Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

Presentation TitleMaking the Right ChoicesHelping Customers and Partners to Design and Implement a Future Ready Laboratory

Page 2: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

2

Company ProfileDesigning and Commissioning Lab since over 20 years

• Established in 1992 (Spin‐off from Saybolt)• Independent company allowing selection of the optimum 

solution• Over 20 years Laboratory Expertise in Oil & Gas, 

Petrochemical and (non‐)Ferrous Lab Methods, Standards and Requirements

• Specialized in Engineering & Design (FEED and Detail) and Turn‐key Project Realization

• ISO 9001‐2008 certified and commitment to HSE• Offering a total solution within one organization and a 

single point of contact

Page 3: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

3

Core and Domain Areas

An Innovative and Customer Oriented  Engineering Partner built on:• Project Managers

Ready to lead & realize complex Front‐End and Detailed Engineering  and Integrated services 

• Project EngineersProven  engineering expertise, expert process know‐how and of laboratory requirements like test methods, standards, regulations, application setup & support etc.

• Procurement Excellent knowledge of world‐wide procurement possibilities 

• Inspectors and Logistics State‐of‐the‐art knowledge of inspection requirements, packaging and strong logistic skills with extensive knowledge of international transport possibilities and requirements to virtually all locations

• Installation& Commissioning EngineersBroad and deep knowledge of Equipment, Methods and (Project) Procedures 

• Long‐Term O&M Services beyond the “Supply only concept”Global partner network of with established relationship to ensure effective and productive use of laboratory systems

Page 4: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

4

Global ReachProven Track Record of Success

LNG Nigeria

Petrochemicals KSA

LNG Egypt

DAMIETTA LNG

Oil UAE

RRE Refinery UAE

LNG Peru

Dahej Ethylene Cracker, India

Wheatstone & Gorgon LNG Australia

LNG Oman

GPP Algeria

CPF Algeria

Prelude F-LNG

Aktobe Plant, Kazakhstan

BCPL Cracker & Polymer, India

Page 5: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

5

Takreer Ruwais Refinery ExpansionProject briefing

Refinery Lab Project executed between 2013 and 2014

• From a FEED of Jacobs M&I‐ Labtech has developed the detailed engineering,defining lab layout, GDS, Furniture and Method/Equipment definition.

• Lab size is over 17000 sqft with over 220  instruments and  methods

• M&I‐Labtech engineeringcontribution has enabled atimely installation and commissioningof the entire lab in 14 months

• A team of ~30  technically qualified people and experts from M&I‐Labtech have worked and successfully completed the project

SampleReception

ShiftLabDay

Lab

Engine Room

Oil Lab

Page 6: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

6

Shell Qatar Gas To Liquid PlantProject briefing

GTL Lab Project executed between 2008 and 2010

• From a FEED of Shell M&I‐Labtech has developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.

• Lab size is over 9000 sqft, with over 130  instruments  and methods 

• Working closely with Shell, M&I‐Labtech has recommended the GC Analyzers and carefully crafted the Sulphur area to avoid contaminations.

• A team of ~25 technically qualified people and experts from M&I‐Labtech have worked and successfully completed the project

StorageRoom

SulphurLab

Water Lab

GC &  Water Lab

SampleReception

CleanRoom

Page 7: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

7

Wheatstone Liquefied Natural GasProject briefing

LNG Lab Project executed between 2014 and 2015

• From a FEED of Bechtel with M&I, we have developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment.

• First time use of  Revit Architectureto predict  building clashes and work seamlessly with civil teams. 

• Lab size is over 5500 sqft, with over 100  instruments  and methods

• A 12 month, well executed project in a remote part of the world with a challenging execution and strictly normed environment

• A significant operational and logistics effort from M&I‐Labtech side to effectively deploy a  team of ~25 technically qualified people and complete project on time.

Page 8: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

8

Customers Define a Job Well DoneWe value our customer feedback and reference

• A vast selection of references and recommendations collected and earned over many years of successful operation.

• Undisputed reputation in the Oil and Energy field. 

• Ready to expand in new markets, functional areas and geographies.

