic and Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 1 EA $500,000.00 500,000.00$              

Grade Crossing Signals EA $250,000.00 ‐$                             

Wayside Signals 0.25 MI $100,000.00 25,000.00$                

Track Circuits 0.25 MI $120,000.00 30,000.00$                

Signal House 1 EA $253,980.68 253,980.68$               One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles EA $55,555.56 ‐$                              upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 808,980.68$              

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

EA $9,688.61 ‐$                              REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

SUBTOTAL  0 ‐$                             

EA $270,648.16 ‐$                             

SUBTOTAL  0 ‐$                             

TOTAL  ‐$                             

Mainline 1 EA $2,373,678.79 2,373,678.79$            Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

TOTAL  1 EA 2,373,678.79$          Substations are to be connected together, such that if a predetermined number 

of substations are down, the remaining substations can carry the vehicle load

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add $10,400 

to each grade crossing to account for wiring 12 guage EF units for traffic signal 

preemption

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 independence

Page 66: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 2 EA $13,969.62 27,939.24$                 Furnish and Install 40‐BI 028 (8 per mile)

Transit Systems Conduits 1 LS $52,000.00 52,000.00$                 30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Drilled Shaft Foundations 15 EA $9,939.77 149,096.55$               Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Remove Existing Foundation (OCS Pole 

Foundation) EA$3,911.67 ‐$                             

At Newtown Road station

OCS System3,120

LF$38.47

120,026.40$               OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, Contact 

Wires

Tapered Tubular Feeder Pole 17 EA $3,027.75 51,471.75$                 Changed OCS poles to approximately 80 foot spacing

Catenary Cantilever   32 EA $3,220.03 103,040.99$               Changed OCS poles to approximately 80 foot spacingProtection Barrier at Bridges EA $91,064.29 ‐$                             

TOTAL    LS 503,574.93$              

Fiber in Duct Bank 0.25 MI $533,762.18 133,440.55$               4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                              Speakers, cameras, and variable message signs; include CAT 5 cable to cameras; 

each station stop in VB

IT Room and Equipment at MOF 0.25 mi $650,000.00 162,500.00$              To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL  1 LS 295,940.55$              

TVM 4 EA $149,213.65 596,855.00$              

TOTAL  LS 596,855.00$              

50.07 CENTRAL CONTROL Not used60 ROW, LAND, EXISTING 

IMPROVEMENTS60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                             

B. Norfolk Southern ROW AcquisitionLS

$25,500,000.00

‐$                              Parcel acquisition will be required, but area and costs are not determined at this 

time.

C. Property Acquisition (Park and Rides)

AC

‐$                              Parcel acquisition will be required, but area and costs are not determined at this 

time.

D. Substation Property Acquisition 

AC

‐$                              Parcel acquisition will be required, but area and costs are not determined at this 

time.

TOTAL  LS ‐$                             

Parcel acquisition will be required, but area and costs are not determined at this 

time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area and costs are not determined at this 

time.

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

50.05 COMMUNICATIONS

Two collection machines at each station; Two additional end of line collection 

machines; 2 TVM per enclosure ($12,000 each); Include CAT 5 cable from TVM's 

to nearest FO (for the machine and connections, each TVM is about $150,000, 

including the cable

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 independence

Page 67: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Independence Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

TOTAL  AC ‐$                             

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                             Includes spare parts, special events, and ATC equipment and $15,000 per vehicle 

for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUS TOTAL EA $657,142.86 ‐$                              Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 independence

Page 68: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles) Stationing off Eastbound unless noted637+00.00 to 640+69.96 370 LF $162.710 60,196.19$                

SUBTOTAL  370 LF 60,196.19$                

B.  Ballast Curb and underdrain 637+00.79 to 638+75.31 WB 175 LF $311.49 54,361.41$                

637+00.00 to 638+76.00 EB 176 LF $311.49 54,822.42$                

SUBTOTAL  351 LF 109,183.83$             

C. Subballast Access Road LF $59.94 ‐$                            

SUBTOTAL  0 LF ‐$                            

TOTAL  370 LF 169,380.02$             

TF $754.100 ‐$                            

TOTAL  0 TF ‐$                            10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

TF $365.30 ‐$                             Include costs for rough grading, excavation and track slab

TOTAL  0 TF ‐$                            

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

LRT Over Independence Blvd640+70.00 655+26.00 1456 LF $11,212.20 16,324,963.20$         Ballast Deck Bridge, 54566 sq ft, 14 Piers

TOTAL  1,456 LF 16,324,963.20$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL Not used

Unsuitable Excavation 1,255 CY $34.75 43,621.49$                Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 1,255 CY $57.64 72,356.45$                 Does not Include MOF

Embankment 3,600 CY $65.57 236,052.00$              

B. Retaining Walls SF $35.84 ‐$                             Furnish and Install;

638+75.31 to 640+71.65 WB 1,936 SF $35.84 69,381.15$                

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 market

Page 69: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

638+76.00 to 640+69.96 EB 1,936 SF $35.84 69,381.15$                

655+27.35 to 656+03.35 WB 1,615 SF $35.84 57,884.83$                

655+25.67 to 656+01.67 EB 1,615 SF $35.84 57,884.83$                

TOTAL  LS 606,561.91$             

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

TOTAL  0 TF ‐$                            

TF $317.54 ‐$                            

TOTAL  0 TF ‐$                            Includes 115lb CWR, concrete ties, OTM

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 637+00.00 to 640+69.96 EB 369.96 TF $322.893 119,457.49$               Furnish and Install;

637+00.79 to 640+71.65 WB 370.86 TF $322.89 119,748.10$               Includes 115lb CWR, concrete ties, OTM, 10" ballast

SUBTOTAL  741 TF 239,205.59$             

LRT Over Independence Blvd640+69.96 to 655+25.67 EB 1,455.71 TF $344.083 500,885.06$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

LRT Over Independence Blvd640+71.65 to 655+27.35 WB 1,455.70 TF $344.08 500,881.62$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

SUBTOTAL  2,911 TF 1,001,766.69$          

TF $1,243.02 ‐$                             Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

SUBTOTAL  0 TF ‐$                            

TOTAL  741 TF 1,240,972.28$          

10.12 TRACK: SPECIAL (NO. 8 TURNOUT) EA $171,341.48 ‐$                             Furnish and Install;

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                             Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast 648+00.00 1 EA $679,171.47 679,171.47$               Furnish and Install;

SUBTOTAL  1 EA 679,171.47$             

C. Universal Crossover in Embedded Track EA $642,674.29 ‐$                            Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                            

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 market

Page 70: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                             Furnish and Install;

SUBTOTAL  0 EA ‐$                            

TOTAL  LS 679,171.47$             

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM EA $321,380.80 ‐$                            

Furnish and Install station platform;

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system.

B.  Operator relief facility 1 EA $321,380.80 321,380.80$               includes 5 ft by 5 ft bath room building at end of line station

TOTAL  0 LF 321,380.80$             

652+00.00 1 EA $880,995.47 880,995.47$              

TOTAL  1 EA 880,995.47$             

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

652+00.00 1 STATION $1,518,219.00 $1,518,219.00

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair towers 

on piles; elevators and towers shall have glass exterior

TOTAL  1 EA 1,518,219.00$          

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

Furnish and Install station platform (Town Center Station, Independence 

Option);

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

20.07 ELEVATORS, ESCALATORS

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 market

Page 71: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

30.03 HEAVY MAINTENANCE FACILITYTOTAL  LS $23,255,645.00 ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                            

30.05 YARD AND TRACKA. Track ‐ Ballast TF $427.97 ‐$                            

B. Track ‐ In Building TF $365.43 ‐$                            

C. No. 8 Turnouts EA $157,533.80 ‐$                            

Interlock Signalization and Control EA $397,001.96 ‐$                            

Asphalt Paving SY $70.34 ‐$                            

TOTAL  LS ‐$                            

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal SF $5.14‐$                             Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track 

Removal1,850 TF $14.49

26,810.20$                

Does not include salvage value

Bridge 

RemovalLF $793.67

‐$                            

B. Clearing Clearing 2 ACRES $8,383.61 16,767.22$                 area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 3,700 LF $34.73 128,508.40$               Double silt fence quantity in detailed estimate

TOTAL  LS 172,085.82$              Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATION

A1. Relocate Distribution Line ‐ OH 1,850 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open Cut1,850 LF

A3. Relocate Distribution Line ‐ UG TrenchlessLF

SUBTOTAL  1 LS $580,000.00 $580,000.00

B. New, relocate, and adjust storm drain lines 

and structures, NS CorridorLF $123.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor 1,850 LF $1.24 2,294.00$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer Utility 

Lines and Structures: NS Corridor548 LF $16.51 9,047.48$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain lines 

and structures; In StreetLF $146.15 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

A. Demolition

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 market

Page 72: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

F. Relocate and adjust water utility lines and 

structures; In Street LF $25.22 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer Utility 

Lines and Structures; In StreetLF $39.26 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  643+00 1 EA $254,278.83 254,278.83$               Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 875+50LS $158,737.93 ‐$                            

TOTAL  LS 845,620.31$             

TOTAL  910 CY $298.22 271,380.20$             

TOTAL  0 AC $740,520.00 ‐$                            

40.05 SITE STRUCTURES INCLUDING  ROW Fence 3,700 LF $40.33 149,221.00$               both side of ROW

Bollard and Chain Along 19th Street LF $119.05 ‐$                            

TOTAL  1 LS 149,221.00$             

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

Ton $92.13 ‐$                            

Ton $92.13 ‐$                            

B. Asphalt Concrete Base Course, 6", Type BM‐

25Ton $94.35 ‐$                            

C. Aggregate Base Material, Type 1, No. 21ATon $49.910 ‐$                            

D. Curb and Gutter (HS‐202) LF $43.78 ‐$                            

granite curb LF $23.56 ‐$                            

D. Park and Rides

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                    

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

A. Asphalt Concrete Surface Course, 5", Type 

SM‐9.5A

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 market

Page 73: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

E. Milling Asphalt SY $47.02 ‐$                             Includes milling of 19th Street Adjacent to track

TOTAL  LS 2,454,803.86$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $55,000.00 55,000.00$                 Includes Maintenance of Traffic and Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 1 EA $500,000.00 500,000.00$              

Grade Crossing Signals EA $250,000.00 ‐$                            

Wayside Signals 0.35 MI $100,000.00 35,000.00$                

Track Circuits 0.35 MI $120,000.00 42,000.00$                

Signal House 1 EA $253,980.68 253,980.68$               One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles EA $55,555.56 ‐$                             upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 830,980.68$             

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

EA $9,688.61 ‐$                             REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

SUBTOTAL  0 ‐$                            

EA $270,648.16 ‐$                            

SUBTOTAL  0 ‐$                            

TOTAL  ‐$                            

Mainline 1 EA $2,373,678.79 2,373,678.79$           Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

TOTAL  1EA

2,373,678.79$          

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 3 EA $13,969.62 41,908.86$                 Furnish and Install 40‐BI 028 (8 per mile)

Transit Systems Conduits 1 LS $73,000.00 73,000.00$                 30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Drilled Shaft Foundations 21 EA $9,939.77 208,735.17$               Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Remove Existing Foundation (OCS Pole 

Foundation) EA$3,911.67 ‐$                            

At Newtown Road station

OCS System4,400

LF$38.47

169,268.00$               OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

Tapered Tubular Feeder Pole 24 EA $3,027.75 72,666.00$                 Changed OCS poles to approximately 80 foot spacing

Catenary Cantilever   44 EA $3,220.03 141,681.36$               Changed OCS poles to approximately 80 foot spacingProtection Barrier at Bridges EA $91,064.29 ‐$                            

Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 market

Page 74: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

TOTAL    LS 707,259.39$             

Fiber in Duct Bank 0.35 MI $533,762.18 186,816.76$               4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                             Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 0.35 mi $650,000.00227,500.00$               To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL  1 LS 414,316.76$             

TVM 4 EA $149,213.65 596,855.00$             

TOTAL  LS 596,855.00$             

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

A. Property Acquisition AC ‐$                            

B. Norfolk Southern ROW AcquisitionLS

$25,500,000.00

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                            Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL EA $657,142.86 ‐$                            Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

Two collection machines at each station; 2 TVM per enclosure ($12,000 each); 

Include CAT 5 cable from TVM's to nearest FO (for the machine and 

connections, each TVM is about $150,000, including the cable

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area and costs are not determined at 

this time.

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 market

Page 75: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Market Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

70.07 SPARE PARTS Not used

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 market

Page 76: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles) Stationing off Eastbound unless noted637+00.00 to 640+69.96 370 LF $162.710 60,196.19$                

655+52.12 to 662+64.65 713 LF $162.71 115,935.76$              

SUBTOTAL  1,082 LF 176,131.95$             

B.  Ballast Curb and underdrain 637+00.00 to 638+76.00 EB 176 LF $311.49 54,822.42$                

637+00.79 to 638+75.31 WB 175 LF $311.49 54,361.41$                

658+25.33 to 662+69.65 EB 444 LF $311.49 138,401.68$              

658+27.13 to 662+70.73 WB 444 LF $311.49 138,177.41$              

across end of track 662+69.65 29 LF $311.49 9,033.24$                  

SUBTOTAL  1,267 LF 394,796.15$             

C. Subballast Access Road LF $59.94 ‐$                             

SUBTOTAL  0 LF ‐$                             

TOTAL  1,082 LF 570,928.10$             

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

TF $754.100 ‐$                             Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

TOTAL  0 TF ‐$                             10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

TF $365.30 ‐$                              Include costs for rough grading, excavation and track slab

TOTAL  0 TF ‐$                             

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

LRT Over Independence Blvd 640+70 655+52 1482 LF $11,212.20 16,616,480.40$         Ballast Deck Bridge, 43669 sq ft, 14 Piers

TOTAL  1,482 LF 16,616,480.40$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation 3,047 CY $34.75 105,883.56$              Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 constitution

Page 77: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

Borrow Fill ‐ Unsuitable Excavation 3,047 CY $57.64 175,632.64$               Does not Include MOF

Embankment 5,200 CY $65.57 340,964.00$              

B. Retaining Walls SF $35.84 ‐$                              Furnish and Install;

638+75.31 to 640+71.65 WB 1,936 SF $35.84 69,390.11$                

638+76.00 to 640+69.96 EB 1,936 SF $35.84 69,390.11$                

655+61.79 to 658+27.13 WB 3,157 SF $35.84 113,153.19$              

655+52.12 to 658+25.33 EB 3,157 SF $35.84 113,153.19$              

TOTAL  1 LS 987,566.81$             

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

TOTAL  0 TF ‐$                             

TF $317.54 ‐$                              Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

Includes 115lb CWR, concrete ties, OTM

TOTAL  0 TF ‐$                             

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 637+00.00 to 640+69.96 EB 369.96 TF $322.893 119,457.49$               Furnish and Install;

637+00.79 to 640+71.65 WB 370.86 TF $322.89 119,748.10$               Includes 115lb CWR, concrete ties, OTM, 10" ballast

655+52.12 to 662+64.65 EB 712.53 TF $322.89 230,070.95$              

655+61.79 to 662+65.74 WB 703.95 TF $322.89 227,300.53$              

SUBTOTAL  2,157 TF 696,577.07$             

LRT Over Independence Blvd640+69.96 655+52.12 EB 1,482.16 TF $344.083 509,986.06$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

LRT Over Independence Blvd640+71.65 655+61.79 WB 1,490.14 TF $344.08 512,731.84$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

SUBTOTAL  2,972 TF 1,022,717.90$          

TF $1,243.02 ‐$                              Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

Use different type of grade crossing, increase cost

SUBTOTAL  0 TF ‐$                             

TOTAL  2,157 TF 1,719,294.97$          

EA $171,341.48 ‐$                              Furnish and Install;

EA $171,341.48 ‐$                              Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                              See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 constitution

Page 78: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

SUBTOTAL  0 EA ‐$                             

B. Universal Crossover in Ballast 649+00.00 1 EA $679,171.47 679,171.47$               Furnish and Install;

Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

SUBTOTAL  1 EA 679,171.47$             

C. Universal Crossover in Embedded TrackEA $642,674.29

‐$                             

Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                             

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                              Furnish and Install;

SUBTOTAL  0 EA ‐$                             

TOTAL  LS 679,171.47$             

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

661+00.00 2 EA $321,380.80 642,761.60$              

Furnish and Install station platform; Town Center Station (Constitution 

Option);

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system.

B.  Operator relief facility 1 EA $321,380.80 321,380.80$               includes 5 ft by 5 ft bath room building at end of line station

TOTAL  2 LF 964,142.40$             

EA $880,995.47 ‐$                             

TOTAL  0 EA ‐$                             

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

Furnish and Install station platform;

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 constitution

Page 79: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

0+00.00 0 STATION $1,518,219.00 $0.00

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair towers 

on piles; elevators and towers shall have glass exterior

TOTAL  0 EA ‐$                             

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $23,255,645.00 ‐$                             

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                             

30.05 YARD AND TRACKA. Track ‐ Ballast TF $427.97 ‐$                              Does not include turnout lengths

B. Track ‐ In Building TF $365.43 ‐$                             

C. No. 8 Turnouts EA $157,533.80 ‐$                             

Interlock Signalization and Control EA $397,001.96 ‐$                             

Asphalt Paving SY $70.34 ‐$                             

TOTAL  LS ‐$                             

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal SF $5.14‐$                              Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track 

Removal2,570 TF $14.49 37,244.44$                

Does not include salvage value

Bridge 

RemovalLF $793.67

‐$                             

B. Clearing Clearing 2 ACRES $8,383.61 16,767.22$                 area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 5,140 LF $34.73 178,522.48$               Double silt fence quantity in detailed estimate

TOTAL  LS 232,534.14$              Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 2,570 LF Adjust utility cost based on new information

20.07 ELEVATORS, ESCALATORS

A. Demolition

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 constitution

Page 80: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

A2. Relocate Distribution Line ‐ UG Open 

Cut2,570 LF

A3. Relocate Distribution Line ‐ UG 

TrenchlessLF

SUBTOTAL  1 LS $800,000.00 $800,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor LF $123.40 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor 2,570 LF $1.24 3,186.80$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 548 LF $16.51 9,047.48$                  

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In StreetLF $146.15 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street LF $25.22 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street LF $39.26 ‐$                             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  643+00 1 EA $254,278.83 254,278.83$               Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $158,737.93 ‐$                             

TOTAL  LS 1,066,513.11$          

TOTAL  1,270 CY $298.22 378,739.40$             

TOTAL  0 AC $740,520.00 ‐$                             

40.05 SITE STRUCTURES INCLUDING  ROW Fence 5,180 LF $40.33 208,909.40$               both side of ROW

Bollard and Chain Along 19th Street LF $119.05 ‐$                             

TOTAL  1 LS 208,909.40$             

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

40.04 ENVIRONMENTAL MITIGATION

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 constitution

Page 81: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

A. Asphalt Concrete Surface Course, 5",  Ton $92.13 ‐$                             

B. Asphalt Concrete Base Course, 6", Type 

BM‐25Ton $94.35 ‐$                             

C. Aggregate Base Material, Type 1, No. 

21ATon $49.910 ‐$                             

D. Curb and Gutter (HS‐202) LF $43.78 ‐$                             

granite curb LF $23.56 ‐$                             

D. Park and Rides

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                    

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materialsE. Milling Asphalt SY $47.02 ‐$                              Includes milling of 19th Street Adjacent to track

TOTAL  LS 2,454,803.86$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $77,000.00 77,000.00$                 Includes Maintenance of Traffic and Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 1 EA $500,000.00 500,000.00$              

Grade Crossing Signals EA $250,000.00 ‐$                             

Wayside Signals 0.49 MI $100,000.00 49,000.00$                

Track Circuits 0.49 MI $120,000.00 58,800.00$                

Signal House 1 EA $253,980.68 253,980.68$               One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles EA $55,555.56 ‐$                              upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 861,780.68$             

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

EA $9,688.61 ‐$                              REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

SUBTOTAL  0 ‐$                             

EA $270,648.16 ‐$                             

SUBTOTAL  0 ‐$                             

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 constitution

Page 82: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

TOTAL  ‐$                             

Mainline 1 EA $2,373,678.79 2,373,678.79$           Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

TOTAL  1EA

2,373,678.79$           Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 4 EA $13,969.62 55,878.48$                 Furnish and Install 40‐BI 028 (8 per mile)

Transit Systems Conduits 1 LS $105,000.00 105,000.00$               30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Drilled Shaft Foundations 29 EA $9,939.77 288,253.33$               Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Remove Existing Foundation (OCS Pole 

Foundation) EA$3,911.67 ‐$                             

At Newtown Road station

OCS System6,110

LF$38.47

235,051.70$               OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

Tapered Tubular Feeder Pole 34 EA $3,027.75 102,943.50$               Changed OCS poles to approximately 80 foot spacing

Catenary Cantilever   62 EA $3,220.03 199,641.92$               Changed OCS poles to approximately 80 foot spacingProtection Barrier at Bridges EA $91,064.29 ‐$                             

TOTAL    LS 986,768.93$             

Fiber in Duct Bank 0.49 MI $533,762.18 261,543.47$               4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                              Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 0.49 mi $650,000.00 318,500.00$              To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL  1 LS 580,043.47$             

TVM 4 EA $149,213.65 596,855.00$             

TOTAL  LS 596,855.00$             

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                             

B. Norfolk Southern ROW AcquisitionLS

$25,500,000.00

‐$                              Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

AC

‐$                              Parcel acquisition will be required, but area and costs are not determined at 

this time.

Parcel acquisition will be required, but area and costs are not determined at 

this time.

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT Two collection machines at each station; 2 TVM per enclosure ($12,000 each); 

Include CAT 5 cable from TVM's to nearest FO (for the machine and 

connections, each TVM is about $150,000, including the cable

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 constitution

Page 83: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

Constitution Option

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

D. Substation Property Acquisition 

AC

‐$                              Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  LS ‐$                             

TOTAL  AC ‐$                             

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                             Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL EA $657,142.86 ‐$                             Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area and costs are not determined at 

this time.

HRT_VB_LRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 constitution

Page 84: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative 1B     

Page 85: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

485+43.28 to 491+81.19 638 LF $162.710103,794.34$              Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

493+27.22 to 503+10.96 984 LF $162.71 160,064.34$             

505+76.33 to 507+47.88 172 LF $162.71 27,912.90$                

508+19.52 to 567+62.81 5,943 LF $162.71 967,032.72$             

568+34.81 to 578+27.00 992 LF $162.71 161,439.23$             

587+00.00 to 592+45.52 546 LF $162.71 88,761.56$                

592+85.52 to 607+70.19 1,485 LF $162.71 241,570.66$             

608+40.19 to 635+49.94 2,710 LF $162.71 440,903.42$             

636+13.94 to 640+70.00 456 LF $162.71 74,205.52$                

655+60.00 to 662+64.64 705 LF $162.71 114,651.97$             

663+54.64 to 675+00.00 1,145 LF $162.71 186,361.53$             

676+86.44 to 692+30.48 1,544 LF $162.71 251,230.75$             

692+62.48 to 718+90.23 2,628 LF $162.71 427,561.20$             

719+30.23 to 728+12.88 883 LF $162.71 143,615.98$             

729+00.88 to 737+00.00 799 LF $162.71 130,024.82$             

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

LF $162.71 ‐$                            

SUBTOTAL  21,628 LF 3,519,130.93$          

B.  Ballast Curb and underdrain 20,138 LF $311.49 6,272,805.76$          

C. Subballast Access Road 533+51.45 to 562+28.75 LT 2,877 LF $59.94 172,476.87$             

608+57.75 to 635+73.98 RT 2,716 LF $59.94 162,821.69$             

670+03.46 to 675+00.48 LT 497 LF $59.94 29,793.37$                

679+47.29 to 683+45.81 RT 399 LF $59.94 23,888.88$                

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 1 of 16 TOTAL

Page 86: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LF $59.94 ‐$                            

LF $59.94 ‐$                            

SUBTOTAL  6,489 LF 388,980.81$             

TOTAL  21,628 LF 10,180,917.50$        

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

491+81.19 to 493+27.22 146 TF $754.100 110,121.22$             Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

503+10.96 to 505+76.33 265 TF $754.10 200,115.52$             

507+47.88 to 508+19.52 72 TF $754.10 54,023.72$                

567+62.81 to 568+34.81 72 TF $754.10 54,295.20$                

592+45.52 to 592+85.52 40 TF $754.10 30,164.00$                

607+70.19 to 608+40.19 70 TF $754.10 52,787.00$                

635+49.94 to 636+13.94 64 TF $754.10 48,262.40$                

662+64.64 to 663+54.64 90 TF $754.10 67,869.00$                

692+30.48 to 692+62.48 32 TF $754.10 24,131.20$                

718+90.23 to 719+30.23 40 TF $754.10 30,164.00$                

728+12.88 to 729+00.88 88 TF $754.10 66,360.80$                

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TF $754.10 ‐$                            

TOTAL  979 TF 738,294.06$             10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

1100+87.29 to 1128+00.30 2,725 TF $365.30 995,442.50$              Include costs for rough grading, excavation and track slab

TOTAL  2,725 TF 995,442.50$             

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 2 of 16 TOTAL

Page 87: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE) 873 LF $11,559.07 10,091,070.73$         Ballast Deck Bridge, 24822 sq ft, 8 Piers

1490 LF $11,212.20 16,706,178.00$         Ballast Deck Bridge, 54243 sq ft, 14 Piers

187 LF $17,551.49 3,282,129.19$           Open Deck Bridge, 5156 sq ft, 2 Piers

LF $12,036.10 ‐$                             Ballast Deck Bridge, 23417 sq ft, 8 Piers

LF $11,740.07 ‐$                             Ballast Deck Bridge, 24422 sq ft, 8 Piers

LF $14,846.82 ‐$                             Open Deck Bridge, 8851 sq ft, 4 Piers

LF $11,559.07 ‐$                             Ballast Deck Bridge, 25731 sq ft, 9 Piers

TOTAL  2,550 LF 30,079,377.92$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation 31,130 CY $34.75 1,081,767.50$          Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 31,130 CY $57.64 1,794,364.33$           Does not Include MOF

Embankment 9,705 CY $65.57 636,356.85$             

B. Retaining Walls 569+00.00 to 572+13.65 WB 1,882 SF $35.84 67,451.06$                 Furnish and Install;

575+60.04 to 578+28.10 WB 1,977 SF $35.84 70,855.15$                 Retaining walls for bridge approaches

575+59.87 to 578+27.02 EB 1,977 SF $35.84 70,855.15$                

587+01.92 to 589+87.86 WB 2,162 SF $35.84 77,485.92$                

587+00.00 to 589+86.85 EB 2,162 SF $35.84 77,485.92$                

638+75.45 to 640+71.65 WB 1,936 SF $35.84 69,381.15$                

638+76.00 to 640+69.96 EB 1,936 SF $35.84 69,381.15$                

655+62.69 to 658+28.11 WB 3,157 SF $35.84 113,157.67$             

655+59.90 to 658+25.30 EB 3,157 SF $35.84 113,157.67$             

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

10.08 GUIDWAY: RETAINED CUT OR FILL

578+27 TO 587+00 LRT

Over Witchduck Rd

640+70 TO 655+60 LRT

Over Independence Blvd

675+00 TO 676+87

LRT Over Waterway

Furnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 3 of 16 TOTAL

Page 88: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

TOTAL  LS 4,241,699.55$          

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

675+00 TO 676+87LRT Over Waterway 187 TF $412.82 77,197.34$                

675+00 TO 676+87LRT Over Waterway 187 TF $412.82 77,197.34$                

0 0 TF $412.82 ‐$                            

0 0 TF $412.82 ‐$                            

TOTAL  374 TF 154,394.68$             

1087+50 to 1128+12.25 EB 4,062 TF $317.54 1,289,851.54$           Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

1087+50 to 1128+00.30 WB 4,050 TF $317.51 1,285,919.55$           Includes 115lb CWR, concrete ties, OTM

TOTAL  8,112 TF 2,575,771.09$          

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 485+43.28 to 491+81.19 EB 638 TF $322.893 205,976.67$              Furnish and Install;

491+73.78 to 491+81.97 WB 8 TF $322.89 2,644.49$                   Includes 115lb CWR, concrete ties, OTM, 10" ballast

493+27.22 to 503+10.96 EB 984 TF $322.89 317,642.76$             

493+28.00 to 502+74.81 WB 947 TF $322.89 305,718.32$             

505+76.33 to 507+47.88 EB 172 TF $322.89 55,392.29$                

505+38.85 to 507+48.72 WB 210 TF $322.89 67,765.55$                

508+19.52 to 567+62.81 EB 5,943 TF $322.89 1,919,046.74$          

508+20.36 to 567+25.03 WB 5,905 TF $322.89 1,906,576.61$          

568+34.81 to 578+27.00 EB 992 TF $322.89 320,371.21$             

567+97.07 to 578+27.01 WB 1,030 TF $322.89 332,560.42$             

587+00.00 to 592+45.52 EB 546 TF $322.89 176,144.59$             

587+01.92 to 592+46.53 WB 545 TF $322.89 175,850.76$             

592+85.52 to 607+70.19 EB 1,485 TF $322.89 479,389.55$             

592+86.53 to 607+71.15 WB 1,485 TF $322.89 479,373.41$             

608+40.19 to 635+49.94 EB 2,710 TF $322.89 874,959.31$             

608+41.15 to 635+50.78 WB 2,710 TF $322.89 874,920.56$             

636+13.94 to 640+70.00 EB 456 TF $322.89 147,258.58$             

636+14.78 to 640+71.65 WB 457 TF $322.89 147,520.12$             

655+60.00 to 662+64.64 EB 705 TF $322.89 227,523.32$             

655+62.69 to 662+66.67 WB 704 TF $322.89 227,310.21$             

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 4 of 16 TOTAL

Page 89: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

663+54.64 to 675+00.00 EB 1,145 TF $322.89 369,828.73$             

663+56.61 to 675+02.06 WB 1,145 TF $322.89 369,857.79$             

676+86.44 to 692+30.48 EB 1,544 TF $322.89 498,559.71$             

676+88.47 to 692+32.57 WB 1,544 TF $322.89 498,579.08$             

692+62.48 to 718+90.23 EB 2,628 TF $322.89 848,482.08$             

692+64.57 to 718+92.21 WB 2,628 TF $322.89 848,446.56$             

719+30.23 to 728+12.88 EB 883 TF $322.89 285,001.51$             

719+32.21 to 728+14.89 WB 883 TF $322.89 285,011.19$             

729+00.88 to 737+00.00 EB 799 TF $322.89 258,030.25$             

729+02.89 to 737+02.02 WB 799 TF $322.89 258,033.48$             

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                            

TF $322.89 ‐$                             Added pocket track

SUBTOTAL  42,626 TF 13,763,775.86$        

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 5 of 16 TOTAL

Page 90: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.083 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.08 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

640+70 TO 655+60 LRTOver Independence Blvd 1,490 TF $344.08 512,683.67$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

640+70 TO 655+60 LRTOver Independence Blvd 1,490 TF $344.08 512,683.67$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

0 0 TF $344.08 ‐$                            Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

0 0 TF $344.08 ‐$                            Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

0 0 TF $344.08 ‐$                            Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

0 0 TF $344.08 ‐$                            Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

0 0 TF $344.08 ‐$                            

0 0 TF $344.08 ‐$                            

SUBTOTAL  4,726 TF 1,626,136.26$          

491+81.19 to 493+27.22 EB 146 TF $1,243.02 181,518.50$              Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

491+81.97 to 493+28.00 WB 146 TF $1,243.02 181,518.50$              Use different type of grade crossing, increase cost

503+10.96 to 505+76.33 EB 265 TF $1,243.02 329,860.75$             

502+74.81 to 505+38.85 WB 264 TF $1,243.02 328,207.53$             

507+47.88 to 508+19.52 EB 72 TF $1,243.02 89,050.10$                

507+48.72 to 508+20.36 WB 72 TF $1,243.02 89,050.10$                

567+62.81 to 568+34.81 EB 72 TF $1,243.02 89,497.58$                

567+25.03 to 567+97.07 WB 72 TF $1,243.02 89,547.30$                

592+45.52 to 592+85.52 EB 40 TF $1,243.02 49,720.88$                

592+46.53 to 592+86.53 WB 40 TF $1,243.02 49,720.88$                

607+70.19 to 608+40.19 EB 70 TF $1,243.02 87,011.54$                

607+71.15 to 608+41.15 WB 70 TF $1,243.02 87,011.54$                

635+49.94 to 636+13.94 EB 64 TF $1,243.02 79,553.41$                

635+50.78 to 636+14.78 WB 64 TF $1,243.02 79,553.41$                

662+64.64 to 663+54.64 EB 90 TF $1,243.02 111,871.98$             

662+66.67 to 663+56.61 WB 90 TF $1,243.02 111,797.40$             

692+30.48 to 692+62.48 EB 32 TF $1,243.02 39,776.70$                

692+32.57 to 692+64.57 WB 32 TF $1,243.02 39,776.70$                

718+90.23 to 719+30.23 EB 40 TF $1,243.02 49,720.88$                

718+92.21 to 719+32.21 WB 40 TF $1,243.02 49,720.88$                

728+12.88 to 729+00.88 EB 88 TF $1,243.02 109,385.94$             

728+14.89 to 729+02.89 WB 88 TF $1,243.02 109,385.94$             

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 6 of 16 TOTAL

Page 91: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

SUBTOTAL  1,957 TF 2,432,258.44$          

TOTAL  42,626 TF 17,822,170.56$        

EA $171,341.48 ‐$                             Furnish and Install;

EA $171,341.48 ‐$                             Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                             See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast 486+01 1 EA $679,171.47 679,171.47$              Furnish and Install;

595+30 1 EA $679,171.47679,171.47$              Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

660+46 1 EA $679,171.47 679,171.47$             

721+51 1 EA $679,171.47 679,171.47$             

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

TOTAL  4 EA 2,716,685.88$          

C. Universal Crossover in Embedded 

TrackEA $642,674.29

‐$                            

Furnish and Install;

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 7 of 16 TOTAL

Page 92: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                            

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                             Furnish and Install;

EA $159,232.23 ‐$                             Includes 115lb rail, concrete ties, switch, OTM, 10" ballast

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

SUBTOTAL  0 EA ‐$                            

TOTAL  LS 2,716,685.88$          

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

490+00.00 1 EA $321,380.80 321,380.80$             

Furnish and Install station platform;

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system. Newtown Road Station includes 

only one side platform for new EB track.

