BETA BUILD LOADLOCK

REDESIGNED LID TO BE STIFFER

REDESIGNED STOP

EXISTING STANDARD DESIGN WINDOWS INCORPORATED WITH ADDITIONAL SAFETY GUARD

HINGES ENLARGED WITH ADDITIONAL FIXINGS

REIFORCING RIBS ADDED

OPTICAL DENSING ADDED FOR POSITIVE VERIFICATION OF EFFECTOR RETRACTED

FIXING POSITIONS ADDED FOR ELECTRICAL AND PNEUMATIC COMPONENTS

NITROGEN PURGE MOVED INBD

PIVOT BLOCKS NOW INTEGRAL WITH CHAMBER

Page 3: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

3

BETA BUILD LOADLOCK

REDESIGNED END EFFECTOR FULLY EXTENDED

REDESIGNED END EFFECTOR FULLY RETRACTED

LID FULLY OPEN

Page 4: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

4

BETA BUILD L/L. CHAMBER FEA

Name Type Min Location Max Location

Displacement1

URES:

Resultant

displacement

0 mm

Node:

231

(235.75

mm,

-

2.60229e-

016 mm,

-4.5 mm)

0.0264306

mm

Node: 23722

(-

18.5156

mm,

-474.425

mm,

10.9278

mm)

Stress1 VON: von

Mises stress

4542.83

N/m^2

Node:

167218

(-122.125

mm,

20 mm,

-8.18061

mm)

5.21238e+007

N/m^2

Node: 118383

(-2.125

mm,

2.9654e-

005 mm,

-

0.819392

mm)

MAXIMUM DEFLECTION = 0.026mm ADDITION OF LASER APATURE RESULTED VERY LITTLE INCREASE

Page 5: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

5

BETA BUILD L/L CHAMBER

Page 6: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

6

BETA BUILD L/L CHAMBER

Page 7: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

7

BETA BUILD L/L INTERNALS SHORTENED, LIGHTENED END EFFECTOR

ADDITIONAL HOLES FOR PLATTEN REMOVAL

JACKING SCREWS WITH LOCK NUTS ADDED

REVISED BELT SUPPORT BLOCK FIXING TO CHAMBER

RAIL END STOPS NOW AT ALL END POSITIONS TO PREVENT ACCIDENTAL DISMOUNTING OF CARRIAGES DURING BUILD/MAINTENANCE

NEW RAIL SUPPORTS ADDED FIXED TO CHAMBER AT EACH END

MACHINED SCREWS ADDED TO PROVIDE PRECISE LOCATION THIS SIDE

SLOTTED HOLES IN CARRIAGE STRUCTURE TO ALL FOR DIFFERENTIAL THERMAL EXPANSION IN ASSY

ACCESS HOLES ADDED TO AID RAIL ASSEMBLY

REDUCED HEIGHT POSN CAMS

Page 8: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

8

BETA BUILD L/L INTERNALS BELT SUPPORT BLOCK & PULLEY REVISIONS

SCREW AND NUT

NOW M4

Ø5 x 0.5 HIGH

PLATTEN

SUPPORTS (x6)

RECESSES

FOR CAMS REVISED BELT

SUPPORT BLOCK

Page 9: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

9

BETA BUILD L/L END EFFECTOR

Page 10: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

10

BETA BUILD L/L END EFFECTOR

PLATTEN SUPPORT PAD 0.5mm ABOVE END EFFECTOR

LOCATING CAMS REDUCED TO 1.5mm THICK TO REDUCE DISPLACEMENT EFFECTS OF PLATTEN THERMAL EXPANSION

Page 11: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

11

BETA BUILD L/L END EFFECTOR DETAILS

Page 12: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

12

BETA BUILD L/L END EFFECTOR FEA

Name Type Min Location Max Location

Displacement1

URES:

Resultant

displacement

0 mm

Node:

254

(-

178.596

mm,

329.811

mm,

-3.5

mm)

0.183342

mm

Node:

122607

(-

107.761

mm,

-

74.8742

mm,

-

3.49999

mm)

Page 13: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

13

BETA BUILD L/L EXTERNALS

GEARBOX TO BE REVISED AT BETA BUILD

COUPLING TO BE REVISED AT BETA BUILD

NEW SENSOR ASSEMBLY ADDED TO REGISTER THAT THE END EFFECTOR IS RETRACTED. LASER OR DEFUSED PHOTO CELL WILL BE TESTED IN NEXT PHASE

Page 14: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

14

BETA BUILD L/L LID

REVISED HINGE HAS AN ADDITIONAL FIXING AND THE ABILITY TO REACT TORSIONAL LOADS FRM THE LID

CIRCLIP GLASS SEAL

ADDITIONAL PYREX PROTECTIVE SHIELD

LID ASSEMBLY MASS AND C OF G VERTUALLY IDENTICAL TO ALPHA BUILD UNIT BUT GREATLY STIFFENED

EXISTING GAS STUTS CAN BE UTILISED

ALPHA BUILD SEAL RETAINED

Page 15: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

15

BETA BUILD L/L LID FEA

Name Type Min Location Max Location

Displacement1

URES:

Resultant

displacement

0 mm

Node:

1921

(251.979 mm,

-718.978 mm,

0 mm)

0.0559768 mm

Node: 4383

(-2.38662 mm,

-289.034 mm,

9.5 mm)

Stress1 VON: von

Mises stress

12737.7

N/m^2

Node:

123775

(339 mm,

4.08452 mm,

27.5 mm)

5.76537e+007

N/m^2

Node: 61052

(258.854 mm,

-366.546 mm,

17.8536 mm)

Page 16: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

16

BETA BUILD L/L LID

Page 17: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

17

BETA BUILD L/L LID WINDOWS – VIEW AREA

Page 18: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

18

BETA BUILD L/L LID WINDOWS – VIEW AREA

Page 19: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

19

BETA BUILD L/L ASSY

Page 20: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

20

BETA BUILD L/L ASSY

Page 21: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

21

BETA BUILD L/L ASSY

Page 22: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

22

BETA BUILD L/L ASSY

Page 23: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

23

BETA BUILD L/L ASSY OUTSTANDING ISSUES

• INCORPORATION OF GEARBOX AS TESTED ON ALPHA BUILD.

• SOURCE NEW DRIVE COUPLING TO ELIMINATE BACKLASH

• TEST SENSORS FOR END EFFECTOR RETRACTED INDICATION

• CONSIDER VAT VALVE OPTIONS AND INTERFACING APATURE

• LOCKING SYSTEM FOR OPEN LID

Page 24: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

24

NGP-B LOADLOCK EXISTING ALPHA BUILD MODIFICATIONS

• MODIFICATIONS TO ALPHA BUILD CHAMBER.

• INTERNAL PART REVISIONS AND ADDITIONS TO BE INCORPORATED. (NEW END EFFECTOR ?)

• ALPHA BUILD LID RETAINED BUT WITH NEW HINGES AND STOP.

Page 25: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

25

ALPA BUILD CHAMBER INTERNAL MACHINING MODS

INCREASED CUTOUT AT RAIL POSITIONS TO INCORPORATE RAIL SUPPORTS

ADDITIONAL HOLES FOR REVISED BELT FIXING BLOCK

Page 26: Loadlock NGP-B Presentation EXTRACT

CF 32 Issue 11

26

ALPA BUILD CHAMBER STIFFENING MOD (UNDERSIDE)

INTERFACE FOR NEW PROXIMITY SENSOR (END EFFECTOR RETRACTED)

FIXING HOLES FOR THE ADDITION OF STIFFENING RIBS