Page 9: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

9

Engineering and DesignThe Value Creation Wheel

OPERATIONALREQUIREMENTS

END‐USER/ OWNERREQUIREMENTS

WORKFLOW &FUNCTIONALITY

LABORATORY REGULATIONS

HSE REQUIREMENTS

DETAILEDDESIGN

CUSTOMER & PARTNER

PRODUCTIVITY

Page 10: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

10

Improve

Learn Innovate Plan Create

From Customer Needs to EngineeringA proven process to transform needs into actions

Customer Needs/ DesignFocus Areas• Feasibility study• Perform technical requirements • Investment cost for the project• Project‐specific requirements and 

guidelines are defined by client

Data available during  Customer Needs/Design• Process samples not available• Laboratory Layout is very basic• Equipment list is estimated and very 

basic• Utilities, Power, HVAC is not available

Detailed DesignProcesses• Problem Definition• Conceptual Design• Preliminary Design• Detail Design• Design Communication

Deliverables• Furniture layout and Spefification• Equipment and Utilities Layout• Gas and Elestrical distribution• Analyzers definitions and optimization• Full operational requirements including 

chemical and standards requirements

Page 11: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

11

Lab Regulations and StandardsEngineering built on a well defined regulatory framework

DEP

Good Laboratory Practices

Page 12: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

12

Workflow and FunctionalityGrouping Equipment, Ergonomics, Accessibility

Sulphur

Condensate

Natural Gas

LPG

Page 13: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

13

Workflow and FunctionalityProductivity delivered in a safe and functional environment

Page 14: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

14

3D‐Detailed DesignFurniture, (MEP) Design of Utilities (GDS, Power, Water) and Extraction Systems. 

3D‐Design software allows you and your team manage and streamline the coordination processto establish the interfaces, and resolve conflicts quickly and efficiently.

Page 15: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

15

Partners in FurnitureFirst Class furniture brands

Page 16: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

16

Partners in FurnitureFirst Class furniture brands:

For over 60 years, our developments have shaped the workplace in laboratories all over the world. With our new SCALA laboratory furniture system, we set the standard, with functional technology, a distinctive design, high quality materials and precise workmanship.From us you can expect top quality made in Germany, highly developed technology, professional project management and perfect service. SCALA offers you the maximum return on your investment with which you are ideally equipped for the future.

Page 17: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

17

Partners in FurnitureFirst class furniture brands

Page 18: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

18

GC Systems

Physical Properties

Spectroscopy Standards Kits

Separation Method

Operational RequirementsComplete Analytical Workflow Solutions  

Methods & StandardsMethods & Standards

Instruments/ EquipmentInstruments/ Equipment Reagents Reagents  SoftwareSoftware Data 

ManagementData 

Management

Page 19: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

19

Deep in Analytical SolutionsCommitted to providing innovative solutions

NGA METHOD Sample Loop: 500 µLCarrier Gas: Helium Column 1 : CP-SilPona (50mx210umx0.5um) Column 1 : 1.5 mL/min Column 3 & 4 : Hayasep Q (6ft *3ft) Column 3&4 Flow(PCM C-1): 30 ml/min Column 5 : Molsieve 13X (10ft) Column 5 Flow(PCM C-2): 16Psi FRONT INLETInjection Temperature: 250 C Split Ratio: 100:1 FRONT DETECTOR(FID) Detector Temperature: 250 C Hydrogen Flow Rate: 35 mL/min Air flow rate: 350 mL/min Makeup flow rate: 25 mL/min SIDE DETECTOR(TCD) Detector Temperature: 250 C Reference Flow Rate: 45 mL/min Make up flow rate: 2mL/min

SULFUR METHOD Sample Size: 250ul Carrier Gas: Helium Column 2: 08-1(60 m x 320 pm x 5.00um) Column Flow: 2 mL/min BACK INLET Injection Temperature: 250 C Split Ratio: 50:1 BACK DETECTOR(FPD) Detector Temperature: 250 C Hydrogen Flow Rate: 60 mL/min Air flow rate: 60 mL/min Const col + Makeup: 60 mL/minOVEN PROGRAM Initial temperature: 40 C Initial time: 5min Intermediate rate: 10 C Final temperature: 150 C Final time: 4min Run time: 20min

We partner with  leading analytical equipment providers to tailor methods and solutions that meet the needs of the most sophisticated Scientists and Engineers

Page 20: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

20

Project Management                                Single Point of Contact, Fully Suited

PROJECT SCHEDULE

PROJECT COMPLIANCE 

SHEET

CHANGE / ISSUE MANAGEMENT

SCOPE & INTERFACES        

(RACI)

PROJECT QUALITY                     & CONTROL PLAN

DOCUMENT CONTROL (VPIS/VDR)

INSPECTION & TEST PLAN

PROGRESS REPORT

YOUR DEDICATED

PROJECT MANAGER

Page 21: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

21

Furniture Installation

Utilities InstallationUnpacking Equipment

Planned Steps to Build a Productive LabFrom Building Readiness till Acceptance

GDS Installation

Page 22: Making the Right Choices - M&I Labtech · Project briefing LNG Lab Project executed between 2014 and 2015 • From a FEED of Bechtel with M&I, we have developed the detailed engineering,

400+ References Worldwide20+ Years of Experience1250 +  Items per Project