J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Key Plan
General Information
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
01 04
G01BBI 3191 DG 121 001 01 01
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
LAMBTON AREA WATER SUPPLY SYSTEM
1215 FORT STREET
POINT EDWARD, ONTARIO N7V 1M2
ADMIN OFFICE HVAC
LAWSS 18-04
NOVEMBER 2018
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Legend
General Information
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
02 04
G01BBI 3191 DG 121 001 01 02
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
Drawing List Piping Symbol Legend
Pump Constant Speed
Pump Variable Speed
Check Valve (Unspecified Type)
Pressure Reducing Valve
Reduced Pressure Backflow Preventer
Double Check Backflow Preventer
Temperature/Pressure Relief Valve
Valve (Unspecified Type)
Ball Valve
Butterfly Valve Lug Type
Needle Valve
Gate Valve
Balancing Valve c/w Measuring Ports
Valve with Locking Handle
Control Valve 2-Way
Control Valve 3-WayControl Valve Temperature Actuated OperatorControl Valve Pressure Actuated OperatorSolenoid Valve 2-Way
Gas Regulator with Internal Exercise
Gas Regulator with External Exercise
Union
Flange
Flange with Blank Off Plate
Grooved Coupling
End Cap Square
End Cap Round
Braided Hose Flex Connector
Vibration Coupling
Expansion Joint
Automatic Air Vent
Manual Air Vent
Combined Air Vent/Vacuum BreakerDisc Steam Trap
F/T Float or Thermostatic Steam Trap
Sight Glass
LWCO Low Water Cut Off
Roof Drain
Floor Drain
Expansion Tank
Reducer
Temperature Switch
Humidity
Pressure
Liquid Flow Meter
Thermowell
Drain with Cap
Receptacle
Split-Wired Receptacle
Dedicated Receptacle
Single Pole Switch
Weather Proof Switch
Supply Air Rectangular Opening
Return Air Rectangular Opening
Supply Air Round Opening
Return Air Round Opening
Round Cross Section
Centrifugal Fan
Axial Fan
Flexible Duct Connection
Ducting Symbol Legend
Damper and Actuator
Data Port
Telephone Port
Telephone/Data Port
Combination Balancing/Check Valve
T Type Strainer
Combination Strainer/Flow Diffuser
Stop Check Valve
Y Type Strainer
Swing Check Valve
Wafer Check Valve
Globe Valve
Plug Valve
Automatic Flow Limiting Valve c/w Measuring PortsCombination Automatic Flow Limiting Valve/Ball Valve
Combination Strainer/Ball Valve
Strainer (Unspecified Type)
RD
FD
AA
AM
AV
D
H
HP
F10A
Circuit Breaker
Fuse30
15 Fused Disconnect
Non-Fused Disconnect
Combination Motor Starter
VFD Variable Frequency Drive
HP 1-Phase Motor
3-Phase Motor
Contactor (N.O. Shown)
Overload
Fused Disconnect
Neut Condensate Neutralization
Filter Sidestream Filter
Feeder Chemical Pot Feeder
Air Air Scoop
Air Air Seperator
Duct Air Flow and Temperature Monitoring
ECS Electrical Current Switch
Temperature
Temperature Switch High Limit
Flow
Temperature/Humidity
Level
Temperature/Pressure
F T
Vacuum BreakerVB
P
T
Device (unless otherwise indicated) with stem shown.
Temperature Switch Low Limit
Post Indicator Valve
RP
DCVA
H
P
T/H
T/P
Project Scope Summary:The following is an overview of other Work and is not complete. Contract Documents in their entirety fully describe Work, including items that may only be listed here.1. Demolish existing services as indicated.2. Modify heating water distribution system piping including relocating electric heating boiler and boiler pump.3. Provide 2 rooftop air handlers including structural design, structural reinforcement, roofing, curbs.4. Structural design is delegated to Contractor. Contractor to retain professional engineering.5. Provide fans including return fan, exhaust fan.6. Provide ductwork including diffusers, grilles.7. Provide electrical services as required.8. Provide building automation services including expansion of existing, modification of graphics, sequences, programming, trending.9. Perform air and hydronic testing and balancing.10. Provide fully functional systems that are complete and ready for intended use and effect.
Design Boundaries:1. Existing air distribution, including VAV boxes and diffusers, are being reused except where critical to modify. Site reviews and testing during and after construction may identify some parts that require additional rework
3 Way Switch
Electrical Symbol Legend
Device (unless otherwise indicated) with Tag ‘A’ shown.
Turbidity
4 Way Switch
Dimmer Switch
3 Way Dimmer Switch
Dewpoint
3
4
D
3D
WP
Indicator Symbol Legend
ThermometerGauge (unless otherwise indicated) with stem shown.
Controls Symbol Legend
System / SYSTEMSystem / SYSTEM
Line and Label LegendREPRESENTATION NAME
System / SYSTEM
Existing to be RemovedBoundary Work (Not Part of This Work At This Time)Existing to be ReusedNew to be ProvidedNot in Current Viewing Plane
Existing to be RemovedExisting to be ReusedNew To be Provided
Typical Flow DirectionCommunication Network (may be wiring including power)Control Signals (may be wiring including power)Controller Internal Signals
T
A
TS
TS-LL
TS-HL
F
L
U
D
A
F
Liquid Volume MeterV
Electric MeterEM
DRAWING & DRAWING NAME REV SHEET & SHEET NAME DRAWING SET TYPE BLDG MEAS
G01 General Information B 01 Key Plan BI 3130 DG121-001-01 Gnrl 121 00102 Legend03 Schedules04 Schedules
M01 Mechanical Systems B 01 Main Floor Existing Layout BI 3130 DM121-001-01 Mech 121 00102 Main Floor Retrofit Layout03 Upper Floor, Roof Existing Layout04 Upper Floor, Roof Retrofit Layout05 Mech. Rm Existing Layout06 Mech. Rm Retrofit Layout07 Heating System Schematics08 Details
E01 Electrical Systems B 01 Electrical Schematics BI 3130 DE121-001-01 Elec 121 001C01 Controls B 01 Notes and Existing Points List BI 3130 DC121-001-01 Ctrl 121 001
02 Retrofit Points List
NOTES:
1. Drawing names represent drawings sets to convey Work and are not intended to be trade specific. Contract documents in their entirety fully describe Work.
