    AREAS OF MAINTENANCE

    SR.NO AREA

    1 SOURCE

    2 MACHINERY

    3 CONVEYANCE

    MAIN

    4 STORAGE, SP &

    CT

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    3/12

    SOURCE

    Which details we must have Position of strainer andblank pipes of tube well

    For what To place the submersible

    pump set against blank pipeWhy To prevent the sand

    infiltration into tube well,

    which results in frequent

    failure of machinery andtube well.

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    4/12

    PUMPING MACHINERY

    Points to take care of:-

    Sr.No Description

    1 Pumping machinery shall be of suitable head and

    discharge.2 During repairs there are changes of altering of

    head and discharge which must be taken care of.

    3 Pressure gauge and water meter are essential for

    monitoring head and discharge of pump

    4 Fuse wire must be of required size they are very

    important in saving the electric and mechanical

    devices during electric fluctuations.Cont:

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    5/12

    5 Panel board must have suitable combination of

    Contactors, Relay, HRC fuse. The input and

    output cables must be according to the load

    6 Panel board must have single phase preventor,

    auto switch and other indicating devices in

    working condition.

    7 For safety rubber matting shall be provided nearcontrol panel

    8 Operator shall be provided with standard hand

    gloves and safe equipments for minor repairs ofcontrol panels etc.

    9 Proper electrification and ventilation is necessary

    for safe and healthy atmosphere.

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    6/12

    FUSE WIRE TABLE

    Ampere Copper wire size

    in SWG

    Aluminum wire

    size in SWG20 28 25

    25 26 24

    30 25 2335 24 22

    40 23 21

    45 22 21

    50 22 20

    60 21 19

    70 20 19

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    7/12

    CHART OF CONTROL PANEL:-

    HP Contactor

    (ML)

    Relay HRCfuse

    (A)

    Cablesupply

    side(m

    m)

    CableMotor

    side(m

    m)

    Fullload

    ampere

    20 1.5-2.0 13-21 63 10 4 28

    25 1.5-2 13-21 63 16 8 35

    30 1.5-2 20-32 80 16 6 40

    35 2 20-32 80 25 10 47

    40 3 28-42 100 25 16 55

    45 3 28-42 100 35 16 60

    50 3 28-42 100 35 16 66

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    8/12

    CONVEYANCE MAIN:-

    Every field engineer must have factual records such as

    1)Ground levels

    2)Size of pipe along with length

    3)Demand of water on each and every section

    4)Actual position of control valves and air valves.

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    9/12

    Design failure of conveyance

    mains When capacity of machinery alters

    When design of rising main is not according

    to discharge of machinery

    When demand of water is not accessed

    correctly.

    When there is over drawl of water more

    than the design.

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    10/12

    Maintenance of conveyance

    mains Air valve must function properly

    Regular greasing of sluice valves

    Leakage shall be attainted properly and non

    conventional methods of temporary

    repairing the leakages shall be avoided.

    After repairing leakage back filling of earth

    shall not be avoided.

  • 8/13/2019 Maintenance of Regional Water Supply Schemes

    11/12

    Importance of control valves in

    distribution system Regional water supply scheme consists of main,

    sub main line and various branches.

    The terminal pressure at the supply point varieshence the discharge flow in pipes is not justified.

    Control valves shall always be operated toequalize the flow between all branches.

    It is observed that many times control valves arenot operated at all and even not available in manyschemes.