590+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Witchduck Station)

731+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Rosemont Station)

EA $321,380.80 ‐$                             two 12' wide platforms (Lynnhaven Station)

EA $321,380.80 ‐$                             two 12' wide platforms (North Oceana Station)

EA $321,380.80 ‐$                             two 12' wide platforms (Convention Center Station)

EA $519,073.02 ‐$                             one 24' wide platform (Oceanfront Station)

B.  Operator relief facility 1 EA $321,380.80 321,380.80$              includes 5 ft by 5 ft bath room building at end of line station

TOTAL  5 LF 1,928,284.80$          

646+00.00 1 EA $880,995.47 880,995.47$             

TOTAL  1 EA 880,995.47$             Furnish and Install station platform (Town Center Station, Independence 

Option);

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. 

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 8 of 16 TOTAL

Page 93: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

646+00.00 1 STATION $1,518,219.00 $1,518,219.00

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair 

towers on piles; elevators and towers shall have glass exterior

TOTAL  1 EA $1,518,219.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $23,255,645.00 ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                            

30.05 YARD AND TRACKA. Track ‐ Ballast Yard TF $427.97 ‐$                             Does not include turnout lengths

B. Track ‐ In Building Yard TF $365.43 ‐$                            

C. No. 8 Turnouts Yard EA $157,533.80 ‐$                            

Interlock Signalization and Control Yard EA $397,001.96 ‐$                            

Asphalt Paving Yard SY $70.34 ‐$                            

TOTAL  LS ‐$                            

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Includes grading, building structure, inspection pits, enclosures, finishes, 

equipment, mechanical and electrical components, security system. Assume 

poor soil (fill) with need for piles. Building is assumed to have an eave height 

of 35' and a  30' wide x 250' long wash bay lean‐to. Increase silt fence 

quantity and permanant fence quantity (double the quantity); add utility 

services to MOF; add $500,000 equipment allowance to reflect cost of pick up 

trucks, etc.; add noice attenuation for the operations and control center 

(OCC); Include cost for upgrading existing OCC in Norfolk

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

(INDEPENDENCE)

20.07 ELEVATORS, ESCALATORS

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 9 of 16 TOTAL

Page 94: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

Pavement Removal 74,865 SF $5.14384,880.97$              Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track 

Removal24,075 TF $14.49

348,894.90$             

Does not include salvage value

Bridge 

Removal111 LF $793.67

88,097.81$                 675+22 to 676+45 Over Waterway = 1320 sf; 876+76 to 878+37 Over 

Waterway = 1735 sf, Total 282 LF/ 3055 SF

B. Clearing Clearing 22.00 ACRES $8,383.61 184,439.42$              area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 44,240 LF $34.73 1,536,543.68$           Double silt fence quantity in detailed estimate

TOTAL  LS 2,542,856.78$           Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 6,120 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open 

Cut5,622 LF

A3. Relocate Distribution Line ‐ UG 

Trenchless452 LF

TOTAL  1 LS $19,817,200.02 $19,817,200.02

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 22,117 LF $123.40 2,729,304.15$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor 22,117 LF $1.24 27,425.08$                

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 22,117 LF $16.51 365,151.67$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street3,040 LF $146.15 444,296.00$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street 3,040 LF $25.22 76,677.92$                

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 3,040 LF $39.26 119,350.40$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  8 EA $254,278.83 2,034,230.66$           Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $158,737.93 ‐$                            

TOTAL  LS 25,613,635.91$        

TOTAL  12,414 CY $298.22 3,702,103.08$          

Increased quantity from 5 acres to 10 acres

TOTAL  6 AC $740,520.00 4,443,120.00$          

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

A. Demolition

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 10 of 16 TOTAL

Page 95: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

40.05 SITE STRUCTURES INCLUDING  ROW Fence 43,410 LF $40.33 1,750,725.30$           10.6 miles * 2 sides

Bollard and Chain Along 19th Street LF $119.05 ‐$                            

TOTAL  LS 1,750,725.30$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

475 Ton $92.13 43,800.41$                

892 Ton $92.13 82,186.70$                

124Ton $92.13 11,405.25$                

29Ton $92.13 2,680.46$                  

29Ton $92.13 2,646.85$                  

Ton $92.13 ‐$                            

Ton $92.13 ‐$                            

Ton $92.13 ‐$                            

Ton $92.13 ‐$                            19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

527+50 TO 533+65 570Ton $94.35 53,828.71$                

583+50 TO 587+70 1070 Ton $94.35 101,003.70$             

606+50 TO 608+50 149 Ton $94.35 14,016.53$                

689+50 35 Ton $94.35 3,294.16$                  

695+50 34 Ton $94.35 3,252.85$                  

Ton $94.35 ‐$                            

Ton $94.35 ‐$                            

Ton $94.35 ‐$                            

Ton $94.35 ‐$                            

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

583+50 TO 587+70 381 Ton $49.910 19,017.21$                

527+50 TO 533+65 190 Ton $49.91 9,491.18$                  

583+50 TO 587+70 357 Ton $49.91 17,809.15$                

606+50 TO 608+50 50 Ton $49.91 2,471.42$                  

689+50 12 Ton $49.91 580.83$                     

695+50 11 Ton $49.91 573.55$                     

Ton $49.91 ‐$                            

689+50

695+50

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A 583+50 TO 587+70

527+50 TO 533+65

606+50 TO 608+50

B. Asphalt Concrete Base Course, 6", 

Type BM‐25

C. Aggregate Base Material, Type 1, No. 

21A

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 11 of 16 TOTAL

Page 96: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

Ton $49.91 ‐$                            

Ton $49.91 ‐$                            

Ton $49.91 ‐$                            

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

D. Curb and Gutter (HS‐202) 500+00 TO 510+50 1048 LF $43.78 45,881.44$                

527+50 TO 533+65 1254 LF $43.78 54,900.12$                

583+50 TO 587+70 1230 LF $43.78 53,849.40$                

606+50 TO 608+50 725 LF $43.78 31,740.50$                

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

granite curb LF $23.56 ‐$                             Curb adjacent to track along 19th Street, both sides

D. Park and Rides

585+00.00 Witchduck Rd 1.00 EA $1,797,388.08 1,797,388.08$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                  

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

730+00.00 Lynn Shores/Thalia 1.00 EA $1,490,727.49 1,490,727.49$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

70,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

EA $1,567,418.29 ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

75,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

EA $1,686,103.51 ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

100,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add costto include removal of unsuitable materials

E. Milling Asphalt SY $47.02 ‐$                             Includes milling of 19th Street Adjacent to track

TOTAL  LS 6,297,349.85$          

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 12 of 16 TOTAL

Page 97: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $1,763,927.54 $1,763,927.54

Includes Maintenance of Traffic and Protection during construction.  Includes 

work on Birdneck rd (70' wide, 5 lanes) and 19th Street (45' wide, 4 lanes); 

Include 24/7 police at intersections @ $45/hour for duration of project ‐ 49 

intersections (notes indicate that total cost may need to increase by about a 

factor of 5)

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 13 EA $500,000.00 6,500,000.00$          

Grade Crossing Signals 13 EA $250,000.00 3,250,000.00$          

Wayside Signals 8.26 MI $100,000.00 826,000.00$              Both Norfolk (3.5 MI) and VB (12.18 mi)

Track Circuits 8.26 MI $120,000.00 991,200.00$              Both Norfolk (3.5 MI) and VB (12.18 mi); Increase curcuits by 20%

Signal House 9 EA $253,980.68 2,285,826.12$           One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles 9 EA $55,555.56 500,000.04$              upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 14,353,026.16$        

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

492+50.00 Newtown Rd 1 EA $9,688.61 9,688.61$                   REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

504+00.00 Princess Anne Rd 1 EA $9,688.61 9,688.61$                  

508+00.00 Freight Ln 1 EA $9,688.61 9,688.61$                  

568+00.00 Greenwich Rd 1 EA $9,688.61 9,688.61$                  

592+50.00 Mac St 1 EA $9,688.61 9,688.61$                  

608+00.00 Euclid Rd 1 EA $9,688.61 9,688.61$                  

636+00.00 Kellam Rd 1 EA $9,688.61 9,688.61$                  

663+00.00 Constitution Dr 1 EA $9,688.61 9,688.61$                  

692+50.00 N Thalia Rd 1 EA $9,688.61 9,688.61$                  

719+00.00 S Kentucky Ave 1 EA $9,688.61 9,688.61$                  

728+50.00 Lynn Shores Dr 1 EA $9,688.61 9,688.61$                  

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

SUBTOTAL  11 106,574.71$             

492+50.00

Newtown Rd 1

EA $270,648.16

270,648.16$              Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

504+00.00 Princess Anne Rd 1 EA $270,648.16 270,648.16$             

508+00.00 Freight Ln 1 EA $270,648.16 270,648.16$             

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 13 of 16 TOTAL

Page 98: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

568+00.00 Greenwich Rd 1 EA $270,648.16 270,648.16$             

592+50.00 Mac St 1 EA $270,648.16 270,648.16$             

608+00.00 Euclid Rd 1 EA $270,648.16 270,648.16$             

636+00.00 Kellam Rd 1 EA $270,648.16 270,648.16$             

663+00.00 Constitution Dr 1 EA $270,648.16 270,648.16$             

692+50.00 N Thalia Rd 1 EA $270,648.16 270,648.16$             

719+00.00 S Kentucky Ave 1 EA $270,648.16 270,648.16$             

728+50.00 Lynn Shores Dr 1 EA $270,648.16 270,648.16$             

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

Private Drive 1 EA $270,648.16 270,648.16$             

SUBTOTAL  12 3,247,777.92$          

TOTAL  3,354,352.63$          

Mainline 5 EA $2,373,678.79 11,868,393.95$         Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

MOF EA $2,832,443.42 ‐$                             includes one for yard and one for lead

TOTAL  5EA

11,868,393.95$         Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 46 EA $13,969.62 642,602.52$              Furnish and Install 40‐BI 028 (8 per mile)

Traction Power Manholes (MOF) EA $13,969.62 ‐$                             40‐BI ‐ 028 

Transit Systems Conduits 1 LS $2,531,314.28 2,531,314.28$           30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Transit Systems Conduits (MOF) LS $337,560.95 ‐$                             MOF Project 30/40 (Time adjusted)

Drilled Shaft Foundations 285 EA $9,939.77 2,832,834.45$           Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Drilled Shaft Foundations (MOF) EA $9,939.77 ‐$                             Project 30 Vol 3 DST ‐ 053 Sht 66

Remove Existing Foundation (OCS Pole 

Foundation) 486+00 1 EA$3,911.67 3,911.67$                  

At Newtown Road station

OCS System58,686

LF$38.47

2,257,650.42$           OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

OCS System (MOF)

LF$38.47

‐$                             OCS ‐ 008/010 ‐ (Same as Above) Includes Jumpers, Hangers, Feeders, 

Messenger Wires, Contact Wires

Tapered Tubular Feeder Pole 333 EA $3,027.75 1,008,240.75$           Changed OCS poles to approxiamtely 80 foot spacing

Tapered Tubular Feeder Pole (MOF) EA $3,027.75 ‐$                             Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever   603 EA $3,220.03 1,941,678.69$           Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever (MOF)   EA $3,220.03 ‐$                             Changed OCS poles to approxiamtely 80 foot spacingProtection Barrier at Bridges 1 EA $91,064.29 91,064.29$                

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 14 of 16 TOTAL

Page 99: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

TOTAL    LS 11,309,297.07$        

Fiber in Duct Bank 4.76 MI $533,762.18 2,540,707.99$           4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                             Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 3 mi $650,000.001,950,000.00$           To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

1.00

TOTAL    LS 4,490,707.99$          

TVM 10 EA $149,213.65 1,492,137.00$          

Two collection machines at each station; added two additional TVM at end of 

line station and Independence station, 4 TVM's need enclosures; 2 per 

enclosure ‐ 2 enclosures total ($12,000 each); Include CAT 5 cable from 

TVM's to nearest FO (for the machine and connections, each TVM is about 

$150,000, including the cable

TVM at PNR EA $161,912.68 ‐$                            

TOTAL  LS 1,492,137.00$          

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

B. Norfolk Southern ROW Acquisition

1.00LS

$25,500,000.00

25,500,000.00$         Parcel acquisition will be required, but area and costs are not determined at 

this time.

AC

‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

Parcel acquisition will be required, but area and costs are not determined at 

this time.

Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

A. Property Acquisition

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 15 of 16 TOTAL

Page 100: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  1 LS 25,500,000.00$        

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  3 EA $4,368,421.05 13,105,263.00$        Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL 12 EA $657,142.86 7,885,714.00$          Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

HRT_VB_LRT‐MOS_Cost Estimate_2013‐09‐13.xlsx 16 of 16 TOTAL

Page 101: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative 2    

Page 102: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

485+43.28 to 491+81.19 638 LF $162.710103,794.34$              Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

493+27.22 to 503+10.96 984 LF $162.71 160,064.34$             

505+76.33 to 507+47.88 172 LF $162.71 27,912.90$                

508+19.52 to 567+62.81 5,943 LF $162.71 967,032.72$             

568+34.81 to 578+27.00 992 LF $162.71 161,439.23$             

587+00.00 to 592+45.52 546 LF $162.71 88,761.56$                

592+85.52 to 607+70.19 1,485 LF $162.71 241,570.66$             

608+40.19 to 635+49.94 2,710 LF $162.71 440,903.42$             

636+13.94 to 640+70.00 456 LF $162.71 74,205.52$                

655+60.00 to 662+64.64 705 LF $162.71 114,651.97$             

663+54.64 to 675+00.00 1,145 LF $162.71 186,361.53$             

676+86.44 to 692+30.48 1,544 LF $162.71 251,230.75$             

692+62.48 to 718+90.23 2,628 LF $162.71 427,561.20$             

719+30.23 to 728+12.88 883 LF $162.71 143,615.98$             

729+00.88 to 757+88.00 2,887 LF $162.71 469,763.30$             

766+11.00 to 782+86.87 1,676 LF $162.71 272,680.81$             

783+56.11 to 847+45.46 6,389 LF $162.71 1,039,611.14$          

848+09.46 to 853+35.00 526 LF $162.71 85,510.61$                

861+91.00 to 875+90.00 1,399 LF $162.71 227,631.29$             

879+10.00 to 897+72.00 1,862 LF $162.71 302,966.02$             

907+25.00 to 926+04.22 1,879 LF $162.71 305,767.89$             

926+40.48 to 941+23.01 1,483 LF $162.71 241,222.46$             

941+50.03 to 951+18.00 968 LF $162.71 157,498.40$             

951+44.00 to 959+10.84 767 LF $162.71 124,772.54$             

959+50.84 to 983+04.75 2,354 LF $162.71 383,004.70$             

983+44.75 to 992+90.48 946 LF $162.71 153,879.73$             

994+70.48 to 1019+32.32 2,462 LF $162.71 400,565.99$             

1019+88.32 to 1042+71.29 2,283 LF $162.71 371,462.05$             

1043+27.29 to 1050+36.89 710 LF $162.71 115,459.02$             

1051+84.94 to 1066+21.26 1,436 LF $162.71 233,703.63$             

1067+44.23 to 1088+54.09 2,110 LF $162.71 343,295.32$             

1089+27.82 to 1100+87.29 1,159 LF $162.71 188,657.36$             

SUBTOTAL  54,124 LF 8,806,558.34$          

B.  Ballast Curb and underdrain 51,438 LF $311.49 16,022,474.06$        

C. Subballast Access Road 533+51.45 to 562+28.75 LT 2,877 LF $59.94 172,476.87$             

608+57.75 to 635+73.98 RT 2,716 LF $59.94 162,821.69$             

670+03.46 to 675+00.48 LT 497 LF $59.94 29,793.37$                

679+47.29 to 683+45.81 RT 399 LF $59.94 23,888.88$                

770+21.22 to 783+00.07 RT 1,279 LF $59.94 76,659.38$                

783+54.79 to 789+74.56 RT 620 LF $59.94 37,151.49$                

798+87.68 to 847+80.97 RT 4,893 LF $59.94 293,323.38$             

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 1 of 16 TOTAL

Page 103: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

866+95.17 to 875+06.96 LT 812 LF $59.94 48,661.94$                

920+88.83 to 926+16.15 RT 527 LF $59.94 31,609.67$                

926+22.78 to 941+32.95 LT 1,510 LF $59.94 90,525.63$                

951+43.44 to 953+82.43 RT 239 LF $59.94 14,326.02$                

959+50.86 to 983+04.77 RT 2,354 LF $59.94 141,102.78$             

1020+00 to 1038+00 RT 1,800 LF $59.94 107,899.20$             

SUBTOTAL  20,523 LF 1,230,240.30$          

TOTAL  54,124 LF 26,059,272.71$        

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

491+81.19 to 493+27.22 146 TF $754.100 110,121.22$             Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

503+10.96 to 505+76.33 265 TF $754.10 200,115.52$             

507+47.88 to 508+19.52 72 TF $754.10 54,023.72$                

567+62.81 to 568+34.81 72 TF $754.10 54,295.20$                

592+45.52 to 592+85.52 40 TF $754.10 30,164.00$                

607+70.19 to 608+40.19 70 TF $754.10 52,787.00$                

635+49.94 to 636+13.94 64 TF $754.10 48,262.40$                

662+64.64 to 663+54.64 90 TF $754.10 67,869.00$                

692+30.48 to 692+62.48 32 TF $754.10 24,131.20$                

718+90.23 to 719+30.23 40 TF $754.10 30,164.00$                

728+12.88 to 729+00.88 88 TF $754.10 66,360.80$                

782+86.87 to 783+56.11 69 TF $754.10 52,213.88$                

847+45.46 to 848+09.46 64 TF $754.10 48,262.40$                

TF $754.10 ‐$                            

926+04.22 to 926+40.48 36 TF $754.10 27,343.67$                

941+23.01 to 941+50.03 27 TF $754.10 20,375.78$                

951+18.00 to 951+44.00 26 TF $754.10 19,606.60$                

959+10.84 to 959+50.84 40 TF $754.10 30,164.00$                

983+04.75 to 983+44.75 40 TF $754.10 30,164.00$                

992+90.48 to 994+70.48 180 TF $754.10 135,738.00$             

1019+32.32 to 1019+88.32 56 TF $754.10 42,229.60$                

1042+71.29 to 1043+27.29 56 TF $754.10 42,229.60$                

1050+36.89 to 1051+84.94 148 TF $754.10 111,644.51$             

1058+08.00 to 1058+72.00 64 TF $754.10 48,262.40$                

1066+21.26 to 1067+44.23 123 TF $754.10 92,731.68$                

1088+54.09 to 1089+27.82 74 TF $754.10 55,599.79$                

TOTAL  1,982 TF 1,494,859.97$          10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

1100+87.29 to 1128+00.30 2,725 TF $365.30 995,442.50$              Include costs for rough grading, excavation and track slab

TOTAL  2,725 TF 995,442.50$             

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 2 of 16 TOTAL

Page 104: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE) 873 LF $11,559.07 10,091,070.73$         Ballast Deck Bridge, 24822 sq ft, 8 Piers

1490 LF $11,212.20 16,706,178.00$         Ballast Deck Bridge, 54243 sq ft, 14 Piers

187 LF $17,551.49 3,282,129.19$           Open Deck Bridge, 5156 sq ft, 2 Piers

823 LF $12,036.10 9,905,710.30$           Ballast Deck Bridge, 23417 sq ft, 8 Piers

856 LF $11,740.07 10,049,499.92$         Ballast Deck Bridge, 24422 sq ft, 8 Piers

320 LF $14,846.82 4,750,982.72$           Open Deck Bridge, 8851 sq ft, 4 Piers

953 LF $11,559.07 11,015,796.57$         Ballast Deck Bridge, 25731 sq ft, 9 Piers

TOTAL  5,502 LF 65,801,367.43$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation 79,510 CY $34.75 2,762,972.50$          Track alignment Assume 24" depth, x 38' width; increased unit cost to $35

Borrow Fill ‐ Unsuitable Excavation 79,510 CY $57.64 4,583,035.91$           Does not Include MOF

Embankment 24,790 CY $65.57 1,625,480.30$          

B. Retaining Walls 569+00.00 to 572+13.65 WB 1,882 SF $35.84 67,451.06$                 Furnish and Install;

575+60.04 to 578+28.10 WB 1,977 SF $35.84 70,855.15$                 Retaining walls for bridge approaches

575+59.87 to 578+27.02 EB 1,977 SF $35.84 70,855.15$                

587+01.92 to 589+87.86 WB 2,162 SF $35.84 77,485.92$                

587+00.00 to 589+86.85 EB 2,162 SF $35.84 77,485.92$                

638+75.45 to 640+71.65 WB 1,936 SF $35.84 69,381.15$                

638+76.00 to 640+69.96 EB 1,936 SF $35.84 69,381.15$                

655+62.69 to 658+28.11 WB 3,157 SF $35.84 113,157.67$             

655+59.90 to 658+25.30 EB 3,157 SF $35.84 113,157.67$             

754+10.54 to 757+89.96 WB 2,131 SF $35.84 76,370.34$                

754+08.94 to 757+87.86 EB 2,131 SF $35.84 76,370.34$                

766+13.57 to 768+86.18 WB 2,149 SF $35.84 77,033.42$                

766+10.58 to 768+83.39 EB 2,149 SF $35.84 77,033.42$                

784+28.44 to 786+59.00 EB 1,383 SF $35.84 49,582.39$                

850+70.40 to 853+36.75 WB 2,057 SF $35.84 73,709.07$                

850+67.95 to 853+35.17 EB 2,057 SF $35.84 73,709.07$                

861+94.17 to 864+65.36 WB 2,045 SF $35.84 73,296.89$                

897+72 TO 907+25 LRT

Over London Bridge Rd

10.08 GUIDWAY: RETAINED CUT OR FILL

578+27 TO 587+00 LRT

Over Witchduck Rd

640+70 TO 655+60 LRT

Over Independence Blvd

675+00 TO 676+87

LRT Over Waterway

757+88 TO 766+11

 LRT Over Rosemont Rd

853+35 TO 861+91 LRT

Over Lynnhaven Parkway

875+90 TO 879+10 LRT

Over Waterway

Furnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 3 of 16 TOTAL

Page 105: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

861+94.17 to 864+35.36 EB 2,041 SF $35.84 73,159.50$                

895+00.00 to 897+72.00 WB 1,741 SF $35.84 62,400.92$                

895+00.00 to 897+72.00 EB 1,741 SF $35.84 62,400.92$                

907+25.00 to 910+00.00 WB 1,860 SF $35.84 66,657.16$                

907+25.00 to 910+00.00 EB 1,860 SF $35.84 66,657.16$                

TOTAL  LS 10,609,080.18$        

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

675+00 TO 676+87LRT Over Waterway 187 TF $412.82 77,197.34$                

675+00 TO 676+87LRT Over Waterway 187 TF $412.82 77,197.34$                

875+90 TO 879+10 LRTOver Waterway 320 TF $412.82 132,102.40$             

875+90 TO 879+10 LRTOver Waterway 320 TF $412.82 132,102.40$             

TOTAL  1,014 TF 418,599.48$             

1087+50 to 1128+12.25 EB 4,062 TF $317.54 1,289,851.54$           Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

1087+50 to 1128+00.30 WB 4,050 TF $317.51 1,285,919.55$           Includes 115lb CWR, concrete ties, OTM

TOTAL  8,112 TF 2,575,771.09$          

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 485+43.28 to 491+81.19 EB 638 TF $322.893 205,976.67$              Furnish and Install;

491+73.78 to 491+81.97 WB 8 TF $322.89 2,644.49$                   Includes 115lb CWR, concrete ties, OTM, 10" ballast

493+27.22 to 503+10.96 EB 984 TF $322.89 317,642.76$             

493+28.00 to 502+74.81 WB 947 TF $322.89 305,718.32$             

505+76.33 to 507+47.88 EB 172 TF $322.89 55,392.29$                

505+38.85 to 507+48.72 WB 210 TF $322.89 67,765.55$                

508+19.52 to 567+62.81 EB 5,943 TF $322.89 1,919,046.74$          

508+20.36 to 567+25.03 WB 5,905 TF $322.89 1,906,576.61$          

568+34.81 to 578+27.00 EB 992 TF $322.89 320,371.21$             

567+97.07 to 578+27.01 WB 1,030 TF $322.89 332,560.42$             

587+00.00 to 592+45.52 EB 546 TF $322.89 176,144.59$             

587+01.92 to 592+46.53 WB 545 TF $322.89 175,850.76$             

592+85.52 to 607+70.19 EB 1,485 TF $322.89 479,389.55$             

592+86.53 to 607+71.15 WB 1,485 TF $322.89 479,373.41$             

608+40.19 to 635+49.94 EB 2,710 TF $322.89 874,959.31$             

608+41.15 to 635+50.78 WB 2,710 TF $322.89 874,920.56$             

636+13.94 to 640+70.00 EB 456 TF $322.89 147,258.58$             

636+14.78 to 640+71.65 WB 457 TF $322.89 147,520.12$             

655+60.00 to 662+64.64 EB 705 TF $322.89 227,523.32$             

655+62.69 to 662+66.67 WB 704 TF $322.89 227,310.21$             

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 4 of 16 TOTAL

Page 106: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

663+54.64 to 675+00.00 EB 1,145 TF $322.89 369,828.73$             

663+56.61 to 675+02.06 WB 1,145 TF $322.89 369,857.79$             

676+86.44 to 692+30.48 EB 1,544 TF $322.89 498,559.71$             

676+88.47 to 692+32.57 WB 1,544 TF $322.89 498,579.08$             

692+62.48 to 718+90.23 EB 2,628 TF $322.89 848,482.08$             

692+64.57 to 718+92.21 WB 2,628 TF $322.89 848,446.56$             

719+30.23 to 728+12.88 EB 883 TF $322.89 285,001.51$             

719+32.21 to 728+14.89 WB 883 TF $322.89 285,011.19$             

729+00.88 to 757+88.00 EB 2,887 TF $322.89 932,230.84$             

729+02.89 to 757+89.96 WB 2,887 TF $322.89 932,214.69$             

766+11.00 to 782+86.87 EB 1,676 TF $322.89 541,126.69$             

766+13.57 to 782+85.57 WB 1,672 TF $322.89 539,877.10$             

783+56.11 to 847+45.46 EB 6,389 TF $322.89 2,063,076.39$          

783+58.57 to 847+47.90 WB 6,389 TF $322.89 2,063,069.93$          

848+09.46 to 853+35.00 EB 526 TF $322.89 169,693.19$             

848+11.90 to 853+36.75 WB 525 TF $322.89 169,470.39$             

861+91.00 to 875+90.00 EB 1,399 TF $322.89 451,727.31$             

861+94.17 to 875+90.00 WB 1,396 TF $322.89 450,703.74$             

879+10.00 to 897+72.00 EB 1,862 TF $322.89 601,226.77$             

879+10.00 to 897+72.00 WB 1,862 TF $322.89 601,226.77$             

907+25.00 to 926+01.99 EB 1,877 TF $322.89 606,066.93$             

926+36.78 to 941+23.01 EB 1,486 TF $322.89 479,893.26$             

907+25.00 to 926+04.22 WB 1,879 TF $322.89 606,786.98$             

926+40.48 to 941+25.55 WB 1,485 TF $322.89 479,518.71$             

941+50.03 to 951+18.00 EB 968 TF $322.89 312,550.74$             

941+52.56 to 951+20.00 WB 967 TF $322.89 312,379.60$             

951+44.00 to 959+10.84 EB 767 TF $322.89 247,607.27$             

951+46.00 to 959+13.36 WB 767 TF $322.89 247,775.17$             

959+50.84 to 983+04.75 EB 2,354 TF $322.89 760,061.06$             

959+53.36 to 983+07.27 WB 2,354 TF $322.89 760,061.06$             

983+44.75 to 992+90.48 EB 946 TF $322.89 305,369.60$             

983+47.27 to 992+74.46 WB 927 TF $322.89 299,383.16$             

994+70.48 to 1019+32.32 EB 2,462 TF $322.89 794,910.90$             

994+34.46 to 1019+34.84 WB 2,500 TF $322.89 807,355.20$             

1019+88.32 to 1042+71.29 EB 2,283 TF $322.89 737,155.03$             

1019+90.84 to 1042+73.80 WB 2,283 TF $322.89 737,151.80$             

1043+27.29 to 1050+36.89 EB 710 TF $322.89 229,124.87$             

1043+29.80 to 1050+39.39 WB 710 TF $322.89 229,121.64$             

1051+84.94 to 1066+21.26 EB 1,436 TF $322.89 463,777.67$             

1051+69.88 to 1066+03.59 WB 1,434 TF $322.89 462,934.92$             

1067+44.23 to 1088+54.09 EB 2,110 TF $322.89 681,259.02$             

1067+45.22 to 1088+57.61 WB 2,112 TF $322.89 682,075.94$             

1089+27.82 to 1100+87.29 EB 1,159 TF $322.89 374,384.75$             

1089+31.34 to 1100+63.05 WB 1,132 TF $322.89 365,421.24$             

1124+35.49 to 1128+00.27 EB 365 TF $322.89 117,784.91$             

1124+48.39 to 1128+13.31 WB 365 TF $322.89 117,830.11$             

1076+30 to 1086+00 970 TF $322.89 313,206.21$              Added pocket track

SUBTOTAL  109,307 TF 35,294,303.70$        

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 5 of 16 TOTAL

Page 107: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.083 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

578+27 TO 587+00 LRTOver Witchduck Rd 873 TF $344.08 300,384.46$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

640+70 TO 655+60 LRTOver Independence Blvd 1,490 TF $344.08 512,683.67$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

640+70 TO 655+60 LRTOver Independence Blvd 1,490 TF $344.08 512,683.67$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

757+88 TO 766+11 LRT Over Rosemont Rd 823 TF $344.08 283,180.31$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

757+88 TO 766+11 LRT Over Rosemont Rd 823 TF $344.08 283,180.31$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

853+35 TO 861+91 LRTOver Lynnhaven Parkway 856 TF $344.08 294,535.05$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

853+35 TO 861+91 LRTOver Lynnhaven Parkway 856 TF $344.08 294,535.05$             Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

897+72 TO 907+25 LRTOver London Bridge Rd 953 TF $344.08 327,911.10$             

897+72 TO 907+25 LRTOver London Bridge Rd 953 TF $344.08 327,911.10$             

SUBTOTAL  9,990 TF 3,437,389.17$          

491+81.19 to 493+27.22 EB 146 TF $1,243.02 181,518.50$              Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

491+81.97 to 493+28.00 WB 146 TF $1,243.02 181,518.50$              Use different type of grade crossing, increase cost

503+10.96 to 505+76.33 EB 265 TF $1,243.02 329,860.75$             

502+74.81 to 505+38.85 WB 264 TF $1,243.02 328,207.53$             

507+47.88 to 508+19.52 EB 72 TF $1,243.02 89,050.10$                

507+48.72 to 508+20.36 WB 72 TF $1,243.02 89,050.10$                

567+62.81 to 568+34.81 EB 72 TF $1,243.02 89,497.58$                

567+25.03 to 567+97.07 WB 72 TF $1,243.02 89,547.30$                

592+45.52 to 592+85.52 EB 40 TF $1,243.02 49,720.88$                

592+46.53 to 592+86.53 WB 40 TF $1,243.02 49,720.88$                

607+70.19 to 608+40.19 EB 70 TF $1,243.02 87,011.54$                

607+71.15 to 608+41.15 WB 70 TF $1,243.02 87,011.54$                

635+49.94 to 636+13.94 EB 64 TF $1,243.02 79,553.41$                

635+50.78 to 636+14.78 WB 64 TF $1,243.02 79,553.41$                

662+64.64 to 663+54.64 EB 90 TF $1,243.02 111,871.98$             

662+66.67 to 663+56.61 WB 90 TF $1,243.02 111,797.40$             

692+30.48 to 692+62.48 EB 32 TF $1,243.02 39,776.70$                

692+32.57 to 692+64.57 WB 32 TF $1,243.02 39,776.70$                

718+90.23 to 719+30.23 EB 40 TF $1,243.02 49,720.88$                

718+92.21 to 719+32.21 WB 40 TF $1,243.02 49,720.88$                

728+12.88 to 729+00.88 EB 88 TF $1,243.02 109,385.94$             

728+14.89 to 729+02.89 WB 88 TF $1,243.02 109,385.94$             

782+86.87 to 783+56.11 EB 69 TF $1,243.02 86,066.84$                

782+85.57 to 783+58.57 WB 73 TF $1,243.02 90,740.61$                

847+45.46 to 848+09.46 EB 64 TF $1,243.02 79,553.41$                

847+47.90 to 848+11.90 WB 64 TF $1,243.02 79,553.41$                

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 6 of 16 TOTAL

Page 108: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

TF $1,243.02 ‐$                            

TF $1,243.02 ‐$                            

926+01.99 to 926+36.78 EB 35 TF $1,243.02 43,244.74$                

926+04.22 to 926+40.48 WB 36 TF $1,243.02 45,071.98$                

941+23.01 to 941+50.03 EB 27 TF $1,243.02 33,586.45$                

941+25.55 to 941+52.56 WB 27 TF $1,243.02 33,574.02$                

951+18.00 to 951+44.00 EB 26 TF $1,243.02 32,318.57$                

951+20.00 to 951+46.00 WB 26 TF $1,243.02 32,318.57$                

959+10.84 to 959+50.84 EB 40 TF $1,243.02 49,720.88$                

959+13.36 to 959+53.36 WB 40 TF $1,243.02 49,720.88$                

983+04.75 to 983+44.75 EB 40 TF $1,243.02 49,720.88$                

983+07.27 to 983+47.27 WB 40 TF $1,243.02 49,720.88$                

992+90.48 to 994+70.48 EB 180 TF $1,243.02 223,743.96$             

992+74.46 to 994+34.46 WB 160 TF $1,243.02 198,883.52$             

1019+32.32 to 1019+88.32 EB 56 TF $1,243.02 69,609.23$                

1019+34.84 to 1019+90.84 WB 56 TF $1,243.02 69,609.23$                

1042+71.29 to 1043+27.29 EB 56 TF $1,243.02 69,609.23$                

1042+73.80 to 1043+29.80 WB 56 TF $1,243.02 69,609.23$                

1050+36.89 to 1051+84.94 EB 148 TF $1,243.02 184,029.41$             

1050+39.39 to 1051+69.88 WB 130 TF $1,243.02 162,201.94$             

1066+21.26 to 1067+44.23 EB 123 TF $1,243.02 152,854.42$             

1066+03.59 to 1067+45.22 WB 142 TF $1,243.02 176,049.21$             

1088+54.09 to 1089+27.82 EB 74 TF $1,243.02 91,648.01$                

1088+57.61 to 1089+31.34 WB 74 TF $1,243.02 91,648.01$                

SUBTOTAL  3,819 TF 4,746,665.96$          

TOTAL  109,307 TF 43,478,358.83$        

910+47.00 RH 2 EA $171,341.48 342,682.96$              Furnish and Install;

921+70.00 LH 2 EA $171,341.48 342,682.96$              Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast 1083+75 RH 2 EA $171,341.48 342,682.96$              See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  6 EA 1,028,048.88$          

B. Universal Crossover in Ballast 486+01 1 EA $679,171.47 679,171.47$              Furnish and Install;

595+30 1 EA $679,171.47679,171.47$              Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

660+46 1 EA $679,171.47 679,171.47$             

721+51 1 EA $679,171.47 679,171.47$             

844+48 1 EA $679,171.47 679,171.47$             

959+98 1 EA $679,171.47 679,171.47$             

1039+47 1 EA $679,171.47 679,171.47$             

TOTAL  7 EA 4,754,200.30$          

C. Universal Crossover in Embedded 

Track1115+57 1 EA $642,674.29

642,674.29$             

Furnish and Install;

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 7 of 16 TOTAL

Page 109: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  1 EA 642,674.29$             

D. No. 8 Turnout in Ballast 740+22 LH 1 EA $159,232.23 159,232.23$              Furnish and Install;

741+20 RH 1 EA $159,232.23 159,232.23$              Includes 115lb rail, concrete ties, switch, OTM, 10" ballast

742+92 RH 1 EA $159,232.23 159,232.23$             

746+36 LH 1 EA $159,232.23 159,232.23$             

748+10 LH 1 EA $159,232.23 159,232.23$             

749+06 RH 1 EA $159,232.23 159,232.23$             

912+44.00 RH 1 EA $159,232.23 159,232.23$             

921+00.00 LH 1 EA $159,232.23 159,232.23$             

1075+63 LH 1 EA $159,232.23 159,232.23$             

1076+67 RH 1 EA $159,232.23 159,232.23$             

1078+35 RH 1 EA $159,232.23 159,232.23$             

1086+97 LH 1 EA $159,232.23 159,232.23$             

SUBTOTAL  12 EA 1,910,786.80$          

TOTAL  LS 8,335,710.26$          

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

490+00.00 1 EA $321,380.80 321,380.80$             

Furnish and Install station platform;

Includes cost for one 12' wide concrete platforms, each with canopy, 

furnishings, utility services, security system. Newtown Road Station includes 

only one side platform for new EB track.