PIPING SCHEDULE 1,2 ,3
SERVICE PIPES INSULATION AND JACKETS OTHER
TAG DESCRIPTION F LUID TYPE 4 OPERATING MATERIAL JOINTS RATED F INISH INSULAT. THICKNESS 5 JACKET 6 F INISH TEXT BAND
PRESS. TEMP. PRESS. TEMP. TYPE/ (Envi ronment: INC) (Defaul t: TY PE/ LETTERS/
[psig] [°F] [psig] [°F] hi. COLOUR [in] ALU ) COLOUR BACKGRO.
MUW Makeup Water From Potable Water Source <= 150 >= 40 to < 105 CO-T-LH Soldered 150 212 MF< NPS 1-1/2: 1
>= NPS 1-1/2: 1-1/2IN: PVC
AMB/OUT: Provide electric heat trace
cables under insulation.HBS
HBR
BHS
BHR
Heating Boiler Supply
Heating Boiler Return
Building Heating Supply
Building Heating Return
Treated Water, 30% Propylene
Glycol<= 150 >= 140 to < 200 CS-P-E40
<= NPS 2: Threaded
> NPS 2: Welded150 250 MF
< NPS 1-1/2: 1-1/2
>= NPS 1-1/2: 2IN: PVC
SLD Service Loop DrainInfrequent Service Fluids and
Gases, Air<= 150 >= 105 to < 180 CS-P-E40
<= NPS 2: Threaded
> NPS 2: Welded150 212
Paint
BlackInsulate to protect other surfaces and occupants.
NOTES & DEF INITIONS:
1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms. For other piping not specifically indicated, match above indicated requirements based on similar piping.
2. Environment types for locations: IN=Indoor space (either INC or INU). INC=Indoor conditioned to >= 60-°F to < 105-°F. INU=Indoor unconditioned. AMB=Ambient outdoor temperature and humidity. OUT=Outdoor.
3. Refer to other design documents for other location types, including: BUR=Buried. NAT=Natatorium. SEA=Sea/ocean side.
4. Air from outdoors at various AMB and OUT conditions, including condensation, local atmospheric contaminants, dust.
5. Insulation thickness for indicated environments and Operating Temp. For INU, add 1/2-in additional insulation to thickness required. For other locations and conditions, add 1-in additional insulation to thickness required. Review final requirements with Engineer.
6. Provide jacket Type AL jacket when insulation is required for all environments unless otherwise indicated. Where PVC jacket is indicated, and piping routing results in ambient/radiant temperatures high enough to damage or warp PVC, use other jackets including AL.
TBD=To Be Determined AL=Aluminum Colours to ASME-A13.1.
CO=Copper EF=Flexible Elastomeric Foam CAN=Canvas
CS=Carbon Steel ISO= Closed Cell Polyisocyanurate CPVC=Chlorinated Polyvinyl Chloride
-P=Pipe MF=Mineral Fibre PE=Polyethylene
-C=Corrugated PVC=Polyvinyl Chloride
-E=Electric Resistance Welded SS=Stainless Steel
-G-Galvanized
-S=Seamless
##=Schedule##
##=PressureClass##
-T=Tube
-C=Corrugated
J=Jacketed
-S=Seamless
-G=Type G
-K=Type K
-L=Type L
H=Hard
DUCTWORK SCHEDULE 1,2 ,3
SERVICE DUCTS INSULATION, LINERS AND JACKETS OTHER
TAG/ DESCRIPTION FLUID OPERATING TY PE MATERIAL CLASS F INISH TYPE THICKNESS R-VALUE F ACING JACKET F INISH
LINE TY PE PRESS. TEMP. PRESS. TY PE/ (Envi ron: INC) [h·ft2·°F/ TYPE/
COLOUR [inWC] [°F] [inWC] COLOUR [in] Btu] min. COLOUR
Bl ue Supply Air >= 50 to < 105 Rectangular GS 3 MF-B1.5
OUT:2IN: FSK 5 OUT: COM
Round GS 3 MF-W 2 IN: FSK 5Flex - Insulated AL 1 MF 6 IN:PE
Purpl e Transfer Air >= 50 to < 105 Rectangular GS 1 MF-L 1-1/2
Orange Return Air >= 50 to < 105 Rectangular GS 3 MF-B1.5
OUT:2IN: FSK 5 OUT: COM
Round GS 2 MF-W 4 2 IN: FSK 5Pi nk Exhaust Air >= 50 to < 105 Rectangular GS 2 MF-B 4 1-1/2 IN: FSK 5
Round GS 2 MF-W 4 2 IN: FSK 5
NOTES & DEF INITIONS:
1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.
2. Environment types for locations: IN=Indoor space (either INC or INU). INC=Indoor conditioned to >= 60-°F to < 105-°F. INU=Indoor unconditioned. AMB=Ambient outdoor temperature and humidity. OUT=Outdoor.
3. Refer to other design documents for other location types, including: BUR=Buried. NAT=Natatorium. SEA=Sea/ocean side.
4. Exhaust/Return: Insulate duct within 6-ft of exterior and unconditioned openings. Add 1-in to indicated insulation thickness.
5. Supply/Exhaust/Return: Provide canvas jacket in exposed locations including mechanical rooms. Paint as required. Review colour with Owner.
