2
Lessons Learnt and Experience Sharing
BY
FIDA HUSSAIN
(DIRECTOR ENGINEERING)
WASA, GDA, GUJRANWALA
PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Contents
• Schemes of F.Y 2013-014• Implementation of ESMF 2013014• Lesson Learnt and Experience Sharing
4ESMF
SUMMARY OF FY 2013-14
Total ADP Schemes
Total EEP’s
Schemes
Application
of ESMF
Categorization of Schemes
30 % of schemes
Target Achieved
(%)E-2 for EEPsschemes
E-3 for EEPs
schemes
E-3 for ADP
schemes
10 19 19 06 13 Nil 08 66%
5
NO NAME OF SCHEME EXPENDITU
RE STATUS
1Repair and general overhauling of 5 sludge pumps (10 cusec) discharges each zone III
8.393 Completed
2Repair of general overhauling of 15 cusec pump at Khiali disposal station zone II
2.151 Completed
3Replacement of delivery pipes and other works at disposal stations Alam Chowk, no. 1 garjakh, mughal pura and liaqat chowk lift station zone iii 3.554 Completed
4Repair/const. Of additional manhole chambers and gully grating at papular nursery, amir park, shaheen abad g.T road, civil line, wahdat colony, peoples colony, arfat colony and farid town in zone I
1.443 Completed
5Replacement of sewer lines and construction of additional manholes at katcha khiali road, takia masoom shah, gala mehar bagoo wala, mehar noor wala, darbar qadria and allied areas zone II
1.910 Completed
6Replacement of old sewer lines in dhullay, shaheenabad and gurunanak pura i/c of const. Of additional manholes in zone III 4.596 Completed
7Desilting of sewer lines with winching machine along jinnah road from d.C road under pass to purani abadi jagna 2.988
Completed
SCHEMES OF FY 2013-14
6
NO NAME OF SCHEME TOTAL EXPENDITURE STATUS
8Mechanical desilting of sewer lines through winching machine at bajwa road, hafizabad road and paru road 2.785 Completed
9Mechanical desilting of sewer lines through winching machine at hafizabadroad and gondalanwala road 2.465 Completed
10 Repair of utility vehicles 4.858 Completed
11Restoration of water supply network street no. 32 "y" block peoples colony and repair of 21 nos. Water works zone I 5.201 Completed
12Restoration of water supply network and renovation of 22 nos. Water works zone II 3.975 Completed
13Restoration of water supply network along g.T road small state no. 1 and renovation of 19 nos. Water works zone III 5.297 Completed
14 Repair of generators 2.193 Completed
SCHEMES OF FY 2013-14
7
NO NAME OF SCHEME TOTAL EXPENDITURE STATUS
15
Rehabilitation of drain along G.T Road Easternside and dc road zone I
2.381 Completed
16
Rehabilitation of drain along western bypass from Alam Chowk to awan chowk and g.T road zone II 6.232 Completed
17
Rehabilitation of strom water drainage from general bus stand to 30ft bazar shaheen abad zone III 2.898 Completed
18 Manhole covers and frames 7.000 Completed
19 Articles for sewerage & water supply 8.700 Completed
SCHEMES OF FY 2013-14
ESMF An Environmental & Social Management Framework
(ESMF) is prepared under PCGIP to ensure the
development schemes implemented by the
CDGs/WASA/City entities to be environmentally and
socially sustainable.
APPLICATION OF ESMF
Environmental and Social Screening of PCGIP and ADP Schemes was carried out.
Environment and Social Management Plans: Prepared Environmental and Social Management
Plans (ESMPs) E-2 category Schemes EPA, Punjab accorded approvals of these ESMPs ESMP cost was included in cost estimates,
Procurement plan and Bidding Documents
Environmental and Social Monitoring: ESMF Committee conducted environmental and social
monitoring of E-2 schemes Site visits, photographic records, public consultation
at each step, Lab analysis and development of monitoring report)
SOME PICS DURING SURVEY MONITORING
Third Party Validation
For an independent assessment of the ESMF implementation, was held in Gujranwala on 3-5 July 2014. TPV team visited following 06 schemes of WASA-G.
1. Restoration of water supply Network along G.T Road Small State No 1 and Renovation of 19 Nos water works Zone-III.
2. Replacement of sewer lines and Construction of Additional Manholes at Katcha Khiali Road, Takia Masoom Shah, Gala Mehr Bagoo wala, Mehr Noor wala, Darbar Qadria and allied areas Zone-II.
3. Replacement of old sewer lines in Dhullay, Shahenabad and Gurunanak Pura i/c of Construction of Additional Manholes in Zone-lll
4. Restoration of water supply Network Street No. 32 "Y" Block Peoples Colony and Repair of 21 Nos water works Zone-I.
5 Restoration of water supply Network and Renovation of 22 Nos Water Works Zone-II.
6. Repair / Construction of Additional Manhole Chambers and Gully grating at Popular Nursery, Amir Park, Shaheen Abad G.T Road, Civil Line, Wahdat Colony, Peoples Colony, Arfat Colony and Farid Town in Zone-l
Lesson Learnt and Experience Sharing
Environmental and social Survey of M&R and ADP schemes by ESMF Committee which was not carried out before ESMF
Environmental and social monitoring of schemes by ESMF Committee during execution, which was not done before PCGIP
Public consultation before, during and after execution schemes
GRM and complaints Management System
Awareness about Punjab Environmental Protection Act 1997 (Amended 2012), Environmental Impact assessment and (EIA) and Initial Environmental Examination due to Workshops and training sessions organized by the Urban
WASA, Gujranwala conducted Environmental Assessment of JICA funded project "Up-Grading Mechanical System for Sewerage and Drainage Services in Gujranwala with the support of The Urban Unit and cases has been submitted with EPA, Punjab.
Environmental Impact Assessment of 04 ADP schemes is in progress
To resolve Gender issues raised during public consultation, there is need of Female staff
THANK YOU