590+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Witchduck Station)

731+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Rosemont Station)

850+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Lynnhaven Station)

955+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (North Oceana Station)

1099+00.00 2 EA $321,380.80 642,761.60$              two 12' wide platforms (Convention Center Station)

1026+00.00 1 EA $519,073.02 519,073.02$              one 24' wide platform (Oceanfront Station)

B.  Operator relief facility 1 EA $321,380.80 321,380.80$              includes 5 ft by 5 ft bath room building at end of line station

TOTAL  12 LF 4,375,642.62$          

646+00.00 1 EA $880,995.47 880,995.47$             

TOTAL  1 EA 880,995.47$             Furnish and Install station platform (Town Center Station, Independence 

Option);

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. 

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 8 of 16 TOTAL

Page 110: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

646+00.00 1 STATION $1,518,219.00 $1,518,219.00

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair 

towers on piles; elevators and towers shall have glass exterior

TOTAL  1 EA $1,518,219.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  1 LS $23,255,645.00 23,255,645.00$        

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL 1 LS $1,587,379.00 1,587,379.00$          

30.05 YARD AND TRACKA. Track ‐ Ballast Yard 14,070.00 TF $427.97 6,021,537.90$           Does not include turnout lengths

B. Track ‐ In Building Yard 2,650.00 TF $365.43 968,392.15$             

C. No. 8 Turnouts Yard 30.00 EA $157,533.80 4,726,014.00$          

Interlock Signalization and Control Yard 1.00 EA $397,001.96 397,001.96$             

Asphalt Paving Yard 10,000.00 SY $70.34 703,400.00$             

TOTAL  LS 12,816,346.01$        

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Includes grading, building structure, inspection pits, enclosures, finishes, 

equipment, mechanical and electrical components, security system. Assume 

poor soil (fill) with need for piles. Building is assumed to have an eave height 

of 35' and a  30' wide x 250' long wash bay lean‐to. Increase silt fence 

quantity and permanant fence quantity (double the quantity); add utility 

services to MOF; add $500,000 equipment allowance to reflect cost of pick up 

trucks, etc.; add noice attenuation for the operations and control center 

(OCC); Include cost for upgrading existing OCC in Norfolk

Includes one 18.75' wide concrete center platform, canopy, furnishings, utility 

services, security system: does not include elevators/escalators (see 20.07); 

increase length of canopy by 20% to cover TVM

(INDEPENDENCE)

20.07 ELEVATORS, ESCALATORS

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 9 of 16 TOTAL

Page 111: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

Pavement Removal 191,226 SF $5.14983,092.87$              Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track 

Removal61,492 TF $14.49

891,142.06$             

Does not include salvage value

Bridge 

Removal282 LF $793.67

223,816.07$              675+22 to 676+45 Over Waterway = 1320 sf; 876+76 to 878+37 Over 

Waterway = 1735 sf, Total 282 LF/ 3055 SF

B. Clearing Clearing 56.50 ACRES $8,383.61 473,673.97$              area from subballast edge to 10' beyond limits of work

C. Earthwork Erosion Control 112,986 LF $34.73 3,924,229.75$           Double silt fence quantity in detailed estimate

TOTAL  LS 6,495,954.72$           Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 15,633 LF Adjust utility cost based on new information

A2. Relocate Distribution Line ‐ UG Open 

Cut14,360 LF

A3. Relocate Distribution Line ‐ UG 

Trenchless1,155 LF

TOTAL  1 LS $19,817,200.02 $19,817,200.02

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 56,493 LF $123.40 6,971,405.68$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor 56,493 LF $1.24 70,051.32$                

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 56,493 LF $16.51 932,699.43$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street7,764 LF $146.15 1,134,708.60$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street 7,764 LF $25.22 195,831.37$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 7,764 LF $39.26 304,814.64$             

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  17 EA $254,278.83 4,322,740.16$           Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+501 LS $158,737.93 158,737.93$             

TOTAL  LS 33,908,189.15$        

TOTAL  24,827 CY $298.22 7,403,907.94$          

Increased quantity from 5 acres to 10 acres

TOTAL  10 AC $740,520.00 7,405,200.00$          

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

A. Demolition

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 10 of 16 TOTAL

Page 112: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

40.05 SITE STRUCTURES INCLUDING  ROW Fence 110,880 LF $40.33 4,471,790.40$           10.6 miles * 2 sides

Bollard and Chain Along 19th Street 1,950 LF $119.05 232,153.35$             

TOTAL  LS 4,703,943.75$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

475 Ton $92.13 43,800.41$                

892 Ton $92.13 82,186.70$                

124Ton $92.13 11,405.25$                

29Ton $92.13 2,680.46$                  

29Ton $92.13 2,646.85$                  

222Ton $92.13 20,474.55$                

166Ton $92.13 15,276.09$                

2520 Ton $92.13 232,169.08$             

1101+00 to 1106+00 1021 Ton $92.13 94,110.11$                19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

527+50 TO 533+65 570Ton $94.35 53,828.71$                

583+50 TO 587+70 1070 Ton $94.35 101,003.70$             

606+50 TO 608+50 149 Ton $94.35 14,016.53$                

689+50 35 Ton $94.35 3,294.16$                  

695+50 34 Ton $94.35 3,252.85$                  

852+95 TO 857+15 267 Ton $94.35 25,162.29$                

857+40 TO 861+60 199 Ton $94.35 18,773.62$                

3024 Ton $94.35 285,325.22$             

1101+00 to 1106+00 1226 Ton $94.35 115,657.04$             

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

583+50 TO 587+70 381 Ton $49.910 19,017.21$                

527+50 TO 533+65 190 Ton $49.91 9,491.18$                  

583+50 TO 587+70 357 Ton $49.91 17,809.15$                

606+50 TO 608+50 50 Ton $49.91 2,471.42$                  

689+50 12 Ton $49.91 580.83$                     

695+50 11 Ton $49.91 573.55$                     

852+95 TO 857+15 89 Ton $49.91 4,436.66$                  

689+50

695+50

852+95 TO 857+15

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A

857+40 TO 861+60

583+50 TO 587+70

527+50 TO 533+65

606+50 TO 608+50

1050+36 TO 1066+21

B. Asphalt Concrete Base Course, 6", 

Type BM‐25

C. Aggregate Base Material, Type 1, No. 

21A

1050+36 TO 1066+21

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 11 of 16 TOTAL

Page 113: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

857+40 TO 861+60 66 Ton $49.91 3,310.20$                  

1008 Ton $49.91 50,309.06$                

1101+00 to 1106+00 409 Ton $49.91 20,392.86$                

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

D. Curb and Gutter (HS‐202) 500+00 TO 510+50 1048 LF $43.78 45,881.44$                

527+50 TO 533+65 1254 LF $43.78 54,900.12$                

583+50 TO 587+70 1230 LF $43.78 53,849.40$                

606+50 TO 608+50 725 LF $43.78 31,740.50$                

852+95 TO 857+15 1844 LF $43.78 80,730.32$                

857+40 TO 861+60 793 LF $43.78 34,717.54$                

3536 LF $43.78 154,806.08$             

1101+00 to 1106+00 1400 LF $43.78 61,292.00$                

19th Street west of Parks Avenue is not part of the City of VB proposed 

roadway improvements, so any widening there would be a project cost.

granite curb 1101+50 TO 1128+00 5300 LF $23.56 124,868.00$              Curb adjacent to track along 19th Street, both sides

D. Park and Rides

585+00.00 Witchduck Rd 1.00 EA $1,797,388.08 1,797,388.08$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                  

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

730+00.00 Lynn Shores/Thalia 1.00 EA $1,490,727.49 1,490,727.49$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

70,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

850+00.00 Lynnhaven Pkwy 1.00 EA $1,567,418.29 1,567,418.29$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

75,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

955+00.00 North Oceana 1.00 EA $1,686,103.51 1,686,103.51$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

100,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add costto include removal of unsuitable materials

E. Milling Asphalt 1100+87 TO 1124+35 7369.00 SY $47.02 346,490.38$              Includes milling of 19th Street Adjacent to track

TOTAL  LS 11,239,172.73$        

1050+36 TO 1066+21

1050+36 TO 1066+21

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 12 of 16 TOTAL

Page 114: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $1,763,927.54 $1,763,927.54

Includes Maintenance of Traffic and Protection during construction.  Includes 

work on Birdneck rd (70' wide, 5 lanes) and 19th Street (45' wide, 4 lanes); 

Include 24/7 police at intersections @ $45/hour for duration of project ‐ 49 

intersections (notes indicate that total cost may need to increase by about a 

factor of 5)

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 33 EA $500,000.00 16,500,000.00$        

Grade Crossing Signals 41 EA $250,000.00 10,250,000.00$        

Wayside Signals 15.68 MI $100,000.00 1,568,000.00$           Both Norfolk (3.5 MI) and VB (12.18 mi)

Track Circuits 15.68 MI $120,000.00 1,881,600.00$           Both Norfolk (3.5 MI) and VB (12.18 mi); Increase curcuits by 20%

Signal House 25 EA $253,980.68 6,349,517.00$           One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles 9 EA $55,555.56 500,000.04$              upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 37,049,117.04$        

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

492+50.00 Newtown Rd 1 EA $9,688.61 9,688.61$                   REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

504+00.00 Princess Anne Rd 1 EA $9,688.61 9,688.61$                  

508+00.00 Freight Ln 1 EA $9,688.61 9,688.61$                  

568+00.00 Greenwich Rd 1 EA $9,688.61 9,688.61$                  

592+50.00 Mac St 1 EA $9,688.61 9,688.61$                  

608+00.00 Euclid Rd 1 EA $9,688.61 9,688.61$                  

636+00.00 Kellam Rd 1 EA $9,688.61 9,688.61$                  

663+00.00 Constitution Dr 1 EA $9,688.61 9,688.61$                  

692+50.00 N Thalia Rd 1 EA $9,688.61 9,688.61$                  

719+00.00 S Kentucky Ave 1 EA $9,688.61 9,688.61$                  

728+50.00 Lynn Shores Dr 1 EA $9,688.61 9,688.61$                  

783+00.00 Plaza Trail 1 EA $9,688.61 9,688.61$                  

847+50.00 Lynnhaven Rd 1 EA $9,688.61 9,688.61$                  

951+40.00 N. Oceana Park and Ride 1 EA $9,688.61 9,688.61$                  

959+50.00 Air Station Dr 1 EA $9,688.61 9,688.61$                  

983+00.00 First Colonial Rd 1 EA $9,688.61 9,688.61$                  

994+00.00 Oceana Blvd 1 EA $9,688.61 9,688.61$                  

1019+50.00 Sykes Ave 1 EA $9,688.61 9,688.61$                  

1043+00.00 Distribution Dr 1 EA $9,688.61 9,688.61$                  

SUBTOTAL  19 184,083.59$             

492+50.00

Newtown Rd 1

EA $270,648.16

270,648.16$              Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

504+00.00 Princess Anne Rd 1 EA $270,648.16 270,648.16$             

508+00.00 Freight Ln 1 EA $270,648.16 270,648.16$             

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 13 of 16 TOTAL

Page 115: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

568+00.00 Greenwich Rd 1 EA $270,648.16 270,648.16$             

592+50.00 Mac St 1 EA $270,648.16 270,648.16$             

608+00.00 Euclid Rd 1 EA $270,648.16 270,648.16$             

636+00.00 Kellam Rd 1 EA $270,648.16 270,648.16$             

663+00.00 Constitution Dr 1 EA $270,648.16 270,648.16$             

692+50.00 N Thalia Rd 1 EA $270,648.16 270,648.16$             

719+00.00 S Kentucky Ave 1 EA $270,648.16 270,648.16$             

728+50.00 Lynn Shores Dr 1 EA $270,648.16 270,648.16$             

783+00.00 Plaza Trail 1 EA $270,648.16 270,648.16$             

847+50.00 Lynnhaven Rd 1 EA $270,648.16 270,648.16$             

EA $270,648.16 ‐$                            

951+40.00 N. Oceana Park and Ride 1 EA $270,648.16 270,648.16$             

959+50.00 Air Station Dr 1 EA $270,648.16 270,648.16$             

983+00.00 First Colonial Rd 1 EA $270,648.16 270,648.16$             

994+00.00 Oceana Blvd 1 EA $270,648.16 270,648.16$             

1019+50.00 Sykes Ave 1 EA $270,648.16 270,648.16$             

1043+00.00 Distribution Dr 1 EA $270,648.16 270,648.16$             

1058+00.00 Hope Ave 1 EA $270,648.16 270,648.16$             

Private Drive 1 EA $270,648.16 270,648.16$             

SUBTOTAL  21 5,683,611.36$          

TOTAL  5,867,694.95$          

Mainline 13 EA $2,373,678.79 30,857,824.27$         Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

MOF 2 EA $2,832,443.42 5,664,886.84$           includes one for yard and one for lead

TOTAL  15EA

36,522,711.11$         Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 98 EA $13,969.62 1,369,022.76$           Furnish and Install 40‐BI 028 (8 per mile)

Traction Power Manholes (MOF) 50 EA $13,969.62 698,481.00$              40‐BI ‐ 028 

Transit Systems Conduits 1 LS $2,531,314.28 2,531,314.28$           30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Transit Systems Conduits (MOF) 1 LS $337,560.95 337,560.95$              MOF Project 30/40 (Time adjusted)

Drilled Shaft Foundations 615 EA $9,939.77 6,112,958.55$           Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Drilled Shaft Foundations (MOF) 110 EA $9,939.77 1,093,374.70$           Project 30 Vol 3 DST ‐ 053 Sht 66

Remove Existing Foundation (OCS Pole 

Foundation) 486+00 1 EA$3,911.67 3,911.67$                  

At Newtown Road station

OCS System128,514

LF$38.47

4,943,933.58$           OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

OCS System (MOF)27,255

LF$38.47

1,048,499.85$           OCS ‐ 008/010 ‐ (Same as Above) Includes Jumpers, Hangers, Feeders, 

Messenger Wires, Contact Wires

Tapered Tubular Feeder Pole 850 EA $3,027.75 2,573,587.50$           Changed OCS poles to approxiamtely 80 foot spacing

Tapered Tubular Feeder Pole (MOF) 138 EA $3,027.75 417,829.50$              Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever   1538 EA $3,220.03 4,952,407.68$           Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever (MOF)   275 EA $3,220.03 885,508.53$              Changed OCS poles to approxiamtely 80 foot spacingProtection Barrier at Bridges 2 EA $91,064.29 182,128.58$             

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 14 of 16 TOTAL

Page 116: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

TOTAL    LS 27,150,519.12$        

Fiber in Duct Bank 12.18 MI $533,762.18 6,501,223.39$           4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security 13 EA $109,272.941,420,548.25$           Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station stop in VB

IT Room and Equipment at MOF 12.18 mi $650,000.007,917,000.00$           To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL    LS 15,838,771.63$        

TVM 14 EA $149,213.65 2,088,991.00$          

Two collection machines at each station; added two additional TVM at end of 

line station and Independence station, 4 TVM's need enclosures; 2 per 

enclosure ‐ 2 enclosures total ($12,000 each); Include CAT 5 cable from 

TVM's to nearest FO (for the machine and connections, each TVM is about 

$150,000, including the cable

TVM at PNR 6 EA $161,912.68 971,476.00$             

TOTAL  LS 3,060,467.00$          

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

B. Norfolk Southern ROW Acquisition

1.00LS

$40,000,000.00

40,000,000.00$         Parcel acquisition will be required, but area and costs are not determined at 

this time.

AC

‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

Parcel acquisition will be required, but area and costs are not determined at 

this time.

Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

A. Property Acquisition

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 15 of 16 TOTAL

Page 117: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  1 LS 40,000,000.00$        

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  19 EA $4,368,421.05 83,000,000.00$        Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL 14 EA $657,142.86 9,200,000.00$          Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

HRT_VB_LRT‐FULL_Cost Estimate_2013‐09‐13.xlsx 16 of 16 TOTAL

Page 118: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative 3 (Laskin Road Roadway)    

Page 119: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

0 LF $162.710 ‐$                            Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

0 LF $162.71 ‐$                            

SUBTOTAL  0 LF ‐$                            

B.  Ballast Curb and underdrain LF $311.49 ‐$                            

C. Subballast Access Road 0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

0 LF $59.94 ‐$                            

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 1 of 16 road quant

Page 120: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

SUBTOTAL  0 LF ‐$                            

TOTAL  0 LF ‐$                            

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

0 TF $754.100 ‐$                            Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

0 TF $754.10 ‐$                            

TOTAL  0 TF ‐$                            Include costs for rough grading, excavation and track slab

0 TF $365.30 ‐$                            

0 TF $365.30 ‐$                            

0 TF $365.30 ‐$                            

TOTAL  0 TF ‐$                            

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

0 LF ‐$                            

0 LF ‐$                            

0 LF ‐$                            

0 LF ‐$                            

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 2 of 16 road quant

Page 121: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

0 LF ‐$                            

0 LF ‐$                            

0 LF ‐$                            

0 LF ‐$                            

0 LF ‐$                            

TOTAL  0 LF ‐$                            

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation CY $34.75 ‐$                             Track alignment Assume 24" depth

Borrow Fill ‐ Unsuitable Excavation CY $57.64 ‐$                             Does not Include MOF

Embankment CY $65.57 ‐$                            

B. Retaining Walls SF $35.84 ‐$                             Furnish and Install;

SF $35.84 ‐$                             Retaining walls for bridge approaches

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

A. Earthwork

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 3 of 16 road quant

Page 122: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

SF $35.84 ‐$                            

TOTAL  LS ‐$                            

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

0 TF $412.82 ‐$                            

0 TF $412.82 ‐$                            

0 TF $412.82 ‐$                            

0 TF $412.82 ‐$                            

TOTAL  0 TF ‐$                            

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

0 TF $317.541 ‐$                            

0 TF $317.54 ‐$                            

0 TF $317.54 ‐$                             Includes 115lb CWR, concrete ties, OTM

0 TF $317.54 ‐$                            

TOTAL  0 TF ‐$                            

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 0 TF $322.893 ‐$                             Furnish and Install;

0 TF $322.89 ‐$                             Includes 115lb CWR, concrete ties, OTM, 10" ballast

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 4 of 16 road quant

Page 123: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 $322.89 ‐$                            

0 TF $322.89 ‐$                            

0 TF $322.89 ‐$                            

SUBTOTAL  0 TF ‐$                            

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 5 of 16 road quant

Page 124: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

00 TF $344.083 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

00 TF $344.08 ‐$                            

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

SUBTOTAL  0 TF ‐$                            

0 TF $1,243.02 ‐$                             Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

0 TF $1,243.02 ‐$                             Use different type of grade crossing, increase cost

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 6 of 16 road quant

Page 125: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

0 TF $1,243.02 ‐$                            

SUBTOTAL  0 TF ‐$                            

TOTAL  0 TF ‐$                            

EA $171,341.48 ‐$                             Furnish and Install;

EA $171,341.48 ‐$                             Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast EA $171,341.48 ‐$                             See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast EA $679,171.47 ‐$                             Furnish and Install;

EA $679,171.47‐$                             Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

EA $679,171.47 ‐$                            

TOTAL  0 EA ‐$                            

C. Universal Crossover in Embedded TrackEA $642,674.29

‐$                            

Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  0 EA ‐$                            

10.12 TRACK: SPECIAL (SWITCHES, TURNOUTS)

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 7 of 16 road quant

Page 126: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

D. No. 8 Turnout in Ballast EA $159,232.23 ‐$                             Furnish and Install;

EA $159,232.23 ‐$                             Includes 115lb rail, concrete ties, switch, OTM, 10" ballast

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

EA $159,232.23 ‐$                            

SUBTOTAL  0 EA ‐$                            

E. Diamond Crossing in Ballasted TrackEA

‐$                            

SUBTOTAL  0 EA ‐$                            

TOTAL  LS ‐$                            

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for concrete platforms, each with canopy, furnishings, utility 

services, security system. Newtown Road Station includes only one side 

platform for new EB track.

EA $321,380.80 ‐$                             one 12' wide ‐ 90' long platform

SUBTOTAL  0 EA ‐$                            

EA $642,761.60 ‐$                             two 12' wide ‐ 90' long platforms

EA $642,761.60 ‐$                             two 12' wide ‐ 90' long platforms

EA $642,761.60 ‐$                             two 12' wide ‐ 90' long platforms

SUBTOTAL  0 EA ‐$                            

EA ‐$                             one 19' wide ‐ 90' long platform

EA ‐$                             one 19' wide ‐ 90' long platform

EA ‐$                             one 19' wide ‐ 90' long platform

EA ‐$                             one 19' wide ‐ 90' long platform

EA ‐$                             one 19' wide ‐ 90' long platform

SUBTOTAL  0 EA ‐$                            

EA ‐$                             one 19' wide ‐ 200' long platform

SUBTOTAL  0 EA ‐$                            

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 8 of 16 road quant

Page 127: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

B.  Operator relief facility EA $321,380.80 ‐$                             includes 5 ft by 5 ft bathroom building at end of line station

TOTAL  0 LF ‐$                            

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

EA $880,995.47 ‐$                            

SUBTOTAL  0 EA ‐$                            

EA ‐$                            

SUBTOTAL  0 EA ‐$                            

TOTAL  0 LF ‐$                            

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

STATION $1,518,219.00 ‐$                            

STATION $1,518,219.00 ‐$                            

TOTAL  0 EA $0.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $23,255,645.00 ‐$                            

Furnish and Install station platform;

Includes one 18.75' wide ‐ 200' long concrete center platform, canopy, 

furnishings, utility services, security system: does not include 

elevators/escalators (see 20.07); increase length of canopy by 20% to cover 

TVM

Furnish and Install station platform;

Includes one 23' wide ‐ 270' long concrete center platform, canopy, 

furnishings, utility services, security system: does not include 

elevators/escalators (see 20.07); increase length of canopy by 20% to cover 

TVM

20.07 ELEVATORS, ESCALATORS Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair towers 

on piles; elevators and towers shall have glass exterior

Includes grading, building structure, inspection pits, enclosures, finishes, 

equipment, mechanical and electrical components, security system. Assume 

poor soil (fill) with need for piles. Building is assumed to have an eave height of 

35' and a  30' wide x 250' long wash bay lean‐to. Increase silt fence quantity 

and permanant fence quantity (double the quantity); add utility services to 

MOF; add $500,000 equipment allowance to reflect cost of pick up trucks, etc.; 

add noice attenuation for the operations and control center (OCC); Include 

cost for upgrading existing OCC in Norfolk

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 9 of 16 road quant

Page 128: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL LS $1,587,379.00 ‐$                            

30.05 YARD AND TRACKA. Track ‐ Ballast Yard TF $427.97 ‐$                             Does not include turnout lengths

B. Track ‐ In Building Yard TF $365.43 ‐$                            

C. No. 8 Turnouts Yard EA $157,533.80 ‐$                            

Yard Lead AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY TF $427.97 ‐$                            

Interlock Signalization and Control Yard EA $397,001.96 ‐$                            

Asphalt Paving Yard SY $70.34 ‐$                            

TOTAL  LS ‐$                            

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 926,348 SF $5.14 4,762,355.07$          

Track Removal TF $14.49 ‐$                             Does not include salvage value

Bridge Removal 131 LF $2,774.00 363,394.00$               Linkhorn Bay

B. Clearing 2097+00 to 2192+00 7 ACRES $8,383.61 58,685.27$                

C. Erosion Control 2097+00 to 2192+00 19,000 LF $34.73 659,908.00$              

TOTAL  LS 5,844,342.34$          

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH 2097+00 to 2192+00 9,500 LF $387.00 3,676,500.00$           Adjust utility cost based on new information

LF

LF

LF

A2. Relocate Distribution Line ‐ UG Open 

CutLF

A3. Relocate Distribution Line ‐ UG 

TrenchlessLF

TOTAL  1 LS 3,676,500.00$          

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor LF $123.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor LF $1.24 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor LF $16.51 ‐$                            

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street2097+00 to 2192+00 9,500 LF $146.15 1,388,425.00$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

F. Relocate and adjust water utility lines 

and structures; In Street 2097+00 to 2192+00 9,500 LF $25.22 239,618.50$              

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

A. Demolition

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 10 of 16 road quant

Page 129: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 2097+00 to 2192+00 9,500 LF $39.26 372,970.00$              

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  EA $254,278.83 ‐$                             Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $158,737.93 ‐$                            

TOTAL  LS 5,677,513.50$          

TOTAL  CY $298.22 ‐$                            

Increased quantity from 5 acres to 10 acres

TOTAL  AC $740,520.00 ‐$                            

40.05 SITE STRUCTURES INCLUDING  ROW Fence LF $40.33 ‐$                            7.51 miles * 2 sides

Linkhorn Bay Bridge 131 LF $36,024.00 4,719,144.00$           11604 sq ft, 2 piers, LRT bridge in middle (0.8 BRT)

TOTAL  LS 4,719,144.00$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

2097+00 to 2192+00 492 Ton $92.13 45,346.51$                

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

0 Ton $92.13 ‐$                            

SUBTOTAL  492 Ton 45,346.51$                

2097+00 to 2192+00 591 Ton $94.35 55,728.79$                

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

0 Ton $94.35 ‐$                            

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A

B. Asphalt Concrete Base Course, 6", Type 

BM‐25

40.04 ENVIRONMENTAL MITIGATION

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 11 of 16 road quant

Page 130: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

0 Ton $94.35 ‐$                            

SUBTOTAL  591 Ton 55,728.79$                

2097+00 to 2192+00

197 Ton $49.910 9,826.20$                  

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

0 Ton $49.91 ‐$                            

SUBTOTAL  197 Ton 9,826.20$                  

D. Curb and Gutter (HS‐202) 2097+00 to 2192+00 1470 LF $43.78 64,356.60$                

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

LF $43.78 ‐$                            

SUBTOTAL  1,470 LF 64,356.60$                

D. Park and Rides

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                   

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

70,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

75,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

C. Aggregate Base Material, Type 1, No. 

21A

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 12 of 16 road quant

Page 131: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 275 SPACES AND 

130,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

EA ‐$                            

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

SUBTOTAL  0 EA ‐$                            

E. Milling Asphalt SY $47.02 ‐$                            

TOTAL  LS 175,258.10$             

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $1,763,927.54 $1,763,927.54

Includes Maintenance of Traffic and Protection during construction.  Includes 

work on Birdneck rd (70' wide, 5 lanes) and 19th Street (45' wide, 4 lanes); 

Include 24/7 police at intersections @ $45/hour for duration of project ‐ 49 

intersections (notes indicate that total cost may need to increase by about a 

factor of 5)

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals EA $500,000.00 ‐$                            

Grade Crossing Signals EA $250,000.00 ‐$                            

Wayside Signals MI $100,000.00 ‐$                             Both Norfolk (3.5 MI) and VB (12.87 mi)

Track Circuits MI $120,000.00 ‐$                             Both Norfolk (3.5 MI) and VB (12.87 mi); Increase curcuits by 20%

Signal House EA $253,980.68 ‐$                             One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles EA $55,555.56 ‐$                             upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS ‐$                            

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

10 EA $9,688.61 96,886.10$                 REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

EA $9,688.61 ‐$                            

A. Grade Crossing Signals to be Removed

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 13 of 16 road quant

Page 132: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

SUBTOTAL  10 96,886.10$                

B. New Grade Crossing Signals EA $270,648.16 ‐$                            

10 EA $270,648.16 2,706,481.60$          

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

EA $270,648.16 ‐$                            

SUBTOTAL  10 2,706,481.60$          

TOTAL  2,803,367.70$          

EA $2,373,678.79 ‐$                             Furnish and Install; one per mile (OCS BID ITEMS 061‐066)

EA $2,832,443.42 ‐$                             includes one for yard and one for lead

TOTAL  0EA

‐$                             Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 14 of 16 road quant

Page 133: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

Traction Power Manholes EA $13,969.62 ‐$                             Furnish and Install 40‐BI 028 (8 per mile)

Traction Power Manholes (MOF) EA $13,969.62 ‐$                             40‐BI ‐ 028 

Transit Systems Conduits LS $2,531,314.28 ‐$                             30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Transit Systems Conduits (MOF) LS $337,560.95 ‐$                             MOF Project 30/40 (Time adjusted)

Drilled Shaft Foundations EA $9,939.77 ‐$                             Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Drilled Shaft Foundations (MOF) EA $9,939.77 ‐$                             Project 30 Vol 3 DST ‐ 053 Sht 66

Remove Existing Foundation (OCS Pole 

Foundation) EA$3,911.67 ‐$                            

At Newtown Road station

OCS System

LF$38.47

‐$                             OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

OCS System (MOF)

LF$38.47

‐$                             OCS ‐ 008/010 ‐ (Same as Above) Includes Jumpers, Hangers, Feeders, 

Messenger Wires, Contact Wires

Tapered Tubular Feeder Pole EA $3,027.75 ‐$                             Changed OCS poles to approxiamtely 80 foot spacing

Tapered Tubular Feeder Pole (MOF) EA $3,027.75 ‐$                             Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever EA $3,220.03 ‐$                             Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever (MOF) EA $3,220.03 ‐$                             Changed OCS poles to approxiamtely 80 foot spacingProtection Barrier at Bridges EA $91,064.29 ‐$                            

TOTAL    LS ‐$                            

Fiber in Duct Bank MI $533,762.18 ‐$                             4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security EA $109,272.94‐$                             Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station platform in VB

IT Room and Equipment at MOF mi $650,000.00‐$                             To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL    LS ‐$                            

TVM EA $149,213.65 ‐$                            

Two collection machines at each station; added two additional TVM at end of 

line station and Independence station, 4 TVM's need enclosures; 2 per 

enclosure ‐ 2 enclosures total ($12,000 each); Include CAT 5 cable from TVM's 

to nearest FO (for the machine and connections, each TVM is about $150,000, 

including the cable

TVM at PNR EA $161,912.68 ‐$                            

TOTAL  LS ‐$                            

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

Parcel acquisition will be required, but area and costs are not determined at 

this time.

A. Property Acquisition

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 15 of 16 road quant

Page 134: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LASKIN ROAD ALTERNATIVE ‐ ROADWAY RECONSTRUCTION REPUBLIC TO BIRDNECK

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

B. Norfolk Southern ROW AcquisitionLS

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

AC

‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  1 LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                            Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL EA $657,142.86 ‐$                            Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides) Parcel acquisition will be required, but area and costs are not determined at 

this time.