TBD=To Be Determined TBD=To Be Determined
AL=Aluminum ISO=Closed Cell Polyisocyanurate FSK=Foil Scrim Kraft
CS=Carbon Steel MF=Mineral Fibre PSK=Poly Scrim Kraft
FC=Fibreglass Cloth -B=Board AL=Aluminum
GS=Galvanized Steel -L=Liner CAN=Canvas
PVC=Polyvinyl Chloride -W=Wrap COM=Composite Membrane
SS=Stainless Steel PE=Polyethylene
PVC=Polyvinyl Chloride
SS=Stainless Steel
Width x Height
Flow (cfm)TagDiffuser Flow Tag
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Schedules
General Information
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
03 04
G01BBI 3191 DG 121 001 01 03
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
BOILER SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SINK SERVICE F LU ID RATED OTHER 2
INPUT OUTPUT ENERGY FLUID TEMP. F LOW PRESS. PRESS. TEMP.[#] [kW] [kW] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] [psig] [°F] hi./lo.
B-1 Heating Boiler 304A Stor. Rm Modi fy Electric Treat.Wat.
HEAT PUMP SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SERVICE FOTHER 2
INPUT OUTPUT ENERGY FLUID[#] [kW] [kW] TY PE
HP-1 Heat Pump Water to Water 304A Stor. Rm Demol i sh Electric Treat.Wat.
CUSTOM VENTILATION CAB INET SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE OPERATING POINTS RATED OTHER 2
FLU ID SUPPLY F LOW RETURN F LOW OUTDOOR F LOW PRESS. TEMP.[#] TY PE [cfm] min. [cfm] max. [cfm] min. [cfm] max. [cfm] min. [cfm] max. [inWC] ESP [inWC] TSP [°F] hi./lo.
AHU-1 Air Handler Custom 302 Mech. Rm Demol i sh Air
PACKAGED VENTILATION UNIT SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINTS HEATING COOLING RATED OTHER 2
FLU ID SUPPLY PRESS. OUTDOOR SOURCE CAPACITY IN/OUT SUPPLY CAPACITY EER SUPPLY PRESS. TEMP.[#] TY PE [cfm] [Δ-inWC] [cfm] ENERGY [MBtu/hr] [MBtu/hr] [°F] [TR] out min. [°F] [inWC] ESP [inWC] TSP [°F] hi./lo.
RTU-1 Rooftop Air Handler Mixed Air, Cool/Heat Roof Provi de Air 950 1 ESP 150 Elec. - 20478 80 3 12.5 55 RTU-1_SF. RTU-1_EF
RTU-2 Rooftop Air Handler Mixed Air, Cool Only Roof Provi de Air 6537 3 ESP 500 - - - - 15 12.1 55 RTU-2_SF
FAN SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINT RUN-OUT POINT DIMENSIONS RATED SOUND OTHER 2
FLU ID F LOW PRESS. SPEED EF F . F LOW PRESS. EF F . W-DIA./H WHEEL PRESS. TEMP. [sones]@[#] TY PE [cfm] [Δ-inWC] [rpm] [%] [cfm] [Δ-inWC] [%] [in] [in] [inWC] [°F] hi./lo. [cfm]
EF-7 Exhaust Fan Inline 302 Mech. Rm Demol i sh Air
RF-1 Return Fan Inline, Axial 302 Mech. Rm Demol i sh Air
RTU-1_SF Supply Fan Plenum Roof Provi de Air 950 1.5 TSP 1868 12 Provided with equipment.
RTU-1_EF Exhaust Fan Plenum Roof Provi de Air 950 0.3 ESP 1156 12 Provided with equipment.
RTU-2_SF Supply Fan Plenum Roof Provi de Air 6537 4.3 TSP 1579 24 Provided with equipment.
RTU-2_RF Return Fan Inline, Mixed Flow 302 Mech. Rm Provi de Air 6000 1 TSP 1544 26
EF-7 Exhaust Fan Inline, Centrifugal 302 Mech. Rm Provi de Air 608 0.75 ESP 1664
VENTILATION LIQU ID COIL SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SERVICE LIQU ID SINK SERVICE FLU ID DIMENSIONS OTHER 2
TOTAL SENSIBLE LIQU ID TEMP. F LOW PRESS. FLU ID TEMP. F LOW PRESS. WIDTH HEIGHT[#] [MBtu/hr] [%] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] TY PE [°F] db/wb [°F] db/wb [cfm] [Δ-inWC] [in] finned [in] finned
VAV7_RC Reheat Coil 201 Corridor Demol i sh Treat.Wat. Air
VAV9B2_RC Reheat Coil 201C Office Demol i sh Treat.Wat. Air
VAVx_RC Reheat Coil Various Existing Treat.Wat. Air
VARIABLE AIR VOLUME BOX SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE OPERATING RANGE INLET OUTLET SOUND RATED OTHER 2
FLU ID FLOW W-DIA./L W-DIA./L DNC/RNC @ TIP @ MAX .FLOW PRESS. TEMP.[#] TY PE [cfm] min. [cfm] max. [in] [in] [NC] max. [Δ-inWC] [NC] max. [Δ-inWC] [inWC] [°F] hi./lo.
VAV7 Variable Air Volume Box Single Duct Various Demol i sh Air 10/10 31/25 1.0 38/33 3.0
VAV9B2 Variable Air Volume Box Single Duct Various Demol i sh Air 10/10 30/25 1.0 33/33 3.0
VAVx Variable Air Volume Box 10 Single Duct Various Existing Air 97 530 6 10/10 28/28 1.0 35/37 3.0
DEF INITIONS: DNC=Discharge Noise Criteria, RNC=Radiated Noise Criteria, TIP=Terminal Inlet Pressure
DIFF USER, GRILLE, REGISTER SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE F LU ID MOUNT DIMENSIONS NECK SOUND RATED OTHER 2
FLU ID TEMP. F LOW PRESS. TY PE WIDTH LENGTH W-DIA./L PRESS. TEMP.[#] TY PE [°F] [cfm] [Δ-ftWC] [in] [in] [in] [NC] max. [inWC] [°F] hi./lo.
S1 Supply Duct Diffuser 2 Square Cone Various Provi de Air As Ind. 24 24 10
T1 Transfer Duct Diffuser 4 Grille - Eggcrate Various Provi de Air As Ind. 12 24 12/24
ELECTRIC CONVECTIVE HEATER SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SINK SERVICE F LU ID RATED OTHER 2
OUTPUT ENERGY FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [cfm] [Δ-ftWC] [psig] [°F] hi./lo.
