LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
A WORLD PRESENCE IN THE FIELD OF WATERA WORLD PRESENCE IN THE FIELD OF WATER
ACTIVITIESACTIVITIES Boiler making : range of productBoiler making : range of product
Expansion tanks
Galvanized tanks with or without bladder
Tanks for the pressure maintenance
Anti water-hammer tanks with bladder for potable water
Anti water-hammer tanks with bladder and self aerating tanks for waste and rain water
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
Tanks for compressed air
COMPRESSED AIRCOMPRESSED AIRLE RESERVOIR MASSALLE RESERVOIR MASSAL
FAYAT GROUP
GALVANISED TANKGALVANISED TANK
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
VAPOR TANKVAPOR TANK
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
ANTI WATER-HAMMER ANTI WATER-HAMMER TANKTANK
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
MANUFACTUREMANUFACTURE
Manufacture in conformity with the European Directive 97/23/CE
Thickness calculation according to CODAP 2000
Capacity from 0 to 100000 L
Pressure from 0 to 100 bar
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
ISO 9001 V2000
ALL MATERIALS used for the MANUFACTURE of the ENCLOSURES UNDER PRESSURE ARE IN CONFORMITY WITH EUROPEAN DIRECTIVE D.E.S.P. 97/23/CE
Material used for the vessel: P265GH
MATERIALSMATERIALSSteelSteel
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
A TANK ASSEMBLYA TANK ASSEMBLY
ROLLING OF A SHELL IN Ø3000 AND 35 mm
ASSEMBLY OF A TANKASSEMBLY OF A TANK
70 M3 TANK DURING THE MANUFACTURING
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
HYDRAULIC TESTHYDRAULIC TEST
MATERIALSMATERIALS BLADDERSBLADDERS
FOR THE TANKS UNTIL 500 L :
FOR THE 750 L TANKS AND MORE :
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
Bladder in EPDM
Bladder in polyurethane
REALISATION OF A BLADDER IN POLYURETHANEREALISATION OF A BLADDER IN POLYURETHANE
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
REALISATION OF A BLADDER IN POLYURETHANEREALISATION OF A BLADDER IN POLYURETHANE
ANTI-CORROSION ANTI-CORROSION PROTECTION PROTECTION
- Hot galvanisation in option up to 4500 litres ( 1250)
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
- Painting after sandblasting for all capacity
Internal : Epoxy
External : Epoxy
Finishing lacquer
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
EQUIPEMENTSEQUIPEMENTS
Visual level
Magnetic level
Weight controller « Mas-Control »
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
VISUAL LEVELVISUAL LEVELLE RESERVOIR MASSALLE RESERVOIR MASSAL
FAYAT GROUP
MAGNETIC LEVELMAGNETIC LEVELLE RESERVOIR MASSALLE RESERVOIR MASSAL
FAYAT GROUP
WEIGHT CONTROLLERWEIGHT CONTROLLERLE RESERVOIR MASSALLE RESERVOIR MASSAL
FAYAT GROUP
ACTIVITIESACTIVITIESINGINEERINGINGINEERING
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
UPSTREAM :
Definition of the material with the bulding site master
At the invitation bids :
Definition of the material with the society answered at the tender
THE ANALYSISTHE ANALYSIS
Hydraulic calculations softwares
All of our hydraulic studies are free:
• Calculation of regulation
• Calculation of pressure maintenance
• Calculation of accumulation
• Anti water-hammer calculation
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
Anti water-hammer Anti water-hammer calculationcalculation
Elements necessary to realize calculation:
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
• Maximum flow
• Hydraulic profile
• Inside diameter of the pipeline
• Nature of the pipeline
• Nature of the water
CALCULATION OF CALCULATION OF REGULATIONREGULATION
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
Elements necessary to realize calculation:
• Pressure at the pump start
• Flow at the pump start
• Pressure at the pump stop
• Flow at the pump stop
(according to the number of pumps, these data have to be communicated for each pump)
• Number of acceptable time starting
CALCULATION WITHOUT CALCULATION WITHOUT PROTECTIONPROTECTIONALLIEVI Formula : ALLIEVI Formula : H = (celerity x speed) / 9,81
Geometric height
Max. Pression
Min. Pression
+ H
- H
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
PROPAGATION OF THE WAVE
Normal functioning
Pump Stop DEPRESSION
ATMOSPHERIC PRESSURE ARRIVALARRIVAL AT THE PUMP CHECK VALVE
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
PROPAGATION OF THE WAVE
PROPAGATION OF THE WAVE
SURPRESSION
ATMOSPHERIC PRESSURE ARRIVAL
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
PROPAGATION OF THE WAVE
Amortisation of the water-Amortisation of the water-hammerhammer
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
PRESSURE IN FONCTIONING
PRESSURE FALL PHASEPRESSURE GOING UP PHASE
SOME REALISATIONSSOME REALISATIONS
San Lorenzo Station
(Salvador)
2 x 25 m3 in 25 bar
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
REALISATIONREALISATION
Pumping station in Abu Dhabi (UAE)
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
REALISATIONREALISATION
Pumping station in Freyming (France)
1 x 6000 L ; 2 x 500 L ; 1 x 2000 L
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
REALISATIONREALISATION
80 m3 tanks in 10 bar
(Egypt)
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
REALISATIONREALISATION
42 m3 tanks in 10 bar (Argentina)
REALISATIONREALISATION
Capelle station
(France)
2 x 5000 L
1 x 1000 L
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP
CONCLUSIONCONCLUSION
• LE RESERVOIR MASSAL is especially a partner
• Free studies from the begining of the project
• Rapidity of response to a consultant
• The best studied price
• Service submitted to a self-control at each station
• After sale service realized on line
LE RESERVOIR MASSALLE RESERVOIR MASSALFAYAT GROUP