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐11‐1 with Birdneck change.xlsx 16 of 16 road quant

Page 135: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative 3 (Transit Components)    

Page 136: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

485+43.28 to 491+81.19 638 LF $162.710 103,794.34$              Include costs for rough grading, excavation, 8" subballast, ballast curb, 

underdrains

493+27.22 to 503+10.96 984 LF $162.71 160,064.34$              

505+76.33 to 507+47.88 172 LF $162.71 27,912.90$                

508+19.52 to 567+62.81 5,943 LF $162.71 967,032.72$              

568+34.81 to 578+27.00 992 LF $162.71 161,439.23$              

587+00.00 to 592+45.52 546 LF $162.71 88,761.56$                

592+85.52 to 607+70.19 1,485 LF $162.71 241,570.66$              

608+40.19 to 635+49.94 2,710 LF $162.71 440,903.42$              

636+13.94 to 640+70.00 456 LF $162.71 74,205.52$                

655+60.00 to 662+64.64 705 LF $162.71 114,651.97$              

663+54.64 to 675+00.00 1,145 LF $162.71 186,361.53$              

676+86.44 to 692+30.48 1,544 LF $162.71 251,230.75$              

692+62.48 to 718+90.23 2,628 LF $162.71 427,561.20$              

719+30.23 to 728+12.88 883 LF $162.71 143,615.98$              

729+00.88 to 757+88.00 2,887 LF $162.71 469,763.30$              

766+11.00 to 782+86.87 1,676 LF $162.71 272,680.81$              

783+56.11 to 847+45.46 6,389 LF $162.71 1,039,611.14$          

848+09.46 to 853+35.00 526 LF $162.71 85,510.61$                

861+91.00 to 875+90.00 1,399 LF $162.71 227,631.29$              

879+10.00 to 881+99.82 290 LF $162.71 47,156.61$                

2000+00.00 to 2015+55.00 1,555 LF $162.71 253,014.05$              

2052+47.00 to 2068+15.43 1,568 LF $162.71 255,199.25$              

2069+31.68 to 2073+14.00 382 LF $162.71 62,207.29$                

2073+98.04 to 2078+60.55 463 LF $162.71 75,255.00$                

2079+73.96 to 2096+63.62 1,690 LF $162.71 274,924.58$              

2097+89.04 to 2101+62.25 373 LF $162.71 60,725.00$                

2102+70.76 to 2108+19.00 548 LF $162.71 89,204.13$                

2115+74.00 to 2125+47.67 974 LF $162.71 158,425.85$              

2126+38.34 to 2134+41.41 803 LF $162.71 130,667.52$              

2135+26.34 to 2139+76.81 450 LF $162.71 73,295.97$                

2140+76.39 to 2164+13.40 2,337 LF $162.71 380,254.90$              

2167+43.78 to 2172+35.10 491 LF $162.71 79,942.68$                

2173+28.45 to 2187+18.56 1,390 LF $162.71 226,184.80$              

2188+15.05 to 2190+51.41 236 LF $162.71 38,458.14$                

SUBTOTAL  47,257 LF 7,689,219.01$          

B.  Ballast Curb and underdrain 63,885 LF $311.49 19,899,602.54$        

C. Subballast Access Road 533+51.45 to 562+28.75 LT 2,877 LF $59.94 172,476.87$              

608+57.75 to 635+73.98 RT 2,716 LF $59.94 162,821.69$              

670+03.46 to 675+00.48 LT 497 LF $59.94 29,793.37$                

679+47.29 to 683+45.81 RT 399 LF $59.94 23,888.88$                

770+21.22 to 783+00.07 RT 1,279 LF $59.94 76,659.38$                

783+54.79 to 789+74.56 RT 620 LF $59.94 37,151.49$                

798+87.68 to 847+80.97 RT 4,893 LF $59.94 293,323.38$              

866+95.17 to 875+06.96 LT 812 LF $59.94 48,661.94$                

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 1 of 17 LRT quant

Page 137: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

SUBTOTAL  14,093 LF 844,777.00$             

TOTAL  47,257 LF 28,433,598.55$        

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

491+81.19 to 493+27.22 146 TF $754.100 110,121.22$              Includes costs for rough grading, excavation, 8" subballast,  precast concrete 

panels

503+10.96 to 505+76.33 265 TF $754.10 200,115.52$              

507+47.88 to 508+19.52 72 TF $754.10 54,023.72$                

567+62.81 to 568+34.81 72 TF $754.10 54,295.20$                

592+45.52 to 592+85.52 40 TF $754.10 30,164.00$                

607+70.19 to 608+40.19 70 TF $754.10 52,787.00$                

635+49.94 to 636+13.94 64 TF $754.10 48,262.40$                

662+64.64 to 663+54.64 90 TF $754.10 67,869.00$                

692+30.48 to 692+62.48 32 TF $754.10 24,131.20$                

718+90.23 to 719+30.23 40 TF $754.10 30,164.00$                

728+12.88 to 729+00.88 88 TF $754.10 66,360.80$                

782+86.87 to 783+56.11 69 TF $754.10 52,213.88$                

847+45.46 to 848+09.46 64 TF $754.10 48,262.40$                

2068+15.43 to 2069+31.68 116 TF $754.10 87,664.13$                

2073+14.00 to 2073+98.04 84 TF $754.10 63,374.56$                

2078+60.55 to 2079+73.96 113 TF $754.10 85,522.48$                

2096+63.62 to 2097+89.04 125 TF $754.10 94,579.22$                

2101+62.25 to 2102+70.76 109 TF $754.10 81,827.39$                

2125+47.67 to 2126+38.34 91 TF $754.10 68,374.25$                

2134+41.41 to 2135+26.34 85 TF $754.10 64,045.71$                

2139+76.81 to 2140+76.39 100 TF $754.10 75,093.28$                

2172+35.10 to 2173+28.45 93 TF $754.10 70,395.24$                

2187+18.56 to 2188+15.05 96 TF $754.10 72,763.11$                

TOTAL  2,125 TF 1,602,409.71$          Include costs for rough grading, excavation and track slab

2164+13.40 to 2165+13.00 100 TF $365.30 36,383.88$                

2166+44.00 to 2167+43.78 100 TF $365.30 36,449.63$                

2190+51.41 to 2282+83.49 9,232 TF $365.30 3,372,478.82$          

TOTAL  9,431 TF 3,445,312.34$          

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

Witchduck578+27.00 to 587+00.00 873 LF $11,559.07 10,091,070.73$         ballast deck bridge, 24822 sq ft, 8 piers

Independence640+70.00 to 655+60.00 1490 LF $11,212.20 16,706,178.00$         Ballast Deck Bridge, 54243 sq ft, 14 Piers

Waterway675+00.00 to 676+87.00 187 LF $17,551.49 3,282,129.19$           Open Deck Bridge, 5156 sq ft, 2 Piers

Rosemont757+88.00 to 766+11.00 823 LF $12,036.10 9,905,710.30$           Ballast Deck Bridge, 23417 sq ft, 8 Piers

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 2 of 17 LRT quant

Page 138: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

Lynnhaven Parkway853+35.00 to 861+91.00 856 LF $11,740.07 10,049,499.92$         Ballast Deck Bridge, 24422 sq ft, 8 Piers

Waterway875+90.00 to 879+10.00 320 LF $14,846.82 4,750,982.72$           Open Deck Bridge, 8851 sq ft, 4 Piers

Laskin Viaduct2015+55.00 to 2052+47.00 3692 LF $9,192.01 33,936,900.92$         Ballast Deck Bridge, 124712 sq ft, 37 piers

First Colonial2108+19.00 to 2115+74.00 755 LF $14,273.94 10,776,824.70$         Ballast Deck Bridge, 22390 sq ft, 7 piers

Linkhorn Bay2165+13.00 to 2166+44.00 131 LF $15,601.66 2,043,817.46$           Embedded Track Bridge, 3651 sq ft, 2 piers, middle of roadway bridge

TOTAL  9,127 LF 101,543,113.94$      

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Unsuitable Excavation 68,000 CY $34.75 2,363,000.00$           Track alignment Assume 24" depth

Borrow Fill ‐ Unsuitable Excavation 68,000 CY $57.64 3,919,588.00$           Does not Include MOF

Embankment 28,000 CY $65.57 1,835,960.00$          

B. Retaining Walls 569+00.00 to 572+13.65 WB 1,882 SF $35.84 67,451.06$                 Furnish and Install;

575+60.04 to 578+28.10 WB 1,977 SF $35.84 70,855.15$                 Retaining walls for bridge approaches

575+59.87 to 578+27.02 EB 1,977 SF $35.84 70,855.15$                

587+01.92 to 589+87.86 WB 2,162 SF $35.84 77,485.92$                

587+00.00 to 589+86.85 EB 2,162 SF $35.84 77,485.92$                

638+75.45 to 640+71.65 WB 1,936 SF $35.84 69,381.15$                

638+76.00 to 640+69.96 EB 1,936 SF $35.84 69,381.15$                

655+62.69 to 658+28.11 WB 3,157 SF $35.84 113,157.67$              

655+59.90 to 658+25.30 EB 3,157 SF $35.84 113,157.67$              

754+10.54 to 757+89.96 WB 2,131 SF $35.84 76,370.34$                

754+08.94 to 757+87.86 EB 2,131 SF $35.84 76,370.34$                

766+13.57 to 768+86.18 WB 2,149 SF $35.84 77,033.42$                

766+10.58 to 768+83.39 EB 2,149 SF $35.84 77,033.42$                

784+28.44 to 786+59.00 EB 1,383 SF $35.84 49,582.39$                

850+70.40 to 853+36.75 WB 2,057 SF $35.84 73,709.07$                

850+67.95 to 853+35.17 EB 2,057 SF $35.84 73,709.07$                

861+94.17 to 864+65.36 WB 2,045 SF $35.84 73,296.89$                

861+94.17 to 864+35.36 EB 2,041 SF $35.84 73,159.50$                

2010+49.83 to 2015+55.00 EB 10,207 SF $35.84 365,834.81$              

2010+43.30 to 2015+33.92 WB 10,207 SF $35.84 365,834.81$              

2052+47.00 to 2056+98.92 EB 2,788 SF $35.84 99,931.98$                

2052+51.77 to 2057+03.06 WB 2,788 SF $35.84 99,931.98$                

10.08 GUIDWAY: RETAINED CUT OR FILLFurnish and Install  Retaining Wall Undercut and Fill in this bid item;

A. Earthwork

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 3 of 17 LRT quant

Page 139: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

2105+49.58 to 2108+19.00 EB 2,980 SF $35.84 106,809.16$              

2105+57.13 to 2108+26.96 WB 2,980 SF $35.84 106,809.16$              

2115+74.00 to 2118+04.40 EB 2,041 SF $35.84 73,140.08$                

2115+81.67 to 2118+12.45 WB 2,041 SF $35.84 73,140.08$                

TOTAL  LS 10,789,455.37$        

Furnish and Install Track on Guideway constructed in 10.04;

Includes 115lb rail on azobe ties connected to aerial structure

Waterway 675+00.00 to 676+87.00 187 TF $412.82 77,197.34$                

Waterway 675+00.00 to 676+87.00 187 TF $412.82 77,197.34$                

Waterway 875+90.00 to 879+10.00 320 TF $412.82 132,102.40$              

Waterway 875+90.00 to 879+10.00 320 TF $412.82 132,102.40$              

TOTAL  1,014 TF 418,599.48$             

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)includes bridge over Linkhorn Bay 2164+13.40 to 2167+43.78 EB 330 TF $317.541 104,909.20$              

includes bridge over Linkhorn Bay 2164+20.80 to 2167+51.18 WB 330 TF $317.54 104,909.20$              

2190+51.41 to 2282+83.49 EB 9,232 TF $317.54 2,931,563.92$           Includes 115lb CWR, concrete ties, OTM

2190+55.15 to 2282+93.36 WB 9,238 TF $317.54 2,933,510.44$          

TOTAL  19,131 TF 6,074,892.75$          

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)A.  Ballasted Track 485+43.28 to 491+81.19 EB 638 TF $322.893 205,976.67$               Furnish and Install;

491+73.78 to 491+81.97 WB 8 TF $322.89 2,644.49$                   Includes 115lb CWR, concrete ties, OTM, 10" ballast

493+27.22 to 503+10.96 EB 984 TF $322.89 317,642.76$              

493+28.00 to 502+74.81 WB 947 TF $322.89 305,718.32$              

505+76.33 to 507+47.88 EB 172 TF $322.89 55,392.29$                

505+38.85 to 507+48.72 WB 210 TF $322.89 67,765.55$                

508+19.52 to 567+62.81 EB 5,943 TF $322.89 1,919,046.74$          

508+20.36 to 567+25.03 WB 5,905 TF $322.89 1,906,576.61$          

568+34.81 to 578+27.00 EB 992 TF $322.89 320,371.21$              

567+97.07 to 578+27.01 WB 1,030 TF $322.89 332,560.42$              

587+00.00 to 592+45.52 EB 546 TF $322.89 176,144.59$              

587+01.92 to 592+46.53 WB 545 TF $322.89 175,850.76$              

592+85.52 to 607+70.19 EB 1,485 TF $322.89 479,389.55$              

592+86.53 to 607+71.15 WB 1,485 TF $322.89 479,373.41$              

608+40.19 to 635+49.94 EB 2,710 TF $322.89 874,959.31$              

608+41.15 to 635+50.78 WB 2,710 TF $322.89 874,920.56$              

636+13.94 to 640+70.00 EB 456 TF $322.89 147,258.58$              

636+14.78 to 640+71.65 WB 457 TF $322.89 147,520.12$              

655+60.00 to 662+64.64 EB 705 TF $322.89 227,523.32$              

655+62.69 to 662+66.67 WB 704 TF $322.89 227,310.21$              

663+54.64 to 675+00.00 EB 1,145 TF $322.89 369,828.73$              

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Furnish and Install; Increase cost to accommodate signal conduit; overall cost 

looks to be low by about $150/TF; Increased track slab length

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 4 of 17 LRT quant

Page 140: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

663+56.61 to 675+02.06 WB 1,145 TF $322.89 369,857.79$              

676+86.44 to 692+30.48 EB 1,544 TF $322.89 498,559.71$              

676+88.47 to 692+32.57 WB 1,544 TF $322.89 498,579.08$              

692+62.48 to 718+90.23 EB 2,628 TF $322.89 848,482.08$              

692+64.57 to 718+92.21 WB 2,628 TF $322.89 848,446.56$              

719+30.23 to 728+12.88 EB 883 TF $322.89 285,001.51$              

719+32.21 to 728+14.89 WB 883 TF $322.89 285,011.19$              

729+00.88 to 757+88.00 EB 2,887 TF $322.89 932,230.84$              

729+02.89 to 757+89.96 WB 2,887 TF $322.89 932,214.69$              

766+11.00 to 782+86.87 EB 1,676 TF $322.89 541,126.69$              

766+13.57 to 782+85.57 WB 1,672 TF $322.89 539,877.10$              

783+56.11 to 847+45.46 EB 6,389 TF $322.89 2,063,076.39$          

783+58.57 to 847+47.90 WB 6,389 TF $322.89 2,063,069.93$          

848+09.46 to 853+35.00 EB 526 TF $322.89 169,693.19$              

848+11.90 to 853+36.75 WB 525 TF $322.89 169,470.39$              

861+91.00 to 875+90.00 EB 1,399 TF $322.89 451,727.31$              

861+94.17 to 875+90.00 WB 1,396 TF $322.89 450,703.74$              

879+10.00 to 881+99.82 EB 290 TF $322.89 93,580.85$                

879+10.00 to 882+02.33 WB 292 TF $322.89 94,391.31$                

2000+00.00 to 2015+55.00 EB 1,555 TF $322.89 502,098.62$              

2000+00.00 to 2015+33.92 WB 1,534 TF $322.89 495,292.03$              

2052+47.00 to 2068+15.43 EB 1,568 TF $322.89 506,435.07$              

2052+51.77 to 2068+15.94 WB 1,564 TF $322.89 505,059.54$              

2069+31.68 to 2073+14.00 EB 382 TF $322.89 123,448.45$              

2069+32.19 to 2073+14.51 WB 382 TF $322.89 123,448.45$              

2073+98.04 to 2078+60.55 EB 463 TF $322.89 149,341.24$              

2073+98.68 to 2078+64.52 WB 466 TF $322.89 150,416.48$              

2079+73.96 to 2096+63.62 EB 1,690 TF $322.89 545,579.39$              

2079+78.63 to 2096+73.64 WB 1,695 TF $322.89 547,306.86$              

2097+89.04 to 2101+62.25 EB 373 TF $322.89 120,506.90$              

2097+96.55 to 2101+69.76 WB 373 TF $322.89 120,506.90$              

2102+70.76 to 2108+19.00 EB 548 TF $322.89 177,022.86$              

2102+77.66 to 2108+26.96 WB 549 TF $322.89 177,365.12$              

2115+74.00 to 2125+47.67 EB 974 TF $322.89 314,391.23$              

2115+81.67 to 2125+59.38 WB 978 TF $322.89 315,695.72$              

2126+38.34 to 2134+41.41 EB 803 TF $322.89 259,305.68$              

2126+50.14 to 2134+54.34 WB 804 TF $322.89 259,670.55$              

2135+26.34 to 2139+76.81 EB 450 TF $322.89 145,453.61$              

2135+38.77 to 2139+86.32 WB 448 TF $322.89 144,510.76$              

2140+76.39 to 2164+13.40 EB 2,337 TF $322.89 754,604.17$              

2140+85.12 to 2164+20.80 WB 2,336 TF $322.89 754,174.72$              

2167+43.78 to 2172+35.10 EB 491 TF $322.89 158,643.79$              

2167+51.18 to 2172+42.15 WB 491 TF $322.89 158,530.78$              

2173+28.45 to 2187+18.56 EB 1,390 TF $322.89 448,856.79$              

2173+35.48 to 2187+23.62 WB 1,388 TF $322.89 448,220.69$              

2188+15.05 to 2190+51.41 EB 236 TF $322.89 76,318.99$                

2188+19.64 to 2190+55.15 WB 236 TF $322.89 76,044.53$                

SUBTOTAL  93,861 TF 30,307,124.45$        

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 5 of 17 LRT quant

Page 141: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

Witchduck578+27.00 to 587+00.00 873 TF $344.083 300,384.46$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Witchduck578+27.00 to 587+00.00 873 TF $344.08 300,384.46$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Independence640+70.00 to 655+60.00 1,490 TF $344.08 512,683.67$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Independence640+70.00 to 655+60.00 1,490 TF $344.08 512,683.67$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Rosemont757+88.00 to 766+11.00 823 TF $344.08 283,180.31$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Rosemont757+88.00 to 766+11.00 823 TF $344.08 283,180.31$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Lynnhaven Parkway853+35.00 to 861+91.00 856 TF $344.08 294,535.05$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Lynnhaven Parkway853+35.00 to 861+91.00 856 TF $344.08 294,535.05$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Laskin Viaduct2015+55.00 to 2052+47.00 3,692 TF $344.08 1,270,354.44$          

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

Laskin Viaduct2015+55.00 to 2052+47.00 3,692 TF $344.08 1,270,354.44$          

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

First Colonial2108+19.00 to 2115+74.00 755 TF $344.08 259,782.67$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

First Colonial2108+19.00 to 2115+74.00 755 TF $344.08 259,782.67$              

Increase unit cost to accommodate increased effort of transporting ballast to 

bridge level

SUBTOTAL  16,978 TF 5,841,841.17$          

491+81.19 to 493+27.22 EB 146 TF $1,243.02 181,518.50$               Furnish and Install;115lb CWR, concrete ties, OTM, 10" ballast

491+81.97 to 493+28.00 WB 146 TF $1,243.02 181,518.50$               Use different type of grade crossing, increase cost

503+10.96 to 505+76.33 EB 265 TF $1,243.02 329,860.75$              

502+74.81 to 505+38.85 WB 264 TF $1,243.02 328,207.53$              

507+47.88 to 508+19.52 EB 72 TF $1,243.02 89,050.10$                

507+48.72 to 508+20.36 WB 72 TF $1,243.02 89,050.10$                

567+62.81 to 568+34.81 EB 72 TF $1,243.02 89,497.58$                

567+25.03 to 567+97.07 WB 72 TF $1,243.02 89,547.30$                

592+45.52 to 592+85.52 EB 40 TF $1,243.02 49,720.88$                

592+46.53 to 592+86.53 WB 40 TF $1,243.02 49,720.88$                

607+70.19 to 608+40.19 EB 70 TF $1,243.02 87,011.54$                

607+71.15 to 608+41.15 WB 70 TF $1,243.02 87,011.54$                

635+49.94 to 636+13.94 EB 64 TF $1,243.02 79,553.41$                

635+50.78 to 636+14.78 WB 64 TF $1,243.02 79,553.41$                

662+64.64 to 663+54.64 EB 90 TF $1,243.02 111,871.98$              

662+66.67 to 663+56.61 WB 90 TF $1,243.02 111,797.40$              

692+30.48 to 692+62.48 EB 32 TF $1,243.02 39,776.70$                

692+32.57 to 692+64.57 WB 32 TF $1,243.02 39,776.70$                

718+90.23 to 719+30.23 EB 40 TF $1,243.02 49,720.88$                

718+92.21 to 719+32.21 WB 40 TF $1,243.02 49,720.88$                

728+12.88 to 729+00.88 EB 88 TF $1,243.02 109,385.94$              

728+14.89 to 729+02.89 WB 88 TF $1,243.02 109,385.94$              

782+86.87 to 783+56.11 EB 69 TF $1,243.02 86,066.84$                

B. Ballasted with concrete panels (GRADE 

CROSSING PANEL PRECAST FULL DEPTH 

MODULAR PANEL ON GRADE)

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 6 of 17 LRT quant

Page 142: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

782+85.57 to 783+58.57 WB 73 TF $1,243.02 90,740.61$                

847+45.46 to 848+09.46 EB 64 TF $1,243.02 79,553.41$                

847+47.90 to 848+11.90 WB 64 TF $1,243.02 79,553.41$                

2068+15.43 to 2069+31.68 EB 116 TF $1,243.02 144,501.31$              

2068+15.94 to 2069+32.19 WB 116 TF $1,243.02 144,501.31$              

2073+14.00 to 2073+98.04 EB 84 TF $1,243.02 104,463.57$              

2073+14.51 to 2073+98.68 WB 84 TF $1,243.02 104,625.16$              

2078+60.55 to 2079+73.96 EB 113 TF $1,243.02 140,971.13$              

2078+64.52 to 2079+78.63 WB 114 TF $1,243.02 141,841.24$              

2096+63.62 to 2097+89.04 EB 125 TF $1,243.02 155,899.82$              

2096+73.64 to 2097+96.55 WB 123 TF $1,243.02 152,779.83$              

2101+62.25 to 2102+70.76 EB 109 TF $1,243.02 134,880.32$              

2101+69.76 to 2102+77.66 WB 108 TF $1,243.02 134,122.07$              

2125+47.67 to 2126+38.34 EB 91 TF $1,243.02 112,704.80$              

2125+59.38 to 2126+50.14 WB 91 TF $1,243.02 112,816.68$              

2134+41.41 to 2135+26.34 EB 85 TF $1,243.02 105,569.86$              

2134+54.34 to 2135+38.77 WB 84 TF $1,243.02 104,948.35$              

2139+76.81 to 2140+76.39 EB 100 TF $1,243.02 123,780.13$              

2139+86.32 to 2140+85.12 WB 99 TF $1,243.02 122,810.57$              

2172+35.10 to 2173+28.45 EB 93 TF $1,243.02 116,036.10$              

2172+42.15 to 2173+35.48 WB 93 TF $1,243.02 116,011.24$              

2187+18.56 to 2188+15.05 EB 96 TF $1,243.02 119,939.19$              

2187+23.62 to 2188+19.64 WB 96 TF $1,243.02 119,354.97$              

SUBTOTAL  4,248 TF 5,280,730.36$          

TOTAL  115,088 TF 41,429,695.99$        

RH EA $171,341.48 ‐$                             Furnish and Install;

LH EA $171,341.48 ‐$                             Includes 115lb rail, concrete ties, switches, OTM, 10" ballast

A. Turnout (Crossover) in Ballast RH EA $171,341.48 ‐$                             See Norfolk LRT Project 40, Volume 1, DTR 429, Sheet 246

SUBTOTAL  0 EA ‐$                            

B. Universal Crossover in Ballast 486+01 EB 1 EA $679,171.47 679,171.47$               Furnish and Install;

595+30 EB 1 EA $679,171.47 679,171.47$              Includes 115lb rail, concrete ties, 4 switches, OTM, 10" ballast, diamond

660+46 EB 1 EA $679,171.47 679,171.47$              

721+51 EB 1 EA $679,171.47 679,171.47$              

844+48 EB 1 EA $679,171.47 679,171.47$              

2088+25 EB 1 EA $679,171.47 679,171.47$              

2146+60 EB 1 EA $679,171.47 679,171.47$              

TOTAL  7 EA 4,754,200.30$          

C. Universal Crossover in Embedded Track2273+51.11 EB 1 EA $642,674.29 642,674.29$              

Furnish and Install;

Includes 115lb rail,  4 switches, OTM, diamond

SUBTOTAL  1 EA 642,674.29$             

10.12 TRACK: SPECIAL (SWITCHES, TURNOUTS)

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 7 of 17 LRT quant

Page 143: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

D. No. 8 Turnout in Ballast 740+22 LH 1 EA $159,232.23 159,232.23$               Furnish and Install;

741+20 RH 1 EA $159,232.23 159,232.23$               Includes 115lb rail, concrete ties, switch, OTM, 10" ballast

742+92 RH 1 EA $159,232.23 159,232.23$              

746+36 LH 1 EA $159,232.23 159,232.23$              

748+10 LH 1 EA $159,232.23 159,232.23$              

749+06 RH 1 EA $159,232.23 159,232.23$              

2000+50.88 EB 1 EA $159,232.23 159,232.23$              

2000+44.23 WB 1 EA $159,232.23 159,232.23$              

SUBTOTAL  8 EA 1,273,857.86$          

E. Diamond Crossing in Ballasted Track2001+88.91 EB 1 EA $336,949.00 336,949.00$              

SUBTOTAL  1 EA 336,949.00$             

TOTAL  LS 7,007,681.45$          

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for concrete platforms, each with canopy, furnishings, utility 

services, security system. Newtown Road Station includes only one side 

platform for new EB track.

Newtown Road 490+00.00 1 EA $321,380.80 321,380.80$               one 12' wide ‐ 90' long platform

SUBTOTAL  1 EA 321,380.80$             

Witchduck 590+00.00 1 EA $642,761.60 642,761.60$               two 12' wide ‐ 90' long platforms

Rosemont 731+00.00 1 EA $642,761.60 642,761.60$               two 12' wide ‐ 90' long platforms

Lynnhaven 850+00.00 1 EA $642,761.60 642,761.60$               two 12' wide ‐ 90' long platforms

SUBTOTAL  3 EA 1,928,284.80$          

Hilltop West 2098+27.03 1 EA $482,071.20 482,071.20$               one 19' wide ‐ 90' long platform

Hilltop East 2131+18.13 1 EA $482,071.20 482,071.20$               one 19' wide ‐ 90' long platform

Birdneck 2208+07.59 1 EA $482,071.20 482,071.20$               one 19' wide ‐ 90' long platform

Convention Center 2246+24.33 1 EA $482,071.20 482,071.20$               one 19' wide ‐ 90' long platform

EA $482,071.20 ‐$                             one 19' wide ‐ 90' long platform

SUBTOTAL  4 EA 1,928,284.80$          

Oceanfront 2279+63.49 1 EA $964,142.40 964,142.40$               one 19' wide ‐ 200' long platform

SUBTOTAL  1 EA 964,142.40$             

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 8 of 17 LRT quant

Page 144: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

B.  Operator relief facility 1 EA $321,380.80 321,380.80$              includes 5 ft by 5 ft bathroom building at end of line station

TOTAL  9 EA 5,463,473.60$          

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORMIndependence 646+00.00 1 EA $880,995.47 880,995.47$              

SUBTOTAL  1 EA 880,995.47$             

Great Neck 2020+57.90 1 EA $1,321,493.21 1,321,493.21$          

SUBTOTAL  1 EA 1,321,493.21$          

TOTAL  2 EA 2,202,488.68$          

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

646+00.00 1 STATION $1,518,219.00 1,518,219.00$          

2020+57.90 1 STATION $1,518,219.00 1,518,219.00$          

TOTAL  2 EA $3,036,438.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY

TOTAL  1 LS $23,255,645.00 23,255,645.00$        

Includes grading, building structure, inspection pits, enclosures, finishes, 

equipment, mechanical and electrical components, security system. Assume 

poor soil (fill) with need for piles. Building is assumed to have an eave height of 

35' and a  30' wide x 250' long wash bay lean‐to. Increase silt fence quantity 

and permanant fence quantity (double the quantity); add utility services to 

MOF; add $500,000 equipment allowance to reflect cost of pick up trucks, etc.; 

add noice attenuation for the operations and control center (OCC); Include 

cost for upgrading existing OCC in Norfolk

Furnish and Install station platform;

Includes one 18.75' wide ‐ 200' long concrete center platform, canopy, 

furnishings, utility services, security system: does not include 

elevators/escalators (see 20.07); increase length of canopy by 20% to cover 

TVM

Furnish and Install station platform;

Includes one 23' wide ‐ 270' long concrete center platform, canopy, 

furnishings, utility services, security system: does not include 

elevators/escalators (see 20.07); increase length of canopy by 20% to cover 

TVM

Furnish and Install;

Includes two elevators on each end of the station platform, at aerial station 

stop locations; include two separate elevator towers on piles, and stair towers 

on piles; elevators and towers shall have glass exterior

20.07 ELEVATORS, ESCALATORS

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 9 of 17 LRT quant

Page 145: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL 1 LS $1,587,379.00 1,587,379.00$          

30.05 YARD AND TRACKA. Track ‐ Ballast Yard 14,070.00 TF $427.97 6,021,537.90$           Does not include turnout lengths

B. Track ‐ In Building Yard 2,650.00 TF $365.43 968,392.15$              

C. No. 8 Turnouts Yard 32.00 EA $157,533.80 5,041,081.60$          

Yard Lead AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY 11,520.00 TF $427.97 4,930,214.40$          

Interlock Signalization and Control Yard 1.00 EA $397,001.96 397,001.96$              

Asphalt Paving Yard 10,000.00 SY $70.34 703,400.00$              

TOTAL  LS 18,061,628.01$        

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 919,795 SF $5.144,728,666.10$           Pavement removal required to construct grade crossing; includes sawcutting, 

reconstruction of Birdneck Rd, road relocations

Track Removal 42,500 TF $14.49 615,910.00$               Does not include salvage value

Bridge Removal 282 LF $793.67 223,816.07$               675+22 to 676+45 Over Waterway = 1320 sf; 876+76 to 878+37 Over 

Waterway = 1735 sf, Total 282 LF/ 3055 SF; Linkhorn bridge removal by others

B. Clearing 49.00 ACRES $8,383.61 410,796.89$               area from subballast edge to 10' beyond limits of work, NS corridor only

C. Erosion Control 135,910 LF $34.73 4,720,426.12$           Double silt fence quantity in detailed estimate

TOTAL  LS 10,699,615.17$         Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATIONA1. Relocate Distribution Line ‐ OH NS 11,800 LF $387.00 4,566,600.00$           Adjust utility cost based on new information

Distribution ‐ OH 2020+00 to 2097+00 7,700 LF $387.00 2,979,900.00$          

Transmission ‐ OH 2073+50 to 2082+00 850 LF $458.00 389,300.00$              

Distribution ‐ OH 2192+00 to 2241+00 4,900 LF $387.00 1,896,300.00$          

A2. Relocate Distribution Line ‐ UG Open 

CutNS 11,000 LF $898.00 9,878,000.00$          

A3. Relocate Distribution Line ‐ UG 

TrenchlessNS 900 LF $754.00 678,600.00$              

TOTAL  1 LS $20,388,700.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 39,656 LF $123.40 4,893,669.37$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

C. Relocate and adjust water utility lines 

and structures; NS Corridor 39,656 LF $1.24 49,173.44$                

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 39,656 LF $16.51 654,720.56$              

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street28,283 LF $146.15 4,133,560.45$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

A. Demolition

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 10 of 17 LRT quant

Page 146: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

F. Relocate and adjust water utility lines 

and structures; In Street 28,283 LF $25.22 713,382.11$              

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low; Increase unit cost to accommodate 8' depth at 

crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 28,283 LF $39.26 1,110,390.58$          

Use Chronologically Adjusted Norfolk LRT Unit Prices; Increase utility costs 

(double) ‐ TIDE was too low

H. Reconstruct culverts  14 EA $254,278.83 3,559,903.66$           Assume 5'x4' box and 65' length; piles every 10'

I. Transmission Guy Wire Mods @ Sta 

875+501 LS $158,737.93 158,737.93$              

J. Relocate Sewer Pump Station 2172+00 1 LS $858,947.00 858,947.00$              

TOTAL  LS $36,521,185.10

TOTAL  24,827 CY $298.22 7,403,907.94$          

Increased quantity from 5 acres to 10 acres

TOTAL  10 AC $740,520.00 7,405,200.00$          

40.05 SITE STRUCTURES INCLUDING  ROW Fence 79,306 LF $40.33 3,198,394.85$           7.51 miles * 2 sides

Bollard and Chain Along 19th Street 3,665 LF $119.05 436,329.25$              

TOTAL  LS 3,634,724.09$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

475 Ton $92.13 43,800.41$                

892 Ton $92.13 82,186.70$                

124 Ton $92.13 11,405.25$                

29 Ton $92.13 2,680.46$                  

29 Ton $92.13 2,646.85$                  

222 Ton $92.13 20,474.55$                

166 Ton $92.13 15,276.09$                

Laskin Rd 2060+70 to 2097+20 9597 Ton $92.13 884,170.09$              

Laskin Rd ‐ guideway only ‐ road by others2097+20 to 2191+80

190Ton $92.13 17,533.61$                

Birdneck and 19th St 2191+80 to 2260+90 8842 Ton $92.13 814,587.43$              

Birdneck and 19th St ‐ guideway only ‐ 

road by others2260+90 to 2282+83

86Ton $92.13 7,915.33$                  

SUBTOTAL  20,652 Ton 1,902,676.76$          

527+50 TO 533+65 570 Ton $94.35 53,828.71$                

583+50 TO 587+70 1070 Ton $94.35 101,003.70$              

606+50 TO 608+50 149 Ton $94.35 14,016.53$                

689+50 35 Ton $94.35 3,294.16$                  

B. Asphalt Concrete Base Course, 6", Type 

BM‐25

852+95 TO 857+15

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

857+40 TO 861+60

583+50 TO 587+70

527+50 TO 533+65

606+50 TO 608+50

689+50

695+50

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 11 of 17 LRT quant

Page 147: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

695+50 34 Ton $94.35 3,252.85$                  

852+95 TO 857+15 267 Ton $94.35 25,162.29$                

857+40 TO 861+60 199 Ton $94.35 18,773.62$                

Laskin Rd 2060+70 to 2097+20 11516 Ton $94.35 1,086,604.74$          

Laskin Rd ‐ guideway only ‐ road by others2097+20 to 2191+80

228Ton $94.35 21,548.01$                

Birdneck and 19th St 2191+80 to 2260+90 10610 Ton $94.35 1,001,090.82$          

Birdneck and 19th St ‐ guideway only ‐ 

road by others2260+90 to 2282+83

103Ton $94.35 9,727.58$                  

SUBTOTAL  24,782 Ton 2,338,303.02$          

527+50 TO 533+65 190 Ton $49.910 9,491.18$                  

583+50 TO 587+70 357 Ton $49.91 17,809.15$                

606+50 TO 608+50 50 Ton $49.91 2,471.42$                  

689+50 12 Ton $49.91 580.83$                     

695+50 11 Ton $49.91 573.55$                     

852+95 TO 857+15 89 Ton $49.91 4,436.66$                  

857+40 TO 861+60 66 Ton $49.91 3,310.20$                  

Laskin Rd 2060+70 to 2097+20 3839 Ton $49.91 191,592.10$              

Laskin Rd ‐ guideway only ‐ road by others2097+20 to 2191+80

76Ton $49.91 3,799.38$                  

Birdneck and 19th St 2191+80 to 2260+90 3537 Ton $49.91 176,514.13$              

Birdneck and 19th St ‐ guideway only ‐ 

road by others2260+90 to 2282+83

34Ton $49.91 1,715.18$                  

SUBTOTAL  8,261 Ton 412,293.79$             

D. Curb and Gutter (HS‐202) 500+00 TO 510+50 1048 LF $43.78 45,881.44$                

527+50 TO 533+65 1254 LF $43.78 54,900.12$                

583+50 TO 587+70 1230 LF $43.78 53,849.40$                

606+50 TO 608+50 725 LF $43.78 31,740.50$                

852+95 TO 857+15 1844 LF $43.78 80,730.32$                

857+40 TO 861+60 793 LF $43.78 34,717.54$                

Laskin Rd 2060+70 to 2097+20 13034 LF $43.78 570,628.52$              

Birdneck and 19th St 2097+20 to 2260+90 32209 LF $43.78 1,410,110.02$          

SUBTOTAL  52,137 LF 2,282,557.86$          

D. Park and Rides

585+00.00 Witchduck Rd 1.00 EA $1,797,388.08 1,797,388.08$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