PHx Baseboard Convect. 15 Various Existing Electric Air
ELECTRIC FORCED F LOW HEATER SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SINK SERVICE F LU ID RATED OTHER 2
OUTPUT ENERGY FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [cfm] [Δ-ftWC] [psig] [°F] hi./lo.
FC1 Unit Heater 201 Corridor Existing Electric Air
PUMP SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINT RUN-OUT POINT SIZE RATED OTHER 2
LIQU ID F LOW PRESS. EF F . F LOW PRESS. EF F . S/D/H PRESS. TEMP.[#] TY PE [USgpm] [Δ-ftWC] [%] [USgpm] [Δ-ftWC] [%] [in.dia.] [psig] [°F] hi./lo.
P-2 Pump Vertical Inline 302 Mech. Rm Demol i sh Treat.Wat.
P-3 Pump Vertical Inline 302 Mech. Rm Demol i sh Treat.Wat.
BP-1 Htg. Boiler Pump Inline Circulator 304A Stor. Rm Demol i sh Treat.Wat.
P-1 Bldg. Htg. Pump Vertical Inline 302 Mech. Rm Existing Treat.Wat.
DEF INITIONS: S=Suction, D=Discharge, H=Housing
LIQU ID HEAT EXCHANGER SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SERVICE LIQU ID SINK SERVICE LIQU ID RATED OTHER 2
TOTAL LIQU ID TEMP. F LOW PRESS. FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] [psig] [°F] hi./lo.
HX-1 Heat Exchanger Plate and Frame 302 Mech. Rm Demol i sh Treat.Wat. Treat.Wat.
LIQU ID EXPANSION TANK SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE ORIENT. VOLUME RATED OTHER 2
LIQU ID TANK ACCEPT. PRESS. TEMP.[#] TY PE [USgal] [USgal] [psig] [°F] hi./lo.
ET1 Expansion Tank Diaphragm 302 Mech. Rm Existing Pot.Wat. Vert.
ET2 Expansion Tank Full Acceptance Bladde 302 Mech. Rm Demol i sh Gly. Vert.
LIQU ID CONTROL VALVE SCHEDULE 1
TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE LIQU ID SIZE RATED OTHER 2
LIQU ID F LOW PRESS. Cv PRESS. TEMP.[#] TY PE [USgpm] [Δ-psi] [in.dia.] [psig] [°F] hi./lo.
VAVx_CV Control Valve 10 2-way Ball Various Existing Treat.Wat.
VAVx_CV Control Valve 2 2-way Ball Various Demol i sh Treat.Wat.
CV-x Control Valve 2 2-way Ball Various Existing Treat.Wat.
NOTES:1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.
2. Additional requirments including features, options, notes.
BOILER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS
VOLTAGE POWER[VAC/ø/Hz] [kW]
B-1 Heating Boiler 304A Stor. Rm 575/3/60 84
HEAT PUMP SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS
VOLTAGE CURRENT[VAC/ø/Hz] [A]
HP-1 Heat Pump Mech. Room 208/3/60
CUSTOM VENTILATION CAB INET SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS OTHER 2
VOLTAGE CURRENT[VAC/ø/Hz] [A]
AHU-1 Air Handler 302 Mech. Rm 575/3/60
PACKAGED VENTILATION UNIT SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS OTHER 2
VOLTAGE CURRENT[VAC/ø/Hz] [A]
RTU-1 Rooftop Air Handler Roof 208/3/60 22.9 Refer to components for individual loads.
RTU-2 Rooftop Air Handler Roof 575/3/60 33.3 Refer to components for individual loads.
FAN SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS CONTROL FEATURES/EQUIPMENT MOTOR
VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]
EF-7 Exhaust Fan 302 Mech. Rm 208/1/60 Pr ovi de Motor Controller Demol i sh Induction
RF-1 Exhaust Fan 302 Mech. Rm 575/3/60 Demol i sh Var. Freq. Drive Demol i sh Induction
RTU-1_SF Exhaust Fan Roof 575/3/60 Pr ovi de ECM Provi de ECM, TEFC 1.3 Provided with equipme
RTU-1_EF Exhaust Fan Roof 575/3/60 Pr ovi de ECM Provi de ECM, TEFC 1.3 Provided with equipme
RTU-2_SF Exhaust Fan Roof 575/3/60 Pr ovi de Var. Freq. Drive Provi de Induction, TEFC 10 Provided with equipme
RTU-2_RF Exhaust Fan 302 Mech. Rm 575/3/60 Modi fy Var. Freq. Drive Provi de Induction, TEFC 2
EF-7 Exhaust Fan 302 Mech. Rm 115/1/60 Pr ovi de Disconnect Provi de Induction 0.3
ELECTRIC CONVECTIVE HEATER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION
VOLTAGE CURRENT QUAN. MAKE/MODEL TY PE RATED OTHER 2
[VAC/ø/Hz] [A] [#] [A]
PHx Baseboard Convect. Various 575/3/60
ELECTRIC FORCED F LOW HEATER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION CONTROL FEATURES/EQUIPMENT MOTOR
VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]
FC1 Unit Heater 201 Corridor
PUMP SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION CONTROL FEATURES/EQUIPMENT MOTOR
VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]
P-2 Pump 302 Mech. Rm
P-3 Pump 302 Mech. Rm
BP-1 Htg. Boiler Pump 304A Stor. Rm
P-1 Bldg. Htg. Pump 302 Mech. Rm
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Schedules
General Information
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
04 04
G01BBI 3191 DG 121 001 01 04
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
AIR TERMINAL BOX SCHEDULE - RTU2
BOX NAME ZONES SERVED MAX COOLING AIRFLOW
MIN AIRFLOW
OTHER
[cfm] [cfm]
VAV1 202 - Office 852 140
VAV2 203 - Office 348 50
VAV3 204 - Conference Room 1,527 204
VAV4 215 - LUNCH ROOM,216 - CORRIDOR 912 273
VAV5 210 - LABORATORY 1,275 364
VAV6 218 - Office 113 65
