MTR Corporation Limited Kwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment Figure: Scale: NTS Rev: OVERVIEW OF TUNNEL CONSTRUCTION METHODS (2) 3.15 Legend: Envisaged Tunnelling Method By Drill & Blast Envisaged Soft Ground Tunnelling Method Envisaged Tunnelling Method By Mechanical Excavation SOFT GROUND TUNNELLING METHOD SOFT GROUND TUNNELLING METHOD TUNNELLING METHOD BY DRILL & BLAST TUNNELLING METHOD BY DRILL & BLAST WHA STATION - CUT AND COVER METHOD HOM STATION - CUT-AND-COVER AND BLASTING METHOD HOM STATION - PLATFORM BY DRILL AND BLAST METHOD TUNNELLING METHOD BY DRILL & BLAST MINED TUNNELLING

Legend: Envisaged Tunnelling Method By Drill & Blast ... · OVERVIEW OF TUNNEL CONSTRUCTION METHODS (2) 3.15 Legend: Envisaged Tunnelling Method By Drill & Blast Envisaged Soft Ground

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Legend: Envisaged Tunnelling Method By Drill & Blast ... · OVERVIEW OF TUNNEL CONSTRUCTION METHODS (2) 3.15 Legend: Envisaged Tunnelling Method By Drill & Blast Envisaged Soft Ground

MTR Corporation LimitedKwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment

Figure:

Scale:NTS

Rev:

OVERVIEW OF TUNNEL CONSTRUCTION METHODS (2)3.15

Legend:

Envisaged Tunnelling Method

By Drill & Blast

Envisaged Soft Ground

Tunnelling Method

Envisaged Tunnelling Method

By Mechanical Excavation

SOFT GROUND

TUNNELLING

METHOD

SOFT GROUND

TUNNELLING

METHOD

TUNNELLING

METHOD BY

DRILL & BLAST

TUNNELLING

METHOD BY

DRILL & BLAST

WHA STATION -

CUT AND COVER

METHOD

HOM STATION -

CUT-AND-COVER

AND BLASTING

METHOD

HOM STATION -

PLATFORM BY

DRILL AND BLAST

METHOD

TUNNELLING

METHOD BY

DRILL & BLAST

MINED

TUNNELLING