C. Aggregate Base Material, Type 1, No. 

21A

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 12 of 17 LRT quant

Page 148: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

650+00.00 Independence Blvd 1.00 EA $2,454,803.86 2,454,803.86$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

110,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION. PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01.                                                                                                                                   

THE DEMOLITION OF THE EXISTING 40,000sf CIRCUIT CITY BUILDING AT THE 

INDEPENDENCE BLVD PARK‐RIDE WILL BE INCLUDED. THIS AREA WILL BE 

RECONSTRUCTED TO EXPAND THE EXISTING PARK‐RIDE FACILITY; Add cost to 

include removal of unsuitable materials

730+00.00 Lynn Shores/Thalia 1.00 EA $1,490,727.49 1,490,727.49$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

70,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

850+00.00 Lynnhaven Pkwy 1.00 EA $1,567,418.29 1,567,418.29$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 200 SPACES AND 

75,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

2015+00.00 Great Neck 1.00 EA $2,398,149.98 2,398,149.98$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 275 SPACES AND 

130,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

2145+00.00 Hilltop East 1.00 EA $1,880,901.95 1,880,901.95$          

THE PARK AND RIDE LOT SHALL HAVE AN AVERAGE OF 250 SPACES AND 

90,000 SQUARE FEET OF PAVING.  IT WILL INCLUDE STORMWATER 

DETENTION/RETENTION.  PROPERTY ACQUISITION INCLUDED IN SECTION 

60.01; Add cost to include removal of unsuitable materials

SUBTOTAL  6 EA 11,589,389.65$        

E. Milling Asphalt 226+00 to 2282+83 6850.00 SY $47.02 322,087.00$             

TOTAL  LS 18,847,308.07$        

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $1,763,927.54 $1,763,927.54

Includes Maintenance of Traffic and Protection during construction.  Includes 

work on Birdneck rd (70' wide, 5 lanes) and 19th Street (45' wide, 4 lanes); 

Include 24/7 police at intersections @ $45/hour for duration of project ‐ 49 

intersections (notes indicate that total cost may need to increase by about a 

factor of 5)

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSA. Equipment for new operations

Interlocking Signals 25 EA $500,000.00 12,500,000.00$        

Grade Crossing Signals 34 EA $250,000.00 8,500,000.00$          

Wayside Signals 16.37 MI $100,000.00 1,637,000.00$           Both Norfolk (3.5 MI) and VB (12.87 mi)

Track Circuits 16.37 MI $120,000.00 1,964,400.00$           Both Norfolk (3.5 MI) and VB (12.87 mi); Increase curcuits by 20%

Signal House 26 EA $253,980.68 6,603,497.68$           One per 0.5 miles (Virginia Beach portion only); 6'x6'

B. Retrofit Existing vehicles for ATC Existing Vehicles 9 EA $55,555.56 500,000.04$               upgrade to cab signaling; increased unit cost to $500,000

TOTAL  LS 31,704,897.72$        

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 13 of 17 LRT quant

Page 149: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

492+50.00 Newtown Rd 1 EA $9,688.61 9,688.61$                   REMOVE EXISTING CROSS GATE EQUIPMENT AND DISPOSE ‐ TYPICAL

504+00.00 Princess Anne Rd 1 EA $9,688.61 9,688.61$                  

508+00.00 Freight Ln 1 EA $9,688.61 9,688.61$                  

568+00.00 Greenwich Rd 1 EA $9,688.61 9,688.61$                  

592+50.00 Mac St 1 EA $9,688.61 9,688.61$                  

608+00.00 Euclid Rd 1 EA $9,688.61 9,688.61$                  

636+00.00 Kellam Rd 1 EA $9,688.61 9,688.61$                  

663+00.00 Constitution Dr 1 EA $9,688.61 9,688.61$                  

692+50.00 N Thalia Rd 1 EA $9,688.61 9,688.61$                  

719+00.00 S Kentucky Ave 1 EA $9,688.61 9,688.61$                  

728+50.00 Lynn Shores Dr 1 EA $9,688.61 9,688.61$                  

783+00.00 Plaza Trail 1 EA $9,688.61 9,688.61$                  

847+50.00 Lynnhaven Rd 1 EA $9,688.61 9,688.61$                  

SUBTOTAL  13 125,951.93$             

B. New Grade Crossing Signals 492+50.00 Newtown Rd 1 EA $270,648.16 270,648.16$              

504+00.00 Princess Anne Rd 1 EA $270,648.16 270,648.16$              

508+00.00 Freight Ln 1 EA $270,648.16 270,648.16$              

568+00.00 Greenwich Rd 1 EA $270,648.16 270,648.16$              

592+50.00 Mac St 1 EA $270,648.16 270,648.16$              

608+00.00 Euclid Rd 1 EA $270,648.16 270,648.16$              

636+00.00 Kellam Rd 1 EA $270,648.16 270,648.16$              

663+00.00 Constitution Dr 1 EA $270,648.16 270,648.16$              

692+50.00 N Thalia Rd 1 EA $270,648.16 270,648.16$              

719+00.00 S Kentucky Ave 1 EA $270,648.16 270,648.16$              

728+50.00 Lynn Shores Dr 1 EA $270,648.16 270,648.16$              

783+00.00 Plaza Trail 1 EA $270,648.16 270,648.16$              

847+50.00 Lynnhaven Rd 1 EA $270,648.16 270,648.16$              

2069+00.00 Phillip Ave 1 EA $811,944.48 811,944.48$              

2073+50.00 Regency Hilltop SC 1 EA $811,944.48 811,944.48$              

2079+00.00 Regency Dr 1 EA $811,944.48 811,944.48$              

2097+00.00 Republic Rd 1 EA $811,944.48 811,944.48$              

2102+00.00 Hilltop Plaza SC 1 EA $811,944.48 811,944.48$              

2126+00.00 Hilltop North SC 1 EA $811,944.48 811,944.48$              

2135+00.00 Hillto East SC 1 EA $811,944.48 811,944.48$              

2140+00.00 Winwood Dr 1 EA $811,944.48 811,944.48$              

2173+00.00 Linkhorn Bay Condos 1 EA $811,944.48 811,944.48$              

2188+00.00 Cardinal Rd 1 EA $811,944.48 811,944.48$              

2192+00.00 Laskin Rd/Birdneck Rd 1 EA $811,944.48 811,944.48$              

2200+00.00 24th St 1 EA $811,944.48 811,944.48$              

2207+00.00 Marabou Ln 1 EA $811,944.48 811,944.48$              

2216+50.00 Old Virginia Beach Blvd 1 EA $811,944.48 811,944.48$              

2230+00.00 Birdneck Rd/19th St 1 EA $811,944.48 811,944.48$              

2245+00.00 Parking Lot Driveway 1 EA $811,944.48 811,944.48$              

2250+00.00 Jefferson Ave 1 EA $811,944.48 811,944.48$              

2261+00.00 Parks Ave 1 EA $811,944.48 811,944.48$              

A. Grade Crossing Signals to be Removed

Includes gates, flashers, signage; Include additional high mast lighting at each 

crossing; Include signal controller at each crossing ($200,000 each); add 

$10,400 to each grade crossing to account for wiring 12 guage EF units for 

traffic signal preemption

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 14 of 17 LRT quant

Page 150: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

2266+50.00 Cypress Ave 1 EA $811,944.48 811,944.48$              

2272+00.00 Mediterranean Ave 1 EA $811,944.48 811,944.48$              

2278+00.00 Baltic Ave 1 EA $811,944.48 811,944.48$              

SUBTOTAL  34 20,569,260.16$        

TOTAL  20,695,212.09$        

Mainline 13 EA $2,373,678.79 30,857,824.27$         Furnish and Install; one per mile (OCS BID ITEMS 061‐066)MOF 2 EA $2,832,443.42 5,664,886.84$           includes one for yard and one for lead

TOTAL  15EA

36,522,711.11$         Substations are to be connected together, such that if a predetermined 

number of substations are down, the remaining substations can carry the 

vehicle load

50.04 TRACTION POWER DISTRIBUTION: CATENARY USE UNIT PRICES FROM PROJECT 30/40 SEE BELOW (Time adjusted )

Traction Power Manholes 103 EA $13,969.62 1,438,870.86$           Furnish and Install 40‐BI 028 (8 per mile)

Traction Power Manholes (MOF) 50 EA $13,969.62 698,481.00$               40‐BI ‐ 028 

Transit Systems Conduits 1 LS $2,531,314.28 2,531,314.28$           30‐ Volume 2 sheet 355; 30‐BI ‐ 025

Transit Systems Conduits (MOF) 1 LS $337,560.95 337,560.95$               MOF Project 30/40 (Time adjusted)

Drilled Shaft Foundations 654 EA $9,939.77 6,500,609.58$           Average spacing 100' to 150'  $8000/ea, 30‐BI043/40‐BI025

Drilled Shaft Foundations (MOF) 110 EA $9,939.77 1,093,374.70$           Project 30 Vol 3 DST ‐ 053 Sht 66

Remove Existing Foundation (OCS Pole 

Foundation) 486+00 1 EA$3,911.67 3,911.67$                  

At Newtown Road station

OCS System135,800

LF$38.47

5,224,226.00$           OCS ‐ 008/010 ‐ Includes Jumpers, Hangers, Feeders, Messenger Wires, 

Contact Wires

OCS System (MOF)27,255

LF$38.47

1,048,499.85$           OCS ‐ 008/010 ‐ (Same as Above) Includes Jumpers, Hangers, Feeders, 

Messenger Wires, Contact Wires

Tapered Tubular Feeder Pole 900 EA $3,027.75 2,724,975.00$           Changed OCS poles to approxiamtely 80 foot spacing

Tapered Tubular Feeder Pole (MOF) 138 EA $3,027.75 417,829.50$               Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever   1625 EA $3,220.03 5,232,550.38$           Changed OCS poles to approxiamtely 80 foot spacing

Catenary Cantilever (MOF)   275 EA $3,220.03 885,508.53$               Changed OCS poles to approxiamtely 80 foot spacingProtection Barrier at Bridges 1 EA $91,064.29 91,064.29$                

TOTAL    LS 28,228,776.58$        

Fiber in Duct Bank 12.87 MI $533,762.18 6,869,519.30$           4‐2" conduit; trough adjacent to ballasted track; buried in street

Public Address/Security 14 EA $109,272.941,529,821.19$           Speakers, cameras, and variable message signs; include CAT 5 cable to 

cameras; each station platform in VB

IT Room and Equipment at MOF 12.87 mi $650,000.008,365,500.00$           To Serve OCC, servers and TVM's; include ethernet through UG FO (was 

$2,000,000 on Norfolk, above ground on OCS poles)

TOTAL    LS 16,764,840.48$        

TVM 17 EA $149,213.65 2,536,632.00$          

Two collection machines at each station; added two additional TVM at end of 

line station and Independence station, 4 TVM's need enclosures; 2 per 

enclosure ‐ 2 enclosures total ($12,000 each); Include CAT 5 cable from TVM's 

to nearest FO (for the machine and connections, each TVM is about $150,000, 

including the cable

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 15 of 17 LRT quant

Page 151: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

TVM at PNR 6 EA $161,912.68 971,476.00$             

TOTAL  LS 3,508,108.00$          

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

B. Norfolk Southern ROW Acquisition1.00 LS $40,000,000.00 40,000,000.00$        

Parcel acquisition will be required, but area and costs are not determined at 

this time.

AC

‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area and costs are not determined at 

this time.

TOTAL  1 LS 40,000,000.00$        

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  19 EA $4,368,421.05 83,000,000.00$        Includes spare parts, special events, and ATC equipment and $15,000 per 

vehicle for ATC

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

70.04 BUS TOTAL 14 EA $657,142.86 9,200,000.00$          Feeder bus; Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used

Parcel acquisition will be required, but area and costs are not determined at 

this time.

Parcel acquisition will be required, but area and costs are not determined at 

this time.

Parcel acquisition will be required, but area and costs are not determined at 

this time.

C. Property Acquisition (Park and Rides)

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

A. Property Acquisition

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 16 of 17 LRT quant

Page 152: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ LASKIN ROAD ALTERNATIVE, INCLUDING MOF

70.07 SPARE PARTS Not used

HRT_VB_LRT‐Laskin_Cost Estimate_2013‐10‐21.xlsx 17 of 17 LRT quant

Page 153: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  LRT Alternative Timberline Report    

Page 154: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 1

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

HRT- Virginia Beach

Transit Extension

LRT

Base Project

Virginia Beach

VA

Conceptual Design

Update

2013-08-21

40

20

3rd Qtr 2013 Union

3rd Qtr 2013

Study

233-VA-NORFOLK

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 155: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 2

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

00_LRT ALT LIGHT RAIL TRANSIT (INCL MOF)

010 GUIDEWAY AND TRACK ELEMENTS

10.01 Guideway: At-grade exclusive right-of-way

32161.00 Grading, Excavation and

Subballast

54,971.00 lf 163.04 /lf 8,962,459

32161.01 Ballast Curb and Underdrain

System

51,438.00 lf 312.13 /lf 16,055,327

32162.01 Subballast Access Road 18,886.00 lf 163.04 /lf 3,079,169

10.01 Guideway: At-grade exclusive right-of-way

54,971.00 lf

511.123/lf 28,096,955

10.02 Guideway: At-grade semi-exclusive

34115.90 Ballasted with concrete panels

(GRADE CROSSING PANEL

PRECAST FULL DEPT

2,089.00 lf 906.84 /lf 1,894,379

10.02 Guideway: At-grade semi-exclusive

2,089.00 lf

906.84 /lf 1,894,379

10.03 Guideway: At-grade in mixed traffic

34119.05 1100+63.05 TO 1128+12.25 EB 5,450.00 lf 183.00 /lf 997,340

10.03 Guideway: At-grade in mixed traffic

5,450.00 tf

183.00 /tf 997,340

5,722.61 Labor hours

675.35 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 156: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 3

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

10.04 Guideway: Aerial structure (Light Rail Transit Bridge)

34720.05 578+27 TO 587+00 LRT Over

Witchduck Rd

873.00 lf 11,579.02 /lf 10,108,485

34720.10 640+70 TO 655+60 LRT Over

Independence Blvd

1,490.00 lf 11,230.752/lf 16,733,820

34720.15 675+00 TO 676+87 LRT Over

Waterway

187.00 lf 17,578.71 /lf 3,287,219

34720.20 757+88 TO 766+11 LRT Over

Rosemont Rd

823.00 lf 12,056.003/lf 9,922,091

34720.25 853+35 TO 861+91 LRT Over

Lynnhaven Parkway

856.00 lf 11,759.48 /lf 10,066,113

34720.30 875+90 TO 879+10 LRT Over

Waterway

320.00 lf 14,871.374/lf 4,758,840

10.04 Guideway: Aerial structure (Light Rail Transit Bridge)

4,549.00 lf

12,063.44 /lf 54,876,566

10.08 Guideway: Retained cut or fill

03302.05 Concrete Retaining Walls 38,487.00 sf 35.91 /sf 1,382,038

31230.02a Unsuitable Excavation 79,510.00 cy 28.37 /cy 2,255,533

31230.05 Excavation 86,134.00 cy 32.611/cy 2,808,879

31230.10 Embankment 24,790.00 cy 56.681/cy 1,405,131

10.08 Guideway: Retained cut or fill

1.00 ls

7,851,581.60 /ls 7,851,582

40,682.12 Labor hours

35,448.861 Equipment hours

10.09 Track: Direct fixation (Direct Fixation Track Construction)

34114.00 Direct Fixation Over Waterway 1,013.00 tf 448.83 /tf 454,663

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 157: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 4

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

10.09 Track: Direct fixation (Direct Fixation Track Construction)

1,013.00 tf

448.83 /tf 454,663

10.10.1 Track: Embedded (Cast-In-Place Reinforced Concrete Track Slab On Grade

34119.01 1100+87.29 TO 1128+12.25 EB 2,725.00 tf 307.20 /tf 837,117

34119.02 1100+63.05 TO 1128+00.30 WB 2,737.00 tf 307.20 /tf 840,803

10.10.1 Track: Embedded (Cast-In-Place Reinforced Concrete

Track Slab On Grade5,462.00 tf

307.20 /tf 1,677,919

10.11 Track: Ballasted (Mainline Ballased Track Construction)

34112.90 Ballasted Track 118,114.00 tf 353.582/tf 41,762,931

34115.90 Ballasted with concrete panels

(GRADE CROSSING PANEL

PRECAST FULL DEPT

4,032.00 lf 1,176.10 /lf 4,742,024

10.11 Track: Ballasted (Mainline Ballased Track Construction)

122,146.00 tf

380.733/tf 46,504,955

10.12 Track: Special (No. 8 Turnouts)

34116.90 No. 8 Turnouts 32.00 ea 159,495.48 /ea 5,103,856

34116.95 Double Crossover 1.00 ea 615,277.57 /ea 615,278

10.12 Track: Special (No. 8 Turnouts)

33.00 ea

173,307.064/ea 5,719,133

010 GUIDEWAY AND TRACK ELEMENTS

1.00 LS

148,073,491.870/LS 148,073,492

46,404.723 Labor hours

36,124.21 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 158: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 5

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

020 STATIONS, STOPS, TERMINALS, INTERMODAL

20.01 At-grade station, stop, shelter, mall, terminal, platform

09000.01 At-Grade Station, Stop, Shelter,

Mall, Terminal, Platform (12')

11.00 ea 319,494.311/ea 3,514,437

09000.02 At-Grade Station, Stop, Shelter,

Mall, Terminal, Platform (24')

1.00 ea 516,955.34 /ea 516,955

09001.01 Operator Relief Facility 1.00 ea 159,063.19 /ea 159,063

20.01 At-grade station, stop, shelter, mall, terminal, platform

12.00 ea

349,204.663/ea 4,190,456

20.02 Aerial station, stop, shelter, mall, terminal, platform

09000.02 At-Grade Station, Stop, Shelter,

Mall, Terminal, Platform (24')

1.00 ea 870,155.14 /ea 870,155

20.02 Aerial station, stop, shelter, mall, terminal, platform

1.00 ea

870,155.14 /ea 870,155

20.07 Elevators, Escalators

14240.02 Elevators 4.00 ea 108,774.203/ea 435,097

20.07 Elevators, Escalators

1.00 sta

435,096.81 /sta 435,097

710.621 Labor hours

020 STATIONS, STOPS, TERMINALS, INTERMODAL

13.00 EA

422,746.762/EA 5,495,708

710.621 Labor hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 159: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 6

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

030 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.03 Heavy Maintenance Facility

MOF substation see 50.3/34202.02

01500.01 Project Identification Sign 1.00 ea 1,650.63 /ea 1,651

01500.05 Construction Fence 4,600.00 lf 7.05 /lf 32,414

01520.01 Install and Furnish HRT Office 1.00 ls 159,063.19 /ls 159,063

01520.05 HRT Field Office Maintenance 24.00 mo 1,409.42 /mo 33,826

01530.01 Temporary Light Rail Vehicle

Shelter

3.00 ea 39,765.793/ea 119,297

02317.01 Precast Prestressed Concrete

Driven Piles

38,520.00 vlf 77.133/vlf 2,971,172

03300.90 MOF_Slab On Grade 3,904.00 cy 576.451/cy 2,250,466

03300.91 MOF_Pits (Foundation) 180.00 cy 591.821/cy 106,528

03300.92 MOF_Pits (Walls) 180.00 cy 751.97 /cy 135,355

04210.01 Brick 45,668.00 sf 16.361/sf 747,193

04220.01 Concrete Block 45,668.00 sf 19.71 /sf 900,011

08350.00 Bi-Fold Industrial Doors 12.00 ea 31,443.423/ea 377,321

09130.01 Acoustic Ceiling 10,000.00 sf 5.842/sf 58,423

09250.01 Gypsum Board 10,000.00 sf 8.10 /sf 80,950

09300.01 Flooring 10,000.00 sf 10.593/sf 105,925

09905.01 Painting 100,000.00 sf 2.48 /sf 247,595

10800.01 Toilet Accesories 1.00 ls 14,011.41 /ls 14,011

11901.01 Automatic Drive-Thru Vehicle

Wash System

1.00 ea 795,473.40 /ea 795,473

11901.10 Body and Paint Shop Equipment 1.00 ls 638,000.83 /ls 638,001

11910.01 Overhead Crane - 10 ton 1.00 ea 212,449.73 /ea 212,450

11910.05 Monorail Hoist - 2 ton 1.00 ea 39,810.72 /ea 39,811

11920.01 Fixed Lifting Jack Stations 2.00 ea 286,471.21 /ea 572,942

11930.01 Shop Equipment 1.00 ls 251,682.25 /ls 251,682

11930.02 Wheel Truing Machine with Chip

Removal

0.001 ea

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 160: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 7

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

11930.02 Wheel Truing Machine with Chip

Removal

0.001 ea

11930.04 Truck Repair Stand with Load

Testing Equipment

1.00 ea 79,689.070/ea 79,689

11940.01 Multi-Purpose On Track Vehicle 0.001 ea

11940.02 Pick-Up Truck w/ High Rail Gear 0.001 ea

13121.01 Pre-Engineered Metal Building 107,500.00 sf 32.32 /sf 3,474,000

Includes full operational control center; paint and body shop - 5000 sf;

22050.01 Building Plumbing System 1.00 ls 260,091.45 /ls 260,091

22710.01 Wet Pipe Sprinkler System 100,000.00 sf 4.77 /sf 476,990

23050.01 Building HVAC System 100,000.00 sf 5.01 /sf 501,049

Includes cost of heating with natural gas

26050.01 Building Electrical System 100,000.00 sf 15.91 /sf 1,590,632

26050.10 Stand By Power, NG 200.00 kw 693.55 /kw 138,710

31230.90 Sitework and Yard Piping (MOF) 1.00 ls 1,153,208.08 /ls 1,153,208

31240.01 Temporary Silt Fence 7,000.00 lf 1.30 /lf 9,093

32171.01 Furnish and Install Bollards 40.00 ea 776.21 /ea 31,048

32311.01 6-Foot CL Fence w/ 3-Strand Barb

Wire

4,600.00 lf 47.44 /lf 218,218

34131.01 Track Turntable 1.00 ls 103,391.08 /ls 103,391

30.03 Heavy Maintenance Facility

100,000.00 sf

188.88 /sf 18,887,679

55,770.89 Labor hours

7,088.14 Equipment hours

30.05 Building and Yard Track

Includes full loop track around building and storage area; 6 tracks through building

34112.63 Track - Ballast (Yard) 14,070.00 tf 428.882/tf 6,034,371

34112.64 Track - Building (Yard) 2,650.00 tf 366.211/tf 970,460

34116.15 No. 8 Turnout - Yard 30.00 ea 157,870.21 /ea 4,736,106

34116.16 Interlock Signalization and Control

per Cirteria K.9

1.00 ea 397,815.43 /ea 397,815

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 161: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 8

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

39900.08 Asphalt Paving (MOF) 10,000.00 sy 70.48 /sy 704,753

30.05 Building and Yard Track

1.00 ls

12,843,504.95 /ls 12,843,505

911.57 Labor hours

727.953 Equipment hours

030 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

1.00 LS

31,731,183.690/LS 31,731,184

56,682.46 Labor hours

7,816.09 Equipment hours

040 SITEWORK & SPECIAL CONDITIONS

40.01 Demolition, clearing, Earthwork

02410.01 Demolition - Pavement Removal 191,226.00 sf 5.151/sf 984,918

02410.02 Demolition - Track Removal 61,492.00 tf 14.52 /tf 892,775

02410.03 Demolition - Bridge Removal 282.00 lf 795.30 /lf 224,275

31230.01 Clearing 56.50 ac 8,399.343/ac 474,563

31230.04 Erosion Control 56,493.00 lf 34.803/lf 1,966,127

40.01 Demolition, clearing, Earthwork

1.00 ls

4,542,657.30 /ls 4,542,657

16,863.652 Labor hours

6,628.11 Equipment hours

40.02 Site Utilities, Utility Relocation

26001.01 Relocate Utility Poles 58.00 ea 10,700.65 /ea 620,638

26100.01 New, Relocate and Adjust Storm

Drain Lines and Structures

56,493.00 lf 61.83 /lf 3,492,841

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 162: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 9

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

26101.01 New, Relocate and Adjust Storm

Drain Lines and Structures; In

Street

7,764.00 lf 84.622/lf 657,002

33310.01 Relocate and Adjust Water Utility

Lines and Structures

56,493.00 lf 0.62 /lf 35,045

33310.02 Relocate and Adjust Water Utility

Lines and Structures, In Street

7,764.00 lf 23.414/lf 181,787

33310.04 Relocate and Adjust Sanitary

Sewer Utility Lines and Structures

56,493.00 lf 8.271/lf 467,270

33310.05 Relocate & Adjust Sanitary Sewer

Utility Lines and Structures, In Str

7,764.00 lf 31.07 /lf 241,189

33500.01 Reconstruct Culverts 17.00 ea 159,063.184/ea 2,704,074

40.02 Site Utilities, Utility Relocation

1.00 ls

8,399,846.15 /ls 8,399,846

5,134.22 Labor hours

1,633.761 Equipment hours

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments

31230.15 Hazardous Material,

Removal/Mitigation

24,827.00 cy 298.81 /cy 7,418,445

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water

treatments1.00 ls

7,418,444.69 /ls 7,418,445

4,668.202 Labor hours

4,237.58 Equipment hours

40.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks

31230.20 Environmental Mitigation

(Wetlands)

5.00 ac 740,520.002/ac 3,702,600

Allowance for Mitigation based on Bank cost of $17/sf

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 163: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 10

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

40.04 Environmental mitigation, e.g. wetlands,

historic/archeologic, parks1.00 ls

3,702,600.01 /ls 3,702,600

40.07 Automobile, bus, van accessways including roads, parking lots

32111.90 Aggregate Base Material, Type 1,

No. 21A

2,570.00 ton 50.01 /ton 128,524

32121.07 Milling Per 2" Depth 7,369.00 sy 47.12 /sy 347,199

32121.90 Asphalt Concrete Surface Course,

Type SM-9.5A

5,478.00 ton 92.32 /ton 505,730

32121.95 Asphalt Concrete Base Course,

Type BM-25

6,575.00 ton 94.55 /ton 621,648

32160.90 Curb and Gutter HS-202 11,830.00 lf 43.87 /lf 518,978

39900.01 Park and Ride (Witchduck Road) 1.00 ea 1,123,124.13 /ea 1,123,124

39900.02 Park and Ride (Independence

Blvd)

1.00 ea 1,631,196.87 /ea 1,631,197

39900.03 Park and Ride (Lynn

Shores/Thalia)

1.00 ea 966,512.49 /ea 966,512

39900.05 Park and Ride (Lynnhaven Pkwy) 1.00 ea 1,005,665.19 /ea 1,005,665

39900.09 Bus Transfer Area @ Oceana 1.00 ea 936,324.67 /ea 936,325

40.07 Automobile, bus, van accessways including roads, parking

lots1.00 ls

7,784,901.94 /ls 7,784,902

7,831.52 Labor hours

5,129.441 Equipment hours

40.08 Temporary Facilities and other indirect costs during construction

01550.01 Maintenance of Traffic 1.00 ls 318,126.37 /ls 318,126

40.08 Temporary Facilities and other indirect costs during

construction1.00 ls

318,126.37 /ls 318,126

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 164: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 11

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

040 SITEWORK & SPECIAL CONDITIONS

1.00 LS

32,166,576.460/LS 32,166,576

34,497.59 Labor hours

17,628.89 Equipment hours

050 SYSTEMS

50.01 Train control and signals

34410.10 Interlocking Signals 33.00 ea 500,000.001/ea 16,500,000

34457.05 Grade Crossing Signals 41.00 ea 250,000.00 /ea 10,250,000

34458.05 Wayside Signals 12.18 mi 100,000.001/mi 1,218,000

34459.05 Track Circuits 12.18 mi 100,000.001/mi 1,218,000

39999.10 Rerofit Existing Vehicles for ATC 9.00 ea 15,000.002/ea 135,000

50.01 Train control and signals

12.18 mi

2,407,307.07 /mi 29,321,000

50.02 Traffic signals and crossing protection

34456.00 Grade Crossing Signals to be

Removed

19.00 ea 9,706.08 /ea 184,415

34456.30 New Grade Crossing Signals; Per

Crossing (Public or Private)

22.00 ea 115,032.713/ea 2,530,720

50.02 Traffic signals and crossing protection

1.00 ls

2,715,135.13 /ls 2,715,135

2,150.000 Labor hours

348.001 Equipment hours

50.03 Traction power supply: substations

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 165: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 12

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

34202.01 Traction Power Supply:

Substations (Mainline)

13.00 ea 2,378,542.57 /ea 30,921,053

34202.02 Traction Power Supply:

Substations (MOF)

2.00 ea 2,838,247.22 /ea 5,676,494

50.03 Traction power supply: substations

15.00 ea

2,439,836.52 /ea 36,597,548

50.04 Traction power distribution: catenary and third rail

26054.01 Traction Power Manholes 98.00 ea 13,998.241/ea 1,371,828

26054.02 Traction Power Manholes (MOF) 50.00 ea 13,998.241/ea 699,912

26055.01 Transit Systems Conduits 1.00 ls 2,536,501.06 /ls 2,536,501

26055.02 Transit Systems Conduits (MOF) 1.00 ls 338,252.63 /ls 338,253

31632.01 Drilled Shaft Foundations 615.00 ea 9,960.14 /ea 6,125,484

31632.02 Drilled Shaft Foundations (MOF) 110.00 ea 9,960.14 /ea 1,095,615

31632.03 Remove Existing Foundation

486+00

1.00 ea 3,919.68 /ea 3,920

34301.01 OCS System 128,514.00 lf 38.544/lf 4,953,468

34301.02 OCS System (MOF) 27,255.00 lf 38.544/lf 1,050,522

34321.01 Tapered Tubular Feeder Pole 615.00 ea 3,033.95 /ea 1,865,879

34321.02 Tapered Tubular Feeder Pole

(MOF)

110.00 ea 3,033.95 /ea 333,734

34342.01 Cantenary Cantilever 1,230.00 ea 3,226.63 /ea 3,968,753

34342.02 Cantenary Cantilever (MOF) 220.00 ea 3,226.63 /ea 709,858

34342.04 Protection Barrier at Bridges 2.00 ea 91,250.89 /ea 182,502

50.04 Traction power distribution: catenary and third rail

1.00 ls

25,236,228.640/ls 25,236,229

50.05 Communications

34301.10 Communications 12.18 mi 650,000.001/mi 7,917,000

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 166: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 13

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

50.05 Communications

12.18 mi

650,000.001/mi 7,917,000

50.06 Fare collection system and equipment

39999.02 Fare Collection Equipment (LRT) 14.00 ea 107,271.37 /ea 1,501,799

50.06 Fare collection system and equipment

1.00 ls

1,501,799.15 /ls 1,501,799

050 SYSTEMS

1.00 LS

103,288,710.800/LS 103,288,711

2,150.000 Labor hours

348.001 Equipment hours

070 VEHICLES

70.01 Light Rail

39999.01 Light Rail Vehicles 83,000,000

70.01 Light Rail

19.00 ea

4,368,421.054/ea 83,000,000

70.04 Bus

39999.01b Feeder Bus Vehicles 9,200,000

70.04 Bus

14.00 ea

657,142.86 /ea 9,200,000

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 167: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 14

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

070 VEHICLES

33.00 EA

2,793,939.40 /EA 92,200,000

00_LRT ALT LIGHT RAIL TRANSIT (INCL MOF) 412,955,671140,445.39 Labor hours

61,917.19 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 168: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 15A

LRT Base Project 8/21/2013 11:01 AM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr 2013 Union Conceptual Design Update ESTIMATORS: RLG/SRB

Equipment Rate Table - 3rd Qtr 2013 Bid Item Report ESTIMATE VERSION: 2013-08-21

City Index - 233-VA-NORFOLK

Estimate Totals

Description Amount Totals Hours Rate

Labor 8,411,452 140,445.389 hrs

Material 21,227,429

Subcontract 242,329,375

Equipment 7,464,452

Other 133,522,962

Escalation (None Included)

Subtotal 412,955,670

EXCLUDES ALLOCATED CONTINGENCY; SOFT COSTS; VEHICLES

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 169: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  Town Center Station Option Comparison    

Page 170: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

TOWN CENTER OVER MARKET OPTION

Remove aerial station at Independence Blvd; add aerial station at Market St

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

‐176 LF $162.71(28,636.96)$                  

reduce length of ballasted track

176 LF $11,212.20 1,973,347.20$               increased length of aerial structure

176 LF $412.82 72,656.32$                     increased length of aerial structure

‐176 LF $322.89 (56,829.17)$                   reduce length of ballasted track

TOTAL OPTION DELTA COST OVER INDEPENDENCE OPTION $1,960,537.39

TOWN CENTER AT CONSTITUTION OPTION

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM 646+00.00 2 EA $321,380.80 642,761.60$                 

add two at‐grade station platforms at Constitution Drive

646+00.00 ‐1 EA $880,995.47 (880,995.47)$                

646+00.00 ‐1 STATION $1,518,219.00 (1,518,219.00)$              remove aerial station at Independene Blvd

TOTAL OPTION DELTA COST OVER INDEPENDENCE OPTION ‐$1,756,452.87

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM. (INDEPENDENCE)

remove aerial station at Independence Blvd

20.07 ELEVATORS, ESCALATORS

LIGHT RAIL TRANSIT (LRT) ALTERNATIVE ‐ TOWN CENTER OPTIONS

10.04 GUIDEWAY: AERIAL STRUCTURE (LIGHT RAIL TRANSIT BRIDGE)

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

HRT_VB_LRT‐FULL_Cost Estimate_2013‐11‐04.xlsx 1 of 1 OPTIONS

Page 171: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  BRT Alternative 1A    

Page 172: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAYStandard BRT with Barriers 10+82.70 20+80.87             998.17  LF $909.87 908,208.93$               3 barriers

22+73.43 25+02.76             229.33  LF $909.87 208,661.40$               2 ‐ 20' roadways

25+68.44 51+03.77         2,535.33  LF $909.87 2,306,830.85$          

51+19.24 85+28.48         3,409.24  LF $909.87 3,101,978.84$          

85+69.97 93+22.36             752.39  LF $909.87 684,580.10$              

111+80.94 119+08.01             727.07  LF $909.87 661,542.09$              

119+45.86 125+36.75             590.89  LF $909.87 537,635.45$              

125+87.68 153+16.73         2,729.05  LF $909.87 2,483,091.64$          

153+61.27 154+00.00               38.73  LF $909.87 35,239.42$                

Subtotal 12,010          LF 10,927,769              

BRT at Split Platforms 106+95.08 111+80.94             485.86  LF $859.38 417,538.85$               2 barriers

single ‐ 45' roadway

Subtotal 486                LF 417,539                    

BRT at Double Platform LF $677.78 ‐$                             no barrier ‐ single 48' roadway

Subtotal ‐                LF ‐                            

Total 11,345,308              

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not used

10.04 GUIDEWAY: AERIAL STRUCTUREWitchduck Rd 96+01.92 104+15.21             813.29  LF $14,889.06 12,109,123.61$         8  Piers; 37397 sq ft

TOTAL  813 LF 12,109,123.61$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

10.08 GUIDEWAY: RETAINED CUT OR FILL

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 base

Page 173: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

BRT with Walls 93+22.36 96+01.92 280 LF $895.19 250,259.32$               median barrier

104+15.21 106+95.08 280 LF $895.19 250,536.83$               2 ‐ walls

0 LF $895.19 ‐$                             2 ‐ barriers on walls

0 LF $895.19 ‐$                             2 ‐ 20' roadways

SUBTOTAL  559 LF 500,796.14$              

Retaining Walls 93+21.90 96+01.92 Lt 2057 SF $39.07 80,378.05$                

93+21.90 96+01.92 Rt 2057 SF $39.07 80,378.05$                

104+15.21 106+95.08 Lt 2031 SF $39.07 79,357.26$                

104+15.21 106+95.08 Rt 2031 SF $39.07 79,357.26$                

SUBTOTAL  8,176 SF 319,470.62$              

Unsuitable Ex 20,400 CY $34.98 713,592.00$              

Borrow Fill ‐ Unsuitable 20,400 CY $58.03 1,183,812.00$          

Embankment 14,200 CY $56.95 808,732.60$              

TOTAL  LS 3,526,403.36$          

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Not used

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

Not used

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

Not used

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)Not used

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for platforms, each with 

canopy, furnishings, utility services, security 

system.