VAV8 212 - MENS WASHROOM,214 - MENS LOCKERS 335 183
VAV9A 201C - Office 768 200
VAV9B 201B - Office 511 50
VAV9C 201 - CORRIDOR,205 - CORRIDOR 623 337
Zone Schedule
ZONE TAG ZONE NAME ZONE FLOOR AREA(Az )
OCCUPANCY CATEGORY AIR CLASS AREA COMPONENT
(Va)
ZONE POPULATION
(Pz )
PEOPLE COMPONENT
(Vp)
ZONE OUTDOOR
AIRFLOW (Voz )
SUPPLY TERMINALS
[ft2] [cfm] [person] [cfm] [cfm]
201 - CORRIDOR Corridor 459 Corridors 1 27.1 0.0 0.0 27.1 VAV9C
201B - Office Office 127 Office space 1 7.5 0.6 3.1 10.6 VAV9B
201C - Office Office 192 Office space 1 11.3 0.9 4.7 16.0 VAV9A
202 - Office Office 246 Office space 1 14.5 1.1 6.1 20.6 VAV1
203 - Office Office 156 Office space 1 9.2 0.7 3.8 13.0 VAV2
204 - Conference Room Conference Room 402 Conference/meeting 1 23.7 18.7 98.9 122.6 VAV3
205 - CORRIDOR Corridor 348 Corridors 1 20.6 0.0 0.0 20.6 VAV9C
206 - WOMENS WASHROOM Womens Washroom 119 (Toilets - public) 2 0.0 0.0 0.0 0.0
207 - WOMENS LOCKERS Womens Lockers 86 Break rooms (Locker Rooms) 2 5.1 2.0 10.6 15.6
210 - LABORATORY Laboratory 502 Office space 1 29.6 2.3 12.3 42.0 VAV5
212 - MENS WASHROOM Mens Washroom 198 (Toilets - public) 2 0.0 0.0 0.0 0.0 VAV8
214 - MENS LOCKERS Mens Lockers 313 Break rooms (Locker Rooms) 2 18.5 7.3 38.5 57.0 VAV8
215 - LUNCH ROOM Lunch Room 155 Break rooms 1 9.1 3.6 19.1 28.2 VAV4
216 - CORRIDOR Corridor 468 Corridors 1 27.6 0.0 0.0 27.6 VAV4
218 - Office Office 173 Office space 1 10.2 0.8 4.3 14.5 VAV6
220 - Control Room Control Room 959 Office space 1 56.6 4.5 23.6 80.2 RTU1
0 5 10 15 20 25ft
T
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Main Floor Existing Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
01 08
M01BBI 1931 DM 121 001 01 01
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
0 5 10 15 20 25ft
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Main Floor Retrofit Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
02 08
M01BBI 3191 DM 121 001 01 02
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
0 5 10 15 20 25ft
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Upper Floor, Roof Existing Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
03 08
M01BBI 3191 DM 121 001 01 03
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
0 5 10 15 20 25ft
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Upper Floor, Roof Retrofit Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
04 08
M01BBI 3191 DM 121 001 01 04
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
0 1 4ft2
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Mechanical Penthouse Existing Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
05 08
M01BBI 3191 DM 121 001 01 05
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
0 1 4ft2
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Mechanical Penthouse Retrofit Layout
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
06 08
M01BBI 3191 DM 121 001 01 06
As Shown
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Heating System Schematics
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
07 08
M01BBI 3191 DM 121 001 01 07
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
P
AHU1 CC
CV-3
Chemical Pot
Feeder
P-2CV-2
Filter
HP-1 Air Separator
P-1
T T
VAV4_RC
VAV5_RC
VAV8_RC
VAV6_RC
VAV7_RC
VAV4_CV
VAV5_CV
VAV8_CV
VAV6_CV
VAV7_CV
VAV9B1_RC
VAV9B2_RC
VAV9A_RC
VAV9C_RC
VAV1_RC
VAV9B1_CV
VAV9B2_CV
VAV9A_CV
VAV9C_CV
VAV1_CV
VAV2_RC
VAV3_RC
VAV2_CV
VAV3_CV
P
CV-1
RPCV-ICL-1
CV-
4
CV-
5
ET-1
HX-1
ET-2
TP-3
GFS-1
TT
CV-
HP
-1
T
FS TP
BoilerB-1
FD
H
LWCO
P
Chemical Pot
Feeder
Filter
P-1
T T
VAV5_RC
VAV8_RC
VAV6_RC
VAV9B
VAV9A
VAV9C
VAV1
VAV2
VAV3
P
CV-1
RP
ET-1
T
TP
H
BP-1
T
Retrofit Schematic
Existing Schematic
VAV4_RCVAV4_CV
VAV5_CV
VAV8_CV
VAV6_CV
VAV9B_CV
VAV9A_CV
VAV9C_CV
VAV1_CV
VAV2_CV
VAV3_CV
HBR 2-in ø
HBS 2-in ø
BH
R
BH
S
BHR
BHS
304 Storage
308 Stairwell
312 Mechanical Room
Cap in 312 Mechanical Room.
TT
FS
BoilerB-1 LWCO
Relocate electric boiler B-1From Storage Room 304A to Mechanical Room 302.
Repipe relocated VAV9B and VAV9C reheat coils as indicated including control valves, strainers.Provide services as required including piping.
304 Storage
308 Stairwell
312 Mechanical Room
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Details
Mechanical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
08 08
M01BBI 3191 DM 121 001 01 08
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
RTU-2 Ductwork
RTU-1 Ductwork
Transfer Duct (Typical of 2)
Provide insulated roof curb.
Maximum height of 14-in.
Provide insulated roof curb.
Maximum height of 14-in.
Provide insulated blank plate for unused
portions of louver.
Provide flexible duct connector
(typical).
Seal roof penetrations.
Provide 1-in acoustic lining on
new supply and return ductwork.
Seal louver penetrations.
