Presentation TitleMaking the Right ChoicesHelping Customers and Partners to Design and Implement a Future Ready Laboratory
2
Company ProfileDesigning and Commissioning Lab since over 20 years
• Established in 1992 (Spin‐off from Saybolt)• Independent company allowing selection of the optimum
solution• Over 20 years Laboratory Expertise in Oil & Gas,
Petrochemical and (non‐)Ferrous Lab Methods, Standards and Requirements
• Specialized in Engineering & Design (FEED and Detail) and Turn‐key Project Realization
• ISO 9001‐2008 certified and commitment to HSE• Offering a total solution within one organization and a
single point of contact
3
Core and Domain Areas
An Innovative and Customer Oriented Engineering Partner built on:• Project Managers
Ready to lead & realize complex Front‐End and Detailed Engineering and Integrated services
• Project EngineersProven engineering expertise, expert process know‐how and of laboratory requirements like test methods, standards, regulations, application setup & support etc.
• Procurement Excellent knowledge of world‐wide procurement possibilities
• Inspectors and Logistics State‐of‐the‐art knowledge of inspection requirements, packaging and strong logistic skills with extensive knowledge of international transport possibilities and requirements to virtually all locations
• Installation& Commissioning EngineersBroad and deep knowledge of Equipment, Methods and (Project) Procedures
• Long‐Term O&M Services beyond the “Supply only concept”Global partner network of with established relationship to ensure effective and productive use of laboratory systems
4
Global ReachProven Track Record of Success
LNG Nigeria
Petrochemicals KSA
LNG Egypt
DAMIETTA LNG
Oil UAE
RRE Refinery UAE
LNG Peru
Dahej Ethylene Cracker, India
Wheatstone & Gorgon LNG Australia
LNG Oman
GPP Algeria
CPF Algeria
Prelude F-LNG
Aktobe Plant, Kazakhstan
BCPL Cracker & Polymer, India
5
Takreer Ruwais Refinery ExpansionProject briefing
Refinery Lab Project executed between 2013 and 2014
• From a FEED of Jacobs M&I‐ Labtech has developed the detailed engineering,defining lab layout, GDS, Furniture and Method/Equipment definition.
• Lab size is over 17000 sqft with over 220 instruments and methods
• M&I‐Labtech engineeringcontribution has enabled atimely installation and commissioningof the entire lab in 14 months
• A team of ~30 technically qualified people and experts from M&I‐Labtech have worked and successfully completed the project
SampleReception
ShiftLabDay
Lab
Engine Room
Oil Lab
6
Shell Qatar Gas To Liquid PlantProject briefing
GTL Lab Project executed between 2008 and 2010
• From a FEED of Shell M&I‐Labtech has developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.
• Lab size is over 9000 sqft, with over 130 instruments and methods
• Working closely with Shell, M&I‐Labtech has recommended the GC Analyzers and carefully crafted the Sulphur area to avoid contaminations.
• A team of ~25 technically qualified people and experts from M&I‐Labtech have worked and successfully completed the project
StorageRoom
SulphurLab
Water Lab
GC & Water Lab
SampleReception
CleanRoom
7
Wheatstone Liquefied Natural GasProject briefing
LNG Lab Project executed between 2014 and 2015
• From a FEED of Bechtel with M&I, we have developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment.
• First time use of Revit Architectureto predict building clashes and work seamlessly with civil teams.
• Lab size is over 5500 sqft, with over 100 instruments and methods
• A 12 month, well executed project in a remote part of the world with a challenging execution and strictly normed environment
• A significant operational and logistics effort from M&I‐Labtech side to effectively deploy a team of ~25 technically qualified people and complete project on time.
8
Customers Define a Job Well DoneWe value our customer feedback and reference
• A vast selection of references and recommendations collected and earned over many years of successful operation.
• Undisputed reputation in the Oil and Energy field.
• Ready to expand in new markets, functional areas and geographies.