Newtown Station 10+00.00 1 EA $647,334.58 647,334.58$               single 200'x12' platform

Witchduck Station 108+00.00 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 base

Page 174: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

B.  Operator relief facility 1 EA $323,667.28 323,667.28$              

TOTAL  3 LF 2,265,671.03$          

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORMIndependence EA $1,774,526.80 ‐$                            

TOTAL  0 EA ‐$                            

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

STATION $1,528,709.33 $0.00

TOTAL  0 EA $0.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  1 LS $18,379,573.00 18,379,573.00$        

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL 1.00 ls $3,197,346.00 3,197,346.00$          

30.05 YARD AND TRACK 1.00 ls $1,475,803.00 1,475,803.00$          40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Furnish and Install station platform;

Includes two 100'x12' platforms including 

canopy, furnishings, utility services, security 

system: does not include 

elevators/escalators (see 20.07)

20.07 ELEVATORS, ESCALATORS

includes 5 ft by 5 ft bath room building at 

end of line station

Furnish and Install;

Includes two elevators on each end of the 

station platform, at aerial station stop 

locations; include two separate elevator 

towers on piles, and stair towers on piles; 

elevators and towers shall have glass 

exterior

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 base

Page 175: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

Pavement Removal 49,000 SF $5.18 253,820.00$              

Track 

Removal16,600 TF $14.58

242,094.40$              

Bridge 

RemovalLF $799.32

‐$                            

Clearing 28 ACRES $8,438.24 236,270.78$              

Erosion Control 14,400 LF $34.98 503,712.00$              

TOTAL  LS1,235,897.18$          

Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATION

Relocate Poles Adjust utility cost based on new information

SUBTOTAL  1 LS $11,400,000.00 $11,400,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 14,500 LF $124.28 1,802,074.50$          

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor

14,500 LF $1.25 18,125.00$                

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 14,500 LF $16.63 241,135.00$              

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street 0 LF $147.53 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

F. Relocate and adjust water utility lines and 

structures; In Street

0 LF $25.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 0 LF $39.54 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

H. Reconstruct culverts  15+00 1 EA $256,055.40 256,055.40$              

44+00 1 EA $256,055.40 256,055.40$              

80+00 1 EA $256,055.40 256,055.40$              

Assume 5'x4' box and 65' length; piles every 

10'

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 base

Page 176: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

111+00 1 EA $256,055.40 256,055.40$              

140+00 1 EA $256,055.40 256,055.40$              

150+00 1 EA $256,055.40 256,055.40$              

I. Transmission Guy Wire Mods @ Sta 

393+50LS $71,450.00 ‐$                            

TOTAL  1 LS 14,997,666.90$        

TOTAL  6,400 CY $300.26 1,921,664.00$          

TOTAL  1 LS $2,150,000.00 2,150,000.00$          

40.05 SITE STRUCTURES INCLUDING  ROW Fence 1 LS $1,220,000.00 1,220,000.00$          Both sides of transitway

TOTAL  LS 1,220,000.00$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 5",  50+00 475 Ton $103.25 49,086.55$                

105+00 892 Ton $103.25 92,105.55$                

125+00 124 Ton $103.25 12,781.71$                

50+00 570 Ton $50.26 28,674.34$                

105+00 1070 Ton $50.26 53,804.27$                

125+00 149 Ton $50.26 7,466.55$                  

C. Aggregate Base Material, Type 1, No. 21A105+00 381 Ton $103.250 39,341.35$                

50+00 190 Ton $103.25 19,634.62$                

105+00 357 Ton $103.25 36,842.22$                

125+00 50 Ton $103.25 5,112.69$                  

D. Curb and Gutter (HS‐202) 22+00 1048 LF $0.00 ‐$                            

50+00 1254 LF $0.00 ‐$                            

105+00 1230 LF $0.00 ‐$                            

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

B. Asphalt Concrete Base Course, 6", Type 

BM‐25

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 base

Page 177: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

125+00 725 LF $0.00 ‐$                            

granite curb LF $23.72 ‐$                            

D. Park and Rides 105+00 Witchduck 1.00 EA $1,809,674.09 1,809,674.09$          

E. Milling Asphalt SY $4.88 ‐$                            

F. Transit Center EA $3,600,000.00 ‐$                            

TOTAL  LS 2,154,523.93$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $460,000.00 460,000.00$              Includes Maintenance of Traffic and 

Protection during construction. 

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALSRetrofit Existing vehicles for ATC Existing Vehicles 1 LS $500,000.00 500,000.00$              

TOTAL  LS 500,000.00$              

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

7 EA $19,527.10136,689.71$               REMOVE EXISTING CROSS GATE EQUIPMENT 

AND DISPOSE ‐ TYPICAL

SUBTOTAL  7 136,689.71$              

Newtown Rd 2 EA $1,432,356.90 2,864,713.80$          

Princess Anne Rd 1 EA $1,432,356.90 1,432,356.90$          

Freight Ln 1 EA $1,432,356.90 1,432,356.90$          

Greenwich Rd 1 EA $1,432,356.90 1,432,356.90$          

Euclid Rd 1 EA $1,432,356.90 1,432,356.90$          

Kellam Rd 1 EA $1,432,356.90 1,432,356.90$          

SUBTOTAL  7 10,026,498.30$        

TOTAL  10,163,188.01$        

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Not used

50.04 TRACTION POWER DISTRIBUTION: CATENARY Not used

A. Grade Crossing Signals to be Removed

50.05 COMMUNICATIONS

B. New Grade Crossing Signals Includes traffic signal, signage; Include 

additional high mast lighting at each 

crossing; Include signal controller at each 

crossing ($200,000 each); add $10,400 to 

each grade crossing to account for wiring 12 

guage EF units for traffic signal preemption

upgrade to cab signaling; increased unit cost 

to $500,000

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 base

Page 178: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

Comm 2.84 MI $650,000.001,847,046.40$           4‐2" conduit; trough adjacent to ballasted 

track; buried in street

Ductbank 2.84 MI $537,293.98

1,526,779.87$           Speakers, cameras, and variable message 

signs; include CAT 5 cable to cameras; each 

station stop in VB

Public Address 2 EA $110,062.47

220,124.94$               To Serve OCC, servers and TVM's; include 

ethernet through UG FO (was $2,000,000 on 

Norfolk, above ground on OCS poles)

TOTAL    LS 3,593,951.21$          

TVM 2 LS $150,275.24 300,550.00$              

Two collection machines at each station; 

added two additional TVM at end of line 

station and Independence station, 4 TVM's 

need enclosures; 2 per enclosure ‐ 2 

enclosures total ($12,000 each); Include CAT 

5 cable from TVM's to nearest FO (for the 

machine and connections, each TVM is 

about $150,000, including the cable

TVM at PNR 2 LS $163,064.63 326,129.00$               Two per PNR

TOTAL  LS 626,679.00$              

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                            

B. Norfolk Southern ROW Acquisition

LS $25,500,000.00 ‐$                            

Parcel acquisition will be required, but area 

and costs are not determined at this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

TOTAL  LS ‐$                            

Parcel acquisition will be required, but area 

and costs are not determined at this time.

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 base

Page 179: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

BASE

TOTAL  AC ‐$                            

70 VEHICLES70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                             Not used70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUS TOTAL 10 EA $657,142.86 6,571,429.00$           Includes spare parts and special events

70.05 OTHER 7 EA $1,200,000.00 8,400,000.00$          70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Parcel acquisition will be required, but area 

and costs are not determined at this time.

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 base

Page 180: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAYStandard BRT with Barriers 154+00.00 158+15.00             415.00  LF $909.87 377,597.71$               3 barriers

2 ‐ 20' roadways

Subtotal 415                LF 377,598                    

BRT at Split Platforms                      ‐    LF $859.38 ‐$                             2 barriers

                     ‐    LF $859.38 ‐$                             single ‐ 45' roadway

Subtotal ‐                LF ‐                            

BRT at Double Platform 158+15.00 160+04.12             189.12  LF $677.78 128,181.75$               no barrier ‐ single 48' roadway

Subtotal 189                LF 128,182                    

Total 505,779                    

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not used

10.04 GUIDEWAY: AERIAL STRUCTURE                     ‐    LF $14,889.06 ‐$                            

TOTAL  0 LF ‐$                            

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

10.08 GUIDEWAY: RETAINED CUT OR FILL

BRT with Walls 0 LF $895.19 ‐$                             median barrier

0 LF $895.19 ‐$                             2 ‐ walls

0 LF $895.19 ‐$                             2 ‐ barriers on walls

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 west

Page 181: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

2 ‐ 20' roadways

SUBTOTAL  0 LF ‐$                            

Retaining Walls SF $39.07 ‐$                            

SUBTOTAL  0 SF ‐$                            

Unsuitable Ex 860 CY $34.98 30,082.80$                

Borrow Fill ‐ Unsuitable 860 CY $58.03 49,905.80$                

Embankment 600 CY $56.95 34,171.80$                

TOTAL  LS 114,160.40$              

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Not used

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

Not used

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

Not used

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)Not used

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for platforms, each with 

canopy, furnishings, utility services, security 

system.

Independence Station 10+00.00 2 EA $323,667.29 647,334.58$               single 100'x12' platform

B.  Operator relief facility 1 EA $323,667.28 323,667.28$              includes 5 ft by 5 ft bath room building at 

end of line station

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 west

Page 182: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

TOTAL  2 LF 971,001.86$              

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

EA $1,774,526.80 ‐$                            

TOTAL  0 EA ‐$                            

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

STATION $1,528,709.33 $0.00

Furnish and Install;

Includes two elevators on each end of the 

station platform, at aerial station stop 

locations; include two separate elevator 

towers on piles, and stair towers on piles; 

elevators and towers shall have glass 

exterior

TOTAL  0 EA $0.00

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $18,379,573.00 ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL ls $3,197,346.00 ‐$                            

30.05 YARD AND TRACK ls $1,475,803.00 ‐$                            

Furnish and Install station platform;

Includes two 100'x12' platforms including 

canopy, furnishings, utility services, security 

system: does not include 

elevators/escalators (see 20.07)

20.07 ELEVATORS, ESCALATORS

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 west

Page 183: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

40 SITEWORK & SPECIAL CONDITIONS40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 2,100 SF $5.18 10,878.00$                

Track 

Removal700 TF $14.58

10,208.80$                

Bridge 

RemovalLF $799.32

‐$                            

Clearing 1.50 ACRES $8,438.24 12,657.36$                

Erosion Control 610 LF $34.98 21,337.80$                

TOTAL  LS55,081.96$                

Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATION

Relocate Poles Adjust utility cost based on new information

SUBTOTAL  1 LS $480,000.00 $480,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 620 LF $124.28 77,054.22$                

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor

620 LF $1.25 775.00$                      

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 620 LF $16.63 10,310.60$                

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street LF $147.53 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

F. Relocate and adjust water utility lines and 

structures; In Street

LF $25.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 west

Page 184: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street LF $39.54 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

H. Reconstruct culverts 160+00 1 EA $256,055.40 256,055.40$              

Assume 5'x4' box and 65' length; piles every 

10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $71,450.00 ‐$                            

TOTAL  LS 824,195.22$              

TOTAL  270 CY $300.26 81,070.20$                

TOTAL  1 LS $90,000.00 90,000.00$                

40.05 SITE STRUCTURES INCLUDING  ROW Fence 1 LS $49,000.00 49,000.00$                10.6 miles * 2 sides

TOTAL  LS 49,000.00$                

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 5",  Ton $103.25 ‐$                            

B. Asphalt Concrete Base Course, 6", Type 

BM‐25Ton $105.49 ‐$                            

Ton $50.262 ‐$                            

D. Curb and Gutter (HS‐202) LF $44.09 ‐$                            

granite curb LF $23.72 ‐$                            

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

C. Aggregate Base Material, Type 1, No. 21A

Increased quantity from 5 acres to 10 acres

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 west

Page 185: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

D. Park and Rides 168+00.00 Independence 1.00 EA $2,471,457.35 2,471,457.35$          

E. Milling Asphalt SY $4.88 ‐$                            

F. Transit Center 159+00.00 Independence Blvd 1.00 EA $3,600,000.00 3,600,000.00$          

Transit Center shall have approximately 

15100 square feet of bus paving; 6800 

square feet of auto paving; 14.600 square 

feet of sidewalk; and a pedestrian bridge 

210 feet long x 15 feet wide; stairs and two 

elevators on each end of pedestrian bridge; 

includes stormwater detention/retention. 

Operator facility included in category 20.01; 

purchase and clearing of parcel included in 

ROW costs

TOTAL  LS 6,071,457.35$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $20,000.00 20,000.00$                Includes Maintenance of Traffic and 

Protection during construction.

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALS

Retrofit Existing vehicles for ATCExisting Vehicles LS $500,000.00

‐$                             upgrade to cab signaling; increased unit cost 

to $500,000

TOTAL  LS ‐$                            

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

EA $19,527.10‐$                             REMOVE EXISTING CROSS GATE EQUIPMENT 

AND DISPOSE ‐ TYPICAL

‐$                            

SUBTOTAL  0 ‐$                            

B. New Grade Crossing Signals EA $1,432,356.90 ‐$                            

A. Grade Crossing Signals to be Removed

Includes traffic signal, signage; Include 

additional high mast lighting at each 

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 west

Page 186: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

SUBTOTAL  0 ‐$                            

TOTAL  ‐$                            

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Not used

50.04 TRACTION POWER DISTRIBUTION: CATENARY Not used

Comm 0.11 MI $650,000.0074,370.83$                 4‐2" conduit; trough adjacent to ballasted 

track; buried in street

Ductbank 0.11 MI $537,293.98

61,475.39$                 Speakers, cameras, and variable message 

signs; include CAT 5 cable to cameras; each 

station stop in VB

Public Address 1 EA $110,062.47

110,062.47$               To Serve OCC, servers and TVM's; include 

ethernet through UG FO (was $2,000,000 on 

Norfolk, above ground on OCS poles)

TOTAL    LS 245,908.69$              

TVM 4 LS $150,275.24 601,101.00$              

Two collection machines at each station; 

added two additional TVM at end of line 

station and Independence station, 4 TVM's 

need enclosures; 2 per enclosure ‐ 2 

enclosures total ($12,000 each); Include CAT 

5 cable from TVM's to nearest FO (for the 

machine and connections, each TVM is 

about $150,000, including the cable

TVM at PNR LS $163,064.63 ‐$                             Two per PNR

TOTAL  LS 601,101.00$              

50.07 CENTRAL CONTROLNot used

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

crossing; Include signal controller at each 

crossing ($200,000 each); add $10,400 to 

each grade crossing to account for wiring 12 

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 west

Page 187: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

WEST OPTION

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                            

B. Norfolk Southern ROW Acquisition

LS $25,500,000.00 ‐$                            

Parcel acquisition will be required, but area 

and costs are not determined at this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

TOTAL  LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                             Not used70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUS TOTAL EA $657,143.00 ‐$                             Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area 

and costs are not determined at this time.

Parcel acquisition will be required, but area 

and costs are not determined at this time.

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 west

Page 188: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAYStandard BRT with Barriers 154+00.00 156+17.95             217.95  LF $909.87 198,307.04$               3 barriers

175+84.91 180+34.13             449.22  LF $909.87 408,733.60$               2 ‐ 20' roadways

Subtotal 667                LF 607,041                    

BRT at Split Platforms                      ‐    LF $859.38 ‐$                             2 barriers

                     ‐    LF $859.38 ‐$                             single ‐ 45' roadway

Subtotal ‐                LF ‐                            

BRT at Double Platform LF $677.78 ‐$                             no barrier ‐ single 48' roadway

Subtotal ‐                LF ‐                            

Total 607,041                    

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not used

10.04 GUIDEWAY: AERIAL STRUCTUREIndependence 159+27.95 173+19.73         1,391.78  LF $13,864.32 19,296,083.29$         15 Piers; 69269 sq ft

TOTAL  1,392 LF 19,296,083.29$        

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

10.08 GUIDEWAY: RETAINED CUT OR FILL

BRT with Walls $895.19 ‐$                             median barrier

156+17.95 159+27.95 310 LF $895.19 277,508.90$               2 ‐ barriers on walls

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 1 of 8 east

Page 189: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

173+19.73 175+84.91 265 LF $895.19 237,386.48$               2 ‐ 20' roadways

SUBTOTAL  575 LF 514,895.38$              

Retaining Walls 156+17.95 159+27.95 Lt 2498 SF $39.07 97,599.47$                

156+17.95 159+27.95 Rt 2498 SF $39.07 97,599.47$                

173+19.73 175+84.91 Lt 2094 SF $39.07 81,809.09$                

173+19.73 175+84.91 Rt 2094 SF $39.07 81,809.09$                

SUBTOTAL  9,183 SF 358,817.13$              

Unsuitable Ex 3,750 CY $34.98 131,175.00$              

Borrow Fill ‐ Unsuitable 3,750 CY $58.03 217,612.50$              

Embankment 2,650 CY $56.95 150,925.45$              

TOTAL  LS 1,373,425.46$          

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Not used

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

Not used

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

Not used

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)Not used

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for platforms, each with 

canopy, furnishings, utility services, security 

system.

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 2 of 8 east

Page 190: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

B.  Operator relief facility 1 EA $323,667.28 323,667.28$              includes 5 ft by 5 ft bath room building at 

end of line station

TOTAL  1 EA 323,667.28$              

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORMIndependence 164+00.00 1 EA $1,774,526.80 1,774,526.80$          

TOTAL  1 EA 1,774,526.80$          

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

164+00.00 Independence 1 STATION $1,528,709.33 $1,528,709.33

TOTAL  1 EA $1,528,709.33

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  LS $18,379,573.00 ‐$                            

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL ls $3,197,346.00 ‐$                            

Furnish and Install station platform;

Includes two 100'x12' platforms including 

canopy, furnishings, utility services, security 

system: does not include 

elevators/escalators (see 20.07)

20.07 ELEVATORS, ESCALATORS Furnish and Install;

Includes two elevators on each end of the 

station platform, at aerial station stop 

locations; include two separate elevator 

towers on piles, and stair towers on piles; 

elevators and towers shall have glass 

exterior

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 3 of 8 east

Page 191: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

30.05 YARD AND TRACK ls $1,475,803.00 ‐$                            40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 9,100 SF $5.18 47,138.00$                

Track 

Removal3,100 TF $14.58

45,210.40$                

Bridge 

RemovalLF $799.32

‐$                            

Clearing 5.50 ACRES $8,438.24 46,410.33$                

Erosion Control 2,650 LF $34.98 92,697.00$                

TOTAL  LS231,455.73$              

Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATION

Relocate Poles Adjust utility cost based on new information

SUBTOTAL  1 LS $2,100,000.00 $2,100,000.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 2,700 LF $124.28 335,558.70$              

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor

2,700 LF $1.25 3,375.00$                  

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 2,700 LF $16.63 44,901.00$                

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

E. New, relocate, and adjust storm drain 

lines and structures; In Street 0 LF $147.53 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 4 of 8 east

Page 192: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

F. Relocate and adjust water utility lines and 

structures; In Street

0 LF $25.40 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 0 LF $39.54 ‐$                            

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

H. Reconstruct culverts 160+00 1 EA $256,055.40 256,055.40$              

Assume 5'x4' box and 65' length; piles every 

10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $71,450.00 ‐$                            

TOTAL  LS 2,739,890.10$          

TOTAL  1,180 CY $300.26 354,306.80$              

Increased quantity from 5 acres to 10 acres

TOTAL  1 LS $392,000.00 392,000.00$              

40.05 SITE STRUCTURES INCLUDING  ROW Fence 1 LS $220,000.00 220,000.00$              10.6 miles * 2 sides

TOTAL  LS 220,000.00$              

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 5",  Ton $103.25 ‐$                            

B. Asphalt Concrete Base Course, 6", Type 

BM‐25Ton $105.49 ‐$                            

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 5 of 8 east

Page 193: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

C. Aggregate Base Material, Type 1, No. 21A Ton $50.262 ‐$                            

D. Curb and Gutter (HS‐202) LF $44.09 ‐$                            

granite curb LF $23.72 ‐$                            

D. Park and Rides 168+00.00 Independence 1.00 EA $2,471,457.35 2,471,457.35$          

E. Milling Asphalt SY $4.88 ‐$                            

F. Transit Center EA $3,600,000.00 ‐$                            

TOTAL  LS 2,471,457.35$          

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $84,000.00 84,000.00$                Includes Maintenance of Traffic and 

Protection during construction.

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALS

B. Retrofit Existing vehicles for ATCLS $500,000.00

‐$                             upgrade to cab signaling; increased unit cost 

to $500,000

TOTAL  LS ‐$                            

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTIONPrivate Crossings $39,115.59 ‐$                            

EA $19,527.10 ‐$                            

‐$                            

SUBTOTAL  0 ‐$                            

B. New Grade Crossing Signals

EA $1,432,356.90

‐$                            

SUBTOTAL  0 ‐$                            

TOTAL  ‐$                            

A. Grade Crossing Signals to be Removed

Includes traffic signal, signage; Include 

additional high mast lighting at each 

crossing; Include signal controller at each 

crossing ($200,000 each); add $10,400 to 

each grade crossing to account for wiring 12 

guage EF units for traffic signal preemption

REMOVE EXISTING CROSS GATE EQUIPMENT 

AND DISPOSE ‐ TYPICAL

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 6 of 8 east

Page 194: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Not used

50.04 TRACTION POWER DISTRIBUTION: CATENARY Not used

Comm 0.50 MI $650,000.00324,277.37$               4‐2" conduit; trough adjacent to ballasted 

track; buried in street

Ductbank 0.50 MI $537,293.98

268,049.66$               Speakers, cameras, and variable message 

signs; include CAT 5 cable to cameras; each 

station stop in VB

Public Address 1 EA $110,062.47

110,062.47$               To Serve OCC, servers and TVM's; include 

ethernet through UG FO (was $2,000,000 on 

Norfolk, above ground on OCS poles)

TOTAL    LS 702,389.50$              

TVM 4 LS $150,275.24 601,101.00$              

Two collection machines at each station; 

added two additional TVM at end of line 

station and Independence station, 4 TVM's 

need enclosures; 2 per enclosure ‐ 2 

enclosures total ($12,000 each); Include CAT 

5 cable from TVM's to nearest FO (for the 

machine and connections, each TVM is 

about $150,000, including the cable

TVM at PNR LS $163,064.63 ‐$                             Two per PNR

TOTAL  LS 601,101.00$              

50.07 CENTRAL CONTROLNot used

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATEA. Property Acquisition AC ‐$                            

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

Parcel acquisition will be required, but area 

and costs are not determined at this time.

50.05 COMMUNICATIONS

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 7 of 8 east

Page 195: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO TOWN CENTER

EAST OPTION

B. Norfolk Southern ROW Acquisition

LS $25,500,000.00 ‐$                            

Parcel acquisition will be required, but area 

and costs are not determined at this time.

C. Property Acquisition (Park and Rides)

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

TOTAL  LS ‐$                            

TOTAL  AC ‐$                            

70 VEHICLES70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                             Not used70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUS TOTAL EA $657,143.00 ‐$                             Includes spare parts and special events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

Parcel acquisition will be required, but area 

and costs are not determined at this time.

HRT_VB_BRT‐Town‐Center_Cost Estimate_2014‐07‐18.xlsx 8 of 8 east

Page 196: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  BRT Alternative 1B     

Page 197: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

Not used

A. Asphalt Concrete Surface Course, 

Type SM‐9.5A10+00 TO 260+00 9,390 Ton $92.93 872,631.48$            

Does not include bridges, see 10.04

A1. Asphalt Concrete Surface Course, 

Type SM‐9.5Amilling 850.00 Ton $92.93 78,992.20$              

B. Asphalt Concrete Base Course, Type 

BM‐2510+00 TO 260+00 23,475 Ton $95.17 2,234,209.65$        

Does not include bridges, see 10.04

C. Aggregate Base Material, Type 1, No. 

21A10+00 TO 260+00 28,810 Ton $50.34 1,450,324.21$        

C. Aggregate Base Material, Type 1, No. 

21A Shoulders10+00 TO 260+00 873 Ton $50.34 43,947.69$              

C. Aggregate Base Material, Type 1, No. 

21A Curb and Gutter10+00 TO 260+00 368 Ton $50.34 18,525.49$              

13+00 TO 15+00 269.00 LF $44.16 11,879.04$              

17+50 TO 20+00 247 LF $44.16 10,907.52$              

22+50 TO 25+00 270 LF $44.16 11,923.20$              

25+50 TO 46+00 2094 LF $44.16 92,471.04$              

92+00 TO 93+00 147 LF $44.16 6,491.52$                

108+00 TO 113+00 474 LF $44.16 20,931.84$              

113+40 TO 113+50 23 LF $44.16 1,015.68$                

LF $44.16 ‐$                          

LF $44.16 ‐$                          

LF $44.16 ‐$                          

LF $44.16 ‐$                          

SUBTOTAL    155,619.84$           E. Ballast Curb 0.00 LF $100.00 ‐$                          

F. Guard Rail 13+00 TO 15+00 269.00 LF $70.32 18,916.08$              

17+50 TO 20+00 247 LF $73.01 18,033.47$              

22+50 TO 25+00 270 LF $70.21 18,956.70$              

25+50 TO 46+00 2094 LF $60.48 126,647.21$            

109+00 TO 113+00 399 LF $65.57 26,162.43$              

LF $66.15 ‐$                          

SUBTOTAL    208,715.89$           G. Guard Rail End Unit Type 350 10 EA $106.69 1,066.94$                

I. Milling 8288.00 SY $47.43 393,099.84$            

TOTAL  LS   5,457,133.24$        

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not Used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not Used

Witchduck Rd 873 LF $9,130.54 7,970,962.29$         36 FT wide double lane bridge;

Independence 1,490 LF $14,074.33 20,970,751.70$       Cast‐in‐place concrete drilled pile foundation;

Waterway 187 LF $9,607.82 1,796,662.34$        

LF $12,018.42 ‐$                          

LF $9,175.50 ‐$                          

D. Curb and Gutter (HS‐202)

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO ROSEMONT

10.04 GUIDEWAY: AERIAL STRUCTURE (BUS TRANSIT BRIDGE)

Page 198: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

LF $11,750.96 ‐$                          

LF $8,916.69 ‐$                          

TOTAL  2,550 LF 30,738,376.33$      

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Structural backfill for MSE walls only;

UNDERCUT EXCAVATION 2,013 CY $32.81 66,052.57$              

EMBANKMENT 11,185 CY $57.18 639,558.30$            

TOTAL  CY   705,610.87$           

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

2.0 EA $713,978.70 1,427,957.41$        

TOTAL  EA   1,427,957.41$        

1 EA $480,352.53 480,352.53$            

TOTAL  EA   480,352.53$           

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

Furnish and Install;

At aerial station stop locations

TOTAL  1 EA $296,538.42 296,538.42$            per station

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

20.07 ELEVATORS, ESCALATORS

Includes two side platforms; does not include elevators/escalators (see 

20.07)

Not used

Not used

Not used

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Includes two side platforms

10.08 GUIDWAY: RETAINED CUT OR FILL

Not used10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)10.10 TRACK: EMBEDDED (GRADE CROSSING PANEL PRECAST FULL DEPTH MODULAR PANEL ON GRADE)

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

10.12 TRACK: SPECIAL (NO. 8 CROSSOVER AND NO 8 TURNOUT)

Page 199: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY LS $13,088,980.00 ‐$                          

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

Not used

30.05 YARD AND TRACK Not used

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 19,172 SF $5.1598,754.97$               Pavement removal required to construct grade crossing; includes 

sawcutting

Track Removal 28,843 TF $14.61 421,396.23$             Does not include salvage value

Bridge Removal 136 LF $482.72 65,650.33$               Removal of existing bridge structure

Clearing 49.00 ACRES $8,450.35 414,067.15$            

Excavation 43,098 CY $2.26 97,401.48$               Does not include undercut (no geotechnical information available)

Unsuitable Excavation 28,444 CY $28.54 811,905.54$            

Fill 42,553 CY $8.37 356,168.61$             Does not include structural fill for MSE wall, see 10.08

Erosion Control 24,992 LF $35.03 875,569.73$            

TOTAL  LS   3,140,914.03$        

40.02 SITE UTILITIES, UTILITY RELOCATION

95+00 TO 105+00 7 EA $12,556.51 87,895.60$              

EA $12,895.87 ‐$                          

EA $12,556.51 ‐$                          

SUBTOTAL  7     87,895.60$              

24,992 LF $62.24 1,555,502.08$        

SUBTOTAL  24,992     1,555,502.08$        

291 LF $399.87 116,363.04$             Size Varies

LF ‐$                          

SUBTOTAL  291     116,363.04$           

24,992 LF $0.62 15,595.01$               Size Varies

LF ‐$                          

SUBTOTAL  24,992     15,595.01$              322 LF $772.72 248,815.84$            

SUBTOTAL  322     248,815.84$           

24,992 LF $8.33 208,183.36$            

SUBTOTAL  24,992     208,183.36$           

TOTAL  LS 2,232,354.93$        

TOTAL  1 LS $3,709,427.34 3,709,427.34$        

TOTAL  1 LS $2,221,560.00 2,221,560.00$        

D. Relocate and Adjust water utility 

lines and structures

E. relocate water line under wall

F. Relocate and adjust sanitary sewer 

utility lines and structures

A. Demolition

B. Clearing

B. New Relocate and adjust storm drain 

lines and structures

C. Earthwork

A. Relocate Utility Poles

C. Reconstruct culverts

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 HAZ. MAT'L, CONTAM'D SOIL REMOVAL/MITIGATION, GROUND 

Page 200: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

93+22 TO 99+51 LT 10,064 SF $72.05 725,141.39$             Furnish and Install;

93+22 TO 99+51 RT 10,064 SF $72.05 725,141.39$             Includes MSE walls for bridge approach

100+89 TO 106+30 LT 8,656 SF $72.05 623,690.77$             Does not include structural fill, see 10.08