Provide 1-in acoustic lining on
new transfer ductwork.
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Electrical Schematics
Electrical Systems
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
01 01
E01BBI 3191 DE 121 001 01 01
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
120/208V, 3 PH, 4 W 200AMechanical Room 302Not all loads shown.
PANEL-HC-1
Heat Pump HP-1
Pump P-2
Pump P-1
Pump P-3
VFD
1.5
1
HP-1
1.5
10
3
3P, 15A
3P, 15A
3P, 15A
3x2P, 150A
MCC-3
VFD
Supply Fan SF-1
Return Fan RF-1
Retrofit Schematic
Existing Schematic
3P
3P
347/600V, 3 PH, 600AMCC Room 217
Not all loads shown.
Pump BP-1 13P, 15A
347/600V, 3 PHMCC Room 211
Not all loads shown.
PANEL-L
B-13P
PANEL-HC-1
1.5
2
3P, 15A
3P, 15A
3x2P
3PMCC-3
VFD
RTU-2
Return Fan, RTU-2_RF
3P
3P
3P, 15A
PANEL-L
B-13P
Spare
Pump P-1
Spare
Spare
RTU-1 Dedicated Receptacle
RTU-2 Dedicated Receptacle
1P, 20AGFI
RTU-1
WP
1P, 20AGFI
WP
RTU-1 RTU-2
120/208V, 3 PH 4W, 100AMechanical Room 302Not all loads shown.
PANEL-RF1P
PANEL-RF1P
0.5
0.5
Boiler B-1 Exhaust Fan EF-7
Exhaust Fan EF-7
120/208V, 3 PH 4W, 100AMechanical Room 302Not all loads shown.
Boiler B-1
120/208V, 3 PH, 4 W 200AMechanical Room 302Not all loads shown.
347/600V, 3 PH, 600AMCC Room 217
Not all loads shown. 347/600V, 3 PHMCC Room 211
Not all loads shown.
Rewire and provide setup of existing VFD.
Relocate electric boiler B-1From Storage Room 304A to Mechanical Room 302. Provide electrical services as required.
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Notes and Existing Points List
Controls
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
01 02
C01BBI 3191 DC 121 001 01 01
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
GENERAL NOTESINTENT Provide controls to these tables. Refer to other documents for additional requirements including other
definitions.Tables are intended to describe minimum scope, requirements, and intent of controls Work. Contractor to provide system that meets specified intent and requirements, including design, construction, and commissioning as required.Tables may not be complete. Verify types and quantities. Provide additional components as required, including additional points, controllers, devices, end devices, termination devices, power supplies, signal conditioning, repeaters, gateways, interfaces, wiring and other equipment.Other contract documents including drawings may not specifically show devices indicated in tables.
DEFINITIONSPOINT A physical signal or a parameter/variable value that may be used for information or to control systems
and equipment, including physical and virtual inputs, outputs, networks, power.CONTROLLER AND/OR INTERFACE
Name of controller and/or interface including equipment, devices. May refer to control system, controller, equipment or other interface. Actual input/output devices for each controller varies. Provide controllers to meet minimum point quantities indicated, with devices as required.
POINT TYPE Nature of point signal required: A=Analog or Modulating, D=Digital or Binary, I=Input, O=Output, NET=networked point, Blank=as required for intent and functionality. Point signal may be different from device capability.
POINT QUAN. Quantity of points required.DEVICE QUAN. Quantity of devices required. Single points may control more than one device including end devices.
Where field is blank, provide device quantities as required for that point.DEVICE TYPE AND/OR TERMINATION
Provide devices as required at termination including end devices. Includes signal conditioning as required. "Interface" means to interface to other controller or networking, including on equipment, devices.
DEVICE OPTIONS Provide device options as indicated. Where field is blank, provide all options required for intent and functionality.
FAIL MODE Indicates the preferred mode of operation upon device failure. The most probable failure (i.e., failed controller, failed relay, cut wire, etc.) should be considered when determining fail logic.
CONTROLLER/INTERFACE Provide controller for each point. This may require providing a new controller, expansion card, or reusing existing points on existing controllers (subject to approval). Includes hardware and software configuration of points and communications. Includes signal conditioning as required.
DEVICE Provide devices. Includes termination, controllers, end devices, termination devices.WIRING AND/OR TUBING Provide electrical wiring and/or fluid tubing to operate device and interface device to controller.
Includes various forms of signal conditioning, including DC power supplies, Class II transformers, transducers, interposing relays.
INTERLOCKS Design and provide required interlocks, safeties, and life safety interfaces. Includes investigation, coordination, wiring, signal conditioning, commissioning.
CALIBRATE Calibrate and test components including controllers, interfaces, signal conditioning, devices, end devices, termination devices. Field work or bench work may be required.
OTHER Additional requirements.
DEMOLISH Remove and modify as required.RELOCATE Relocate as required. Includes wiring/tubing.
SYSTEM AND POINT DESCRIPTION 1 CONTROLLER AND/OR
INTERFACE
POINT T
YPEPOIN
T QUAN.
DEVICE Q
UAN.