9
Engineering and DesignThe Value Creation Wheel
OPERATIONALREQUIREMENTS
END‐USER/ OWNERREQUIREMENTS
WORKFLOW &FUNCTIONALITY
LABORATORY REGULATIONS
HSE REQUIREMENTS
DETAILEDDESIGN
CUSTOMER & PARTNER
PRODUCTIVITY
10
Improve
Learn Innovate Plan Create
From Customer Needs to EngineeringA proven process to transform needs into actions
Customer Needs/ DesignFocus Areas• Feasibility study• Perform technical requirements • Investment cost for the project• Project‐specific requirements and
guidelines are defined by client
Data available during Customer Needs/Design• Process samples not available• Laboratory Layout is very basic• Equipment list is estimated and very
basic• Utilities, Power, HVAC is not available
Detailed DesignProcesses• Problem Definition• Conceptual Design• Preliminary Design• Detail Design• Design Communication
Deliverables• Furniture layout and Spefification• Equipment and Utilities Layout• Gas and Elestrical distribution• Analyzers definitions and optimization• Full operational requirements including
chemical and standards requirements
11
Lab Regulations and StandardsEngineering built on a well defined regulatory framework
DEP
Good Laboratory Practices
12
Workflow and FunctionalityGrouping Equipment, Ergonomics, Accessibility
Sulphur
Condensate
Natural Gas
LPG
13
Workflow and FunctionalityProductivity delivered in a safe and functional environment
14
3D‐Detailed DesignFurniture, (MEP) Design of Utilities (GDS, Power, Water) and Extraction Systems.
3D‐Design software allows you and your team manage and streamline the coordination processto establish the interfaces, and resolve conflicts quickly and efficiently.
15
Partners in FurnitureFirst Class furniture brands
16
Partners in FurnitureFirst Class furniture brands:
For over 60 years, our developments have shaped the workplace in laboratories all over the world. With our new SCALA laboratory furniture system, we set the standard, with functional technology, a distinctive design, high quality materials and precise workmanship.From us you can expect top quality made in Germany, highly developed technology, professional project management and perfect service. SCALA offers you the maximum return on your investment with which you are ideally equipped for the future.
17
Partners in FurnitureFirst class furniture brands
18
GC Systems
Physical Properties
Spectroscopy Standards Kits
Separation Method
Operational RequirementsComplete Analytical Workflow Solutions
Methods & StandardsMethods & Standards
Instruments/ EquipmentInstruments/ Equipment Reagents Reagents SoftwareSoftware Data
ManagementData
Management
19
Deep in Analytical SolutionsCommitted to providing innovative solutions
NGA METHOD Sample Loop: 500 µLCarrier Gas: Helium Column 1 : CP-SilPona (50mx210umx0.5um) Column 1 : 1.5 mL/min Column 3 & 4 : Hayasep Q (6ft *3ft) Column 3&4 Flow(PCM C-1): 30 ml/min Column 5 : Molsieve 13X (10ft) Column 5 Flow(PCM C-2): 16Psi FRONT INLETInjection Temperature: 250 C Split Ratio: 100:1 FRONT DETECTOR(FID) Detector Temperature: 250 C Hydrogen Flow Rate: 35 mL/min Air flow rate: 350 mL/min Makeup flow rate: 25 mL/min SIDE DETECTOR(TCD) Detector Temperature: 250 C Reference Flow Rate: 45 mL/min Make up flow rate: 2mL/min
SULFUR METHOD Sample Size: 250ul Carrier Gas: Helium Column 2: 08-1(60 m x 320 pm x 5.00um) Column Flow: 2 mL/min BACK INLET Injection Temperature: 250 C Split Ratio: 50:1 BACK DETECTOR(FPD) Detector Temperature: 250 C Hydrogen Flow Rate: 60 mL/min Air flow rate: 60 mL/min Const col + Makeup: 60 mL/minOVEN PROGRAM Initial temperature: 40 C Initial time: 5min Intermediate rate: 10 C Final temperature: 150 C Final time: 4min Run time: 20min
We partner with leading analytical equipment providers to tailor methods and solutions that meet the needs of the most sophisticated Scientists and Engineers
20
Project Management Single Point of Contact, Fully Suited
PROJECT SCHEDULE
PROJECT COMPLIANCE
SHEET
CHANGE / ISSUE MANAGEMENT
SCOPE & INTERFACES
(RACI)
PROJECT QUALITY & CONTROL PLAN
DOCUMENT CONTROL (VPIS/VDR)
INSPECTION & TEST PLAN
PROGRESS REPORT
YOUR DEDICATED
PROJECT MANAGER
21
Furniture Installation
Utilities InstallationUnpacking Equipment
Planned Steps to Build a Productive LabFrom Building Readiness till Acceptance
GDS Installation
400+ References Worldwide20+ Years of Experience1250 + Items per Project