100+89 TO 106+95 RT 9,696 SF $72.05 698,625.89$            

156+65 TO 162+99 LT 10,128 SF $72.05 729,752.78$            

156+65 TO 162+99 RT 10,128 SF $72.05 729,752.78$            

164+78 TO 171+54 LT 10,816 SF $72.05 779,325.25$            

164+78 TO 171+54 RT 10,816 SF $72.05 779,325.25$            

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

SF $72.05 ‐$                          

TOTAL  80,368 SF 5,790,755.50$        

TOTAL  LS ‐$                          

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 

Type SM‐9.5ATon $92.93 ‐$                          

Does not include bridges, see 10.04

B. Asphalt Concrete Base Course, Type 

BM‐25Ton $95.17 ‐$                          

B. Aggregate Base Material, Type 1, No. 

21ATon $50.34 ‐$                          

LF $44.16 ‐$                          

D. Stormwater Management 3.00 EA $248,081.00 744,243.00$            

E. Park and Ride (Witchduck Road) 1.00 EA $1,256,438.72 1,256,438.72$        

E. Park and Ride (Independence Blvd.)1.00 EA $1,398,123.33 1,398,123.33$        

F. Park and Ride (Lynn Shores/Thalia)1.00 EA $1,256,438.72 1,256,438.72$        

EA ‐$                          

EA ‐$                          

EA ‐$                          

EA ‐$                          

TOTAL  LS   4,655,243.77$        

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

Not used

50.01 TRAIN CONTROL AND SIGNALS Not used

C. Curb and Gutter (HS‐202)

Not used40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING

WATER TREATMENT40.05 SITE STRUCTURES INCLUDING RETAINING WALLS, SOUND WALLS

50 SYSTEMS

Page 201: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

NEWTOWN RD 2 EA $9,777.01 19,554.02$              

PRINCESS ANNE RD 2 EA $9,777.01 19,554.02$              

FREIGHT LANE 2 EA $9,777.01 19,554.02$              

GREENWICH RD 2 EA $9,777.01 19,554.02$              

WITCHDUCK RD 2 EA $9,777.01 19,554.02$              

EUCLID RD 2 EA $9,777.01 19,554.02$              

KELLAM RD 2 EA $9,777.01 19,554.02$              

INDEPENDENCE BLVD 2 EA $9,777.01 19,554.02$              

GARRETT DR 2 EA $9,777.01 19,554.02$              

CONSTITUTION DR 2 EA $9,777.01 19,554.02$              

S KENTUCKY AVE 4 EA $9,777.01 39,108.04$              

LYNN SHORES DR 2 EA $9,777.01 19,554.02$              

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

EA $9,777.01 ‐$                          

SUBTOTAL  26   254,202.26$           

NEWTOWN RD 2 EA $342,577.45 685,154.90$            

PRINCESS ANNE RD 2 EA $342,577.45 685,154.90$            

FREIGHT LANE 2 EA $342,577.45 685,154.90$            

GREENWICH RD 2 EA $342,577.45 685,154.90$            

EUCLID RD 2 EA $342,577.45 685,154.90$            

KELLAM RD 2 EA $342,577.45 685,154.90$            

CONSTITUTION DR 4 EA $342,577.45 1,370,309.80$        

S KENTUCKY AVE 4 EA $342,577.45 1,370,309.80$        

LYNN SHORES DR 4 EA $342,577.45 1,370,309.80$        

EA $342,577.45 ‐$                          

EA $342,577.45 ‐$                          

EA $342,577.45 ‐$                          

EA $342,577.45 ‐$                          

EA $342,577.45 ‐$                          

EA $342,577.45 ‐$                          

S LOWTHER (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

PENNSYLVANIA AVENUE (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

DORSET AVENUE (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

SOUTHERN BLVD (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

SUBTOTAL  32   8,535,250.32$        

TOTAL  LS 8,789,452.58$        

50.04 TRACTION POWER DISTRIBUTION: CATENARY AND THIRD RAIL

Not used

50.05 COMMUNICATIONS Not used

Not used50.06 FARE COLLECTION SYSTEM AND 

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

A. Grade Crossing Signals to be 

Removed

B. Traffic Signals to be installed 

Not used

Page 202: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

50.07 CENTRAL CONTROL Not used60 ROW, LAND, EXISTING 

IMPROVEMENTSNORFOLK SOUTHERN ROW ACQUISITION 1.00 LS $40,000,000.00 40,000,000.00$      

‐$                          

TOTAL  1 AC   40,000,000.00$      

TOTAL  AC ‐$                          

70 VEHICLES

70.01 LIGHT RAIL Not used70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUSArticulated 5.00 EA $1,200,000.00 6,000,000.00$        

Feeder 15.00 EA $500,000.00 7,500,000.00$        

TOTAL  EA   13,500,000.00$      

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Not usedEQUIPMENT

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

60.01 PURCHASE OR LEASE OF REAL ESTATE

Page 203: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  BRT Alternative 2    

Page 204: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAY

Not used

A. Asphalt Concrete Surface Course, 

Type SM‐9.5A10+00 TO 568+80 20,987 Ton $92.93 1,950,363.88$        

Does not include bridges, see 10.04

A1. Asphalt Concrete Surface Course, 

Type SM‐9.5Amilling 1899.00 Ton $92.93 176,477.87$            

B. Asphalt Concrete Base Course, Type 

BM‐2510+00 TO 568+80 52,470 Ton $95.17 4,993,779.78$        

Does not include bridges, see 10.04

C. Aggregate Base Material, Type 1, No. 

21A10+00 TO 568+80 64,393 Ton $50.34 3,241,608.01$        

C. Aggregate Base Material, Type 1, No. 

21A Shoulders10+00 TO 568+80 1,952 Ton $50.34 98,265.63$              

C. Aggregate Base Material, Type 1, No. 

21A Curb and Gutter10+00 TO 568+80 824 Ton $50.34 41,455.81$              

13+00 TO 15+00 269 LF $44.16 11,879.04$              

17+50 TO 20+00 247 LF $44.16 10,907.52$              

22+50 TO 25+00 270 LF $44.16 11,923.20$              

25+50 TO 46+00 2094 LF $44.16 92,471.04$              

92+00 TO 93+00 147 LF $44.16 6,491.52$                

108+00 TO 113+00 474 LF $44.16 20,931.84$              

113+40 TO 113+50 23 LF $44.16 1,015.68$                

302+00 TO 306+00 400 LF $44.16 17,664.00$              

359+00 TO 360+50 156 LF $44.16 6,888.96$                

365+00 TO 375+00 120 LF $44.16 5,299.20$                

LF $44.16 ‐$                          

SUBTOTAL    185,472.00$           E. Ballast Curb 0.00 LF $100.00 ‐$                          

F. Guard Rail 13+00 TO 15+00 269 LF $70.32 18,916.08$              

17+50 TO 20+00 247 LF $73.01 18,033.47$              

22+50 TO 25+00 270 LF $70.21 18,956.70$              

25+50 TO 46+00 2094 LF $60.48 126,647.21$            

109+00 TO 113+00 399 LF $65.57 26,162.43$              

359+00 TO 360+50 156 LF $66.15 10,319.87$              

SUBTOTAL    219,035.76$           G. Guard Rail End Unit Type 350 20.00 EA $106.69 2,133.88$                

H. Milling 18525.00 SY $47.43 878,640.75$            

TOTAL  LS   11,787,233.38$      

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not Used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not Used

Witchduck Rd 873 LF $9,130.54 7,970,962.29$         36 FT wide double lane bridge;

Independence 1,490 LF $14,074.33 20,970,751.70$       Cast‐in‐place concrete drilled pile foundation;

Waterway 187 LF $9,607.82 1,796,662.34$        

Rosemont Rd 823 LF $12,018.42 9,891,159.66$        

Lynnhaven 856 LF $9,175.50 7,854,229.71$        

D. Curb and Gutter (HS‐202)

BUS RAPID TRANSIT (BRT) ALTERNATIVE ‐ NEWTOWN ROAD TO BIRDNECK ROAD, INCLUDING MOF

10.04 GUIDEWAY: AERIAL STRUCTURE (BUS TRANSIT BRIDGE)

Page 205: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

Waterway 320 LF $11,750.96 3,760,307.20$        

TOTAL  4,549 LF 52,244,072.91$      

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

Structural backfill for MSE walls only;

UNDERCUT EXCAVATION 4,500 CY $32.81 147,658.50$            

EMBANKMENT 25,000 CY $57.18 1,429,500.00$        

TOTAL  CY   1,577,158.50$        

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

6.5 EA $713,978.70 4,640,861.57$        

TOTAL  EA   4,640,861.57$        

1 EA $480,352.53 480,352.53$            

TOTAL  EA   480,352.53$           

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

Furnish and Install;

At aerial station stop locations

TOTAL  1 EA $296,538.42 296,538.42$            per station

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

20.07 ELEVATORS, ESCALATORS

Includes two side platforms; does not include elevators/escalators (see 

20.07)

Not used

Not used

Not used

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Includes two side platforms

10.08 GUIDWAY: RETAINED CUT OR FILL

Not used10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)10.10 TRACK: EMBEDDED (GRADE CROSSING PANEL PRECAST FULL DEPTH MODULAR PANEL ON GRADE)

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

10.12 TRACK: SPECIAL (NO. 8 CROSSOVER AND NO 8 TURNOUT)

Page 206: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

30.02 LIGHT MAINTENANCE FACILITY Not used

30.03 HEAVY MAINTENANCE FACILITY 1 LS $13,088,980.00 13,088,980.00$      

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

Not used

30.05 YARD AND TRACK Not used

40 SITEWORK & SPECIAL CONDITIONS

40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 42,852 SF $5.15220,730.65$             Pavement removal required to construct grade crossing; includes 

sawcutting

Track Removal 64,469 TF $14.61 941,892.09$             Does not include salvage value

Bridge Removal 304 LF $482.72 146,747.79$             Removal of existing bridge structure

Clearing 109.40 ACRES $8,450.35 924,468.29$            

Excavation 96,334 CY $2.26 217,714.84$             Does not include undercut (no geotechnical information available)

Unsuitable Excavation 63,580 CY $28.54 1,814,827.52$        

Fill 95,114 CY $8.37 796,104.18$             Does not include structural fill for MSE wall, see 10.08

Erosion Control 55,862 LF $35.03 1,957,069.31$        

TOTAL  LS   7,019,554.67$        

40.02 SITE UTILITIES, UTILITY RELOCATION

95+00 TO 105+00 7 EA $12,556.51 87,895.60$              

365+00 TO 375+00 6 EA $12,895.87 77,375.24$              

460+00 TO 470+00 7 EA $12,556.51 87,895.59$              

SUBTOTAL  20     253,166.43$           

55,862 LF $62.24 3,476,850.88$        

SUBTOTAL  55,862     3,476,850.88$        

650 LF $399.87 259,917.45$             Size Varies

LF ‐$                          

SUBTOTAL  650     259,917.45$           

55,862 LF $0.62 34,857.89$               Size Varies

LF ‐$                          

SUBTOTAL  55,862     34,857.89$              720 LF $772.72 556,358.40$            

SUBTOTAL  720     556,358.40$           

55,862 LF $8.33 465,330.46$            

SUBTOTAL  55,862     465,330.46$           

TOTAL  LS 5,046,481.51$        

TOTAL  1 LS $7,465,651.00 7,465,651.00$        

TOTAL  1 LS $5,928,511.00 5,928,511.00$        

D. Relocate and Adjust water utility 

lines and structures

E. relocate water line under wall

F. Relocate and adjust sanitary sewer 

utility lines and structures

A. Demolition

B. Clearing

B. New Relocate and adjust storm drain 

lines and structures

C. Earthwork

A. Relocate Utility Poles

C. Reconstruct culverts

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 HAZ. MAT'L, CONTAM'D SOIL REMOVAL/MITIGATION, GROUND 

Page 207: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

93+22 TO 99+51 LT 10,064 SF $72.05 725,141.39$             Furnish and Install;

93+22 TO 99+51 RT 10,064 SF $72.05 725,141.39$             Includes MSE walls for bridge approach

100+89 TO 106+30 LT 8,656 SF $72.05 623,690.77$             Does not include structural fill, see 10.08

100+89 TO 106+95 RT 9,696 SF $72.05 698,625.89$            

156+65 TO 162+99 LT 10,128 SF $72.05 729,752.78$            

156+65 TO 162+99 RT 10,128 SF $72.05 729,752.78$            

164+78 TO 171+54 LT 10,816 SF $72.05 779,325.25$            

164+78 TO 171+54 RT 10,816 SF $72.05 779,325.25$            

271+53 TO 278+39 LT 10,976 SF $72.05 790,853.73$            

271+53 TO 278+39 RT 10,976 SF $72.05 790,853.73$            

279+89 TO 286+42 LT 10,464 SF $72.05 753,962.59$            

279+89 TO 286+42 RT 10,464 SF $72.05 753,962.59$            

367+00  TO 374+52 LT 12,192 SF $72.05 878,470.18$            

367+00  TO 374+52 RT 12,192 SF $72.05 878,470.18$            

375+95  TO 382+29 LT 10,096 SF $72.05 727,447.09$            

375+95  TO 382+29 RT 10,096 SF $72.05 727,447.09$            

412+90 TO 419+40 LT 10,400 SF $72.05 749,351.20$            

412+90 TO 419+40 RT 10,400 SF $72.05 749,351.20$            

420+84 TO 427+49 LT 10,624 SF $72.05 765,491.07$            

420+84 TO 427+49 RT 10,624 SF $72.05 765,491.07$            

TOTAL  209,872 SF 15,121,907.22$      

TOTAL  LS ‐$                           Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTSA. Asphalt Concrete Surface Course, 

Type SM‐9.5A365+00 TO 375+80 263 Ton $92.93 24,441.12$              

Does not include bridges, see 10.04

B. Asphalt Concrete Base Course, Type 

BM‐25365+00 TO 375+00 658 Ton $95.17 62,624.49$              

B. Aggregate Base Material, Type 1, No. 

21A365+00 TO 375+00 808 Ton $50.34 40,675.53$              

365+00 TO 375+00 910.00 LF $44.16 40,185.60$              

D. Stormwater Management 3.00 EA $578,855.20 1,736,565.61$        

E. Park and Ride (Witchduck Road) 1.00 EA $1,256,438.72 1,256,438.72$        

E. Park and Ride (Independence Blvd.)1.00 EA $1,398,123.33 1,398,123.33$        

F. Park and Ride (Lynn Shores/Thalia)1.00 EA $1,256,438.72 1,256,438.72$        

G. Park and Ride (Lynnhaven Pkwy) 1.00 EA $1,256,438.72 1,256,438.72$        

H. Park and Ride (London Bridge Road)1.00 EA $1,256,438.72 1,256,438.72$        

I. Park and Ride (Birdneck) 1.00 EA $1,256,438.72 1,256,438.72$        

J. Bus Transfer Area @ Oceana 1.00 EA $418,812.92 418,812.92$            

TOTAL  LS   10,003,622.20$      

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

Not used

C. Curb and Gutter (HS‐202)

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING

WATER TREATMENT40.05 SITE STRUCTURES INCLUDING RETAINING WALLS, SOUND WALLS

50 SYSTEMS

Page 208: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

50.01 TRAIN CONTROL AND SIGNALS Not used50.02 TRAFFIC SIGNALS AND CROSSING PROTECTION

NEWTOWN RD 2 EA $9,777.01 19,554.02$              

PRINCESS ANNE RD 2 EA $9,777.01 19,554.02$              

FREIGHT LANE 2 EA $9,777.01 19,554.02$              

GREENWICH RD 2 EA $9,777.01 19,554.02$              

WITCHDUCK RD 2 EA $9,777.01 19,554.02$              

EUCLID RD 2 EA $9,777.01 19,554.02$              

KELLAM RD 2 EA $9,777.01 19,554.02$              

INDEPENDENCE BLVD 2 EA $9,777.01 19,554.02$              

GARRETT DR 2 EA $9,777.01 19,554.02$              

CONSTITUTION DR 2 EA $9,777.01 19,554.02$              

S KENTUCKY AVE 4 EA $9,777.01 39,108.04$              

LYNN SHORES DR 2 EA $9,777.01 19,554.02$              

ROSEMONT RD 2 EA $9,777.01 19,554.02$              

PLAZA TRAIL 2 EA $9,777.01 19,554.02$              

LYNNHAVEN RD 2 EA $9,777.01 19,554.02$              

LYNNHAVEN PKWY 2 EA $9,777.01 19,554.02$              

FIRST COLONIAL RD 2 EA $9,777.01 19,554.02$              

S OCEANA BLVD 2 EA $9,777.01 19,554.02$              

N OCEANA BLVD 2 EA $9,777.01 19,554.02$              

DISTRIBUTION DR 2 EA $9,777.01 19,554.02$              

SUBTOTAL  42   410,634.42$           

NEWTOWN RD 2 EA $342,577.45 685,154.90$            

PRINCESS ANNE RD 2 EA $342,577.45 685,154.90$            

FREIGHT LANE 2 EA $342,577.45 685,154.90$            

GREENWICH RD 2 EA $342,577.45 685,154.90$            

EUCLID RD 2 EA $342,577.45 685,154.90$            

KELLAM RD 2 EA $342,577.45 685,154.90$            

CONSTITUTION DR 4 EA $342,577.45 1,370,309.80$        

S KENTUCKY AVE 4 EA $342,577.45 1,370,309.80$        

LYNN SHORES DR 4 EA $342,577.45 1,370,309.80$        

PLAZA TRAIL 2 EA $342,577.45 685,154.90$            

LYNNHAVEN RD 2 EA $342,577.45 685,154.90$            

LYNNHAVEN PKWY 4 EA $342,577.45 1,370,309.80$        

OCEANA BLVD 4 EA $342,577.45 1,370,309.80$        

FIRST COLONIAL RD 2 EA $342,577.45 685,154.90$            

DISTRIBUTION DR 2 EA $342,577.45 685,154.90$            

S LOWTHER (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

PENNSYLVANIA AVENUE (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

DORSET AVENUE (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

SOUTHERN BLVD (private sign and flashing signal) 2 EA $39,173.94 78,347.88$              

SUBTOTAL  48   14,016,489.52$      

TOTAL  LS 14,427,123.94$      

50.04 TRACTION POWER DISTRIBUTION: CATENARY AND THIRD RAIL

Not used

50.05 COMMUNICATIONS Not used

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

A. Grade Crossing Signals to be 

Removed

B. Traffic Signals to be installed 

Not used

Page 209: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

50.07 CENTRAL CONTROL Not used60 ROW, LAND, EXISTING 

IMPROVEMENTSNORFOLK SOUTHERN ROW ACQUISITION 1.00 LS $40,000,000.00 40,000,000.00$      

‐$                          

TOTAL  1 AC   40,000,000.00$      

TOTAL  AC ‐$                          

70 VEHICLES

70.01 LIGHT RAIL Not used70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used70.04 BUS TOTAL  45 EA $686,666.67 30,900,000.15$      

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

Not used50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

60.01 PURCHASE OR LEASE OF REAL ESTATE

Page 210: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  BRT Alternative 3    

Page 211: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

10 GUIDWAY & TRACK ELEMENTS (route miles)

10.01 GUIDEWAY: AT‐GRADE EXCLUSIVE RIGHT‐OF‐WAYStandard BRT with Barriers 10+82.70 20+80.87             998.17  LF $909.87 908,208.93$               3 barriers

22+73.43 25+02.76             229.33  LF $909.87 208,661.40$               2 ‐ 20' roadways

25+68.44 51+03.77         2,535.33  LF $909.87 2,306,830.85$          

51+19.24 85+28.48         3,409.24  LF $909.87 3,101,978.84$          

85+69.97 93+22.36             752.39  LF $909.87 684,580.10$              

111+80.94 119+08.01             727.07  LF $909.87 661,542.09$              

119+45.86 125+36.75             590.89  LF $909.87 537,635.45$              

125+87.68 153+16.73         2,729.05  LF $909.87 2,483,091.64$          

153+61.27 156+17.95             256.68  LF $909.87 233,546.46$              

175+84.91 180+34.13             449.22  LF $909.87 408,733.60$              

180+99.97 192+59.58         1,159.61  LF $909.87 1,055,098.99$          

194+45.53 209+93.48         1,547.95  LF $909.87 1,408,439.46$          

210+14.13 236+49.41         2,635.28  LF $909.87 2,397,772.75$          

236+84.01 245+80.78             896.77  LF $909.87 815,947.71$              

246+49.90 248+77.52             227.62  LF $909.87 207,105.52$              

255+99.59 271+57.15         1,557.56  LF $909.87 1,417,183.35$          

286+46.16 300+56.67         1,410.51  LF $909.87 1,283,386.38$          

301+02.76 363+85.24         6,282.48  LF $909.87 5,716,265.21$          

382+60.17 393+49.30         1,089.13  LF $909.87 990,971.07$              

396+69.10 397+03.49               34.39  LF $909.87 31,290.57$                

397+03.49 405+50.18             846.69  LF $909.87 770,381.22$              

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

                     ‐    LF $909.87 ‐$                            

Subtotal 30,365          LF 27,628,652              

BRT at Laskin Curbed 468+75.18 471+12.02             236.84  LF $546.00 129,314.64$               2 curbs

472+13.47 476+12.83             399.36  LF $546.00 218,050.56$               single ‐ 24' roadway

476+80.33 481+59.62             479.29  LF $546.00 261,692.34$              

482+59.90 499+68.41         1,708.51  LF $546.00 932,846.46$              

500+67.75 502+95.14             227.39  LF $546.00 124,154.94$              

511+52.80 514+52.58             299.78  LF $546.00 163,678.79$              

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 1 of 13 BRT quant

Page 212: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

515+89.11 528+52.40         1,263.29  LF $546.00 689,756.34$              

529+23.77 531+14.43             190.66  LF $546.00 104,100.36$              

539+57.42 542+80.12             322.70  LF $546.00 176,194.20$              

543+59.52 568+06.40         2,446.88  LF $546.00 1,335,996.48$          

569+36.78 575+32.45             595.67  LF $546.00 325,235.82$              

576+05.66 590+19.95         1,414.29  LF $546.00 772,202.34$              

590+98.75 594+23.46             324.71  LF $546.00 177,291.66$              

Subtotal 9,909            LF 5,410,515                

BRT at Split Platforms 106+95.08 111+80.94             485.86  LF $859.38 417,538.85$               2 barriers

248+77.52 255+99.59             722.07  LF $859.38 620,533.24$               single ‐ 45' roadway

Subtotal 1,208            LF 1,038,072                

BRT at Double Platform 363+85.24 368+21.24             436.00  LF $677.78 295,512.08$               no barrier ‐ single 48' roadway

Subtotal 436                LF 295,512                    

BRT at Laskin Platforms 502+95.14 504+80.72             185.58  LF $1,102.56 204,613.08$               2 curbs

505+57.23 511+52.80             595.57  LF $1,102.56 656,651.66$               single ‐ 48' roadway

531+14.43 539+57.42             842.99  LF $1,102.56 929,447.05$              

Subtotal 1,624            LF 1,790,712                

Total 43,543          LF 36,163,462              

10.02 GUIDEWAY: AT‐GRADE SEMI‐EXCLUSIVE (ALLOWS CROSS TRAFFIC)

Not used

10.03 GUIDEWAY: AT‐GRADE IN MIXED TRAFFIC

Not used

10.04 GUIDEWAY: AERIAL STRUCTUREWitchduck Rd 96+01.92 104+15.21             813.29  LF $14,889.06 12,109,123.61$         8  Piers; 37397 sq ft

Independence 159+27.95 173+19.73         1,391.78  LF $13,864.32 19,296,083.29$         15 Piers; 69269 sq ft

Waterway 192+59.58 194+45.53             185.95  LF $19,469.38 3,620,331.95$           2 Piers; 8556 sq ft

Rosemont Rd 274+62.18 283+42.36             880.18  LF $14,157.16 12,460,849.09$         8 Piers; 40480 sq ft

Lynnhaven 371+31.24 379+20.17             788.93  LF $13,538.25 10,680,731.57$         8 Piers; 36290 sq ft

Waterway 393+49.30 396+69.10             319.80  LF $18,372.24 5,875,442.35$           4 Piers; 14609 sq ft

Linkhorn Bay 568+06.40 569+36.78             130.38  LF $15,601.66 2,034,144.43$           2 Piers;  3781 sq ft

TOTAL  4,510 LF 66,076,706.30$        

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 2 of 13 BRT quant

Page 213: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

10.05 GUIDEWAY: BUILT UP FILL Not used10.06 GUIDEWAY: UNDERGROUND CUT & COVER

Not used

10.07 GUIDEWAY: UNDERGROUND TUNNEL

Not used

10.08 GUIDEWAY: RETAINED CUT OR FILL

BRT with Walls 93+22.36 96+01.92 280 LF $895.19 250,259.32$               median barrier

104+15.21 106+95.08 280 LF $895.19 250,536.83$               2 ‐ walls

156+17.95 159+27.95 310 LF $895.19 277,508.90$               2 ‐ barriers on walls

173+19.73 175+84.91 265 LF $895.19 237,386.48$               2 ‐ 20' roadways

271+57.15 274+62.18 305 LF $895.19 273,059.81$              

283+42.36 286+46.16 304 LF $895.19 271,958.72$              

368+21.24 371+31.24 310 LF $895.19 277,508.90$              

379+20.17 382+60.17 340 LF $895.19 304,364.60$              

0 LF $895.19 ‐$                            

0 LF $895.19 ‐$                            

SUBTOTAL  2,393 LF 2,142,583.55$          

Retaining Walls 93+21.90 96+01.92 Lt 2057 SF $36.07 74,206.67$                

93+21.90 96+01.92 Rt 2057 SF $36.07 74,206.67$                

104+15.21 106+95.08 Lt 2031 SF $36.07 73,264.26$                

104+15.21 106+95.08 Rt 2031 SF $36.07 73,264.26$                

156+17.95 159+27.95 Lt 2498 SF $36.07 90,105.84$                

156+17.95 159+27.95 Rt 2498 SF $36.07 90,105.84$                

173+19.73 175+84.91 Lt 2094 SF $36.07 75,527.84$                

173+19.73 175+84.91 Rt 2094 SF $36.07 75,527.84$                

271+57.15 274+62.18 Lt 2472 SF $36.07 89,167.95$                

271+57.15 274+62.18 Rt 2472 SF $36.07 89,167.95$                

283+42.36 286+46.16 Lt 1943 SF $36.07 70,080.82$                

283+42.36 286+46.16 Rt 1943 SF $36.07 70,080.82$                

368+21.24 371+31.24 Lt 1858 SF $36.07 67,005.60$                

368+21.24 371+31.24 Rt 1858 SF $36.07 67,005.60$                

379+20.17 382+60.17 Lt 1949 SF $36.07 70,297.26$                

379+20.17 382+60.17 Rt 1949 SF $36.07 70,297.26$                

SF $36.07 ‐$                            

SF $36.07 ‐$                            

SF $36.07 ‐$                            

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 3 of 13 BRT quant

Page 214: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

SF $36.07 ‐$                            

SUBTOTAL  33,801 SF 1,219,312.49$          

Unsuitable Ex 63,600 CY $34.98 2,224,728.00$          

Borrow Fill ‐ Unsuitable 63,600 CY $58.03 3,690,708.00$          

Embankment 19,850 CY $56.95 1,130,517.05$          

TOTAL  LS 10,407,849.09$        

10.09 TRACK: DIRECT FIXATION (DIRECT FIXATION TRACK CONSTRUCTION)

Not used

10.10 TRACK: EMBEDDED (CAST‐IN‐PLACE REINFORCED CONCRETE TRACK SLAB ON GRADE)

Not used

10.11 TRACK: BALLASTED (MAINLINE BALLASTED TRACK CONSTRUCTION)

Not used

10.12 TRACK: SPECIAL (NO. 8 TURNOUT)Not used

10.12 TRACK: SPECIAL (NO. 8 EQUILATERAL TURNOUT)

Not used

10.13 TRACK: VIBRATION AND NOISE DAMPENING

Not used

20 STATIONS, STOPS, TERMINALS, INTERMODAL (number)

20.01 AT‐GRADE STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Furnish and Install station platform;

Includes cost for platforms, each with 

canopy, furnishings, utility services, security 

system.

Newtown Station 10+00.00 1 EA $647,334.58 647,334.58$               single 200'x12' platform

Witchduck Station 108+00.00 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Rosemont Station 252+00.00 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Lynnhaven Station 367+00.00 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Greatneck Station 422+65.22 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Hilltop West 505+57.23 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Hilltop East 531+14.43 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

Birdneck 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

convention center 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

oceanfront 2 EA $647,334.58 1,294,669.16$           two 200'x12' platforms

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 4 of 13 BRT quant

Page 215: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

B.  Operator relief facility end of line 1 EA $323,667.28 323,667.28$              includes 5 ft by 5 ft bath room building at 

end of line station

TOTAL  19 LF 12,623,024.34$        

20.02 AERIAL STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORMIndependence 164+00.00 1 EA $1,774,526.80 1,774,526.80$          

TOTAL  1 EA 1,774,526.80$          

20.03 UNDERGROUND STATION, STOP, SHELTER, MALL, TERMINAL, PLATFORM

Not used

20.04 OTHER STATIONS, LANDINGS, TERMINALS: INTERMODAL, FERRY, TROLLEY, ETC.

Not used

20.05 JOINT DEVELOPMENT Not used20.06 AUTOMOBILE PARKING MULTI‐STORY STRUCTURE

Not used

164+00.00 Independence 1 STATION $1,528,709.33 $1,528,709.33

Furnish and Install;

Includes two elevators on each end of the 

station platform, at aerial station stop 

locations; include two separate elevator 

towers on piles, and stair towers on piles; 

elevators and towers shall have glass 

exterior

TOTAL  1 EA $1,528,709.33

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.01 ADMINISTRATION BUILDING: OFFICE, SALES, STORAGE, REVENUE COUNTING

Not used

30.02 LIGHT MAINTENANCE FACILITY Not used30.03 HEAVY MAINTENANCE FACILITY

TOTAL  1 LS $18,379,573.00 18,379,573.00$        

30.04 STORAGE AND MAINTENANCE OF WAY BUILDING

TOTAL 1 ls $3,197,346.00 3,197,346.00$          

30.05 YARD AND TRACK 1 ls $1,475,803.00 1,475,803.00$          

Furnish and Install station platform;

Includes two 100'x12' platforms including 

canopy, furnishings, utility services, security 

system: does not include 

elevators/escalators (see 20.07)

20.07 ELEVATORS, ESCALATORS

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 5 of 13 BRT quant

Page 216: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

40 SITEWORK & SPECIAL CONDITIONS40.01 DEMOLITION, CLEARING, EARTHWORK

Pavement Removal 919,795 SF $5.18 4,764,538.10$          

Track 

Removal40,000 TF $14.58

583,360.00$              

Bridge 

Removal282 LF $799.32 225,408.24$               2 waterway bridges

Clearing 48.00 ACRES $8,438.24 405,035.62$              

Erosion Control 103,750 LF $34.98 3,629,175.00$          

TOTAL  LS9,607,516.96$          

Does not include grading for MOF, see 30.03

40.02 SITE UTILITIES, UTILITY RELOCATION

A1. Relocate Distribution Line ‐ OHNS 11,800 LF $387.00 4,566,600.00$          

Adjust utility cost based on new information

Distribution ‐ OH 2020+00 to 2097+00 7,700 LF $387.00 2,979,900.00$          

Transmission ‐ OH 2073+50 to 2082+00 850 LF $458.00 389,300.00$              

Distribution ‐ OH 2192+00 to 2241+00 4,900 LF $387.00 1,896,300.00$          

A2. Relocate Distribution Line ‐ UG Open 

CutNS 11,000 LF $898.00 9,878,000.00$          

A3. Relocate Distribution Line ‐ UG 

TrenchlessNS 900 LF $754.00 678,600.00$              

TOTAL  1 LS $20,388,700.00

B. New, relocate, and adjust storm drain 

lines and structures, NS Corridor 38,800 LF $124.28 4,822,102.80$          

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

C. Relocate and adjust water utility lines and 

structures; NS Corridor

38,800 LF $1.25 48,500.00$                

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

D. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures: NS Corridor 38,800 LF $16.63 645,244.00$              

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 6 of 13 BRT quant

Page 217: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

E. New, relocate, and adjust storm drain 

lines and structures; In Street 19,700 LF $147.53 2,906,380.40$          

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

F. Relocate and adjust water utility lines and 

structures; In Street

19,700 LF $25.40 500,439.10$              

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low; Increase unit cost to 

accommodate 8' depth at crossings

G. Relocate  and Adjust Sanitary Sewer 

Utility Lines and Structures; In Street 19,700 LF $39.54 778,938.00$              

Use Chronologically Adjusted Norfolk LRT 

Unit Prices; Increase utility costs (double) ‐ 

TIDE was too low

H. Reconstruct culverts 14 EA $256,055.40 3,584,775.60$          

Assume 5'x4' box and 65' length; piles every 

10'

I. Transmission Guy Wire Mods @ Sta 

875+50LS $159,867.27 ‐$                            

J. Relocate Sewer Pump Station 1107+00 1 LS $858,947.00 858,947.00$              

TOTAL  LS 64,530,243.86$        

TOTAL  24,827 CY $300.26 7,454,555.02$          

Increased quantity from 5 acres to 10 acres

TOTAL  1 LS $7,405,200.00 7,405,200.00$          

40.05 SITE STRUCTURES INCLUDING  ROW Fence 77,600 LF $40.33 3,129,608.00$         

TOTAL  LS 3,129,608.00$          

40.06 PEDESTRIAN / BIKE PATH ACCESS AND ACCOMODATION, LANDSCAPING Not used

40.07 AUTOMOBILE, BUS, VAN ACCESSWAYS INCLUDING ROADS, PARKING LOTS

527+50 TO 533+65 475 Ton $103.25 49,086.55$                

583+50 TO 587+70 892 Ton $103.25 92,105.55$                

606+50 TO 608+50 124 Ton $103.25 12,781.71$                

689+50 29 Ton $103.25 3,003.95$                  

40.03 HAZ. MAT'L., CONTAM'D SOIL REMOVAL/MITIGATION, GROUND WATER TREATMENT40.04 ENVIRONMENTAL MITIGATION

A. Asphalt Concrete Surface Course, 5", 

Type SM‐9.5A

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 7 of 13 BRT quant

Page 218: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

695+50 29 Ton $103.25 2,966.29$                  

852+95 TO 857+15 222 Ton $103.25 22,945.56$                

857+40 TO 861+60 166 Ton $103.25 17,119.71$                

Laskin Rd 9952 Ton $103.25 1,027,502.80$          

Ton $103.25 ‐$                            

SUBTOTAL  11,889 SF 1,227,512.12$          

527+50 TO 533+65 570 Ton $105.49 60,181.77$                

583+50 TO 587+70 1070 Ton $105.49 112,924.52$              

606+50 TO 608+50 149 Ton $105.49 15,670.81$                

689+50 35 Ton $105.49 3,682.95$                  

695+50 34 Ton $105.49 3,636.77$                  

852+95 TO 857+15 267 Ton $105.49 28,132.03$                

857+40 TO 861+60 199 Ton $105.49 20,989.35$                

Laskin Rd 11942 Ton $105.49 1,259,753.26$          

Ton $105.49 ‐$                            

SUBTOTAL  14,266 SF 1,504,971.46$          

583+50 TO 587+70 381 Ton $50.262 19,151.33$                

527+50 TO 533+65 190 Ton $50.26 9,558.11$                  

583+50 TO 587+70 357 Ton $50.26 17,934.76$                

606+50 TO 608+50 50 Ton $50.26 2,488.85$                  

689+50 12 Ton $50.26 584.93$                      

695+50 11 Ton $50.26 577.59$                      

852+95 TO 857+15 89 Ton $50.26 4,467.95$                  

857+40 TO 861+60 66 Ton $50.26 3,333.54$                  

Laskin Rd 3981 Ton $50.26 200,074.95$              

Ton $50.26 ‐$                            

SUBTOTAL  5,137 SF 258,172.01$              

D. Curb and Gutter (HS‐202) 500+00 TO 510+50 1048 LF $44.09 46,207.37$                

527+50 TO 533+65 1254 LF $44.09 55,290.11$                

583+50 TO 587+70 1230 LF $44.09 54,231.93$                

606+50 TO 608+50 725 LF $44.09 31,965.98$                

852+95 TO 857+15 1844 LF $44.09 81,303.80$                

857+40 TO 861+60 793 LF $44.09 34,964.16$                

Laskin Rd 13848 LF $44.09 610,572.17$              

LF $44.09 ‐$                            

B. Asphalt Concrete Base Course, 6", Type 

BM‐25

C. Aggregate Base Material, Type 1, No. 21A

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 8 of 13 BRT quant

Page 219: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

SUBTOTAL  20,742 SF 914,535.52$              

D. Park and Rides 585+00.00 Witchduck 1.00 EA $1,809,674.09 1,809,674.09$          

650+00.00 Independence 1.00 EA $2,471,457.35 2,471,457.35$          

730+00.00 Lynn Shores 1.00 EA $1,500,957.10 1,500,957.10$          

850+00.00 Lynnhaven Pkwy 1.00 EA $1,578,167.18 1,578,167.18$          

423+00.00 Greatneck 1.00 EA $2,398,149.98 2,398,149.98$           same as LRT Hilltop