DEVICE T
YPE AND/OR
TERMIN
ATION
DEVICE O
PTIONS
CONTROLLER/INTERFACE
DEVICE
WIR
ING A
ND/OR TUBIN
G
INTERLOCKS
CAL IBRATE
OTHER 2
A. AHU-1 Air HandlerA1 Outdoor Air Temperature BAS AI 1 Temperature Devices - Air - Outdoor D D DA2 Return Fan VFD Modulation BAS AO 1 Interface: Variable Frequency Drive D D DA3 Return Fan Command BAS DO 1 Interface: Variable Frequency Drive D D DA4 Return Fan Status BAS DI 1 Interface: Variable Frequency Drive D D DA5 Mixed Air Dampers BAS AO 1 3 Actuators - Electronic D D DA6 Filter Status BAS DI 1 Electrical Current Switches D D DA7 Cooling Valve CV-ICL-1 BAS AO 1 Actuators - Electronic D D DA8 Supply Fan VFD Modulation BAS AO 1 Interface: Variable Frequency Drive D D DA9 Supply Fan Command BAS DO 1 Interface: Variable Frequency Drive D D DA10 Supply Fan Status BAS DI 1 Interface: Variable Frequency Drive D D DA11 Return Air CO2 Level BAS AI 1 Concentration Devices - Gas - Carbon Dioxide - Duct D D DA12 Return Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA13 Mixed Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA14 Mixed Air Temperatre Low Limit BAS DI 1 Temperature Switches - Air - Duct (Low Limit) D D DA15 Mixed Air Temperatre Low Limit VFD DI 1 Additional points from other devices. D D DA16 Supply Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA17 Supply Air Static Pressure High Limit BAS DI 1 Pressure Switches - Air - Differential - High Limit D D DA18 Supply Air Static Pressure High Limit VFD DI 2 Additional points from other devices. D D DA19 Supply Air Static Pressure BAS AI 1 Pressure Devices - Air - Differential D D D
B. HP-1 Heat PumpB1 Supply Water Temperature BAS AI 1 Temperature Devices - Liquid D DB2 Return Water Temperature BAS AI 1 Temperature Devices - Liquid D DB3 P1 Command BAS DO 1 Electric Switches - Control Relay D DB4 P1 Status BAS DI 1 Electrical Current Switches D DB5 P3 Command BAS DO 1 Electric Switches - Control Relay D D DB6 P3 Status BAS DI 1 Electrical Current Switches D D DB7 Source Water Return Temperature BAS AI 1 Temperature Devices - Liquid D D DB8 Source Water Control Valve BAS AO 1 Actuators - Electronic D D DB9 Source Supply Water Temp BAS AI 1 Temperature Devices - Liquid D D DB10 Transfer Supply Glycol Temperature BAS AI 1 Temperature Devices - Liquid D D DB11 HP-1 Command BAS DO 1 Interface: Heat Pump Controller D D DB12 HP-1 Status BAS DI 1 Interface: Heat Pump Controller D D DB13 HP-1 Temperature Setpoint BAS AO 1 Interface: Heat Pump Controller D D DB14 HP-1 Heating Mode Enable BAS DO 1 Interface: Heat Pump Controller D D DB15 HP-1 Cooling Mode Enable BAS DO 1 Interface: Heat Pump Controller D D DB16 P2 Command BAS DO 1 Electric Switches - Control Relay D D DB17 P2 Status BAS DI 1 Electrical Current Switches D D DB18 Cooling Changeover Valves BAS DO 1 2 Electric Switches - Control Relay D D DB19 Heating Changeover Valves BAS DO 1 2 Electric Switches - Control Relay D D D
C. Electric Heating BoilerC1 Supply Water Setpoint BAS NET 1 Interface: Heating Boiler SequencerC2 Boiler Stage Status BAS NET 5 Interface: Heating Boiler SequencerC3 BP-1 Command BAS DO 1 Electric Switches - Control Relay D D DC4 BP-1 Status BAS DI 1 Electrical Current Switches D D D
D. VAV BoxesD1 Supply Air Temperature BAS AI 10 Temperature Devices - Air - DuctD2 Reheat Valve Open BAS DO 10 Actuators - Electronic D3 Reheat Valve Close BAS DO 10 Additional points from other devices.D4 Space Temperature BAS AI 10 Temperature Devices - Air - ZoneD5 Supply Air Damper BAS NET 10 Actuators - Electronic D6 Supply Air Flow BAS NET 10 Pressure Devices - Air - Differential
E. VAV Boxes (VAV7, VAV9B2)E1 Supply Air Temperature BAS AI 2 Temperature Devices - Air - Duct D D D DE2 Reheat Valve Open BAS DO 2 Actuators - Electronic D D D DE3 Reheat Valve Close BAS DO 2 Additional points from other devices. D D D DE4 Space Temperature BAS AI 2 Temperature Devices - Air - Zone D D D DE5 Supply Air Damper BAS NET 2 Actuators - Electronic D D D DE6 Supply Air Flow BAS NET 2 Pressure Devices - Air - Differential D D D D
F. EF-7, EF-4 Exhaust FansF1 Exhaust Fan EF-7 Command BAS DO 2 Electric Switches - Control Relay D DF2 Exhaust Fan EF-7 Status BAS DI 2 Electrical Current Switches D DF3 Exhaust Fan EF-4 Command BAS DO 2 Electric Switches - Control Relay D D D DF4 Exhaust Fan EF-4 Status BAS DI 2 Electrical Current Switches D D D DNOTES & DEFINITIONS: Scope: ●=Provide; D=Demolish; I=Included (with other parts); N=NIC (possibly by others); O=OFCI; R=Relocate
1 Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.2 Additional requriements including features, options, notes.
BAS=Building Automation SystemHBS=Heating Boiler SequencerVFD=Variable Frequency DriveHPC=Heat Pump ControllerTag=Refer to other schedules for component tag." " (Blank)=No specific controller required for point/signal/device.
Review
Review
Oct 11, 2018
Nov 2, 2018
JH
JH
JD
JD
-
A
B Tender Nov 9, 2018 JH JD
JD JH JD
1215 Fort StreetLAWSS Admin Office
Retrofit Points List
Controls
JD
HVAC
Oct 01, 2018
Point Edward, ON N7V 1M2
02 02
C01BBI 3191 DC 121 001 01 02
NTS
These drawings are issued solely for the purpose indicated and are not to
be used for construction unless designated as such and sealed by a
professional engineer.
1 3 4 5 6 7 8
A
B
C
D
E
F
G
H
I
J
2 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
I
J
SHEET NAME
DRAWING NAME
CLIENT/PROJECT LOCATION
CHECKED APPROVED
STAMP STAMP
SCALEDATE CREATED
FILE NO. REVDRAWING NO.
SHEET NO.
REV REVISION ISSUED FOR DATE BY APPR.
750 Oakdale Road, Unit 54
Toronto, Ontario M3N 2Z4
voice: (416) 748-6222
fax: (416) 748-0344
www.buildinginnovation.com
of
50A Jackson Street West
Hamilton, Ontario L8P 1L4
voice: (289) 389-5555
DESIGNED DRAWN
1 3 4 5 6 7 82 9 10 11 12 13 14 15
CLIENT
ACCT PROJECT TYPE BUILDING MEASURE SET SHEET
- -
These draw
ings are to be view
ed in colour only. T
hese draw
ings are to be read in conjunction w
ith other draw
ings and design docum
ents.
Lambton Area Water Supply System
1215 Fort Street
Point Edward, Ontario N7V 1M2
www.lawss.org
SYSTEM AND POINT DESCRIPTION 1 CONTROLLER AND/OR
INTERFACE
POINT T
YPEPOIN
T QUAN.
DEVICE Q
UAN.
DEVICE T
YPE AND/OR
TERMIN
ATION
DEVICE O
PTIONS
CONTROLLER/INTERFACE
DEVICE
WIR
ING A
ND/OR TUBIN
G
INTERLOCKS
CAL IBRATE
OTHER 2
A. RTU-1 Air HandlerA1 Discharge Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A2 Mixed Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A3 Return Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A4 Outdoor Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A5 Discharge Air Static Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●A6 Air Filter Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●A7 Outdoor Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A8 Return Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A9 Exhaust Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A10 Unit Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●A11 Cooling Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●A12 Supply Air Temperature Setpoint BAS AI 1 Interface: Air Handler Controller ● ● ● ● ●A13 Air Handler Internal Points BAS NET ALL Interface: Air Handler Controller ● ● ● ● ● Note 3
A14 Return Air Smoke Concentration AHC DI ALL Concentration Transmitters - Particulate - Optical - Vent (Optical Smoke Sensors) ● ● ● ● ● Note 5
B. RTU-2 Air HandlerB1 Discharge Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B2 Mixed Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B3 Return Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B4 Outdoor Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B5 Discharge Air Static Pressure AHC AI 1 Pressure Transmitters - Air - Differential ● ● ● ● ●B6 Discharge Air Static Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●B7 Air Filter Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●B8 Outdoor Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B9 Return Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B10 Exhaust Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B11 Discharge Air Temperature Low Limit AHC AO 1 Temperature Switches - Air - Duct (Low Limit) ● ● ● ● ●B12 Outdoor Air Temperature BAS AI 1 Temperature Devices - Air - Outdoor ●B13 Supply Air Pressure Setpoint BAS AO 1 Interface: Air Handler Controller ● ● ● ● ●B14 Unit Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●B15 Cooling Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●B16 Supply Air Temperature Setpoint BAS AI 1 Interface: Air Handler Controller ● ● ● ● ●B17 Air Handler Internal Points BAS NET ALL Interface: Air Handler Controller ● ● ● ● ● Note 3
B18 Return Fan VFD Enable BAS DO 1 Interface: Variable Frequency Drive ● ● ● ● ●B19 Return Fan VFD Command BAS AO 1 Interface: Variable Frequency Drive ● ● ● ● ●B20 Return Fan VFD Speed Feedback BAS AI 1 Interface: Variable Frequency Drive ● ● ● ● ●B21 Return Fan VFD Internal Points BAS NET ALL Interface: Variable Frequency Drive ● ● ● ● ●B22 Return Fan Pressure Sensor BAS AI 1 Pressure Transmitters - Air - Differential ● ● ● ● ●B23 Return Air Smoke Concentration AHC DI ALL Concentration Transmitters - Particulate - Optical - Vent (Optical Smoke Sensors) ● ● ● ● ● Note 5
C . Heating Boiler and Building HeatingC1 Building Heating Supply Water Temperature BAS AI 1 Temperature Devices - Liquid ● ● ●C2 Building Heating Return Water Temperature BAS AI 1 Temperature Devices - Liquid ● ● ●C3 Pump P1 Command BAS DO 1 Electric Switches - Control Relay ● ● ●C4 Pump P1 Status BAS DI 1 Electrical Current Switches ● ● ●C5 Building Heating Loop Differential Pressure BAS AI 1 Pressure Transmitters - Liquid - Differential LCD ● ● ● ● ●C6 Heating Boiler Supply Water Temperature Setpoint BAS NET 1 Interface: Heating Boiler Sequencer ● ● ● ● ● Note 4
C7 Heating Boiler Internal Points BAS NET ALL Interface: Heating Boiler Sequencer ● ● ● ● ●C8 Pump BP-1 Command BAS DO 1 Electric Switches - Control Relay ● ● ● ● ●C9 Pump BP-1 Status BAS DI 1 Electrical Current Switches ● ● ● ● ●
D. VAV BoxesD1 Supply Air Temperature BAS AI 10 Temperature Devices - Air - Duct ●D2 Reheat Valve Open BAS DO 10 Actuators - Electronic ●D3 Reheat Valve Close BAS DO 10 Additional points from other devices. ●D4 Zone Temperautre BAS AI 10 Temperature Devices - Air - Zone ●D5 Supply Air Damper BAS NET 10 Actuators - Electronic ●D6 Supply Air Flow BAS NET 10 Pressure Devices - Air - Differential ●
E. EF-7 Exhaust FansE1 Exhaust Fan EF-7 Command BAS DO 2 Electric Switches - Control Relay R ● ● ●E2 Exhaust Fan EF-7 Status BAS DI 2 Electrical Current Switches R ● ● ●NOTES & DEFINITIONS: Scope: ●=Provide; D=Demolish; I=Included (with other parts); N=NIC (possibly by others); O=OFCI; R=Relocate
1 Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.2 Additional requriements including features, options, notes.3 Interface to BAS via equipment/controller BACnet interface or BACnet gateway as required. Provide BACnet gateway as required.4 Match existing devices.5 Hard wire to air handler supply fan and return fan VFDs.
BAS=Building Automation SystemHBS=Heating Boiler SequencerAHC=Air Handler ControllerVFD=Variable Frequency DriveTag=Refer to other schedules for component tag." " (Blank)=No specific controller required for point/signal/device.