531+15.00 Hilltop East 1.00 EA $1,893,800.62 1,893,800.62$           same as LRT Hilltop

SUBTOTAL  6 SF 11,652,206.32$        

E. Milling Asphalt SY $4.88 ‐$                            

TOTAL  LS 15,557,397.43$        

40.08 TEMPORARY FACILITIES AND OTHER INDIRECT COSTS DURING CONSTRUCTION

TOTAL 1 LS $1,776,477.16 $1,776,477.16

Includes Maintenance of Traffic and 

Protection during construction.  Includes 

work on Birdneck rd (70' wide, 5 lanes) and 

19th Street (45' wide, 4 lanes); Include 24/7 

police at intersections @ $45/hour for 

duration of project ‐ 49 intersections (notes 

indicate that total cost may need to increase 

by about a factor of 5)

50 SYSTEMS50.01 TRAIN CONTROL AND SIGNALS

B. Retrofit Existing vehicles for ATCExisting Vehicles 1 LS $500,000.00

500,000.00$               upgrade to cab signaling; increased unit cost 

to $500,000

TOTAL  LS 500,000.00$              

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 9 of 13 BRT quant

Page 220: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

50.02 TRAFFIC SIGNALS AND CROSSING PROTECTIONPrivate Crossings 8 $39,115.59 312,924.75$              

13 EA $19,527.10253,852.33$               REMOVE EXISTING CROSS GATE EQUIPMENT 

AND DISPOSE ‐ TYPICAL

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

‐$                            

SUBTOTAL  13 253,852.33$              

Newtown Rd 1 EA $1,432,356.90 1,432,356.90$          

Princess Anne Rd 1 EA $1,432,356.90 1,432,356.90$          

Freight Ln 1 EA $1,432,356.90 1,432,356.90$          

S Lowther (private sign and flashing signal) 1 EA $1,432,356.90 1,432,356.90$          

Greenwich Rd 1 EA $1,432,356.90 1,432,356.90$          

Southgate Ave (private sign and flashing signal) 1 EA $1,432,356.90 1,432,356.90$          

Dorset Ave (private sign and flashing signal) 1 EA $1,432,356.90 1,432,356.90$          

Euclid Rd 1 EA $1,432,356.90 1,432,356.90$          

Kellam Rd 1 EA $1,432,356.90 1,432,356.90$          

Constitution Dr 1 EA $1,432,356.90 1,432,356.90$          

Fir Ave 1 EA $1,432,356.90 1,432,356.90$          

S Thalia Rd 1 EA $1,432,356.90 1,432,356.90$          

Budding Ave 1 EA $1,432,356.90 1,432,356.90$          

S Kentucky Ave 1 EA $1,432,356.90 1,432,356.90$          

A. Grade Crossing Signals to be Removed

B. New Grade Crossing Signals Includes traffic signal, signage; Include 

additional high mast lighting at each 

crossing; Include signal controller at each 

crossing ($200,000 each); add $10,400 to 

each grade crossing to account for wiring 12 

guage EF units for traffic signal preemption

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 10 of 13 BRT quant

Page 221: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

Lynn Shores Dr 1 EA $1,432,356.90 1,432,356.90$          

Plaza Trail 1 EA $1,432,356.90 1,432,356.90$          

Lynnhaven Rd 1 EA $1,432,356.90 1,432,356.90$          

SUBTOTAL  17 24,350,067.30$        

TOTAL  24,916,844.38$        

50.03 TRACTION POWER SUPPLY: SUBSTATIONS

Not used

50.04 TRACTION POWER DISTRIBUTION: CATENARY Not used

Comm 12.87 MI $650,000.00 8,365,500.00$          4‐2" conduit; trough adjacent to ballasted 

track; buried in street

Ductbank 12.87 MI $537,293.98 6,914,973.54$          

Speakers, cameras, and variable message 

signs; include CAT 5 cable to cameras; each 

station stop in VB

Public Address 13.00 EA $110,062.47 1,430,812.14$          

To Serve OCC, servers and TVM's; include 

ethernet through UG FO (was $2,000,000 on 

Norfolk, above ground on OCS poles)

TOTAL    LS 16,711,285.67$        

At stations 15 EA $150,275.24 2,254,129.00$          

Two collection machines at each station; 

added two additional TVM at end of line 

station and Independence station, 4 TVM's 

need enclosures; 2 per enclosure ‐ 2 

enclosures total ($12,000 each); Include CAT 

5 cable from TVM's to nearest FO (for the 

machine and connections, each TVM is 

about $150,000, including the cable

At Park and Rides 6 EA $163,064.63 978,388.00$              

TOTAL  EA 3,232,517.00$          

50.07 CENTRAL CONTROLNot used

50.05 COMMUNICATIONS

50.06 FARE COLLECTION SYSTEM AND EQUIPMENT

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 11 of 13 BRT quant

Page 222: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

60 ROW, LAND, EXISTING IMPROVEMENTS

60.01 PURCHASE OR LEASE OF REAL ESTATE

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

B. Norfolk Southern ROW Acquisition

1.00 LS $40,000,000.00 40,000,000.00$        

Parcel acquisition will be required, but area 

and costs are not determined at this time.

AC

‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

AC ‐$                            

D. Substation Property Acquisition 

AC

‐$                             Parcel acquisition will be required, but area 

and costs are not determined at this time.

TOTAL  LS 40,000,000.00$        

TOTAL  AC ‐$                            

70 VEHICLES

70.01 LIGHT RAIL TOTAL  EA $4,368,421.05 ‐$                            Not used

70.02 HEAVY RAIL Not used70.03 COMMUTER RAIL Not used

Parcel acquisition will be required, but area 

and costs are not determined at this time.

Parcel acquisition will be required, but area 

and costs are not determined at this time.

Parcel acquisition will be required, but area 

and costs are not determined at this time.

C. Property Acquisition (Park and Rides)

60.02 RELOCATION OF EXISTING HOUSEHOLDS AND BUSINESSES

A. Property Acquisition

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 12 of 13 BRT quant

Page 223: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

STANDARD COST CATEGORY STATION LIMITS QUANTITY UNITSUNIT PRICE 

(MATERIALS & LABOR)

TOTAL PRICE ASSUMPTIONS

BUS RAPID TRANSIT (BRT) LASKIN ROAD ALTERNATIVE ‐ NEWTOWN ROAD TO OCEANFRONT, INCLUDING MOF

70.04 BUS TOTAL 45 EA $657,143.00 29,571,435.00$        Feeder bus; Includes spare parts and special 

events

70.05 OTHER Not used70.06 NON‐REVENUE VEHICLES Not used70.07 SPARE PARTS Not used

HRT_VB_BRT‐Laskin_Cost  Estimate_2013‐10‐21.xlsx 13 of 13 BRT quant

Page 224: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

         Cost Estimate Details  BRT Alternative Timberline Report    

Page 225: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 1

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Project Name 1 HRT- Virginia Beach

Project Name 2 Transit Extension

Project Info 1 BRT Alternative

Project Location 1 Virginia Beach

Project Location 2 VA

Design Stage 1 Alternative Analysis

Design Stage 2 Conceptual Design

Estimate Version BASE_BUS 2013-08-16

Upper Range +% 40

Lower Range -% 20

Labor Rate Table 3rd Qtr2013 Union

Equip Rate Table 3rd Qtr2013

Cost index 233-VA-NORFOLK

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 226: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 2

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

06_BRT BUS RAPID TRANSIT ALTERNATIVE

010 GUIDEWAY AND TRACK ELEMENTS

10.02 Guideway: At-grade semi-exclusive

32111.02 Aggregate Base Material, Type 1,

No. 21A (10+00 TO 568+80)

69,116.00 ton 50.341/ton 3,479,365

32111.03 Aggregate Base Material, Type 1,

No. 21A Shoulders (10+00 TO

568+80)

2,096.00 ton 50.341/ton 105,515

32111.04 Aggregate Base Material, Type 1,

No. 21A Curb & Gutter (10+00 TO

568+8

824.00 ton 50.341/ton 41,481

32121.01a Asphalt Concrete Surface Course,

Type SM-9.5A (Milling)

2,037.75 ton 92.932/ton 189,373

32121.03 Asphalt Concrete Surface Course,

Type SM-9.5A (10+00 TO 568+80)

22,526.00 ton 92.932/ton 2,093,391

32121.04 Asphalt Concrete Base Course,

Type BM-25 (10+00 TO 568+80)

56,318.00 ton 95.174/ton 5,360,001

32121.07 Milling Per 2" Depth 18,525.00 sy 47.43 /sy 878,611

32160.02 Curb and Gutter HS-202 (13+00

TO 15+00)

269.00 lf 44.16 /lf 11,879

32160.03 Curb and Gutter HS-202 (17+50

TO 20+00)

247.00 lf 44.16 /lf 10,908

32160.04 Curb and Gutter HS-202 (22+50

TO 25+00)

270.00 lf 44.16 /lf 11,923

32160.05 Curb and Gutter HS-202 (25+50

TO 46+00)

2,094.00 lf 44.16 /lf 92,472

32160.06 Curb and Gutter HS-202 (92+00

TO 93+00)

147.00 lf 44.16 /lf 6,492

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 227: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 3

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

32160.06 Curb and Gutter HS-202 (92+00

TO 93+00)

147.00 lf 44.16 /lf 6,492

32160.07 Curb and Gutter HS-202 (108+00

TO 113+00)

474.00 lf 44.16 /lf 20,932

32160.08 Curb and Gutter HS-202 (113+40

TO 113+50)

23.00 lf 44.16 /lf 1,016

32160.09 Curb and Gutter HS-202 (302+00

TO 306+00)

400.00 lf 44.16 /lf 17,664

32160.10 Curb and Gutter HS-202 (359+00

TO 360+50)

156.00 lf 44.16 /lf 6,889

32160.11 Curb and Gutter HS-202 (365+00

TO 375+00)

120.00 lf 44.16 /lf 5,299

32160.12 Curb and Gutter HS-202 (375+00

TO 390+00)

34711.01 Guard Rail (13+00 to 15+00) 269.00 lf 70.32 /lf 18,915

34711.02 Guard Rail (17+50 TO 20+00) 247.00 lf 73.01 /lf 18,033

34711.03 Guard Rail (22+50 TO 25+00) 270.00 lf 70.21 /lf 18,955

34711.04 Guard Rail (25+50 TO 46+00) 2,094.00 lf 60.481/lf 126,648

34711.05 Guard Rail (109+00 TO 113+00) 399.00 lf 65.57 /lf 26,161

34711.06 Guard Rail (359+00 TO 360+50) 156.00 lf 66.153/lf 10,320

34711.07 Guard Rail End Unit Type 350 20.00 ea 106.694/ea 2,134

10.02 Guideway: At-grade semi-exclusive 12,554,375

220.815 Labor hours

109.365 Equipment hours

10.04a Guideway: Aerial structure (Bus Transit Bridge)

34720.40 99+51 TO 100+89 BRT Over

Witchduck Rd

138.00 lf 9,130.541/lf 1,260,015

34720.45 162+99 TO 164+81 BRT Over

Independence Blvd

182.00 lf 14,074.33 /lf 2,561,528

34720.50 192+81 TO 194+01 BRT Over

Waterway

120.00 lf 9,607.82 /lf 1,152,938

34720.55 278+39 TO 279+89 BRT Over

Rosemont Rd

150.00 lf 12,018.42 /lf 1,802,763

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 228: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 4

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

34720.55 278+39 TO 279+89 BRT Over

Rosemont Rd

150.00 lf 12,018.42 /lf 1,802,763

34720.60 374+62 TO 375+95 BRT Over

Lynnhaven Parkway

133.00 lf 9,175.502/lf 1,220,342

34720.65 394+39 TO 396+02 BRT Over

Waterway

163.00 lf 11,750.96 /lf 1,915,406

34720.70 419+40 TO 420+84 BRT Over

London Bridge Rd

144.00 lf 8,916.69 /lf 1,284,003

10.04a Guideway: Aerial structure (Bus Transit Bridge)

1,030.00 lf

10,870.87 /lf 11,196,995

10.08 Guideway: Retained cut or fill

31230.06 Undercut Excavation 9,208.00 cy 32.813/cy 302,142

31230.11 Embankment 75,589.00 cy 57.18 /cy 4,322,096

10.08 Guideway: Retained cut or fill

84,797.00 cy

54.533/cy 4,624,238

12,009.702 Labor hours

12,304.374 Equipment hours

010 GUIDEWAY AND TRACK ELEMENTS

55,862.00 LF

507.96 /LF 28,375,609

12,230.52 Labor hours

12,413.74 Equipment hours

020 STATIONS, STOPS, TERMINALS, INTERMODAL

20.01 At-grade station, stop, shelter, mall, terminal, platform

09000.01 At-Grade Station, Stop, Shelter,

Mall, Terminal, Platform

6.50 ea 713,978.703/ea 4,640,862

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 229: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 5

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

09000.01 At-Grade Station, Stop, Shelter,

Mall, Terminal, Platform

6.50 ea 713,978.703/ea 4,640,862

20.01 At-grade station, stop, shelter, mall, terminal, platform

6.00 ea

773,476.93 /ea 4,640,862

20.02 Aerial station, stop, shelter, mall, terminal, platform

09000.02 Aerial Station, Stop, Shelter, Mall,

Terminal, Platform

1.00 ea 480,352.53 /ea 480,353

20.02 Aerial station, stop, shelter, mall, terminal, platform

1.00 ea

480,352.53 /ea 480,353

20.07 Elevators (1) & Stairs (2)

14240.01 Elevators and Metal Stairs 1.00 sta 296,538.42 /sta 296,538

20.07 Elevators (1) & Stairs (2)

1.00 sta

296,538.42 /sta 296,538

106.67 Labor hours

26.67 Equipment hours

020 STATIONS, STOPS, TERMINALS, INTERMODAL

6.00 EA

902,958.753/EA 5,417,753

106.67 Labor hours

26.67 Equipment hours

030 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

30.03 Heavy Maintenance Facility - LRT

MOF substation see 50.3/34202.02

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 230: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 6

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

01500.01 Project Identification Sign 1,661

01500.05 Construction Fence 32,629

01520.01 Install and Furnish HRT Office 160,118

01520.05 HRT Field Office Maintenance 26,956

01530.01 Temporary Light Rail Vehicle

Shelter

120,088

02317.01 Precast Prestressed Concrete

Driven Piles

1,769,713

03300.90 MOF_Slab On Grade 1,342,222

03300.91 MOF_Pits (Foundation) 107,185

03300.92 MOF_Pits (Walls) 136,176

04210.01 Brick 470,830

04220.01 Concrete Block 764,632

08332.01 Overhead Coiling Door 120,426

09130.01 Acoustic Ceiling 58,785

09250.01 Gypsum Board 81,444

09300.01 Flooring 106,591

09905.01 Painting 142,030

10800.01 Toilet Accesories 14,100

11901.01 Automatic Drive-Thru Vehicle

Wash System

320,235

11910.01 Overhead Crane - 10 ton 213,795

11910.05 Monorail Hoist - 2 ton 40,063

11930.01 Shop Equipment 413,547

13121.01 Pre-Engineered Metal Building 2,042,747

Includes full operational control center; paint and body shop - 5000 sf;

22050.01 Building Plumbing System 261,806

22710.01 Wet Pipe Sprinkler System 273,493

23050.01 Building HVAC System 336,247

Includes cost of heating with natural gas

26050.01 Building Electrical System 912,670

31230.90 Sitework and Yard Piping (MOF) 1,080,793

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 231: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 7

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

31240.01 Temporary Silt Fence 9,148

32171.01 Furnish and Install Bollards 31,245

32311.01 6-Foot CL Fence w/ 3-Strand Barb

Wire

219,595

30.03 Heavy Maintenance Facility - LRT

62,400.00 sf

186.073/sf 11,610,969

36,318.402 Labor hours

4,461.014 Equipment hours

30.05 Building and Yard Track

Includes full loop track around building and storage area; 6 tracks through building

39900.08 Asphalt Paving (MOF) 20,840.00 sy 70.922/sy 1,478,011

30.05 Building and Yard Track

1.00 ls

1,478,011.09 /ls 1,478,011

1,899.71 Labor hours

1,517.06 Equipment hours

030 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS

1.00 LS

13,088,979.73 /LS 13,088,980

38,218.11 Labor hours

5,978.071 Equipment hours

040 SITEWORK & SPECIAL CONDITIONS

40.01 Demolition, clearing, Earthwork

02410.01 Demolition - Pavement Removal 42,852.00 sf 5.151/sf 220,724

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 232: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 8

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

02410.02 Demolition - Track Removal 64,469.00 tf 14.61 /tf 941,544

02410.03 Demolition - Bridge Removal 304.00 lf 482.723/lf 146,748

31230.01 Clearing 109.40 ac 8,450.35 /ac 924,468

31230.02 Excavation 96,334.00 cy 2.26 /cy 217,644

31230.02a Unsuitable Excavation 63,580.00 cy 28.544/cy 1,814,852

31230.03 Fill 95,114.00 cy 8.37 /cy 795,823

31230.04 Erosion Control 55,862.00 lf 35.034/lf 1,957,053

40.01 Demolition, clearing, Earthwork

1.00 ls

7,018,855.72 /ls 7,018,856

30,553.12 Labor hours

26,462.274 Equipment hours

40.02 Site Utilities, Utility Relocation

26001.02 Relocate Utility Poles (95+00 TO

105+00)

7.00 ea 12,556.514/ea 87,896

26001.03 Relocate Utility Poles (365+00 TO

375+00)

6.00 ea 12,895.873/ea 77,375

26001.04 Relocate Utility Poles (460+00 TO

470+00)

7.00 ea 12,556.513/ea 87,896

26100.01 New, Relocate and Adjust Storm

Drain Lines and Structures

55,862.00 lf 62.24 /lf 3,476,721

26100.08 Reconstruct Culverts 650.00 lf 399.873/lf 259,917

33310.01 Relocate and Adjust Water Utility

Lines and Structures

55,862.00 lf 0.624/lf 34,884

33310.02 Relocate Water Line under MSE

Wall Fill

720.00 lf 772.72 /lf 556,356

33310.04 Relocate and Adjust Sanitary

Sewer Utility Lines and Structures

55,862.00 lf 8.33 /lf 465,113

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 233: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 9

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

40.02 Site Utilities, Utility Relocation

1.00 ls

5,046,157.56 /ls 5,046,158

4,821.874 Labor hours

1,621.283 Equipment hours

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments

31230.15 Hazardous Material,

Removal/Mitigation

24,827.00 cy 300.71 /cy 7,465,651

40.03 Haz. mat'l, contam'd soil removal/mitigation, ground water

treatments1.00 ls

7,465,650.64 /ls 7,465,651

4,668.202 Labor hours

4,237.58 Equipment hours

40.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks

31230.20 Environmental Mitigation

(Wetlands)

5.00 ac 1,185,702.182/ac 5,928,511

40.04 Environmental mitigation, e.g. wetlands,

historic/archeologic, parks1.00 ls

5,928,510.91 /ls 5,928,511

40.05 Site structures including retaining walls, sound walls

32322.50 MSE Walls (93+22 TO 99+51 LT) 10,064.00 sf 72.053/sf 725,140

32322.51 MSE Walls (93+22 TO 99+51 RT) 10,064.00 sf 72.053/sf 725,140

32322.52 MSE Walls (100+89 TO 106+30

LT)

8,656.00 sf 72.053/sf 623,690

32322.53 MSE Walls (100+89 TO 106+95

RT)

9,696.00 sf 72.053/sf 698,625

32322.54 MSE Walls (156+65 TO 162+99

LT)

10,128.00 sf 72.053/sf 729,752

32322.55 MSE Walls (156+65 TO 162+99

RT)

10,128.00 sf 72.053/sf 729,752

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 234: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 10

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

32322.56 MSE Walls (164+78 TO 171+54

LT)

10,816.00 sf 72.053/sf 779,324

32322.57 MSE Walls (164+78 TO 171+54

RT)

10,816.00 sf 72.053/sf 779,324

32322.58 MSE Walls (271+53 TO 278+39

LT)

10,976.00 sf 72.053/sf 790,852

32322.59 MSE Walls (271+53 TO 278+39

RT)

10,976.00 sf 72.053/sf 790,852

32322.60 MSE Walls (279+89 TO 286+42

LT)

10,464.00 sf 72.053/sf 753,961

32322.61 MSE Walls (279+89 TO 286+42

RT)

10,464.00 sf 72.053/sf 753,961

32322.62 MSE Walls (367+00 TO 374+52

LT)

12,192.00 sf 72.053/sf 878,469

32322.63 MSE Walls (367+00 TO 374+52

RT)

12,192.00 sf 72.053/sf 878,469

32322.64 MSE Walls (375+95 TO 382+29

LT)

10,096.00 sf 72.053/sf 727,446

32322.65 MSE Walls (375+95 TO 382+29

LT)

10,096.00 sf 72.053/sf 727,446

32322.66 MSE Walls (412+90 TO 419+40

LT)

10,400.00 sf 72.053/sf 749,350

32322.67 MSE Walls (412+90 TO 419+40

RT)

10,400.00 sf 72.053/sf 749,350

32322.68 MSE Walls (420+84 TO 427+49

LT)

10,624.00 sf 72.053/sf 765,490

32322.69 MSE Walls (420+84 TO 427+49

RT)

10,624.00 sf 72.053/sf 765,490

40.05 Site structures including retaining walls, sound walls

209,872.00 sf

72.053/sf 15,121,882

40.07 Automobile, bus, van accessways including roads, parking lots

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 235: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 11

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

32111.021 Aggregate Base Material, Type 1,

No. 21A (365+00 TO 375+00)

808.00 ton 50.341/ton 40,675

32121.031 Asphalt Concrete Surface Course,

Type SM-9.5A (365+00 TO

375+80)

263.00 ton 92.932/ton 24,441

32121.041 Asphalt Concrete Base Course,

Type BM-25 (365+00 TO 375+00)

658.00 ton 95.174/ton 62,624

32160.11 Curb and Gutter HS-202 (365+00

TO 375+00)

910.00 lf 44.16 /lf 40,186

33310.36 Stormwater Management 3.00 ea 578,855.203/ea 1,736,566

39900.01 Park and Ride (Witchduck Road) 1.00 ea 1,256,438.72 /ea 1,256,439

39900.02 Park and Ride (Independence

Blvd)

1.00 ea 1,398,123.33 /ea 1,398,123

39900.03 Park and Ride (Lynn

Shores/Thalia)

1.00 ea 1,256,438.73 /ea 1,256,439

39900.05 Park and Ride (Lynnhaven Pkwy) 1.00 ea 1,256,438.72 /ea 1,256,439

39900.06 Park and Ride (London Bridge Rd) 1.00 ea 1,256,438.74 /ea 1,256,439

39900.07 Park and Ride (Birdneck) 1.00 ea 1,256,438.73 /ea 1,256,439

39900.09 Bus Transfer Area @ Oceana 1.00 ea 418,812.92 /ea 418,813

40.07 Automobile, bus, van accessways including roads, parking

lots1.00 ls

10,003,622.50 /ls 10,003,623

9,904.81 Labor hours

6,877.97 Equipment hours

040 SITEWORK & SPECIAL CONDITIONS

1.00 LS

50,584,679.170/LS 50,584,679

49,948.00 Labor hours

39,199.103 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 236: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 12

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

050 SYSTEMS

50.02 Traffic signals and crossing protection

34411.01 Private Signs and Flashing

Signals (S Lowther)

2.00 ea 39,173.94 /ea 78,348

34411.02 Private Signs and Flashing

Signals (Pennsylvanea Ave.)

2.00 ea 39,173.95 /ea 78,348

34411.03 Private Signs and Flashing

Signals (Dorset Ave.)

2.00 ea 39,173.95 /ea 78,348

34411.04 Private Signs and Flashing

Signals (Southern Blvd)

2.00 ea 39,173.94 /ea 78,348

34456.50 Grade Crossing Signals Removal

(Newtown Rd)

2.00 ea 9,777.01 /ea 19,554

34456.51 Grade Crossing Signals Removal

(Princess Anne Rd)

2.00 ea 9,777.01 /ea 19,554

34456.52 Grade Crossing Signals Removal

(Freight Ln)

2.00 ea 9,777.01 /ea 19,554

34456.53 Grade Crossing Signals Removal

(Greenwich Rd)

2.00 ea 9,777.02 /ea 19,554

34456.54 Grade Crossing Signals Removal

(Witchduck Rd)

2.00 ea 9,777.01 /ea 19,554

34456.55 Grade Crossing Signals Removal

(Euclid Rd)

2.00 ea 9,777.02 /ea 19,554

34456.56 Grade Crossing Signals Removal

(Kellam Rd)

2.00 ea 9,777.01 /ea 19,554

34456.57 Grade Crossing Signals Removal

(Independence Blvd)

2.00 ea 9,777.02 /ea 19,554

34456.58 Grade Crossing Signals Removal

(Garrett Dr)

2.00 ea 9,777.02 /ea 19,554

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 237: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 13

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

34456.59 Grade Crossing Signals Removal

(Constitution Dr)

2.00 ea 9,777.01 /ea 19,554

34456.60 Grade Crossing Signals Removal

(S Kentucky Ave & N Thalla Rd)

4.00 ea 9,777.02 /ea 39,108

34456.61 Grade Crossing Signals Removal

(Lynn Shores Dr)

2.00 ea 9,777.00 /ea 19,554

34456.62 Grade Crossing Signals Removal

(Rosemont Rd)

2.00 ea 9,777.02 /ea 19,554

34456.63 Grade Crossing Signals Removal

(Plaza Trail)

2.00 ea 9,777.01 /ea 19,554

34456.64 Grade Crossing Signals Removal

(Lynnhaven Rd)

2.00 ea 9,777.02 /ea 19,554

34456.65 Grade Crossing Signals Removal

(Lynnhaven Pkwy)

2.00 ea 9,777.01 /ea 19,554

34456.66 Grade Crossing Signals Removal

(First Colonial Rd)

2.00 ea 9,777.01 /ea 19,554

34456.67 Grade Crossing Signals Removal

(S Oceana Blvd)

2.00 ea 9,777.01 /ea 19,554

34456.68 Grade Crossing Signals Removal

(N Oceana Blvd)

2.00 ea 9,777.01 /ea 19,554

34456.69 Grade Crossing Signals Removal

(Distribution Dr)

2.00 ea 9,777.01 /ea 19,554

34456.70 New Traffic Crossing Signals

(Newtown Rd)

2.00 ea 342,577.45 /ea 685,155

34456.71 New Traffic Crossing Signals

(Princess Anne Rd)

2.00 ea 342,577.44 /ea 685,155

34456.72 New Traffic Crossing Signals

(Freight Ln)

2.00 ea 342,577.45 /ea 685,155

34456.73 New Traffic Crossing Signals

(Greenwich Rd)

2.00 ea 342,577.43 /ea 685,155

34456.74 New Traffic Crossing Signals

(Euclid Rd)

2.00 ea 342,577.45 /ea 685,155

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 238: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 14

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

34456.75 New Traffic Crossing Signals

(Kellam Rd)

2.00 ea 342,577.44 /ea 685,155

34456.76 New Traffic Crossing Signals

(Constitution Rd & S Fir Ave)

4.00 ea 342,577.45 /ea 1,370,310

34456.77 New Traffic Crossing Signals (S.

Kentucky Ave & N thalla Rd)

4.00 ea 342,577.45 /ea 1,370,310

34456.78 New Traffic Crossing Signals

(Lynn Shores Dr & N Budding Ave)

4.00 ea 342,577.443/ea 1,370,310

34456.79 New Traffic Crossing Signals

(Plaza Trail)

2.00 ea 342,577.45 /ea 685,155

34456.80 New Traffic Crossing Signals

(Lynnhaven Rd & Air Station Rd)

4.00 ea 342,577.443/ea 1,370,310

34456.81 New Traffic Crossing Signals

(Lynnhaven Pkwy)

2.00 ea 342,577.45 /ea 685,155

34456.82 New Traffic Crossing Signals (S

Oceana Blvd & S Sykes Ave)

4.00 ea 342,577.44 /ea 1,370,310

34456.83 New Traffic Crossing Signals

(First Colonial Rd)

2.00 ea 342,577.45 /ea 685,155

34456.84 New Traffic Crossing Signals

(Distribution Dr)

2.00 ea 342,577.45 /ea 685,155

50.02 Traffic signals and crossing protection

1.00 ls

14,427,123.77 /ls 14,427,124

7,443.334 Labor hours

1,542.67 Equipment hours

050 SYSTEMS

1.00 LS

14,427,123.77 /LS 14,427,124

7,443.334 Labor hours

1,542.67 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 239: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 15

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

060 ROW, LAND, EXISTING IMPROVEMENTS

60.01 Purchase or lease of real estate

01210.09 Purchase/Lease Real Estate

(93+25 TO 99+75)

01210.10 Purchase/Lease Real Estate

(100+79 TO 104+66)

0.18 ac 326,700.111/ac 58,806

01210.11 Purchase/Lease Real Estate

(156+42 TO 163+00)

0.15 ac 1,089,000.133/ac 163,350

01210.12 Purchase/Lease Real Estate

(164+80 TO 169+00)

0.10 ac 1,089,000.100/ac 108,900

01210.13 Purchase/Lease Real Estate

(170+01 TO 180+07)

0.46 ac 1,089,000.04 /ac 500,940

01210.14 Purchase/Lease Real Estate

(247+00 TO 258+33)

0.52 ac 435,600.02 /ac 226,512

01210.15 Purchase/Lease Real Estate

(273+22 TO 277+56)

0.10 ac 435,600.10 /ac 43,560

01210.16 Purchase/Lease Real Estate

(279+55 TO 284+85)

0.12 ac 435,600.17 /ac 52,272

01210.17 Purchase/Lease Real Estate

(376+25 TO 381+00)

0.67 ac 435,600.03 /ac 291,852

01210.18 Purchase/Lease Real Estate

(365+07 TO 374+70)

0.91 ac 435,600.02 /ac 396,396

01210.19 Purchase/Lease Real Estate

(458+59 TO 470+46)

0.54 ac 438,825.963/ac 236,966

01210.21 Norfolk Southern ROW Acquisition 1.00 ls 40,000,000.010/ls 40,000,000

01210.22 Purchase/Lease Real Estate

(Witchduck Rd Park&

Ride)($7.50/sf)

3.12 ac 326,700.003/ac 1,019,304

01210.23 Purchase/Lease Real Estate

(Independence Park& Ride)

($25.00/sf)

3.12 ac 1,089,000.01 /ac 3,397,680

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 240: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 16

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

01210.23 Purchase/Lease Real Estate

(Independence Park& Ride)

($25.00/sf)

3.12 ac 1,089,000.01 /ac 3,397,680

01210.24 Purchase/Lease Real Estate

(Lynn Shores/Thalia Park& Ride)

($10.00/sf)

3.12 ac 435,600.003/ac 1,359,072

01210.25 Purchase/Lease Real Estate

(Lynn Shores Dr Park& Ride)

3.12 ac 0.003/ac 0

01210.26 Purchase/Lease Real Estate

(Lynnhaven Pkwy Park&

Ride)($10.00/sf)

3.12 ac 435,600.01 /ac 1,359,072

01210.27 Purchase/Lease Real Estate

(London Bridge Park&

Ride)($5.00/sf)

3.12 ac 217,800.01 /ac 679,536

01210.28 Purchase/Lease Real Estate

(Birdneck Park& Ride)$5.00/sf)

3.12 ac 217,800.003/ac 679,536

60.01 Purchase or lease of real estate

1.00 ls

50,573,754.290/ls 50,573,754

060 ROW, LAND, EXISTING IMPROVEMENTS

1.00 LS

50,573,754.290/LS 50,573,754

070 VEHICLES

70.04 Bus

39999.01a Articulating Bus Vehicles 12.00 ea 1,200,000.002/ea 14,400,000

39999.01b Feeder Bus Vehicles 33.00 ea 500,000.00 /ea 16,500,000

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 241: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 17

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Description Quantity

Total

Unit Cost Amount

70.04 Bus

45.00 ea

686,666.67 /ea 30,900,000

070 VEHICLES

45.00 EA

686,666.67 /EA 30,900,000

06_BRT BUS RAPID TRANSIT ALTERNATIVE

55,862.00 RF

3,461.53 /RF 193,367,898

107,946.623 Labor hours

59,160.25 Equipment hours

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%

Page 242: L Environmental Impact Statement VIRGINIA BEACH TRANSIT ...bloximages.newyork1.vip.townnews.com/pilotonline...Dra L Environmental Impact Statement VIRGINIA BEACH TRANSIT EXTENSION

HRT- Virginia Beach Transit Extension Page 18A

BRT Alternative 8/16/2013 4:11 PM

Virginia Beach VA HDR-DBI, Inc. Estimate Report

Labor Rate Table - 3rd Qtr2013 Union Alternative Analysis Conceptual Design ESTIMATORS: RLG/NW/SRB/TAS

Equipment Rate Table - 3rd Qtr2013 Bid Item Report ESTIMATE VERSION: BASE_BUS 2013-08-16

City Index - 233-VA-NORFOLK

Partial Totals

Description Amount Totals Hours Rate

Labor 6,692,513 107,946.623 hrs

Material 33,679,070

Subcontract 52,303,194

Equipment 7,448,934

Other 93,244,188

Escalation (None Included)

Subtotal 193,367,899 3,461.528

AACE Classification Accuracy Range

Upper Range +40% Lower Range -20%